Case Study: Bringing Affordable Housing Into the Future

Page 1

ASP E N L U MBERYA R D


AS PEN L UM BE RYARD

DESIGN TEAM

RANGELEY

CONSULTING, LLC

C USH ING T ERREL L

2


AS PEN L UM BE RYARD

Cooperation, Coordination & Collaboration Ke y D e p a r t m e nts & Staff • APCHA – Cindy Christensen • City of Aspen Engineering – Hailey Guglielmo • City of Aspen Utilities – Justin Forman, Ron Christian, Keith Wester • City of Aspen Environmental Health – Tessa Schreiner, Ainsley Brosnan-Smith, Jimena Baldino • City of Aspen Parks and Open Space – Matt Kuhn, Michael Tunte, John Spiess • City of Aspen Transportation – Pete Rice, Lynn Rumbaugh • City of Aspen Finance – Don Pergande, Matt Grau • Community Development – Kevin Rayes, Ben Anderson, Bob Narracci • Building Department – Denis Murray • Aspen Fire Protection District – Jan Legersky • Pitkin County – Suzanne Wolff, GR Fielding, Ellen Sassano, Michael Port • Aspen/Pitkin County Airport - Dan Bartholomew

Key St akeholder s • • • • • • •

Mountain Rescue Aspen Annie Mitchell Residents Aspen Airport Business Center CORE AVLT CDOT Carbondale Age Friendly Community Initiative

C USH ING T ERREL L

3


AS PEN L UM BE RYARD

Th e Housin g Cr is is AFFORDABLE HOUSING PHILOSOPHY IN ASPEN The Aspen Area Community Plan states that the City of Aspen believes in a strong and diverse year-round community and a viable and healthy local workforce are fundamental cornerstones for the sustainability of the Aspen Area community. The Aspen community has consistently supported affordable housing through both the 1% Housing Real Estate Transfer Tax and 45% of the .45% Housing and Day Care Sales Tax. These funds have supported the City to build new affordable housing units. Aspen Voters recently approved a short-term rental tax which will provide additional funding for affordable housing. C USH ING T ERREL L

4


AS PEN L UM BE RYARD

T h e H ou si n g Cr is is HOW CAN THE LUMBERYARD HELP? Urgent Community Need

Who is the Lumberyard For?

In response to the urgent need for affordable housing in the Aspen area, Aspen’s Lumberyard affordable housing neighborhood creates: • 195 new affordable rental units • 82 new affordable ownership units

This neighborhood will house local workforce who will be qualified within income and asset limits of the Aspen / Pitkin County Housing Authority (APCHA).

Variety

Extensive community engagement and market studies helped establish that Aspen should plan for a variety of unit types and a broad mix of demographics. And since affordable childcare is also a primary community need, space was also set aside for a future early childhood education center within the neighborhood.

Lumberyard will serve a broad range of working household incomes. •

15% of units will serve households at or below 50% AMI

33% of units will serve households from 50 to 85% AMI

33% of units will serve households from 85 to 130% AMI

13% of units will serve households from 130 to 205% AMI

5% of units will serve households from 205 to 240% AMI

The Lumberyard will help ensure that more people who provide critical services to Aspen’s community and businesses have a local place to call home. C USH ING T ERREL L

5


AS PEN L UM BE RYARD

Overall Development Timeline 2005

2011

2007

City of Aspen Reserves Ability to Develop Housing at 3+ acre “Triangle Parcel” North of BMC West

2016

Annexation of BMC West Property into Aspen City Limits

Use of Housing Funds to Purchase BMC West Property 4+ acres

2019

2020

Community Outreach and Conceptual Design Process Begins

Lease Assumed by ProBuild/BFS, Extended through 7/31/2025

2021

2022

Parking Alternatives Analysis, Schematic Design Community Outreach, Mini Storage Annexation Application

Community Outreach, Conceptual Design Target of 310 Units, Purchase of 3-acre Mini Storage Property

YOU ARE HERE 2023

2024

PD Recording, Construction Documents, Building Permit Application Process

Complete Schematic Design, Submit Development Application for Approval Process

2026

2027

Target for First Phase of Housing Construction to Start

Target for Access & Infrastructure Construction Start

2028

Remaining Phases of Housing Construction and Occupancy TBD

Target for Occupancy of First Phase of Affordable Housing

Near-term Timeline Development Application | Design Development NOVEMBER 2, 2022

MARCH-MAY 2023

MAY 2023

JUNE-SEPT 2023

SEPT 2023

Development Agreement Approval Development Application Submitted

Council Approves

First Council Reading Planning & Zoning Public Hearing

Second Council Reading C USH ING T ERREL L

6


AS PEN L UM BE RYARD

Council Worksessions Integrated with Public Outreach

November 18, 2019 Council Session: Density “Heat Maps” Winter 2019/20 Community Outreach #2 March 2, 2020 Council Session: Site Diagrams with 140 - 215 Units July 6, 2020 Council Session: Site Diagrams with 216 - 501 Units Fall 2020 Community Outreach #3 October 26, 2020 Council Session: Site Plans with 250 330 Units November 23, 2020 Council Session: 310 Units, 100% Underground Parking

November 1, 2021 Council Session: Alternatives to 100% underground Parking December 2021 Community Outreach #4 - Feedback January 10, 2022 Council Session: Alternatives to 100% underground Parking “Hinge” approach selected as best fit, aligning with project goals and community input February 14, 2022 Modified “Hinge” with 310 Units Council Session: “Are we asking too much?” Design team challenged to recommend best path forward March 21 & April 4, 2022 Council Session: 75% Schematic Design Two options presented, 310 and 266 Units, Keep the 4th floor and maximize bedroom count and livability

May 16, 2022 Council Session: 100% Schematic Design Livability, bedroom count balance 277 Units / 467 Bedrooms September 26, 2022 Council Session: Development App Review November 2022 Community Outreach #5 - Feedback

Co mm un ity

Co

un

cil

De sig n

Fall, 2019 Community Outreach #1

SCHEMATIC DESIGN

De sig n

CONCEPTUAL DESIGN

C USH ING T ERREL L

7


AS PEN L UM BE RYARD

O vercom ing Ch a lle n ge s to I mp l e me n ta ti on Development Cost & Time • Site Development Costs – Unknown Conditions (environmental & geotechnical) • Infrastructure • Permitting & Site Plan Approvals

Funding Resources to Overcome the Gap Between Target Rents and Development Cost

C USH ING T ERREL L

8


AS PEN L UM BE RYARD

F ina n ce Con sid e r a t io n I mp a c ti n g D e s i g n Underwriting Assumptions • Target market to be served • Alignment of funding resources with the target market • Tenant Income levels • Rents • Bedroom Size • Project Size – Limits on Funding Availability – Entitlement Restrictions – Site/Parking Restrictions • Operating income and expense assumptions

CAT. 1

CAT. 2

CAT. 3

CAT. 4

CAT. 5

CAT. RO

C USH ING T ERREL L

9


AS PEN L UM BE RYARD

F ina n ce Con sid e r a t io n I mp a c ti n g D e s i g n Operating Proforma Projections

Project Development Budget • Cost Estimates • Development pro forma • Timing

Timing & Phasing • Funding resources timelines • Design • Entitlements

Local commitments are key to leveraging other funding sources

Base P Accessories Janitor rop Supplie Base Annual Jani s Expe erty In PUPTAOTA Credit Rep Base sura nse orts Pe torial Cont Assumptio nce0 L ENT PU ract ns st ITYPA 0 Base An rol Expe Ex ContAspen TO 14 Project Name: Collateral Lumberyard Multifamily Rental I andnu BII termin EXPhase TAL nse aal se P 2,72 ating Mat 22 0 EN $40 bud eria ls N Tr Su as O W lie pp gete SES P h Rem195 Referral Fee Units: IA PA d for rksm 4,U20 Assum Ba35% s 14 oval Ex o turn T F e rate 0 s O n T e per pt s Counits 8 pe ER ann TOTAL ADV A ioum. ns Unit type: Multifamily mpeTAL P 1,50 2,805 28 (195nn ERTISING M nserental E0N XBu35% 075 aasl e = 68 unit nsa T 0tioROF edic s). 5,400 al & n Y Eplan Date: Aspen Lumberyard 60 IT IT 112P,1UP Not Life 93 OR X1, OTHER REN to be necessa P20 25A 17 18, Ened Bas 120 0O L TING N Pr 0 ry B Ass EXP give ot an ectio ENS SS sedem Lease Com ES ump and 33,150SES d ue n La An . mission bor M p 0 SecuExp tion o nua n im Ex ispe rityens Based and c. ns s Sye ml Inesu 1 stT OTA N up em 3 a on ra tiona ediate co Resident 0 rlingin availab 5,0Bu l Apa TOT L TAXE nce co 9 am mp Activity Grou 0 m e 0 le 2,54comps Ra S& AL O Expens e/e set, 0 rtme ncxh Affo1 e pp s Su rdab 6 INS II p le Gr nd P 11 n 6 in and an e 5 va E Gl high n lie bin d R le Buno se d othet rAsso Ru URA en ounds s 99wo ATIN Base and wast 5tdem dgeexp ,0 ata ci As Brown TOTAL OTH NCE 2,5od e se Co TO 123 Assumptions 2,200 Sp ens Base Annual te G EX 15 e 9 rin rv w raTct 3,00 d 3 0 ER RENTIN nt iced aist C44 gs. Noith a ation saunmp 2,20 0 AL N PUPA PEN G EXPENS Disc inoclu 24,0 nuatlio budgete 0 n incr TOTAL REN Ma lo dedd OI B SES 00retionary. Holiday ES ns TING in 992 d. ra INCOME o in Fire, an tena EFO EXP and com rath ENS is 15 speci ease for nceFES Five mun te 12 R 3 ity ,5 d IN Sala E o se 3,0 numbe f $0 fi curit 00 FTE4s4 A rie FIN eng age y ala .86 c comp men r. ANC 308 2,9 42 In NCsIAL ADMINISTR at n events. 40 rmt sy per IAL ation of cov EXP ATIVE EXP stem RENTAL REVENUE 608 6,13 0 tere $100s 60 EXP heco e E ENS Office Sup a ES 1 re st ,0 N nt l 4 a 8 00 ra S a d lt 3 Exp EN Pri ES hcact ,593 payro plies & Equipm La1 wn d verage re an ,19an 691 SE m Licenses entR ncipal P ense ll. p ai d e re nt mplo 6,0gr enance miu a & Fees epla RENT REVENUE 47ounds mai 1354, ,772 cem yments 659 Ha sprinkle 15 $6,4 m amou yer ent rd 3,00 r system ntenance co 40/a 0 e,1 Rent Revenue - Gross Potential 2,352,360 Revenue Assumptions fromSe Grant n m2aiApplication 1 Elec ware An ntract 47 Man TOdTMillw 12,063 Reserv nnum t of m agemen 4nten plus e Ex 9,135 AL Fork Ex Feetri c Ex 69ance salarie aintenance /FTE provided during discovery payrol,1 Exp ens $36 p pe tPlu INA p-Ma TO ens 0 for mis ex l plan s for fir e-Mate TA m plus ba Prop Assoccia CIA terials 450 Gain/Loss to Lease st 2 ph pense. se riaN erty d Ap bing ExpensL NO Man ls up L age tion sa ases on I AF on Dement EX 31,668 pliance e-Mate 87,750 Parking Income 162 One free space per unitsoft projected. nver Ap warelary T Bud ER F PEN s Expe fees gete ria Ha su 4 of S d Salary Exp ls rv off $45 ES artmen of granar ey ea co nse-Ma INA rd PA (s/PU t sub ee at msion mis Assumptionequ is garage and covered with t 6778 ps ad NCIA terials Elec ware CEx 14 . Th tached 5ates p-IT 0 to $37.50/ justis Cont LE ) and tric Ex AP edbud o fin upget PUPM. NMar ct will be2, utilized attached wa pense-AL ra Plu 13(See 800 first. al dfees 827 XPENstorage IM 1,62 CarpCont m No fi ket SE4S,290 P arerd for time. prob e 161 ably 5 clos 6man Seeabstract et ractROVEM detailed proposed rates). nal d bt serv Re bing Expens 12 parking 780 to $45 5 0agefor ase ment salaries Ber pairs Co e-Co e/PU ENT PM. ice info 5,02, bt se d up -50 nt for ra S nt 9 first 1 40 ct 6 o pay ract rm 0roll rvic 2 npha Elevat 0 plan 3 Emp 1,62 Rent Income - Commercial 0 0 N/A grases loyee Apa bas an a nt aon e inform ation av 5upon Den rtmor 1,ocia entMaintena 200tion 992 ed 2 Ass verdd pp ailab Apa TOTAL RENT REVENUE 2,384,028 it n ent ation ,54 nce 12,226 salary le surv 4 ey (see Kn iortm al $5 lication S 12 480 attaob assu availab . 71 che s,d) ecuri puand 13,920 Two mpti le. lls,0/PUP 2,emp 18 ty S 400 loye on yste area comps. pans,Aetfoc.r so VACANCIES e units for lead m lar sy plus 10 3, 60 8 s maintenanc manage A/C & 0 stem Legal Expens Vacancy Loss -362 -70,571 3% for turns. Below Apartment e and staff pers 21,000 mentNational es Furnace Ma . on. Budget intena Assocation experience of GPR. at 50% of 2 Ne bed edof /2to4.5% H nce bath unit Nnf co o irm prof ard 11 Professiona orma rate of budto Property management need bufirm Surf dget will 2,100 ADA gwi l Fees ebe tth is base aces fofin , Fair Houto al ve Rent Exp $1,1 r in Ad 60/ sing ssturns. held accountable timely nd th. & La up caseunit 120 itiamon um ense - Equipm on s and Curre l yeor co vari ptious nd0 typia ow Re ent 12 onmispote ps. Vacancy Loss-Commercial 0 N/A scap ars ca TelephoneSn cc ntia lly 23 m ord l du nt Se 2,40 inin ov ,4 Expense ing clu 0 00 In al e to de servrvice gly d fol re lega Compute 3 TOTAL VACANCIES -362 -70,571 crease sa to e accplan H ds. year r Mainten furnnee 500 Nomb d fro one o n ge of ass ancaerdw d re 31 Bad Deb u co $1 d tr will m place afute g e 20 a p e re & t Expense cons 6,000 /PUPA t av forerinage be si t. truct mioen Ass Millw 11,864 pe 10 sy of r NET RENTAL REVENUE 2,313,457 st zed Ch it u $4 25 em ia Ca mris ork 6 1,900 l yea 0/PUPA n.ts over pnes desigancc Pho tioEv er rpet Cl sointe and n 17 to Residen rs time n' an o is 50 s rnet ea rd d d fe ,000 re asgdd t Ap ning u 3,400 Bud Acti in . /Cable arvity ly iti rveedbaecktoon onal se geted to tm Ba a to en OTHER REVENUE Confere g se com di a t eo nce fund scover dp Nset cco ExCl up o bBu exp Deco &ra Edu on erience inHV teea udg availab nth rionir ng wi t will f asset. 12 tincati Mou rlie plance y u Other Income/Expense 0 0 Delivery ACre ng ntai g P/on De le Pain t fo ame co & Frei 2,400 R-Co be si ntram Assin coraght ting cte ntract downwa comps orns. tingExp Misc zed h II an 5 u Glpen r initRa ts NSF Charge 0 050 1,00 ialnc Adm - Com rdCom inco yearea De mon m tiowo Exp foracc 0 odV/In area ars ds.d other over tim mon Ar n ra de CAT Sp o is tin di 1 rin rd Sales &TOT Service 0 0 ca g Supp tern e. ue 62 gs et AL inte ADM d stre reserv ad PainINI gage 200 9,800 ly Man lies Ex eas sted tin age tomen e acc juto Elim turn gSTRATIVE s train 12 5 3,4000 $50 budgeted Application Fees 17 per annum. main EXPpENSE fuet Neorate Ve at ntd tainoed 1,000 ,000 for 35% in untby of asse ifbuha hicle Replace replaing dgrd 1,518 will et su men (195 X 35% = UTILITY EXP /Maintena ce 7295 forfa be si t. 0 68 units). National r ince Assu Apartment ,995 s installCity/Cmou ennt nce tOp Rese ENSES ze itia tsy mpti46.9%. 1,400 turn rate for a Electrici er rve Un Association 2021 5 on is l yearsed in units. over tim d ty ifo ccordwas Fund Exp ens rm e d s e. rese 174 1,000 ue to ing ingly Ma rve in a to fu tena 34,000 No b Tenant Damage 0 720 Mnce Equi MiClaims 120 140 nd re accoun ge of ass udge sc Main aso pment n ,400 t will place et. t forat 2% of t Expry Late Charges 12 2,384 5% of2,past balances projected d to Repair 40Nee b ultimatel men 0 due Pa Ain initia ss y tin Elimin con umgpfirm ts ov e sized with leng of yeainee e ifacc 3 tio68 er ti studat ring y. B noord n isvaGPR rs ca ase ve m nt d upo d hi s e re ue to clens curr at $5 ing . wor Pet Rent 0 Need 60 to 0determine to accept pets. 11 0 serv ent kforce houwhether mou 00 ntai ani toow e acc n /u Proper Nsing comps ly d by get o TOT fune less annum 21975 2,20affo comom omban nd re Court Costs 5 forty5% units per f ass 40% 7 uun AL C 0 $100 rdable waiv uof nt ity dag er for hou place geem e will. sing t fo 42,400 en Asp be si t. TOTAL OTHER REVENUE APITA 35 6,759 men Vac r tinan Assu rate cate itkin ant Elec $1gory L IM ze iten/P ts 3 85.1 ain County T tric iadl m ,4 %m-p130 y. Th PRO tion% AMI geane earstenance st over tim d Non Con IMOTAL N amount of00 ccra o is V l e af rd sola exa pl d sum O E e f re ct us r u M ingerin IA . Pptio met TOTA ENT ROVn Elec costnet TOTAL 11,899 2,320,216 raben lygag tric rvenee e to ag FT INCOME 0 ge se Wat s L RE efit S er Exp e of rkinagccds $150/sto fu ens PA 0 e IRESMENT ER CAP o bu at ndpa ouer $5N0/ op asse pace nto ded 0 & MAI ITA sp dgbe inclu tatwin S oncre e pava la t. EN illgbe L NTEN 0 Martin Assaceetmfo anceilab ainenan plus mdi TAEXPENSES ad OPERATING ele. XES ANTITY E ANCE sized 46 Non ntio at De itialce re ump r in tsna -Co 0 X ovl 8,970 D IN serve PEN years tian ionSU ain Re nsumpt cle on ex Wat ccgord sm er an per Sc er time Bas Sew SES pe is RA ed al Es upo d rie er Exp NC re n u evBur in 2,486 5 ot nce. Se to . tate ens E O serv ling er gyly e es EXPENSES th six RENTING ,090 48 Pa age toame ech 0 timate of 0 monRan II ola r ar yroll Taer Ta acc ExxpExpense 20 per fun ocom 4,0739 d ths ($15 unt p rayof asse ADVERTISING 0/ 314 buildin repinfo Non-Consu Partxe wyill nesrs enses ar t. ra tion 61,230 992,5 g Xla2cerma hip A mption Sew 4 Advertising Expense 54 10,500 Website listing services nts o Xbe sized mm erd 4Based and uletif TOTAL UTI upononline amily ver Burlingame LITY EXPENS ministra re 0 1,000 time ntII Marketing T Newsprint 5 Basic Fair Housing Marketing requirements Ran al ch ti 0 ES ph v com otal . e Fe as pes) 0 0 e O only. High demand projected. 1,080185 information REPAIRS & ther E 210 360 14 Based xpe MAPublications INTENA Marketing 12 2,400 ,60,1 up nse NCE JanitorSpecial Budget on grant ap s Payroll Expens plicatio ed at e 0 6.2% n assu social m pt ion 0 secu 0 0 Nrent medica rity, 1.45% Cur o buly included re, 4.55 dget in maintenanc Page 1 of 5 0 CO e sala% due ries to la final below requ ck of in 0 fo ir Pa 3 eme rma tion nts p Pagege 5 2Pag ofof reg er e54 o finan partners arding f5 cing h agre ip and eme nts. Pag e

5 of

5

• Community engagements • Local government support • Cost & schedule are always questions C USH ING T ERREL L

10


AS PEN L UM BE RYARD

A ddre ssing Fu n din g G ap s Early-Stage Risk Capital/Shortening Developer Timeline • Acquisition • Site prep and remediation (geotech/environmental) • Infrastructure • Entitlement/permitting • Clean and buildable site

Construction Financing • Interest rate savings • Early-stage construction risk/mezzanine financing

Subordinate Debt • Rental • For-sale C USH ING T ERREL L

11


AS PEN L UM BE RYARD

A ddre ssing Pro je c t Fu n d i n g E a rl y Addressing funding early and throughout the process is key to: • Transparency • Realistic Expectations • Predictable Outcomes • Adapting to Inevitable Change

C USH ING T ERREL L

12


AS PEN L UM BE RYARD

Du e D il ige n c e O v e r vi e w • Phase 1 Environmental Site Assessment (ESA) • Cultural Resource Inventory • Geotechnical Subsoil Study • Traffic and Aircraft Noise Impact Assessment • Sample Air Testing for Volatile Organic Compounds • Transportation Impact Analysis • Demographic and Market Assessment / APCHA Guidelines • Airport Obstruction Evaluation • Glare Analysis for Air Traffic Control Tower and Runways 15 and 33 • Resilience Assessment & Opportunities

C USH ING T ERREL L

13


AS PEN L UM BE RYARD

V is ion & P h ilo so p h y City of Aspen - 2012 Aspen Area Community Plan (Housing Section) Vision

Aspen/Pitkin County Housing Authority (2021 APCHA Housing Regulations) Mission Statement

We believe that a strong and diverse year-round community and a viable and healthy local workforce are fundamental cornerstones for the sustainability of the Aspen Area community.

The goal of APCHA is to provide affordable housing opportunities through rental and sale to persons who are or have been actively employed or selfemployed within Aspen and Pitkin County, and that provide or have provided goods and services to individuals, businesses or institutional operations, within Aspen and Pitkin County (prior to retirement and/or any disability), and other qualified persons as defined in these Regulations, and as they are amended from time to time.

Philosophy We are committed to providing affordable housing because it supports: •

A stable community that is invested in the present and future of the Aspen Area.

A reliable workforce, also resulting in greater economic sustainability.

Opportunities for people to live in close proximity to where they work.

A reduction in adverse transportation impacts.

Improved environmental sustainability.

A reduction in down valley growth pressures.

Increased citizen participation in civic affairs, non-profit activities and recreation programs.

A better visitor experience, including an appreciation of our genuine, lights-on community.

A healthy mix of people, including singles, families and seniors.

C USH ING T ERREL L

14


AS PEN L UM BE RYARD

V I S I O N S TAT E M E N T

A stable, thriving affordable neighborhood. Pedestrian friendly, environmentally sustainable, connected, and welcoming. Looks, lives and feels authentically Aspen!

C USH ING T ERREL L

15


AS PEN L UM BE RYARD

V is ion & P h ilo so p h y GUIDING PRINCIPLES Community Connection Contribute to well-being and contentment in day-today. Sustainability Sustainability has been defined through three pillars: Environmental, Economic, and Social. All three are needed to create a strong and long-lasting community. Pedestrian Friendly Emphasizing people over cars. Living Well Providing for residents’ basic needs, creating a safe and secure environment. Authentically Aspen Speaks to place. It is the recognition of the elements that make this place unique.

PROJECT PRIORITIES 1. Maximize Affordable Housing, Prioritizing Bedroom Count 2. Maintain Livability 3. Minimize Other Uses - Devote site to Affordable Housing & potential Early Childhood Center 4. Move Forward as Quickly as Possible, to Address Housing Crisis

C USH ING T ERREL L

16


AS PEN L UM BE RYARD

C O MMU N IT Y CO N N EC T I O N D e f in i n g C o mm u n i ty Co nn e c ti o n Successful neighborhoods are integrated into the fabric of their communities. A big part of this connection is ensuring ease of access to the diversity of modes of transit that already exist in Aspen.

What success might look like: •

Adequate parking on-site so as not to negatively impact neighboring areas

Having the ability to select the appropriate mode of transit based on weather, destination, purpose, or whim allows residents of the Lumberyard to leave their cars parked for incidental travel.

Pedestrian walkways throughout and connecting to the ABC and existing trails

Maintain and improve the bike paths to the ABC and Annie Mitchell

Vehicular connections to the ABC and Highway 82 with appropriate stacking distances

Space for a possible transit stop

Space for multi-modal transportation alternatives

Spaces allowing neighbors to engage with one another

A connected community can greatly contribute to well-being and contentment in day-to-day life.

C USH ING T ERREL L

17


AS PEN L UM BE RYARD

S USTA INA B IL IT Y D e f in i n g S u s t ai nab i l i ty In working with the City of Aspen Environmental Health & Sustainability department and Community Office for Resource Efficiency (CORE), the design team has defined Sustainability through three pillars: Environment, Economic, and Social. All three are needed to create a strong and long lasting community.

What success might look like: Energy

Environmental Sustainability - The ability to avoid

• • •

depletion and degradation of natural resources while allowing for long term environmental quality.

Economic Sustainability - The ability of an economy to support an appropriate level of economic capacity and activity to serve societal needs.

Social Sustainability - The capacity to create healthy, accessible, livable places for all.

• • • •

Full Electrified Buildings and Net Zero Energy Site-wide, including on-site storage Forward-looking Electric Vehicle infrastructure Leveraging passive solar strategies Enhanced building commissioning and metering

Water

Advanced metering Low usage building systems and fixtures Native plantings and xeriscaping

Waste & Recycling • •

C&D waste management and planning Construction activity pollution prevention

Wellness • • •

As history has shown, Aspen has a civic responsibility to act on behalf of its constituents, a moral imperative to take the steps necessary to meet the challenge of climate change, and the potential to be a catalyst for meaningful and effective action around the state, country and world. - City of Aspen Climate Plan.

Healthy and sustainable building materials Dedicated and filtered fresh air Increased daylighting and well controlled electric lighting

C USH ING T ERREL L

18


AS PEN L UM BE RYARD

PEDES T RIA N FR IEN DLY D e f in i n g P e d e s tri an F ri e n d l y The goal of this development is to emphasize people over cars. We know there will be a lot of vehicles housed at the lumberyard along with residents. Strategies that calm traffic and reduce physical conflicts between cars and people will be utilized. Providing landscaping or parallel parking along walkways bordering streets helps provide physical separation. Pedestrian friendly means thoughtfully designed sidewalks. Walkways should be connected and well lit. They should be wide enough to allow people to pass comfortably, especially when pushing strollers, walking dogs, or carrying that particularly heavy bag of groceries. A walkway lined with trees providing dappled shade in the summer makes them inviting places to be.

What success might look like: •

Tree lined, well-lit sidewalks adjacent to but separated from streets by tree lawns

Sidewalks throughout site that directly connect to adjacent trails

Safe lighting levels at all pedestrian circulation areas throughout site

Maximize solar access at sidewalks and outdoor public spaces

Snow storage areas and awareness of snow shed safety clearances to pedestrian areas

C USH ING T ERREL L

19


AS PEN L UM BE RYARD

L IVING W EL L D e f in i n g L i vi n g We l l At the root of all housing projects, but particularly acute when discussing affordable communities, is the sentiment that everyone deserves a good place to live. What does this mean and how do we get there?

What success might look like: •

Day-lit indoor spaces with access to views

Adequate storage space for outdoor lifestyle equipment as well as maintenance and repair facilities

Living Well means providing for community members basic needs, but also allowing them the opportunity to thrive and enjoy all the same benefits afforded to all members of the community.

Easy access to parking or public transportation when running errands

Quality design & finishes to promote a sense of ownership- Easy access to outdoor spaces

Comfortable spaces to allow for gathering of friends and family

Quiet, efficient and reliable fixtures and equipment

Increased accessibility both on site and within dwellings

At a basic level, Living Well means providing a safe and secure environment. It also means creating an environment that allows for positive physical and mental health. For the sake of this effort the Design Team has categorized items such as indoor air quality, noise and hazard materials under the ‘sustainability’ tag, but it is important to note the interconnectedness. Specific to the way the community members of Aspen at large live, Living Well might mean creating a community that does not preclude or challenge one’s ability to enjoy the natural resources found in abundance in and around the area.

SKI MAGAZINE

ASPEN TIMES

C USH ING T ERREL L

20


AS PEN L UM BE RYARD

AUTH ENTI CA L LY A S P E N D e f in i n g A u t h e n ti c al l y As p e n “I think keeping it mountain contemporary in style fits best with the ABC area, the aspen ideal, and the appeal to a broader range of inhabitants”.

A practical rugged quality that reflects the alpine lifestyle of this historic mining town turned ski destination. SURVEY RESULTS:

“...Needs to have mountain appeal due to entrance to Aspen and how many people see this every day”. “Efficiency, efficiency, efficiency. The design should be efficient! Aspen has a long history of building very inefficient and affordable housing units with excess emphasis on ‘custom’ design, ‘no 2 units alike’. Housing resources are limited and outstrip demand.” “Keep the mountain aesthetic

C USH ING T ERREL L

21


AS PEN L UM BE RYARD

Su st a inabi lit y S e t a B a s e l i n e S trateg y : Ad o p t E n t er pr ise Green C ommunit ies P lus Comparison: Certification Programs vs. Project Goals

C USH ING T ERREL L

22


AS PEN L UM BE RYARD

Su st a inabi lit y E n te r p r i s e G reen Co m m u n i ti es Cer t ificat ion Enterprise Green Communities has a Resilience component which focuses on proactively designing for day-to-day conservation of resources, new climate challenges, hazard mitigation preparedness, and strengthening cultural connections. • The focus on hazard mitigation preparedness requires that we recognize considerations for hazards such as wildfire, air quality, new disease vectors, extreme events, loss of power, drought and mud flows. • The focus on cultural resilience provides mental health benefits such as increased sense of shared ownership, social accountability, and sense of belonging.

EGC SCORE: 123pts (40+ Required) MILESTONES COMPLETED TO DATE: • Sustainability Charrette • Context Map • Social Determinants of Health Analysis • Project Priority Survey • Cultural Resilience / Responsive Design Assessment • Multi-Hazard Vulnerability / Climate Resilient Design Assessment C USH ING T ERREL L

23


AS PEN L UM BE RYARD

Su st a inabi lit y

7 5 % N e t Z e ro We are currently on track to meet our 75% Net Zero Stretch Goal! • Designing around a low Energy Use Intensity building • Enhanced insulation and infiltration approaches • Energy efficient heating/cooling systems • Energy efficient water heating systems

%DVHOLQH 2YHUYLHZ •

• Heat recovery systems • Maximizing area of solar array with independent roof structure

• Create a comparative energy analysis between different HVAC and Plumbing systems to begin to identify best value

• Identified a path forward with Aspen Electric balance

production limitations for utility and needs on site using a battery system

(QYHORSH EDVHG RQ ,(&& YDOXHV o 5RRI 5 o :DOOV 5 o )HQHVWUDWLRQ IL[HG 8 6+*& o )HQHVWUDWLRQ RSHUDEOH 8 6+*& o ,QILOWUDWLRQ $&+ +9$& o 95) V\VWHP RQH SHU IORRU o 'HGLFDWHG RXWGRRU DLU V\VWHPV Z KHDW UHFRYHU\ /LJKWLQJ o %XLOGLQJ : IW o 3DUNLQJ *DUDJH : IW 3OXJ /RDGV o (QHUJ\ 6WDU $SSOLDQFHV 5HIULJHUDWRU 'LVKZDVKHU (OHFWULF 6WRYH 2YHQ &ORWKHV :DVKHU 9HQWHG &ORWKHV 'U\HU 0LVF 3OXJ ORDG 'RPHVWLF +RW :DWHU o (OHFWULF 5HVLVWDQFH +RW :DWHU +HDWHUV o JDOORQV GD\ SHUVRQ

C USH ING T ERREL L

24


AS PEN L UM BE RYARD

S IT E D E S I GN

C USH ING T ERREL L

25


AS M BE RD ASPEN PEN LLU UM BERYA RYARD

Vini ici tnyit M y aMpa p V ic

CCUSH USHING ING TTERREL ERRELLL

3 26


AS PEN L UM BE RYARD

LATCH

72% Underground Parking

FLANGE

PIVOT

61% Underground Parking

HINGE

1 1 .0 1.20 2 1

Site Evolut io n

81% Underground Parking

0% Underground Parking

C USH ING T ERREL L

27


AS PEN L UM BE RYARD

Site Com p a r is o n M a t r ix GUIDING PRINCIPLES GUIDING PRINCIPLES

PIVOT LATCH

PIVOT

LATCH HINGE

HINGE FLANGE

FLANGE

Community Connection Community Connection Buffer to Annie Mitchell (Building

Buffer to Annie Mitchell at(Building within Triangle Adjacent to Annie No at within Triangle Adjacent to Annie Mitchell) Mitchell) Parked Entirely on Site

On-Site Daycare

On-Site Daycare

No Yes

Yes Yes

Yes

Yes

Yes Yes

Yes Yes

Yes Yes

Yes

Yes

Yes Yes

Yes Yes

Yes Yes

Yes

Sustainability Sustainability

Net-Zero Ability (Ability of on-site PV Net-Zero Ability (Ability of on-site PV to offset energy consumption) 42.3% to offset energy consumption)

42.3% 43.2%

(Ease of Surface Detention Stormwater (Ease of SurfaceStormwater Detention v. Underground Detention) Mixed v. Underground Detention)

Mixed Underground Most All

to Daylight (Direct Sun Access to Daylight (Direct Access Sun Hours at all S/E/W Unit Faces) Most Hours at all S/E/W Unit Faces)

43.2% 48.9%

48.9% 42.4%

42.4%

Underground Surface

MixedSurface

Mixed

Trail Connectivity

Trail Connectivity

Public Transit Stop

Public Transit Stop

All All

All Most

Living Well

1.25 acres 1.77 acres

1.77 0.5acres acres

Yes

Yes Yes

Yes Yes

Yes

Yes Yes Best Better

Most

Good

Potential for some 3-story Roofs Potential for some 3-story Roofs Unlikely

Unlikely Unlikely

Unlikely Likely

Structures)

Mass & Scale (Option w/ Smallest Mass & Scale (Option w/ Smallest Structures) Best

Best Better

Good

Exterior Accessed Units (Can Exterior Accessed Units (Can units be access without using All an units be access without using an interior corridor) interior corridor)

All All

1/3rd

FLANGE

Best

Good Unlikely

Likely Unlikely

Better

Good Better

Better

All

1/3rd All

All

Construction Cost Construction Cost

Project Phasing (Does scheme allow Project Phasing (Does scheme allow for project to be phased) Yes for project to be phased)

YesYes

x45 x31

(Minimum Number of Elevators (Minimum NumberElevators of Anticipated Elevators) 12 Anticipated Elevators)

Yes Yes

Yes

Interior Corridors (Cost associated Interior Corridors (Cost associated with constructing int. common No space) with constructing int. common space)

NoNo

Yes Yes

Yes Yes

Yes

(Relative cost based on mix Parking (Relative cost based onParking mix of parking types) of parking types) x2.15

x2.15 x1.79

Better Best

Good Best

1012

YesYes

YesYes

Yes

x31 Baseline

x46

Baseline

x46

106

20

6

20

YesNo x1.44

x1.79

NoYes

No

x1.44 Baseline

Baseline

Good

Operations & Maintenance Operations & Maintenance Better Better

Better Best

Best Better

Better

Access Access to Views (Uninterrupted viewto Views (Uninterrupted view Some >60' before adjacent structure)>60' before adjacent structure)

Some Some

Outside of Noise Buffer (Units Outside of Noise Buffer (Units 200' buffer fromBest Hwy 82) Outside 200' buffer from Hwy Outside 82)

Best Best

Good Best

Good Better

Better

Good Better

Better Best

Best Better

Better

Parking Near Unit (ParkingParking Near Unit (Parking Proportionately w/ Units) Better Distributed Proportionately w/Distributed Units)

Better Best

Best Better

Good Better

Good

Storage At/Near Parking Storage (Cover At/Near Parking (Cover Parking Storage Space) Parking w/ Room to Add Storage Space)w/ Room to AddBetter

Better Best

Best Best

Good Best

Good

Noise (Ability for Mechanical Noise (Ability Mechanical for Centralized vs. Individual Units) Good Centralized Systems vs. Individual Units) Systems

Good Best

Good

0.5 acres

Living Well

Universal Design (Units can be Universal Design (Units can be accessed from inside) Better accessed by elevator and/or from inside)by elevator and/or

Better

Design Innovative (Ability for Design Innovative (Ability for architectural variation) Better

architectural variation)

Building Envelope (Linear Feet of Building Envelope (Linear Feet of Exterior Exposedx45 to Elements) Exterior Exposed to Elements) 0.6 acres 1.25 acres

Safe / Site Circulation (street / Safe Site Circulation (street limited in traversing Best site) driveways limited in traversingdriveways site)

HINGE FLANGE

PROJECT FEASIBILITY PROJECT FEASIBILITY

Pedestrian Friendly Pedestrian Friendly Concentrated Green Space Concentrated Green Space 0.6 acres

PIVOT LATCH

Authentically Aspen Authentically Aspen No No

Parked Entirely on Site

LATCH HINGE

PIVOT

Some Most

Half Most

Half

Management (Ease of Waste Management (Ease Waste of accommodate waste infrastructure) Good accommodate waste infrastructure)

Good Best

Best Best

Best Best

Best

Snow Storage (For plowing ofSnow roads,Storage (For plowing of roads, drives & parking) Good

Good Better

Better Best

Best Better

Better

drives & parking)

Snow Removal (Sidewalks / Snow Exit Removal (Sidewalks / Exit Stairs & Catwalks) Better Stairs & Catwalks)

Better Better

Better Best

Good Best

Good

Elevator Maintenance (Annual Elevator Maintenance (Annual number of elevators) maintenance based on numbermaintenance of elevators) based onBetter

Better Better

Better Best

Good Best

Good

Good Better

Better Best

Best Better

Better

Parks Dept Maintained Parks Dept Maintained Green Spaces No Green Spaces

NoNo

YesNo

NoYes

No

Streets Dept Maintained Streets Streets Dept Maintained Streets Best as streets v. (Paved areas likely designated as(Paved streetsareas v. likely designated

Best Better

Better Better

Good Better

Systems (Ability to Mechanical Systems (AbilityMechanical to centralize systemsGood / simplify maintenance) centralize systems / simplify maintenance)

parking lots)

parking lots)

Good

C USH ING T ERREL L

28


AS PEN L UM BE RYARD

04.04. 2022

02.14.2022

01.10.2022

Site Evolut io n - Hin g e

C USH ING T ERREL L

29


AS PEN L UM BE RYARD

Co mmu n a l L a n ds c a pe s

Airport Business Cent

er

Solar Map of The Hinge Site Directed building orientation

Bldg 1 Bldg 2

M.R.A

Bldg 3

Hwy 82

KEY Native Revegetation

Rain Garden / Stormwater

Vegetated Berm

Communal Landscape

Community Plaza

Future Early Childhood Education Facility

C USH ING T ERREL L

30


AS PEN L UM BE RYARD

Airport Business Ce

nter

Ve hi cu lar A c c e ss

Bldg 2 Bldg 1

Bldg 3 M.R.A

Hwy 82

KEY Two-Way Road

Eliminated Intersection

RFTA Bus Stop

Garage Entrance

Firetruck Turnaround

Signalized Intersection

Raised Pedestrian Zone

Loading & Drop-Off

Trash Enclosure

PUD Parcel

C USH ING T ERREL L

31


AS PEN L UM BE RYARD

ter Airport Business Cen

Pe dest r ian A c c e ss

Bldg 2 Bldg 1

Bldg 3 M.R.A

Hwy 82

KEY Multi-Use Trail

Underpass

RFTA Bus Stop

Bike Parking

Building Entrance

Shared Bike Lane

5 - 6’ Sidewalk

Raised Pedestrian Zone

WeCycle Station

Community Plaza

PUD Parcel C USH ING T ERREL L

32


AS PEN L UM BE RYARD

Tra nspor t a t io n & Pa r ki n g M a n a g e me n t PHASE 2 PHASE 1 PHASE 2

PHASE 3

PHASE 1 G SPACES

PHASE 3

GE PARKIN 84 GARA

BUILDING 2 G SPACES

65 GARAGE PARKING SPACES

GE PARKIN 84 GARA

BUILDING 2 65 GARAGE PARKING SPACES

BUILDING 3 69 GARAGE PARKING SPACES

BUILDING 1

BUILDING 3

FUTURE PHASE

69 GARAGE PARKING SPACES

BUILDING 1 FUTURE PHASE

KEY BUILDING 1 RESIDENT ASSIGNED PARKING

KEY

LOADING (6 SPACES - TWO PER BUILDING)

104 TOTAL PARKING SPACES 84 GARAGE 20 CARPORT

UNASSIGNED PARKING (142 SPACES) BUILDINGBUILDING 2 RESIDENT ASSIGNED PARKINGPARKING LOADING (6 SPACES - TWO 1 RESIDENT ASSIGNED VISITOR AND RESIDENT PARKING TOPER BE BUILDING) 91 TOTAL PARKING SPACES 104 TOTAL PARKING SPACES 65 GARAGE 26 84CARPORT GARAGE 20 CARPORT

MANAGED BY THE PROPERTY MANAGER

UNASSIGNED (142 SPACES) BUILDINGBUILDING 3 RESIDENT ASSIGNED PARKINGPARKING FUTURE CHILDCARE (10PARKING SPACES) 2 RESIDENT ASSIGNED VISITOR AND RESIDENT PARKING TO BE 82 TOTAL PARKING SPACES 91 TOTAL PARKING SPACES 69 GARAGE 13 CARPORT 65 GARAGE 26 CARPORT

MANAGED BY THE PROPERTY MANAGER

REQUIRED PARKING

TOTAL PARKING PROVIDED:

(129) 1-BEDROOM UNITS = 129 X 1 PARKING SPACE = 129 (106) 2-BEDROOM UNITS = 106 X 2 PARKING SPACES = 212 (42) 3-BEDROOM UNITS = 42 X 2 PARKING SPACES = 84

1 SPACE ASSIGNED PER UNIT

ASSIGNED TO BUILDING 1 = 104 SPACES ASSIGNED TOTOTAL BUILDING 2 = 91 SPACES PARKING PROVIDED: ASSIGNED TO BUILDING 3 = 82 SPACES TOTAL PARKING REQUIREMENT = 425 PARKING SPACES 142 ASSIGNED PER UNIT SPACE (129) 1-BEDROOM UNITS = 129 X 1 PARKING SPACE = 129UNASSIGNED1 = LOADING = 6 SPACES (106) 2-BEDROOM UNITS = 106 X 2 PARKING SPACES = 212 = 10 ASSIGNED TOSPACES BUILDING 1 = 104 SPACES (42) 3-BEDROOM UNITS = 42 X 2 PARKING SPACES = 84 FUTURE CHILDCARE ASSIGNED TO BUILDING 2 = 91 SPACES C USH ING T ERREL L PROVIDED = 435 PARKING ASSIGNED TO BUILDING 3 = 82SPACES SPACES TOTAL PARKING REQUIREMENT = 425 PARKING SPACES TOTAL PARKING UNASSIGNED = 142

REQUIRED PARKING

33


AS PEN L UM BE RYARD

DROP OFF AND LOADING ZONE

BIKE SHARE STATION (24 DOCKS)

TRAIL EXPANSION

BIKE WASH STATION

A S PEN L U M BE RYA RD

CONNECTION TO BIKE PATH

RAISED PEDESTRIAN ZONE

STORM WATER FACILITY

ELIMINATED INTERSECTION

CONCRETE; 10' WIDTH, TYP.

BLDG 2 ENTRANCE WITH ADA RAMP & BIKE PARKING

RFTA BUS STOP

L a ndsca pe SeitSit e Pla Lan ds cap e Pn lan SIGNALIZED INTERSECTION BIKE PATH UNDERPASS

SCALE: 1"=60' NORTH

60'

0'

5/24/2022 8:25:09 AM | Project# ASPEN_LMBRYD | L:\

120'

NOT FOR CONSTRUCTION - PREL

COMMUNITY PLAZA BLDG 1 MAIN ENTRANCE WITH ADA RAMP AND BIKE PARKING

© 2022

|

ALL RIGHTS RESERVED

LANDSCAPE CHARACTER PLAN SET 10/28/2022 PROJECT# | ASPEN_LMBRYD DESIGNED BY | Designer DRAWN BY | Author REVISIONS

SITE

L.1.00

BLDG 2 BATTERY BANK

ASPEN LUMBERYARD AFFORDABLE HOUSING

RAIN GARDEN/ STORMWATER BLDG 2 TRANSFORMERS BLDG 2 GARAGE ENTRANCE BLDG 1 & 2 TRASH ENCLOSURE BIKE PARKING

COMMUNAL LANDSCAPE 2 COVERED PARKING WITH STORAGE, TYP. RAIN GARDEN/ STORMWATER

COMMUNAL LANDSCAPE & STORM WATER FACILITY BLDG 1 GARAGE ENTRANCE

TWO-WAY ROAD, TYP. SIDEWALK; 5' WIDTH

SCHOOL BUS DROP OFF WITH BIKE PARKING BLDG 3 TRASH ENCLOSURE FIRE TRUCK TURNAROUND BLDG 3 GARAGE ENTRANCE BLDG 3 BATTERY BANK BLDG 3 TRANSFORMERS

BLDG 1 BATTERY BANK BLDG 1 TRANSFORMERS BIKE PARKING UTILITY VAULT BIKE PARKING

BIKE PARKING

COVERED PARKING WITH OUT STORAGE, TYP.

BLDG 1 7783 FFE

COVERED PARKING WITH STORAGE, TYP.

MULTI-USE TRAIL, STABILIZED CRUSHER FINES; 8' WIDTH

BLDG 2 7787 FFE AN

NI

E

MI

FUTURE ON-SITE CHILDCARE FACILITY

TC

HE

LL

BIKE PARKING TR AI

L

BIKE SHARE STATION (12 DOCKS)

BLDG 3 7796 FFE

AABC TRAIL

AABC TRAIL

FIRE TRUCK TURNAROUND CROSSWALK, TYP.

PUBLIC AMENITY SPACE

EXISTING TRAIL LOADING AND DROP-OFF BLDG 1 MAIN ENTRANCE WITH ADA RAMP AND BIKE PARKING TRAIL EXPANSION ELIMINATED INTERSECTION

HWY 82

PUBLIC AMENITY SPACE ENTRANCE WITH BIKE PARKING

SIDEWALK; 6' WIDTH

COMMUNITY PLAZA BIKE SHARE STATION (24 DOCKS) RFTA BUS STOP BIKE WASH STATION STORM WATER FACILITY

DROP OFF AND LOADING ZONE

MULTI-USE TRAIL, CONCRETE; 10' WIDTH, TYP.

BLDG 3 ENTRANCE WITH ADA RAMP AND BIKE PARKING

SHARED BIKE LANE & 2-WAY TRAFFIC RAIN GARDEN/ STORMWATER

DROP OFF AND LOADING ZONE SIDEWALK; 6' WIDTH CONNECTION TO BIKE PATH

BLDG 2 ENTRANCE WITH ADA RAMP & BIKE PARKING RAISED PEDESTRIAN ZONE

SIGNALIZED INTERSECTION BIKE PATH UNDERPASS

CUSHING TERRELL

4

T FOR CONSTRUCTION - PRELIMINARY DESIGN

M.R.A.

C USH ING T ERREL L SCALE: 1"=60'

CITY OF ASPEN PLANNED DEVELOPMENT APPLICATION

COMMUNAL LANDSCAPE 3

COMMUNAL LANDSCAPE 1

© 2022

|

ALL RIGHTS RESERVED

LANDSCAPE CHARACTER PLAN SET 10/28/2022 PROJECT# | ASPEN_LMBRYD DESIGNED BY | Designer DRAWN BY | Author REVISIONS

34 SITE