Page 1

ART

ZOO

environment

event

ROAD 88%

INSIDE WYNDHAM

GEELONG TO MELB 2026889 TONNES

LIGHT 63720

RAIL 7%

time Machine

HEAVY 7854 OTHER

culture

SEA 5% OUTSIDE WYNDHAM MELB TO GEELONG 1879023 TONNES

architecture design studio: air final project

FREIGHT TRANSPORTATION

FREIGHT FLOWS

VEHICLE TYPE

EMPLOYMENT LOCATION

presidents BRISBANE GIRLS GRAMMAR SCHOOL -Simple Facade -Complex Moire Effects

pattern

CATERINA RUSSILDI, miao xue, xiaoyan wang, wenye zhu

ST. ANDREWS BEACH HOUSE

N IO DI T AD

TR I

M

R RR O MI

ft lo

MO VE

IE S SE R

BA SI C

FR

AM

E

RO TA TI O

N

form

-Copper -Frame+Panel -Structure -Connection


DESIGN NARRATIVES & concept NORTH ELEVATION 1:500

Wyndham is in need of a display that will reflect this as well as their ideal of change, progress and prosperity. Our proposal successfully envelops all these concepts of movement in space and time in a provocative playfulness where light and form combine to illustrate the city’s intention. By creating a tunnel, a fantastic change of perspective will be brought out. As the cars enter the city, the tunnel works as a vortex that will create the illusion of fast-paced change and the patterns created by the perforated surfaces and light will further accentuate the city’s view of the future. Our proposal creates and reflects this investment in tomorrow’s city, enhancing the surrounding environment and turning a regular freeway into an eye-catching monument, a symbol of the city and its progressive identity. The ‘Time Machine’ will indeed become a part of Wyndham, conveying its desire of moving forward in time and becoming a new and pioneering entity.

WEST ELEVATION EAST ELEVATION1:200 1:200

NORTH ELEVATION 1:200

SOUTH ELEVATION 1:500

EAST ELEVATION 1:200 WEST ELEVATION 1:200 Panels: Measurements: 2.5x2.5x.1 m Material: copper Installation: they will be held together by a clasp system set up on the frames where nails perforate the panel and will be hung from horizontal frames. Panels will be cut to adapt to tunnel structure

PANEL DETAIL

PANEL JOINT

OUTSIDE LAYER AND STRUCTURE

FRAME-PANEL JOINT

PANEL DETAIL

FIRST LAYER AND STRUCTURE FOUNDATION JOINT

SITE PLAN 1:500

SOUTH ELEVATION 1:200

PRINCES FREEWAY

NIGHTT VIEWS

Frames: Material: stainless steel Installation: each individual frame will be connected to the others by a long horizontal frame on top, from which panels will be able to hang as well. Frames will be anchored to the ground by means of a foundation held on a concrete footing.

SECTION 1:200

SECTION 1:500

Final Posters  

Final crit posters

Read more
Read more
Similar to
Popular now
Just for you