PENNY
72
7
PRESS
repairing and replacing the fuel lines and pumps throughout the ship is a tremendous job and it all came down to this event. This onload could not be possible without a team effort between the shipyard and the crew.
A Newport News shipbuilder prepares a chain pulley.
“The integration between our Sailors and the shipyard is important and the team effort between Newport News Shipbuilding and the Sailors involved was performed flawlessly,� Smith said.
Newport News shipbuilders prepare a fitting.
ABF3 Lydia Kocourek tests fuel.
Chief Warrant Officer Christopher Smith inspects fuel before testing.
Newport News shipbuilders prepare a fitting.