Detail of Sun Breaker

Water Body

Interactive Green Spaces

Circulation - Ground Floor

Circulation - First Floor

Circulation - Second Floor

Ramya Sankara Raman

Works 1999 - 2011

2011

Rane College, Trichy - India


Construction photos - Project to be completed by March 2012 Ramya Sankara Raman

Works 1999 - 2011

2011

Rane College, Trichy - India


03

HP - SOFTWARE PARK


OVERALL CONSTRUCTION SCHEDULE

PROJECT BUDGET (Proposed Vs Actual)- Phase I & II

TOTAL COST (PROPOSED Vs ACTUAL)

100 90

455, 549,028

450 AMOUNT IN MILLIONS (In INR)

AMOUNT IN MILLIONS

500 400 350

362, 899,028

300 250 200 150

AREA SCOPE WORK @ SERVICES

80 70 60 50 40 30 20 10 0

My Role

100

����������������

50 0

Proposed

Actual ACTUAL

PROPOSED

Start

Finish

2008

141, 200

Tue 4/15/08 Wed 8/20/08

92,000

Phase 4 102 days Thu 11/11/10

Fri 4/1/11

2010

CASH FLOW (For Phase II)

2011

Area(In Sqft) Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

Fri 1/4/08 Thu 7/24/08

Wed 9/9/09 Tue 5/25/10

2009

46,158

WORK SPACE DENSITY DONUT

TOTAL NO. OF WORKSTATIONS / PHASE

35%

19%

140 122.99

120

123.62

131.03

128.63

148.88 130.40

150.35

98.34

Phase 4 (119.58)

21%

Phase 1

Phase 2 (1072 WS)

(2150 WS)

DESIGN

CONSTRUCTION DRAWINGS

Ramya Sankara Raman

Works 1999 - 2011

2008

Phase 3 (650 WS)

INTERIORS

Phase 4 (386 WS)

COSTING

(PMC)

144.68

VENDORS

CONSULTANTS

131.17

110.21

100

Architects

Access Control

Civil & Interior

Electrical

HVAC

Blinds

Carpets

HVAC

Electrical

Work Stations

FA & PA

Fire Sprinklers

Fire, Safety, Security

Grid Ceiling

BMS

Audio Video Equipment

Networking works

UPS

Signages

Rising Main

PAC

Light Fixtures

95.25

80 72.78 60 57.44

0

Phase 3 (71.01)

CBRE

159.03 148.88

20

Phase 1 (65.67) Phase 2 (85.82)

25%

HP (Client)

52.98

40

���

: 325,516 sq.ft : Interior Fit-out for Hewlett- Packard : C B Richard Ellis South Asia Pvt Ltd : Project Management Consultancy services comprising Design management, Site coordination, Planning and Scheduling, Quality & Cost Control, Documents and drawings lists, Construction Management, commissioning & handing over . : As Project Coordinator involved in the complete project cycle of Phase I & II. Responsible for preparing PO packages, budget and material tracking,reviewing vendor bills, monitoring cash flow, risk analysis and design coordination.

PROJECT TEAM

160

46,158

:

180

AMOUNT IN MILLIONS (In INR)

PHASE Duration Phase 1 145 days Phase 2 92 days Phase 3 185 days

CLIENT

17.93

1.44

Mar-08 May-08

Jun-08

Jul-08

Aug-08

Sep-08

Oct-08

Nov-08

Dec-08

Jan-09

1,437,184

57,437,308 98,341,021 122,994,603 123,617,473 131,030,711 148,875,936 148,875,936 150,348,507 159,032,275

1,437,184

17,928,675 52,976,528 72,782,506

PROPOSED ACTUAL

SCHEDULING

95,250,349 110,207,937 128,634,387 130,396,936 131,173,821 144,681,352

MONTHS

SITE COORDINATION

DOCUMENTATION

TENDERING

Hewlett- Packard, First Software Park, Chennai- India


TENDERING PROCESS

TENDERING PROCESS - TRACKER

2% 7%

12- May-08

7%

14%

3%

5%

CIVIL AND WET WORKS DOORS AND WINDOWS PARTITIONS AND PANELLING CEILING AND FLOORING LOOSE FURNITURE BUILT IN FURNITURE FINISHES ADDITIONAL WORKS SLIDING FOLDING PARTITION HOUSEKEEPING & MAINTENANCE

12%

7% 14%

17%

16%

���

���

14%

13%

���

���

���

5%

��

6%

6%

5%

10%

12%

Rising Mains UPS ACS/CCTV Sprinkler Systems Electrical Works HVAC Civil and Interior Works Cafe Chairs FAS/ PAS Light Fixtures Modular Grid Ceiling

2- Apr-08 23- Mar-08 13- Mar-08 3- Mar-08 22- Feb-08 12- Feb-08 2- Feb-08

r r r s es ant de id es g s er g s es s s es tes ate n at lt ffe off ffe t te es e B tiv tin te tin ate te a at l d nsu f Te at th ara ee ed o ed o ed da da a ee al d l da al d al d al d da v o g s p o m m s i al val al d val s v o a v v ro v C ue r v in om on evi evi ev v o n o v o v p o o r o o s o r r pr pp C ati e r pr ce pr pr pro ppr Ap from Is e r the ati App pp Ap Ap R A R Re Ap Ap Ap A A th th s oti oti DB oc BR DBR DB eg ved ned s for neg DBR BR BR DBR BR DBR n D D D D i D f t e ve e d s o p r c n t O rati Fi Re co ip ce Se pa m Re o C

160 140

136 122

122

117

CONSULTANT- RATE BREAK UP WORK WISE

L1- RATE BREAK UP WORK WISE

(INR 119, 953,495.00)

(INR 106, 650,210.00)

119 112 112

101

119 109 106

118

Sl G 1

1.1 1.2 1.3 1.4 1.5

L3

BID TABULATION FOR NEGOTIATIONS 1 - 4 (Civil and Interior Works) Ramya Sankara Raman

Works 1999 - 2011

2008

Amount

Rate

Paint on walls and gypboard/POP ceiling including surface preparation,primercoats, levellingpattiand minimum 3 coats of brush and roller finish. Type A - Normal plastic emulsion Paint Type B - Dark coloredAccent Paint witha base coat of oil paint. Type C - Novafine paint for partition / Wall Type D - Duco paint Type E - Grey/Blackpainton soffitof ceiling/pelmetLab/ Hub fascia towards glazing Room / Server Room Type F - Epoxy coating on floor with necessary QRO surface prepration,primer coat, filler coat and top coats as per manufacturer's specification. Min thickness of epoxy coating to be 250 microns FOSROC make

L3 Amount

Rate

-

Amount -

11680 2200

Sqm Sqm

165 265

INR 1,927,200.00 INR 583,000.00

150.00 170.00

1,752,000.00 374,000.00

140.00 175.00

1,635,200.00 385,000.00

145.00 190.00

1,693,600.00 418,000.00

4001 70 505

Sqm Sqm Sqm

500 1,350 350

INR 2,000,500.00 INR 94,500.00 INR 176,750.00

250.00 600.00 120.00

1,000,250.00 42,000.00 60,600.00

575.00 700.00 100.00

2,300,575.00 49,000.00 50,500.00

490.00 1,100.00 125.00

1,960,490.00 77,000.00 63,125.00

0

Sqm

700

INR 0.00

1,250.00

350

Rm

275

INR 96,250.00

75.00 1,950.00

3

Providing & applying in position3M opaque vinyl of approved shade on glazing.

QRO

sqm

2,750

INR 0.00

900.00

4

Wall Papers - Supplying & laying wall papers on walls / partitions/ RCC columns after making the subfloorneat & clean. Wall paper's basic cost of wall paper shall be 90/sft. Wall papers shall be vinyl backed and as per architect's selection.

QRO

5

Digital art by 3M - Solvent printed(waterproofink) art workon opaquevinyl to be stuck directlyon wall. Art work to be given by client.

6

Providing & Fixing Leatherite panelling as per detail complete with cleaning etc.

7

Theme Panelling - Providing and fixing theme panelling at locations as indicated on the drawings Cane Panelling - withply backing for cane boutique or equivalentas per approved design and pattern. Basic Rate of Rs. 200 + taxes per sft Silk panelling with 12mm MDF with 3mm foam backing. Include cost of 10mm thk mirrorpolished temperedglass panels in frontmountedon brushed SS studs. Basic rate of silk fabric at Rs 1500/- per meter Sandstone dry claddingon partitionsas per selected stone with design and pattern as shown on the drawingsor as approvedby the architect.Basic rate of stone - Rs. 65 per sft.+ taxes

Total for Finishes

Rate

-

INR 0.00

7.3

L2 Amount

Finishes

2,000

7.2

L2

Rate

L1

Sqm

20

L1

Remarks Total Units

QRO

7.1

CONSULTANT

Description

CONSULTANT ESTIMATE

Providing & applying in position3M crystal quality frosted film [Clear] on glazing.

40

Negotiation -4

(INR 118, 571,769.30)

2

104 106

Negotiation -3

L3- RATE BREAK UP WORK WISE

(INR 104, 184,351.40)

p/f silicone sealant at all areas where partitions abutt external glass wall.

60

Negotiation -2

L2- RATE BREAK UP WORK WISE

1.7

80

Negotiation -1

26%

13%

BILL OF QUANTITIES FOR FINISHES

154

148

22%

12%

27%

27%

1.6

180

IN MILLIONS

13%

3% 6%

��

12- Apr-08

0

13%

5%

21%

22- Apr-08

100

14%

13%

2-May-08

120

3%

1%

1%

2%

3%

-

26,250.00

-

150.00

52,500.00

430.00

75.00

-

26,250.00

-

-

-

-

-

-

1,825.00

-

-

-

1,600.00

-

1,875.00

-

Sqm

1,750

INR 0.00

1,250.00

330

Sqm

6,900

INR 2,277,000.00

3,500.00

1,155,000.00

5,000.00

1,650,000.00

4,700.00

1,551,000.00

69

sqm

5,500

INR 379,500.00

3,500.00

241,500.00

4,000.00

276,000.00

3,200.00

220,800.00

QRO

-

-

-

-

-

Sqm

4,400

INR 0.00

7,000.00

42

Sqm

5,000

INR 210,000.00

10,500.00

441,000.00

3,750.00

157,500.00

7,600.00

319,200.00

150

Sqm

2,750

INR 412,500.00

1,650.00

247,500.00

2,500.00

375,000.00

1,900.00

285,000.00

-

INR 8,157,200.00

5,340,100.00

-

6,931,275.00

4,500.00

-

-

6,614,465.00

Hewlett- Packard, First Software Park, Chennai- India


Finish Predecessors ID Task Name Duration Start 146 days Tue 4/15/08 Sun 9/7/08 1 HP FIRST SOFTWARE PARK, PORUR, CHENNAI- PHASE 2 128 days Tue 4/15/08Wed 8/20/08 CONSTRUCTION STAGE 2 Site Commencement Work 30 days Tue 4/15/08Wed 5/14/08 3 109 days Sun 5/04/08Wed 8/20/08 11 INTERIOR WORKS 45 days Sun 5/04/08 Tue 6/17/08 Masonry Works 12 82 days Thu 5/15/08 Mon 8/4/08 Partition works 20 38 daysMon 6/16/08Wed 7/23/08 30 Gyp Ceiling works 83 days Sun 5/4/08 Fri 7/25/08 Modular Ceiling 35 76 days Thu 5/15/08 Tue 7/29/08 Paneling & Boxing 41 Doors and shutters 32 days Sun 7/20/08Wed 8/20/08 46 7 daysMon 6/16/08 Sun 6/22/08 Pelmets 55 Finishing works 54 days Sun 6/08/08 Thu 7/31/08 59 Carpets 65 100 days Sun 5/4/08Mon 8/11/08 Chairs 73 days Sun 5/4/08 Tue 7/15/08 68 Blinds 71 74 days Sun 5/4/08Wed 7/16/08 Modular Furniture 74 68 days Sun 5/04/08 Thu 7/10/08 Completion of interior works 0 daysMon 8/04/08Mon 8/04/08 80,29 81 82 103 days Sun 5/04/08 Thu 8/14/08 MEP WORKS Thu 8/7/08 83 96 days Sun 5/04/08 ELECTRICAL WORKS 6 42 days Sun 5/04/08 Sat 6/14/08 Mobilisation and delivery of materials 84 Installation Works 92 days Thu 5/8/08 Thu 8/7/08 98 99 35 days Thu 5/8/08Wed 6/11/08 Trunking fixing & junction boxes installation 85 6 days Thu 6/12/08 Tue 6/17/08 Conduting from ceiling & cable 100 99 2 daysWed 6/18/08 Thu 6/19/08 101 100 Concealed conducting from wall Concealed switch boxes from wall 2 days Sat 5/24/08 Sun 5/25/08 102 88 Wire Pulling (Raw, Fire Detect, Musi, ACS/ CCTV) 6 days Sun 6/15/08 Fri 6/20/08 94,95,96,97 103 Wire Pulling (Raw, UPS)- From floor- Cables 3 days Thu 5/29/08 Sat 5/31/08 89,92 104 Installation of main cabling work above ceiling 105 20 days Thu 5/29/08 Tue 6/17/0889FS+10 days Installation of DB’s 5 daysWed 5/14/08 Sun 5/18/08 90FS+3 days 106 Installation of Fire Detecting system with panels 94 5 days Sun 6/15/08 Thu 6/19/08 107 Installation of Light Fixtures 91,38 5 days Sat 7/26/08Wed 7/30/08 108 Sat 8/2/08 Installation of Lamps & Tubes 3 days Thu 7/31/08 108 109 Installation of Smoke Detector heads & Sprinkler 95,38 7 days Sat 7/26/08 Fri 8/1/08 110 97 Installation of Access Control System 7 days Sun 6/15/08 Sat 6/21/08 111 Installation of UPS outgoing and floor power panel 5 days Thu 5/29/08 Mon 6/2/08 92 112 Commissioniong & testing of system 5 days Sun 8/3/08 Thu 8/7/08 109,111,112 113 66 days Sun 6/8/08 Tue 8/12/08 114 BMS 103 days Sun 5/4/08 Thu 8/14/08 HVAC 120 45 days Sun 5/4/08 Tue 6/17/08 121 Delivery of materials 122 10 days Sat 5/24/08 Mon 6/2/08 6FS+20 days Delivery of GI Sheets Delivery of diffusers or grills 20 days Sat 5/24/08 Thu 6/12/08 6FS+20 days 123 30 daysMon 5/19/08 Tue 6/17/08 6FS+15 days 124 Delivery of control & power cables 25 daysMon 5/19/08 Thu 6/12/08 6FS+15 days Delivery of ventilation fans 125 15 days Fri 5/9/08 Fri 5/23/08 6FS+5 days Delivery of pipes 126 35 daysWed 5/14/08 Tue 6/17/08 6FS+10 days Delivery of attenuator 127 6 15 days Sun 5/4/08 Sun 5/18/08 128 Delivery of Cross talk silencer 6 20 days Sun 5/04/08 Fri 5/23/08 Delivery of split units 129 40 days Sun 5/4/08 Thu 6/12/08 Delivery of flexible connection 130 6 Fabrication & Erection Works 88 daysMon 5/19/08 Thu 8/14/08 131 Erecting of piping 5 days Mon 6/2/08 Fri 6/6/08126FS-11 day 132 Duct fabrication and installation 25 daysMon 5/19/08 Thu 6/12/08 122 133 Erection of collars for ducting 7 days Fri 6/13/08 Thu 6/19/08 133 134 Erection of diffusers or grills 10 days Sat 7/26/08Mon 8/04/08 123,38 135 Fri 6/20/08 3 days Erection of power & control cables 124 Wed 6/18/08 136 Erection of ventilator fans 3 days Fri 6/13/08 Sun 6/15/08 125 137 4 days Fri 6/13/08 Erection of flexible connection Mon 6/16/08 130 138 Insulation of pipes 5 days Sat 6/21/08 138 Tue 6/17/08 139 Interconnection 2 days Tue 6/17/08Wed 6/18/08 138 140 5 days Thu 6/19/08Mon 6/23/08 Pressure Testing 140 141 5 days Tue 8/5/08 Sat 8/9/08 140,138,135 142 Start up & Dry run of AHU’s 5 days Sun 8/10/08 Thu 8/14/08 Testing & Adjustment 142 143 SPRINKLER WORKS 68 daysSun 5/4/08 Thu 7/10/08 144 71 days Sun 5/04/08 Sun 7/13/08 NETWORKING 153 2 days Fri 8/15/08 Sat 8/16/08 159 HAND OVER STAGE 22 days Sun 8/17/08 Sun 9/7/08 162 POST CONSTRUCTION

HP- First Software Park, Porur

Task Split

Ramya Sankara Raman

6

APR ‘08 20 13

Summary Project Summary

Progress Milestone Works 1999 - 2011

30

2008

27

4

MAY ‘08 11 18

25

1

8

JUN ‘08 15

22

29

6

JUL ‘08 13

20

27

3

AUG ‘08 10 17

24

31

SEP ‘08 7 14

MILESTONE DATES FOR DESIGN DEVELOPMENT

22- Feb-08 12- Feb-08 02- Feb-08 23- Jan-08 8/4

13- Jan-08 3- Jan- 08 24- Dec- 07

MANPOWER DISTRIBUTION VENDOR WISE AT SITE

Micron, 2740 RSD, 250

Ocean, 8020

Deadline

Race,200 Alba,260 Johnson, 450

Sastha, 460 Emerson, 200 Trac, 930

Hewlett- Packard, First Software Park, Chennai- India


TYPICAL PLAN- FOURTH FLOOR

FLOOR WISE PROGRAM BREAK UP ACCOMODATION HEAD COUNT BALCONY

CLUSTER-1TRIBUNE

BALCONY

AHU

AHU Electrical

295 sq.ft

1400 mm WIDE PASSAGE LIFT

2.10 X 2.50

LIFT

Ladies Toilet

LIFT

Gents Toilet Trade Server 125 sq ft

Ladies Toilet 4P Mtg Rm 77 sq ft

LIFT

2.24 X 2.55

Gents Toilet

2.24 X 2.55

LIFT

Trade Server 125 sq ft

LIFT

2.24 X 2.55

Office Lobby

Office Lobby

Ph. Booth 80 sq ft 4P Mtg Rm 4P Mtg Rm 80 sq ft 79 sq ft

Compactor Rm 264 sq ft

Compactor Rm 326 sq ft

MTG Rm

Meeting Rm 266 sq ft

253 sq ft

Training Rm

Training Rm

630 sq ft

630 sq ft

Mtg Rm

Mtg Rm

140 sq ft

106 sq ft

1275 mm WIDE PASSAGE TOUCH DOWN

(RATIO 1:28.40)

2

MEETING -20 SEATER

0

MEETING- 10 SEATER

4

MEETING- 6 SEATER MEETING- 4 SEATER

1 10

PRINTER STATION

2

IT STORE ROOM

1

HUB ROOM COMPACTOR ROOM

2 2

WET PANTRY

2

PHONE BOOTH

2

TOUCH DOWN BPO SERVER

12 3

BALCONY

WORKSTATION

35

MGR WORKSTATION TOTAL NO.OF SEATS

0 35

CLUSTER -2-SUDS

260 sq ft

1275 mm WIDE PASSAGE

2008

AHU 3380 X 6010 [ NON F.S.I]

1700 mm WIDE PASSAGE

WORKSTATION

197

MGR WORKSTATION TOTAL NO.OF SEATS

7 204

CLUSTER -3-GENESIS/ICI

ELEC DB

1300 mm WIDE PASSAGE

ELEC DB

ATRIUM

568 20

CLUSTER -1-TRIBUNE Fire Hydrant

Meeting Rm 247 sq ft

IT Store 204 sq ft

TOUCH DOWN

Works 1999 - 2011

CLUSTER-3- GENESIS/ICI

Elec DB

Ph. Booth 4P Mtg Rm 4P Mtg Rm 80 sq ft 76 sq ft 82 sq ft

MTG Rm

4P Mtg Rm 79 sq ft

2.24 X 2.55

Elec DB

1700 mm WIDE PASSAGE

Ramya Sankara Raman

LIFT

2.24 X 2.55LIFT LOBBY 2.24 X 2.55

Server room 258 sq ft

1300 mm WIDE PASSAGE

AHU 3380 X 6010 [ NON F.S.I]

1875 mm WIDE PASSAGE

Fire Hydrant

1600 mm WIDE PASSAGE

Hub room 210 sq ft

CLUSTER-2- SUDS

Printer Stn 4P Mtg Rm Hub room 77 sq ft 210 sq ft

1600 mm WIDE PASSAGE

1400 mm WIDE PASSAGE Printer Stn

ELEC DB

Electrical

1875 mm WIDE PASSAGE

ELEC DB

MGR WORKSTATION TRAINING ROOM

PANTRY PANTRY 295 sq.ft

BALCONY

WORKSTATION

WORKSTATION

260

MGR WORKSTATION TOTAL NO.OF SEATS

10 270

Hewlett- Packard, First Software Park, Chennai- India


1

7

2 12

8

7 5

10 4

Sprinkler branch and AC Duct 3

Laying of raceways with junction box

Cafeteria

GROUND FLOOR PLAN

9

4

Discussion Room 10

6

1 8

Completion of Al. Partition work 5

GF Lobby Completion works

Workstation area

FIRST FLOOR PLAN

6

11

Lobby 12

9 2

Hub Room server rack installation

Ramya Sankara Raman

Works 1999 - 2011

Installation of modular workstations 2008

SIXTH FLOOR PLAN

3

Exterior View

UPS Room

Hewlett- Packard, First Software Park, Chennai- India


04

INFOSYS EDUCATION CAMPUS - SERVICE APARTMENTS


SCOPE

CLIENT

1 APARTMENT UNIT X 3098 TIMES

AREA SCOPE WORK @ SERVICES

TIMELINE

NOV ‘06

APR ‘07 My Role

: : 1,800,000 sq.ft : Furnishing & Interiors for apartments : Consolidated Interior Limited : Coordinating and executing total interior solutions comprising interior design, furnishing, styling, and related works. Offering allied services such as Electrical, Air Conditioning, Networking and Building Management Systems. Enforcing quality control and enivronmental site safety. : As Design Manager responsibilities fell in the way of design coordination, site execution, on site technical decisions, scheduling project deliverables, quality of construction, material tracking, preparation of drawings and reviewing work progress.

MYSORE

MASTER PLAN OF HOSTELS AND SERVICE APARTMENTS AT INFOSYS EDUCATION CAMPUS, MYSORE

DESIGN

CONSTRUCTION DRAWINGS

Ramya Sankara Raman

Works 1999 - 2011

2006

INTERIORS

COSTING

LOCATION IN INDIA

SCHEDULING

SITE COORDINATION

DOCUMENTATION

TENDERING

Infosys Education Campus, Mysore - India


MATERIAL SPECIFICATIONS FOR ONE UNIT DESCRIPTION False ceiling (Above the Wardrobe and entry corridor) Antiskid tile (In room and toilet)

Ceramic wall tile (In toilet)

Tile

TECHNICAL DETAILS 1200 mm c/c 450 mm c/c

Shower cubicle glass partition

12.5mm

Nitco wood series (Natural Plank)

600 x 600 mm

Latecrete Cement Tile spacer

1:5 Nitco (Vulcano Crema)

3M

12 mm thk toughened glass

Saint gobain

6mm thk mirror Ply boxing in 12mm thk plywood

Saint Gobain Green Marine Plywood

Wardrobe

19 mm thk plywood 4mm thk. Veneer 12mm thk toughened glass

Green Block board Green high pressure decorative laminate Saint Gobain

SS handle Silver paint

Duco

1550 x 460 mm x (top slab)

Essar Saint Gobain

Frame Shutter Veneer Mirror Hardware

Teak wood Kutty Solid core Green Saint Gobain Hettich

Frame Shutter Veneer

Teak wood Green flush door Green high pressure decorative laminate Saint Gobain Hettich

Mirror Hardware

D C

300 x 1200 mm 300 x 15 mm

A1

5%

19 mm thk plywood 4mm thk. Veneer

Green Block board Green high pressure decorative laminate

Silver paint SS handle 12mm thk toughened glass

Duco

32" x 82" 4 mm thick

19 mm thk plywood 4mm thk. Veneer Silver paint Timber legs Mattress

26" x 82" 4 mm thick

Lounge chair

A4

E1a E1b

3%

1600 x 600 mm

35%

2850 x 600 mm

QUANTITIES FOR FINISHES TYPICAL OF ONE UNIT

Green Block board Green high pressure decorative laminate Duco Kurlon

2

(11.50 SQ.M)

POP

7

(124.00 SQ.M)

100 x 100 mm 150 mm thk.

27

7

PAINTING WORKS

Green Block board Kurlon Kurlon

9.5

90 32

(97.00 SQ.M)

45

13 0

10

20

30

40

50

A B NITCO TILES (A1/A2) AS

FLOORING PLAN

0.00lvl

SECTION AA

Works 1999 - 2011

60

70

80

90

100

IN SQUARE METRES

WASTAGE CALCULATION TOILET TILE - DSR (300 X 600)

DSR TILES AS PER APPROVED SAMPLE

D C

69,500.00 51,125.00 206,200.00 126,225.00 15,000.00 20,000.00 30,000.00 70,000.00

POP WORKS FIXED FURNITURE LOOSE FURNITURES PAINTING WORKS ELECTRICAL WORKS PLUMBING WORKS MISCELLANEOUS

Saint Gobain

19 mm thk plywood 25 mm thk rubber foam 6" thk foam 25 mm thk. SS tube Uphosltery

1' 0" x 5' 0"

CIVIL WORKS

9%

3%

21%

AMOUNT (IN INR )

WORK DESCRIPTION

12%

12%

+2450 lvl

A2

A3

TOTAL COST OF WORK FOR ONE UNIT

FALSE CEILING Bed

B1a

Ramya Sankara Raman

Sticker for glass Silicon sealent

Mirror (Above the granite counter)

T.V unit Essar

Granite 12 mm thk. Toughened glass

B

Saint gobain

1:5

M.S. Angle Granite

A

12mm thk toughened glass

Patch fittings

300 x 600mm

Latecrete Cement Tile spacer

Granite Niche (Shower cubicle

Toilet door

BRAND India gypsum India gypsum India gypsum India gypsum Amstrong

Tile

Granite counter (In toilet)

Main door (Entrance)

COMPONENTS Perimeter Channels Intermediate channels Connecting clips Drywall screws Grid ceiling

Window in the toilet area

2006

A29

C1b

D1a

A21

B1c

A5

C1a

A13

D1b

A14

D2b

B1b

A30

C2b

D2a

A22

B1d

A6

C2a

B2a

A31

C3b

D3a

A23

B2c

A7

C3a

A15

D3b

B2b

A32

C4b

D4a

A24

B2d

A8

C4a

A16

D4b

B3a

A33

C5b

D5a

A25

B3c

A9

C5a

A17

D5b

B3b

A34

C6b

D6a

A26

B3d

A10

C6a

A18

D6b

B4a

A35

C7b

D7a

A27

B4c

A11

C7a

A19

D7b

B4b

A36

C8b

D8a

A28

B4d

A12

C8a

A20

D8b

0.00lvl

SECTION BB

SECTION CC

TILE NO DSR TILE SIZE TILE WASTAGE (In Percentage) 300 X 600 0%

B1-B4

36 4

C1-C8

8

10%

D1-D8

8

15%

E1

1

35%

A1-A36

TOTAL

TILE WASTAGE (In Sq.M)

0%

57 X 0.18

SO THE TILE WASTAGE IS .351/10.26 X 100 = 3.42%

SECTION DD

Infosys Education Campus, Mysore - India


12

19

Works 1999 - 2011

2006

26

Dec’06 3

10

17

24

Jan’07 31 7

14

21

28

Feb’07 4

11

18

25

Mar’07 4

11

18

TOTAL NO OF ROOMS (3098 NOS) 350

350

300 270

270

250 200

226

192

168

140

150 11/30

226

212 168

168

100

168

112

168 140

112

50

31 K OC

OC BL

BL

K

30

29

K

K

OC

OC

BL

BL

BL

OC

K

28

27

B

A BL

OC

K

26

25 K

K

OC

OC

BL

BL

BL

26

BL OC K OC 21 K 2 BL OC 2A K BL 22B OC K 24

0 16 A

Nov’06 5

NO OF ROOMS IN EACH BLOCK

BREAKUP OF ROOMS FLOORWISE/ BLOCK BLOCK 31

20

20

20

20

20

20

20

GROUND FLOOR

BLOCK 30

30

30

30

34

34

34

34

BLOCK 29

30

30

30

34

34

34

34

BLOCK 28 BLOCK 27

16

BLOCK 26A

20

BLOCK 25

24

16

16

16

24

24

24

24

BLOCK 26B

24

24

24

24

33

20

20

16

16

24

24

24

SECOND FLOOR

24

24

24

THIRD FLOOR

16 33

33

FOURTH FLOOR

33

35

35

24

24

FIRST FLOOR

FIFTH FLOOR

35

35

SIXTH FLOOR BLOCK 24 BLOCK 22B

24 16

BLOCK 22A BLOCK 21 BLOCK 18

Task Split

INFOSYS MYSORE Hostel Block-29

Ramya Sankara Raman

29

BL 16B OC K 1 BL OC 7 K 18

FINISH DATE

K

START DATE

K

DURATION

123 days Wed 11/15/06 Sat 3/17/06 40 days Wed 11/15/06 Mon 12/24/06 Walls 40 days Wed 11/15/06 Mon 12/24/06 15 days Wed 11/15/06 Wed 11/29/06 Completion of Chasing for Electrical Works Completion of Plumbing Works in toilet area 10 days Mon 11/20/06 Wed 11/29/06 10 days Mon 11/20/06 Wed 11/29/06 Pipeline for water supply and drainage Plastering of walls after conduiting/ cabling 25 days Thu 11/30/06 Mon 12/24/06 15 days Wed 11/15/06 Wed 12/29/06 Above Ceiling works Erection of FCU/ Ducting 7 days Wed 11/15/06 Tue 11/21/06 10 days Wed 11/15/06 Fri 11/24/06 Cabling for electrical/ other services Conduiting for electrical/ other services 10 days Mon 12/10/06 Wed 12/29/06 Marking of opening for electrical/other service 5 days Mon 11/25/06 Mon 11/29/06 15 days Mon 12/10/06 Mon 12/24/06 Flooring 15 days Mon 12/10/06 Mon 12/24/06 Laying of tile Toilet Flooring and wall tiling 10 days Mon 12/10/06 Tue 12/19/06 CIL SCOPE 120 days Wed 11/5/06 Wed 3/14/07 49 days Thu11/30/06 Wed 1/7/07 Punning 4 days Wed 12/20/06 Sat 12/23/06 Preparation of wall surfaces 6 days Thu 11/30/06 Tue 12/5/06 Preperation of ceiling surfaces Application of POP for wall surfaces 25 days Mon 12/24/06 Wed 1/17/07 Application of POP for ceiling surfaces 30 days Wed 12/6/06 Thu 1/4/07 51 days Wed 1/10/06 Thu 3/1/07 False Ceiling works Gypsum board ceiling 21 days Wed 1/10/06 Tue 1/30/07 Framework for gypsum ceiling 15 days Wed 1/10/06 Wed 1/24/07 Fixing of Laminate ceiling 10 days Mon 1/21/07 Tue 1/30/07 Laminate Ceiling 30 days Wed 1/31/07 Thu 3/1/07 20 days Wed 1/31/07 Mon 2/19/07 Frame work of laminate ceiling Fixing of laminate ceiling 20 days Tue 2/10/07 Thu 3/1/07 34 days Thu 2/1/07 Tue 3/6/07 Painting Fri 2/9/07 Initial finishing of ceiling Fri 2/11/07 3 days Final finishing of ceiling 10 days Mon 2/12/07 Wed 2/21/07 Thu 2/1/07 5 days Mon 2/5/07 Initial finishing of walls 15 days Tue 2/20/07 Tue 3/6/07 Final finishing of walls Main Door 90 days Fri 12/15/06 Wed 3/14/07 Fixing of Door Frame to wall 15 days Fri 12/15/06 Fri 12/29/06 Fixing of Door panels to frames 15 days Mon 12/25/06 Mon 1/08/06 10 days Tue 2/27/07 Fixing of Hardwares to doors Thu 3/8/07 Finishing of Doors 10 days Fri 3/5/07 Wed 3/14/07 54 days Tue 12/5/06 Sat 1/27/07 Window Granite jamb around window 10 days Tue 12/5/06 Thu 12/24/06 Fixing of pelmet for curtain 10 days Thu 1/18/07 Sat 1/27/07 Toilet 118 days Wed 11/15/06Mon 3/12/07 Granite Counter 97 days Wed 11/15/06 Tue 2/20/07 Preparation of brick work for granite counter 10 days Wed 11/15/06 Fri 11/24/06 10 days Fri 12/15/06 Mon 12/24/06 Fixing of granite counter top Finishing and polishing 5 days Thu 2/15/07 Tue 2/20/07 5 days Wed 11/15/06 Mon 11/19/06 Window in toilet area 10 days Mon 12/10/06 Tue 12/19/06 Fixing of granite jamb in toilet door 89days Mon 12/10/06 Thu 3/8/07 Granite niche with glass shelves 5 days Mon 2/25/07 Thu 3/1/07 Fixing of plumbing fixtures 5 days Tue 2/27/06 Sat 3/3/07 Installation of EWC and wash basin 5 days Tue 3/6/07 Fri 3/2/07 Installion of shower glass partition 88days Fri 12/15/06 Mon 3/12/07 Toilet Door Fixing of door frame to the jamb 10 days Fri 12/15/06 Mon 12/24/06 5 days Wed 12/20/06 Mon 12/24/06 Fixing of door panels to frames 10 days Tue 2/27/07 Fixing of hardwares to door Thu 3/8/07 Sat 3/3/07 Mon 3/12/07 10 days Finishing of door 2days Thu 3/15/07 Fri 3/16/07 Testing/ Commissioning 1 day Thu 3/15/07 Thu 3/15/07 Testing/ Commissioning of AHU’s- Dry Run 1 day Thu 3/15/07 Thu 3/15/07 Testing/ Commissioning of Panel Board- EB 1 day Thu 3/15/07 Thu 3/15/07 Testing/ Commissioning of DB’s- EB 1 day Fri 3/16/07 Testing/ Commissioning of DG sets Fri 3/16/07 2days Thu 3/15/07 Cleaning of site Fri 3/16/07 1 day Sat 3/17/07 Sat 3/17/07 Handing Over of site

OC

TASK NAME

BLOCK 29 CCCL SCOPE OF WORK

BL OC

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64

BL

ID

Deadline Milestone

Summary Project Summary

50 24

22

BLOCK 16B

20 29

16

16

24 30

24 20

20 30

24

24

24

22 30

45 24 22

45

50

50

24

24

35 22

50

50

50 24

30 24

24

24

16

50 24

29

BLOCK 17 BLOCK 16A

16

16

24

24

24

24 16

45

45

24

22 45

45

45

Infosys Education Campus, Mysore - India


10

ELEC. ROOM 11 3.05 X 6.85

Laminated Ceiling

Dubbed in Pelmet

Storage for baggage

1

Lounge chair

Standing Lamp

C ION 16

ELEVAT

ELEVATION 16 D

Dubbed in sliding shutters for wardrobe

Dubbed in Pelmet

18mm ply shelf supported by wooden post

Luggage rack at 500 ht with raised S.S Strips Dubbed in glass panel btw wooden shutters

Table top in Ply finished with veneer

Coffee Table

Working table with veneered top

Free standing side table

18mm shelf

Fridge below the table

Free standing bed 2300 x 1400x 450

Cabinet finished in veneer Kettle to placed in tray

SECTION AT B ELEVATION 16 B

VOID

ROOM 3.80 X 6.85 10

C

LIFT 2.50 X 2.45 11

Post (75 x 75mm) in veneer boxing

8

HOUSEKEEPING TOI 1.61 X 2.65

9

ELEC. ROOM 3.05 X 6.85

Plywood boxing as head board

Shelf below table top

STORE ROOM

8

VOID SHAFT

C

2

9

2

Luggage rack at 500 ht and glass shelves above

1

Wardrobe 1600 x 600x 2530 ht Dubbed in Sliding shutter

ELEVATION 16 A

GROUND/ FIRST/ SECOND FLOOR PLAN FOR BLOCK -16

TYPICAL UNIT PLAN

100 X 100 post in ply boxing finished with veneer

Plywood box finished with veneer Ceramic Fritt Laminated Glass

Mirror mounted behind main door Tabletop In Veneer

Head Board finished in veneer

SECTION AT C

ELEVATION 16 B

Ramya Sankara Raman

Works 1999 - 2011

2006

Infosys Education Campus, Mysore - India


05

DUNE - ECO BEACH RESORT


439.0 383.0 230.0

58.0

26.0

SECTION BB

45.1 100.0 235.0

to be made glass

75.1

12 cm brick jelly 12 cm brick jelly

20 cm sand fill

PLAN FOR KERALA HOUSE

up

106.1

bench

720.5 25 140.0

up 40 138.5 35

steel column

38.5

bench

+85 verandah

+60 +85

toilet

bedroom 1 38.5

B

4410.0

verandah

sitout

+85

30

+30

bedroom 2

B

38.5 98

356.4 A

wall ht +180

120 up

80 92.8 60 1384.4 +20

+60

120

60

96

bath

212.4

up +60

207.3

.1 345

Fro Ga m te

side

4265.3 .6 3901 4863.0

each To b

38.5

140

109

Hedges

208.3

RCC column

375.9

door yet to come

+20

627.9

38.5

38.5

4.0

Kerala House

N

951.2

To Kerala House 1

A

up

+60

106.1

40 61.4 40 31 40 66.5 40

328.1

756.5

544.3

473.8

+20

1005.3

20 cm sand fill

CLIENT : Kidim India Pvt Ltd AREA : 35 acres WORK @: MANCINI ENTERPRISES SCOPE : Architectural Design for Eco Beach Resort at Pondicherry- India SERVICES : The design approach to this large (50 keys, 2 Restaurants, Pool, Spa) Resort enjoys the coexistence and contrast of a multitude of artistic expressions: Traditional houses are reassembled on their contemporary bases, Palmleaf huts are lavishly furnished with colonial furniture. Contemporary sculptures in the landscape, experimentation and collaboration of disciplines are at the base of this Hotel project. MY ROLE : Identified, documented and detailed traditional houses before relocation. Traditional indigenous construction techniques were researched, and disseminated to the workers.

60 120.0 60.0 92.8

Toilet Mud House

DESIGN

CONSTRUCTION DRAWINGS

Ramya Sankara Raman

Works 1999 - 2011

2005

INTERIORS

COSTING

SCHEDULING

SITE COORDINATION

DOCUMENTATION

TENDERING