Page 33

01 03 04

FOREWORDS

02

J RECONSTRUCTION IMPLEMENTATION COMMISSION FOR SERBIAN ORTHODOX RELIGIOUS SITES IN KOSOVO

05

Llaushë/L auša Sk ën deraj /S r bica

08 09

Monastery of St Joanikije/ Dević Monastery

10 11

20 05

PROTEC TIVE I N T ER VENTIO NS

14 15 16 17 18 19

20 06

RECONSTRUCTION WORKS

21 23

26 27 28 29 30 31 32 33 34 35

gutters and down pipes in the church.

Reconstruction of the old guest house:

33Reconstruction of partitions, plaster, floors and joinery, services. 33New concrete slabs. 33New roof construction and roof tiles. 33Lead roof cover to the winter chapel.

Reconstruction of a collapsed retaining wall. Internal repairs to the church: 33Restoration of damaged plaster and floors. 33Electrical installations. Protective works in the central konak: 33New concrete slabs and walls consolidation.

22

25

33Repair of perimeter walls. 33Replacement or repair of damaged doors, windows, 33Repair of the altar table and of the lead roof. 33Demolition of unstable and unsafe partition wall in the old konak.

20

24

In March 2004, the whole complex was set on fire, the interiors gutted and the cemetery desecrated.The church was badly affected by fire, the roof, iconostasis and konaks destroyed and the wall paintings covered in soot and graffiti. Only the main walls were still standing. In 2004, after the riots, the church roof was repaired and the former refectory reconstructed and turned into the nuns’ living quarters.

HOW THE RIC WORKS

DAMAG E ASSESSMENT

RESTORED SITES

13

20 04

20 07 20 08 20 09

RECONSTRUCTION WORKS

20 10

RECONSTRUCTION WORKS

Reconstruction of the central guest house:

33New concrete floor slabs. 33New roof construction and roof tiles. 33Reconstruction of partitions, plaster, floors and joinery. Services installed. 33Construction of a new boiler house and heating system. 33Cemetery, graveyard and gravestones repairs. 33Floor heating and new marble floor in the church. 33Installation of the bells in the bell tower. 33Cleaning of the well and construction of protective structure over the well.

FURTHER INTERVENTIONS NEEDED:

33Reconstruction of the Guest House, the Guest Reception

building and the Farm building.

APPENDICES

12

FURTHER INFORMATION

07

INTRODUCTION

06

33Reconstruction of the perimeter wall and landscaping. 33Wall paintings restoration and new iconostasis.

D Library of this project

Return to thumbnails : : Return to list

Page 33

Reconstruction Implementation Commission for Serbian Orthodox Religious Sites in Kosovo  

Technical cooperation and consultancy programme related to the integrated conservation of the cultural and natural heritage

Reconstruction Implementation Commission for Serbian Orthodox Religious Sites in Kosovo  

Technical cooperation and consultancy programme related to the integrated conservation of the cultural and natural heritage