Page 1

A r c h i t e c t u r e

Cu Vi Hoang P o r t f o l i o


Portfolio | Cu Vi Hoang

CU VI HOANG Experience

Photo Editor / Norbert Hirneisen Camera Accessory Seller / Tripod, Phụ Kiện Máy Ảnh Chính Hãng - Đà Nẵng Photographer / Kenh Giai Phap Company

Education

Junior Architect / BOM architects - HALO Interiors & Architecture - Ho Chi Minh Intern Architect / Da Nang Construction Designing & Consulting Joint Stock Company - Da Nang Junior Architect / Global Design Network - Bangkok

Keimyung University Architecture and Civil Engineering   University of Danang – Danang University of Science and Technology Bachelor of Architecture - BArch

cuvihoang94@gmail.com linkedin.com/in/hoangcuvi/

I am a junior architect who fascinated with physics, designing and sustainable development. I’m hard-working and always promised to maintain a good team work .

France

2

Publication

Photography

Sketch

Sport

Physics

Personal interests

Certifications & Courses

English

Honors & Awards

+84 121 5848 296

Oct 2017 -  Present Nov 2016  -  Jan 2017 Jul 2016  -  Aug 2016 Feb 2016  -  Jul 2016 May 2013  -  May 2016 Mar 2014  -  Nov 2014 

Jul 2017 - Aug 2017

GKS ASEAN Science and Engineering Program 2017 / NIIED Scholarship Holder Winning team chosen from 5 Korean Universities in the research during the “2017 Korean Government Invitation Program for GKS ASEAN Countries” 3rd Prize - The Student Research Conference / Da Nang University The analysis of assembling house designing based on used containers’ utilization along with low-price spending.

2012 – 2017

Aug 2017

Jun 2014

Building Your Leadership Skills / HEC Paris Oct 2017 Speak English Professionally / Georgia Institute of Technology Apr 2017 Landscape and Urban Design of Co Co River Bank Workshop / Mar 2017 Maebashi Institute of Technology and University of Danang Making Architecture / IE School of Architecture and Design Jan 2017 The Meaning of Rome: The Renaissance and Baroque City / May 2016 University of Notre Dame Sustainable Urban Development / Wageningen University Mar 2016 Livable Future Cities / ETH, Zurich Dec 2015 – Jan 2016 Architecture 101 / Abadir Academy Jan 2015 – Feb 2015 Seminar Architectural Project Management / Danang University 2015

“Một bước đi và muôn vàn trải nghiệm” Publication by Department of Architecture - University of Danang Danang University of Science and Technology

Nov 2018


Curriculum Vitae | Table of Contents

table of content s

01

Hotel

02

Kid’s club & Fitness

03

Spa

04

Beach Club

05

Ballroom

06

Villa

08

Hotel

Professional

07

Restaurant

09

10

Aquarium

Academic

House

08

09

Photograph

Others

Sketch

3


Portfolio | Cu Vi Hoang

A/C SWING

CHAIR

SPA BOH

SPA MANAGER

PANTRY

15.0 STORAGE

SINGLE TREATMENT

VIP TREATMENT

JACUZZI

20.0

SINGLE TREATMENT

A/C LEDGE

SPA OFFICE

+ 17.50

LOCKERS

70275

RELAXATION LOUNGE

LOCKERS

A/C

JW Marriott Cam Ranh Resorts & Spa Software: Autocad, Sketchup, Photoshop Phase: Schematic design, Design development Area: 4490.0 m2 (GBA - 5 Blocks)

UNDERGROUND TECHNICAL ZONE BY HYDRANT DESIGNER

01hotel SWING

16.0

MEP SINGLE TREATMENT

SINGLE TREATMENT

JACUZZI

BOH SPA BOH

IDF

19.0

CHAIR SWING

CHAIR

+ 17.00

SWING

CHAIR

SWING

CHAIR

+ 21.50

+ 21.85

SWING

CHAIR

CHAIR

20.0

FL+19.00

SWING

+ 19.50

SWING

11

SERVICE YARD

5

SINGLE TREATMENT

15

13

SINGLE TREATMENT

19

17

9

FFL +14.00

FFL +15.00

21

7

VIP TREATMENT

FFL +14.00

CLEANING TROLLEY (BY OTHER)

(BY CART OTHER)

HOUSEKEEPING

1

23

+ 18.50

Ø75

25

3

52900

21.0

22.0

CHAIR

27

1

1

3 5

21.0

7

9

5

11

13

SWING

CHAIR

CHAIR

SWING

CLEANING TROLLEY (BY OTHER)

19

17

15

13

CHAIR

11

FL+21.0

21

9

CHAIR

23

7

22.0

SWING CHAIR

CLEANING TROLLEY OTHER) (BY

SWING CHAIR

17

15

+ 21.85

19

19

21

17

23

5

7

13

+ 22.00

11

SWING

17

19

21

23

25

27

11

9

7

5

3

1

SWING CHAIR

+ 11.00

SWING CHAIR

15

13

3 5

21.0

+ 22.00

CLEANING TROLLEY (BY OTHER)

HOUSEKEEPING CART (BY OTHER)

SWING

CHAIR

CHAIR

Ø75

1

9

15

25

SWING CHAIR

Ø75

21 13

27

SWING CHAIR

11

3

27 25

23 9

1

1 3

5

7

HOUSEKEEPING CART OTHER) (BY

SWING

CHAIR

SWING

CHAIR

+ 14.00

+ 21.85

5

SWING

Ø75

25

SWING

3

CHILLER RISER (2000X1500)

CART (BY OTHER)

HOUSEKEEPING

27

1

SWING CHAIR

SWING CHAIR

9

20.0

11

1

3 5

27

25

23

7

5

3

19.0

+ 22.00

HOUSEKEEPING CART (BY OTHER)

CLEANING

TROLLEY (BY OTHER)

21.0

FFL +15.00

+ 21.00

+ 21.00

13 9

11

11

9

Ø75

13

21

19

17

15

20.0

7

+ 8.00

+ 22.00

7

13

1

1 3 5

+ 21.00

18.0

9

+ 22.00

11

+ 22.00

7

13

+20.0

+5.0

+15.0

GENERAL FLOOR PLAN

+5.0

FFL +4.00

4

4

9 K K HCK K 4

10 K K K K 4

Bays 4th Floor 3rd Floor 2nd Floor 1st Floor K DD

K K K K 4

2 K K K K 4

3 DD DD DD DD

Block 3 4 DD DD DD DD

4

4

5 DD DD DD DD

6 DD DD DD DD

4

4

HOSER

7 K K K K 4

8 K K K K 4

GUEST ROOM

Bays 4th Floor 3rd Floor CORRIDOR 2nd Floor 1st Floor K DD

TRASH

1 K K K K 4

GUEST ROOM

-0.050

2 K K HCK K 4

GUEST ROOM

3 DD DD DD DD

4 DD DD DD DD

4

4

GUEST ROOM

HOSER

Block 1 5 K K K K 4

HOUSE KEPPING STORE

ICE MACHINE

WORK TOP

6 K K K K 4

JANITOR ROOM

Ø75

MOP SINK

FLOOR SINK

LINEN STORGE SHELF

15

17

19

21

23

25

27

13

11

9

7

5

3

1

5062482

8 DD DD DD DD

CLEANING TROLLEY (BY OTHER)

7 DD DD DD DD

GUEST ROOM

HOUSEKEEPING CART (BY OTHER)

6 K K K K 4

GUEST ROOM

i= 2%

Block 5 5 K K K K 4

GUEST ROOM

i= 2%

4

TERRACE

±0.000

5675000

4

RIAHC GNIWS

RIAHC GNIWS

RIAHC GNIWS

FFL +0.200

+0.200

CHEMICAL STORE 6M2

FFL +0.200

CARPENTRY STORE 24M2

CARPENTRY WORKSHOP 28M2

4 DD DD DD DD

TERRACE

FFL +0.200

FFL +0.200

3 DD DD DD DD

TERRACE

ENGINEERING STORE 17M2

ENGINEERING WORKSHOP 22M2

ENGINEERING OFFICE 43M2

FFL +0.0000

MAINTENANCE BUGGY 3 LOTS

FFL +0.0000

FFL +0.200

OFFICE ROOM 206 sqm

MOTORCYCLE PARKING 30 LOTS

FFL +0.200

2 K K K K 4

TERRACE

+0.200

ROLLER SCREEN

3555

STAFF OPEN LOUNGE 86 sqm

3555

EQUIPMENT STORE 8M2

FFL +0.150

FFL +0.150

+0.200

FURNITURE STORE 99M2

FEMALE STAFF LOCKER & TOILET 92 sqm

MALE STAFF LOCKER & TOILET 81 sqm

FFL +0.200

STAFF CREATION ROOM 34 sqm

FFL +0.200

FFL +0.200

CAN-TEEN 250 sqm STAFF CANTEEN. A/C 24°C

1 K K K K 4

TERRACE

TRASH

50 meters

GUEST ROOM

Bays 4th Floor 3rd Floor 2nd Floor 1st Floor K DD

TERRACE

TRASH

20

TERRACE

TRASH

+4.0

10

TERRACE

SWING CHAIR

5

+0.200

MAINTAINANCE 23M2 LANDSCAPE

FFL

FFL

FFL

01

+10.0

FFL

STAFF GYM 74 sqm

+0.200

UPHOLSTERY & FABRIC STORE 48M2

FFL

48250

1

ELEC

3

4

8 DD DD DD DD 4

9 K K K K 4

10

Bays K 4th Floor K 3rdK Floor 2nd K Floor 1st Floor 4 K DD

K K K 4

K K K 4

DD DD DD

DD DD DD

5 DD DD DD DD

6 DD DD DD DD

4

4

4

4

7 K K K K 4

Bays 4th Floor 3rd Floor 2nd Floor 1st Floor K DD

8 K K K K 4

HOTEL BLOCKS 5 - GUEST ROOM MATRIX

8 K K K K 4

11

9

1 K K K K 4

2 K K K K 4

3 DD DD DD DD

Block 2 4 DD DD DD DD

5 DD DD DD DD

6 DD DD DD DD

4

4

4

4

7 K K K K 4

8 K K K K 4

10 BAYS HOTEL BLOCK - 1st FLOOR PLAN TERRACE

TERRACE

TERRACE

TERRACE

TERRACE

SWING CHAIR

TERRACE

TERRACE

RIAHC GNIWS

48250

RIAHC GNIWS

TERRACE

VARIES GUEST ROOM

GUEST ROOM

GUEST ROOM

GUEST ROOM

TRASH

GUEST ROOM

GUEST ROOM

GUEST ROOM 20250

GUEST ROOM

22700

TRASH

CORRIDOR

VARIES CLEANING TROLLEY (BY OTHER)

HOSER

VARIES

HOUSEKEEPING CART (BY OTHER)

4

7 DD DD DD DD

13

RIAHC GNIWS

4

6 K K K K 4

CHILLER PUMP UNDER STAIR

TRASH

4 DD DD DD DD

% 4Mix Keys Block K (KING) 96 32.7% 1 2 3 4 DD (DOUBLE) 27.3% 80 K CONNECTING K DOOR DD28 (15%) DD

7

TRASH

3 DD DD DD DD

Block 1 5 K K K K 4

5

CHILLER

JANITOR ROOM

HOUSE KEPPING STORE

Ø75

MOP SINK WORK TOP

FLOOR SINK

LINEN STORGE SHELF

HOSER

15

17

19

21

23

25

27

13

11

9

7

5

3

1

27 1 25 3 23

MEP ROOM

5

21 7 19

4

17

15

13

11

9

7 DD DD DD DD

8 DD DD DD DD

4

4

9 K K K K 4

10 K K K K 4


Professional Project | Hotel

600

600

1235

4300

HOTEL BLOCK 4

900

Owner

2700

SPNI (SPN INVESTMENT CORP.)

DT1

Ø75

15

1

3

5

7

9

11

13

440

840 1100 240 600

300 290

4/2'

120 120

145

385

385

Revision notes

4/3

120

17

480

19

240

21

120

23

300

25

3175

1185

27

480 300 480 300 480 300 480 300 480 300 480

840

ICE MACHINE

WORK TOP

385

4/C

840 385

7x120=840 385

885

455

840

950

840

1700

4/A

950

840

1100

4300

480 300 480 300 480 300 480 300 480 1425

4/A'

4/B

1540

2650

1925

4/B'

4/B"

Date

4/C

11/12/2017 Stage

Scale

335

SCALE 1:50

385

240

DETAIL

4/2'

CTB1 HB4.A101

360

Checked by

Designed by

Ng S Quy Long

x

120 300

120 120

120

240

x

395

840

x x

120

x

385

Revision

x

--

HB4.A401

Ng S Quy Long

x

120 120

@ A2

Drawing no.

120

215

4/2' 385

120 120

360

240

4/A

Contractor to confirm samples of finish with client and designer (in a sample board) Detail drawings to be prepared by contractor for confirmation by client and designer All designs are copyright of HALO and cannot be used without their permission Do not scale drawings Measurements must be checked on site by the contractor. Current measurements are based on architects drawings. Design is based on existing drawings and are subject to issues on site with regards to structural and mechanical All materials and fixtures to be installed as per manufacturers recommendations and specifications

4/B"

STAIRCASE DETAIL

4th Dist Tel

Ema Web

Pro

JW RE

+ 18.50

1 + 19.50

+ 17.00

FFL +20.00

FFL +18.50

+ 17.50

FFL +17.50

+21.900

2700

+ 8.00

200

+ 11.00

+ 14.00

ROOF FLOOR +18.900

TECHNICAL FLOOR +16.200

+5.0

455

7x120=840

DETAIL PLAN

530 MOP SINK

4/A

5/2'

Drawing title

4/4

460 1200

1185

200 250

D1a

HOUSE KEEPING STORE

315

900

385

770

840

120 120

50

LINEN STORGE SHELF

5675

3x120=360

HOSER

CLEANING TROLLEY (BY OTHER)

360

450

1925

2000

Dnt1

HOUSEKEEPING CART (BY OTHER)

120 120

3x120=360

2650

6050

FLOOR SINK

215

300

JW MARRIOTT CAM RANH RESORT & SPA

4/C

1425

250

JANITOR ROOM

360

120

4/B'' 1700

-0.050 Fs1 FFL

385

240

1925

600

120 120

120

420

385

840

415

500

4x120=480 290

215

4/A

Project title

2500

360

385

420

440

220 480

120 120

Email: info@halodesign.com Web: www.halodesign.com.vn

4/4

4/4

70

120 120

DRAINAGE PIPE FOR PLANTER BOX RECESSED INTO BRICK WALL OCCURS WHERE PLANTER BOXES ARE

4th Floor, 18 Dinh Tien Hoang District 1, HCM City, Vietnam Tel : (84) (028) 3822.4637

840

360

770

200

120 120

2970

HO

Ow 4050

SP (SP

5

5

5

5

5

1

5

5

5

5

5

5

5

5

5

1

4050

1

5

5

5

5

5

Dra

4th FLOOR +8.100

5

4050

5

5

ELE

24200

5

5th FLOOR +12.150

3rd FLOOR +4.050

2

4050

Rev

8

5

8

5

8

5

8

5

8

7

7

7

7

6000

6000

6000

6000

5

8

9

5

8

5

8

8

7

7

7

7

6000

6000

6000

6000

1st FLOOR -5.600

5

48000

4/I

4/H

4/G

4/F

4/E

4/D

4/C

4/B

5100

5

2nd FLOOR ±0.000

4/A


Portfolio | Cu Vi Hoang

1 G-A301

CONNECT TO BBC

& fitness

C G-A201

DE4

LINE OF ROOF ABOVE

-0.050

G-A402

100

300

A/C LEDGE

±0.000

300

02

kid's club

STORAGE DOWNSPOUT

4400

200

4200

JW Marriott Cam Ranh Resorts & Spa Software: Autocad, Sketchup, Photoshop Phase: Schematic design, Design development Area: 980.0 m2

4200

MEP

4400

4400 4400

4400

KINESIS ONE

4400

STRETCHING PAD

±0.000 4400

22200

A G-A201

ADJUSTABLE BENCH SELECTION

+6.150

D

A

G-A201

G-A201

22200

DE1 G_A401

Volcanic stone DE1

2

2

2

G-A301

G-A301

G-A301

4400

4400

4400

2670

RF1

G.W

SHOULDER PRESS SELECTION

330

+3.150

G-A401

20%

4400

4200

3150

300

100

300

-0.150

1

150

±0.000

4200

DOWNSPOUT LEG CURL SELECTION

CHEST PRESS SELECTION

G-A301

1250

9000

650

10900

D G-A201

G1

G2

SECTION 2

GYM GENERAL PLAN

GYM DIMEN

SCALE 1:100

SCALE 1:100

GYM GENERAL PLAN

SECTION 2 SCALE 1:100 x x x x x x

+6.150

Date Scale Drawing no.

25/06/2018 1:100 G-A101

----

For

----

Checked by

Designed by

Ng S Quy Long

Ng S Quy Long

Volcanic stone

DD

Stage Revision

Revision notes

1725

1275

x

Contractor to confirm samples of finish with client and designer (in a sample board) Detail drawings to be prepared by contractor for confirmation by client and designer All designs are copyright of HALO and cannot be used without their permission Do not scale drawings Measurements must be checked on site by the contractor. Current measurements are based on architects drawings. Design is based on existing drawings and are subject to issues on site with regards to structural and mechanical All materials and fixtures to be installed as per manufacturers recommendations and specifications

3150

ELEVATION 1

+3.150

±0.000 150

-0.015

GA

GB

GC

GD

GE

GF

SECTION 1

ELEVATION 2

SCALE 1:100

x x x x x x

Contractor to confirm samples of finish with client and designer (in a sample board) Detail drawings to be prepared by contractor for confirmation by client and designer All designs are copyright of HALO and cannot be used without their permission Do not scale drawings Measurements must be checked on site by the contractor. Current measurements are based on architects drawings. Design is based on existing drawings and are subject to issues on site with regards to structural and mechanical All materials and fixtures to be installed as per manufacturers recommendations and specifications

Date Scale Drawing no. Checked by

15/05/2018 1/100 BBC_A102

Stage DESIGN DEVELOPMENT Revision

----

For

----

Revision notes

Drawing title

BEACH BAKING COMPANY-ROOF FLOOR PLAN

Designed by

ELEVATION 3

x

6


Professional Project | Kid's Club & Fitness

G.D2

200 4430800 200

2 G-A301

238

2

2

G-A301

G-A301

9000 10900

D

D

G-A201

G-A201

650

650

+3.150

ERAL GYM PLANGENERAL PLAN

Stage 25/06/2018

Scale 1:100

Revision

G-A101 Drawing no.

For

1:100 G-A101

cked on site by

Checked by

Designed by

1750

RF1

D

D

G-A201

G-A201

i= 2%

900

650

20%

1750

9000

9000

11750

1

D

G-A301

G-A201

GYM ROOF PLAN GYM ROOF PLAN

SCALE 1:100

SCALE 1:100

GYM DIMENSION PLAN SCALE 1:100

1000

1000

11750

1 G-A301

GYM DIMENSION GYM PLAN DIMENSION PLAN

Stage

±0.000 DD

Revision notes DD -0.150

Revision ----

----

----

----

For

Revision notes

D G-A201

GYM ROOF PLAN

SCALE 1:100

Drawing title

Drawing title

Project title

GYM - PLANS

GYM - PLANS

JW MARRIOTTJW CAM MARRIOTT RANH CAM RANH

G1 Ng S Quy Long

Ng S Quy Long

Project title

RESORT & SPA

RESORT & SPA

Owner

Owner

KID CLUB & FITNESS KID CLUB & FITNESS

Designed by

be installed as per tions and

G2

4th Floor, 18 Dinh Tien Hoang 4th Floor, 18 Dinh Tien Hoang District 1, HCM City, Vietnam District 1, HCM City, Vietnam Tel : (84) (028) 3822.4637Tel : (84) (028) 3822.4637

SPNI (SPN INVESTMENT SPNI (SPN CORP.) INVESTMENT CORP.)

Email: info@halodesign.com Email: info@halodesign.com Web: www.halodesign.com.vn Web: www.halodesign.com.vn

Ng S Quy Long

SECTION 2 SCALE 1:100

Volcanic stone

1725

1275

+6.150

3150

+3.150

-0.015

±0.000 150

GA

GB

GC

GD

GE

GF

SECTION 1

SECTION 1 SCALE 1:100

KF-B1

+6.150

3000

KF-P2

6300

+3.150

x x x x x x x

Contractor to confirm samples of finish with client and designer (in a sample board) Detail drawings to be prepared by contractor for confirmation by client and designer All designs are copyright of HALO and cannot be used without their permission Do not scale drawings Measurements must be checked on site by the contractor. Current measurements are based on architects drawings. Design is based on existing drawings and are subject to issues on site with regards to structural and mechanical All materials and fixtures to be installed as per manufacturers recommendations and specifications

Date Scale Drawing no. Checked by

15/05/2018 1/100 BBC_A102

Stage DESIGN DEVELOPMENT Revision

----

For

----

Revision notes

Drawing title

Project title

3150

Quy Long

650

RD

JW MAR

BEACH BAKING COMPANY-ROOF FLOOR PLAN

RESORT &

±0.000

KID CLU

150

wings. drawings and are h regards to

1 G-A301

150

Date 25/06/2018

ng no.

ked by surements

9000 10900

1 G-A301

RD

3150

SCALE 1:100

es of finish a sample board) ed by contractor d designer HALO and cannot sion

9000 10900

i= 20%

100

900 9000 10900

1250

i= 2%

i= 20%

1900

150

DOWNSPOUT 4400

2350 1900

G-A301

1250

1250

330

G-A301

4400

2 G-A301

100

300

100

300

100

Volcanic stone

4400

2 G-A301

4400

DE3 G-A402

150

4200

4400

4200

4400

DE3 G-A402

4400

2

DOWNSPOUT

G_A401

+6.150

1

D G-A201

G-A301

G.W2

100

DOWNSPOUT

2670

1

D G-A201

2750 4400

2750

G.W1

4400

2 G-A301

G.W2

CHEST PRESS SELECTION

A G-A201

1550

2 G-A301

DE1

CHEST PRESS SELECTION

A G-A201

100

2 G-A301

DOWNSPOUT LEG CURL SELECTION

900

100 G-A201

4400

4400

2 G-A301

4400

4400

4400

G-A401

G.W1

SHOULDER PRESS SELECTION

LEG CURL SELECTION

i= 20%

1550 4400

D

4400

4400

D

DE1

G-A401

SHOULDER PRESS SELECTION

±0.000

G-A201

19550

DE1

i= 20%

GYM

±0.000

22200

A G-A201

1550

A G-A201

i= 20%

19550

D G-A201

4400

D G-A201

ADJUSTABLE BENCH SELECTION

4400

ADJUSTABLE BENCH SELECTION

22200

GYM

±0.000

22200

±0.000

i= 20%

7150

4400

1550

G.W2

7150

4400

4400 4400

4400

4400 4400

G.W2

2350

KINESIS ONE

RD

DOWNSPOUT

4400

KINESIS ONE

900

DOWNSPOUT

4430 2350

STRETCHING PAD

RD

i= 2%

200 800 200

1100

900 100 450 650

100

STRETCHING PAD

C G-A201

i= 2%

G.D3

C G-A201

4400

G.D3

1 G-A301

4400

1900

900

4400

1100 1050

100 100

100 100

G.D2 1900 1780

1050 750 900 1100900 100 680 450 1050 650

4400

1050

238

680 1800

4400

G.D1

7501270 1100

1 G-A301

LINE OF ROOF ABOVE

150 200 1600

1780

LINE OF ROOF ABOVE

550

4400

1800 400 650

900

2350

200

1270

C

-0.050

650

3980 550

G-A201

22200

400 650

4400

200

650

900

C

1

2450

DOWNSPOUT

4400

MEP

500

G-A201 G-A301

4200

DOWNSPOUT MEP

1800 3980

CONNECT TO BBC

-0.050

G.D1

STORAGE

9000

500

150 200 1600

A/C LEDGE

±0.000

DE4 1 G-A402G-A301

10900

9000 500770

300

A/C LEDGE

DE4 G-A402

100

LINE OF ROOF ABOVE

±0.000 STORAGE

1800

300

LINE OF ROOF ABOVE

-0.050

100

C G-A201

300

C

G-A201

500

CONNECT TO BBC

4200

-0.050

1250 770

300

1250

CONNECT TO BBC

2450

1 G-A301

CONNECT TO BBC

4400

10900

1 G-A301

Designed by

Owner

SPNI (SPN

ELEVATION A

ELEVATION A SCALE 1:100

+6.150

7


Portfolio | Cu Vi Hoang

03spa

STORAGE

· · · · · · ·

Contractor to confirm samples of finish with client and designer (in a sample board) Detail drawings to be prepared by contractor for confirmation by client and designer All designs are copyright of HALO and cannot be used without their permission Do not scale drawings Measurements must be checked on site by the contractor. Current measurements are based on architects drawings. Design is based on existing drawings and are subject to issues on site with regards to structural and mechanical All materials and fixtures to be installed as per manufacturers recommendations and specifications

Date Scale Drawing no. Checked by

1/200 SP-A003

Stage

CD

Revision

----

For

----

Designed by

Revision notes

Drawing title

Project title

OVERALL FLOOR PLAN

JW MARRIOTT CAM RANH RESORT & SPA

OVERALL SITE PLAN

Ng S Quy Long

OVERALL

RESORT & SPA

SPA

Owner

SPNI (SPN INVESTMENT CORP.) Ng S Quy Long

8

17/05/2018

MEP

A/C LEDGE

JW Marriott Cam Ranh Resorts & Spa Software: Autocad, Sketchup, Photoshop Phase: Schematic design, Design development Area: 3281.0 m2

4th Floor, 18 Dinh Tien Hoang District 1, HCM City, Vietnam Tel : (84) (028) 3822.4637 Email: info@halodesign.com Web: www.halodesign.com.vn


Professional Project | Spa

31

32

33

34

35

36

37

38

21700 4700

2725

3425

3425

B LO-A201

3F

2725

3900

800

5 LO-A302

-0.350

VITALITY POOL

5150

4 LO-A302

-0.050

4

-1.050

LO-A302

-0.050

DOWNSPOUT

DOWNSPOUT

3E 3

3

LO-A301

SAUNA

LO-A301

SAUNA

D LO-A201

±0.000

6250

EXPERIENCE SHOWER

±0.000

EXPERIENCE SHOWER

C

20550

LO-A201

STREAM

-0.050

STREAM

-0.050

DOWNSPOUT

DOWNSPOUT

SW

SW

SW

SW

CH

CH

CH

CH

A/C LEDGE

±0.000

A/C LEDGE

2200

3D ±0.000

3C 2

2

LO-A301

LO-A301

4450

±0.000

±0.000

LADY

ROOM LOCKER

ROOM LOCKER

GENT

DOWNSPOUT

DOWNSPOUT

3B 2500

±0.000

±0.000

3A 1

1

LO-A301

LO-A301

REFLECTIVE POND

SLOPE

SLOPE

SLOPE

SLOPE

SLOPE

±0.000

REFLECTIVE POND

-0.550

-0.550

A LO-A201

5 LO-A302

GENERAL FLOOR PLAN

3D MODEL

LOCKER FLOOR PLAN SCALE 1:100

· · · · · · ·

Contractor to confirm samples of finish with client and designer (in a sample board) Detail drawings to be prepared by contractor for confirmation by client and designer All designs are copyright of HALO and cannot be used without their permission Do not scale drawings Measurements must be checked on site by the contractor. Current measurements are based on architects drawings. Design is based on existing drawings and are subject to issues on site with regards to structural and mechanical All materials and fixtures to be installed as per manufacturers recommendations and specifications

Date Scale Drawing no.

17/05/2018 1/100 LO-A101

Stage

CD

Revision

----

For

----

Checked by

Designed by

Ng S Quy Long

Ng S Quy Long

Revision notes

Drawing title

LOCKER - GENERAL & DIMENSION PLAN

9


Portfolio | Cu Vi Hoang

04beach club JW Marriott Cam Ranh Resorts & Spa Software: Autocad, Sketchup, Photoshop Phase: Schematic design, Design development Area: 2407.0 m2 -2.700

-2.700

88600

-1.350

-1.350

41600

SWIMMING POOL

-1.300 BL

2 DJ

±0.000

INSIDE

±0.000

±0.000 28300

RUM KITCHEN RESTAURANT

OUTDOOR PARTY

33200

POOL BAR

CABANA SEATING

x FL+7.85

STORE

-0.200

x FL+8.00 5

+ 8.85

INSIDE

0 1

1

10

x FL+5.85

BOH SERVICE YARD

GENERAL FLOOR PLAN

+ 5.85

CABANA SEATING

20 meters

SECTION 2

SECTION 1

SITE PLAN

10


Professional Project | Beach Club & Ballroom 2650

3750

5

6 3750

4

1500

3

1400

2

1300

2000

2000

2000

2650

1

5

6

±0.000

F.G.L.

-0.200

4

1500

2000

2

ELEVATION 1

±0.000

F.G.L.

-0.200

SCALE 1:50

400

ARTWORK

1400

MALE

3

1300

1 ±0.000

2000

RTc

2000

ARTWORK

RTc ±0.000 MALE

ELEVATION 1

1000

1300

2350

-

725

1550

2600

7

900

1000

SCALE 1:50

400

4

5

1

6

2000

1200

550

1200

1000

4

2000

-0.200

3100

-

2850

1500

±0.000

450

F.G.L.

-0.200 -0.200

1900

1

2200

1450

7

VOID FOR PLANTER

13

1000

650

850

450

1900

2

1 RT4

ELEVATION 2 SCALE 1:50

3100

2850

±0.000

BEACH CLUB ENTRANCE

-

3

1450

1

4

2

750

1800

650

1

3

-0.200

2200

850

850

1800

4

2350

2

SCALE 1:50

BEACH CLUB DROP-OFF

5

±0.000

BEACH CLUB ENTRANCE

-

-

1 1

3

-0.100

400

RTa

ELEVATION 2 F.G.L.

4700

2

1400

2 1300

2

6

750

1300

5

6

-0.200

-

400

1150

850

2

2350

1000

4

5

1

BEACH CLUB DROP-OFF

RTb

2600

3

F.G.L.

3

-0.100

1

RTa

7

4700

1500

2350 550 900

725

1300

2

1300

2000

6

1300

1150

2

1000

RTb

1400

2

-

2000

1550

4

7

ENTRANCE PLAN

BEACH CLUB'S ENTRANCE DETAIL BC-A101

VOID FOR SCALE 1:50PLANTER

1025

ELEVATION ±0.000 3

1

F.G.L.

SCALE 1:50

-

-0.200 2250

H 2000

2 1450 650 STONE 3 1900 1000 STONE BLOCK DIMENSIONS 4 W STONE 3100 1800 1 STONE STONE 5 750 2850 1200 2 6 STONESTONE 2525 1450 2000

1300

STONE

· · · · · · ·

BC-A101

5

750

1200

2000

STONE

6

2525

2000

2000

STONE

7

4700

2350

2200

20/04/2018 1/50

Scale

Drawing no. Checked by Date Scale Drawing no.

Quy Long

Checked by

BC-A401

DD

Stage

BC-A401

Revision For

Ng S Quy Long

Designed by

+0.000 ±0.000

SCALE 1:50

±0.000

SECTION 2

+0.000

SCALE 1:50

SECTION 1

SECTION 2

SCALE 1:50

SCALE 1:50

Revision notes

ELEVATION 4 SCALE 1:50

Revision notes

DD

-0.100 7

6

1

SECTION 1

7

6

±0.000

For

1/50

INNER STONE SURFACE ALIGN WALL SURFACE

1

Revision

Designed by 20/04/2018 Stage

ELEVATION 3

INNER STONE SURFACE ALIGN WALL SURFACE

650 2000 1300 4700 1900 2350 1000 2200 1400 3100 1800 1500

STONE

Date

SCALE 1:50

2250

3 4

1025

SCALE 1:50

1400 D1500 H 850 2000 2000

7 STONESTONE STONE

Contractor to confirm samples of finish with client and designer (in a sample board) Detail drawings to be prepared by contractor for confirmation by client and designer All designs are copyright of HALO and cannot be used without their permission Do not scale drawings Measurements must be checked on site by the contractor. Current measurements are based on architects drawings. Design is based on existing drawings and are · Contractor to confirm samples of finish subject to issues on site with regards to with client and designer (in a sample board) structural and mechanical · Detail drawings to be prepared by contractor All materials and fixtures to be installed as per for confirmation by client and designer manufacturers recommendations and · All designs are copyright of HALO and cannot specifications be used without their permission · Do not scale drawings Ng S · Measurements must be checked on site by the contractor. Current measurements are based on architects drawings. · Design is based on existing drawings and are subject to issues on site with regards to structural and mechanical · All materials and fixtures to be installed as per manufacturers recommendations and specifications

ENTRANCE PLAN

Drawing title ENTRANCE DETAIL

±0.000

-0.100

Project title

JW MARRIOTT CAM RANH RESORT & SPA

ELEVATION 4 SCALE 1:50

BEACH CLUB

05ballroom

Drawing title ENTRANCE DETAIL

Owner Project title

JW MARRIOTT CAM RANH RESORT & SPA

SPNI (SPN INVESTMENT CORP.) BEACH CLUB Owner

SPNI (SPN INVESTMENT CORP.)

Ng S Quy Long

Ng S Quy Long

2100

D 850

2100

W 2850

INNER STONE SURFACE ALIGN WALL SURFACE

2700

STONE BLOCK DIMENSIONS STONE 1

INNER STONE SURFACE 1 ALIGN WALL SURFACE

2700

RT4

4th Floor, 18 Dinh Tien Hoang District 1, HCM City, Vietnam Tel : (84) (028) 3822.4637

Email: info@halodesign.com Web: www.halodesign.com.vn

4th Floor, 18 Dinh Tien Hoang District 1, HCM City, Vietnam Tel : (84) (028) 3822.4637 Email: info@halodesign.com Web: www.halodesign.com.vn

ELEVATION 2

ELEVATION 1

JW Marriott Cam Ranh Resorts & Spa Software: Autocad, Sketchup, Photoshop Phase: Schematic design, Design development Area: 3222.0 m2

11


ELEVATION 2

ELEVATION 1

ART WORK

JW Marriott Cam Ranh Resorts & Spa Software: Autocad, Sketchup, Photoshop Phase: Schematic design, Design development Area: 140.0 m2

12 A B' B C D

1 BEDROOM VILLA FLOOR PLAN 1/100 Revision

16-05-2018 Stage

Ng S Quy Long

·

·

· ·

·

·

Contractor to confirm samples of finish with client and designer (in a sample board) Detail drawings to be prepared by contractor for confirmation by client and designer All designs are copyright of HALO and cannot be used without their permission Do not scale drawings Measurements must be checked on site by the contractor. Current measurements are based on architects drawings. Design is based on existing drawings and are subject to issues on site with regards to structural and mechanical All materials and fixtures to be installed as per manufacturers recommendations and specifications

Ng S Quy Long ·

Designed by Checked by

For

V1-A101b Drawing no.

Scale

Date

Revision notes

Drawing title FLOOR PLAN WITH OUTDOOR BATHTUB

--

06villa

SPNI (SPN INVESTMENT CORP.)

Owner

1BR VILLA

Project title

Email: info@halodesign.com Web: www.halodesign.com.vn

4th Floor, 18 Dinh Tien Hoang District 1, HCM City, Vietnam Tel : (84) (028) 3822.4637

Portfolio | Cu Vi Hoang

E

7

6

5

4

3

2

1 1

2

GATE HANDLE DETAIL


Professional Project | Villa

2 V1-A306

FLOOR TRAP

SHOWER SPECIFIED BY SHOWER ID SPECIFIED BY ID

FLOOR LOCAL TRAPSTONE

DOWNSPOUT

LOCAL STONE

2

3

3

V1-A306

V1-A306

V1-A306

DOWNSPOUT

4th Floor, 18 Dinh Tien 4th

V1-A306

145

1

2875

5 V1-A101

+0.000

i= 2%

3

V1-A306

V1-A306

V1-A306

V1-A306

SCALE 1:50

V1-A101

BATHROOM FLOOR PLAN

SCALE 1:50

2

2

3

V1-A306

V1-A306

V1-A306

1

625

i= 2%i= 2%

1875 3750

3 V1-A306

DET. V1-A306

i= 2%

1875

1 V1-A306

A

i= 2

%

ROOF ABOVE

ROOF ABOVE

2675

1 V1-A306

A

1

V1-A306

Date B' 16-05-201 Da

B'

1875 3750

B

1

SECTION 1 SECTION 1 SCALE 1:20

SCALE 1:20

3100

3100

4500 7600

1

1

2

2

V1-A306

2

3

V1-A306

V1-A306

3

3

3

V1-A306

EXISTING R.C FLAT ROOF EXISTING R.C FLAT ROOF WITH NEW VOLCANIC WITH STONE NEW LAYER VOLCANIC STONE LAYER

Fo

Checked by

Ch

Ng S Quy Long

Ng

· ·

· ·

BATHROOM ROOF PLAN

·

SCALE 1:50

·

ELEVATION 1 A

B'

B

C

D

E

ELEVATION 1 - INDOOR BATHTUB SCALE 1:75

P1

P1

ELEVATION 2 P1

1

2

3

P1

4

5

ELEVATION 4 SCALE 1:75

6

7

AS SHOW Sc

For

·

BATHROOM ROOF BATHROOM PLAN ROOF PLAN SCALE 1:50

Scale

Drawing Dr B no.V1-A30

4500

7600

2

1

V1-A306

+2.820

+2.820

700

1875 625

DET. V1-A306

FLOOR TRAP

%

625

Revision notes Re

BATHROOM PLAN BATHROOM PLAN 5

i= 2

625

Drawing title Dr INDOOR BATHTUB IN

3

3

2675

FLOOR LOCAL TRAP STONE

3 2

1975

+0.000

2 2

700

2875

4500

7600

2

1437

1

LOCAL STONE

4500 7600

1975

750

1975

1500

1500 145 750

1437 1437

3100

1B

Owner Ow B SPNI SP (SPN INVESTMEN (S

i= 2%

i= 2% 1437750

1

B' 1BR VILLA

B

3100

Pr

1

B'

i= 2%

1 750

+0.000

LINE OF ROOF ABOVELINE OF ROOF ABOVE

1

Project title V1-A306

700

1

+0.000

1 V1-A306

700

V1-A306

2675

1975

1

3000

i= 2%

1 i= 2%

Tel : (84) (028) 3822.46 Te

2675

1500

1500

1

3000

i= 2%

1

District 1, HCM City, Dis Vie A

Email: info@halodesign Em Web: www.halodesign.c We

i= 2%

i= 2%

A

P1

P1

13

Contractor to confirm sample · (in a sample board) Detail drawings to be prepar · by client and designer All designs are copyright·of H their permission Do not scale drawings · Measurements must be chec · Current measurements are based on architects draw Design is based on existing · d on site with regards to struct All materials and fixtures·to b recommendations and speci


Portfolio | Cu Vi Hoang

07kfc

KFC - 128 Tan Son Nhi, Tan Phu, Ho Chi Minh Software: Autocad, Sketchup, Photoshop Renovation project Dark Grey Al. Composite as per L5 Area: 181.0 m2 Existing white KFC Lightbox Move 500 mm. to the left of existing position

Change Colour (to black awning)

Change Colour (to black awning)

A2

A2 P3

AL. as per L4

P3

AL. as per L4 A1 A2

G-0

G-0

Existing

G-0 Existing

FT-0 Existing

A1

G-0 Existing

A1

ST-0

FT-0 Existing

EXTERIOR

EXTERIOR INTERIOR

P3

G-0

G-0

P3

Paint as per CL9

ELEVATION

14

P3

White KFC Light Box

G-0 Existing G-0 Existing

P3

G-0 Existing

A2

AL. as per L4

G-0

A1 A2

OPEN

FT-0 FT-0 FT-0

Paint as per CL9

A1

A1

ST-0

OPEN

FT-0 Existing

FT-0 FT-0 FT-0

FT-0 Existing


Professional Project | Restaurant & Hotel

08hotel

Vung Tau Retreat Software: Autocad, Sketchup, Photoshop Phase: Concept Design Area: 5072.0 m2  





OVERALL 3D MODEL

SEMI-DETACHED HOUSE FLOOR PLAN   Đƒ Đ‘Đ?ÇŁÍ™Č€Í™Í˜Í˜



4



MAIN ENTRANCE



  3ĐŒ Đ‘Đ?ÇŁÍ™Č€Í™Í˜Í˜

0

1

5m

CENTRAL PARK

 ĆŹ  3

4 15




Portfolio | Cu Vi Hoang

09house The House of Light Software: Autocad, Sketchup, Photoshop, Midas Gen, Revit In cooperation with: Natasha Annisa Terri Yunus Cho Lai Yee

16


Academic Project | House & Aquarium

10aquarium

Da Nang Oceanarium Architecture Thesis Project Software: Autocad, Sketchup, Photoshop Flow design, Ecotect

1st BASEMENT FLOOR PLAN

ACOUSTIC DESIGN FOR THE MINI THEATHER

17


Portfolio | Cu Vi Hoang

11sketch BELOW | Ayutthaya

- Thai Land MIDDLE + BOTTOM RIGHT | Hoi An - Viet Nam BOTTOM LEFT | Hue - Viet Nam

18


Others | Sketch & Photograph

12photograph Sapa - Lao Cai - Viet Nam BELOW | Keimyung University - Deagu - South Korea MIDDLE LEFT | Yongdusan Park - Busan - South Korea BOTTOM | Ly Son - Quang Ngai - Viet Nam LEFT |

19


T H A N K

Y O U

(+84)

FO R

1 2 1

Y O U R

5 8 4 8

TI ME

2 9 6

cuv i ho a n g9 4 @ gm a i l .c om

Cu Vi Hoang - Architecture Portfolio & Curriculum Vitae  

Selected works - Published in July 2018

Cu Vi Hoang - Architecture Portfolio & Curriculum Vitae  

Selected works - Published in July 2018

Advertisement