Page 1

Seamless integration of mission critical applications in subzero temperatures

About Commtel Commtel is a specialist turnkey provider of converged communication, surveillance and related technology solutions. We build dedicated converged telecommunication networks, for voice, video surveillance, data and Ethernet IP traffic over optical fibre, radio or copper links, for our customers in the Oil & Gas, Power, Transportation, Mining and related sectors. We also provide in-plant communication systems for monitoring and control of equipments, processes and facilities.

A case where Commtel's superior customer engagement and time bound approach met even the most stringent deadlines with highest quality deliverables.

Our strength lies in complex multi-system integration of highly engineered systems for mission-critical applications requiring safe and reliable operation in demanding environments. Commtel has been in business since 1998, in the telecom and technology space and its range of offerings include: Turnkey Solutions Product Solutions TechCare- 24x7 Technical Support Advanced Engineering Services

C 24x7 TECHNICAL SUPPORT

Tel: +91 22 6773 4151/ 2767 0005 Email: TechCare@commtelnetworks.com INDIA TOLL FREE No.: 1800 209 8011 U.A.E. TOLL FREE No.: 8000 3570 3755

Web: www.commtelnetworks.com

Convergence Centre: RICC, B3 & B4, IT Incubation Centre Plot-GEN-2/1/B, “D� Block, MIDC TTC Juinagar, Navi Mumbai- 400 706. India Tel: +91 22 6773 4100 Fax: +91 22 6773 4141 Email: sales@commtelnetworks.com

U.A.E. Centre: P6-048 & 049, SAIF-Zone P. O. Box 120988 Sharjah, United Arab Emirates Tel: +971 6 5573038 Fax: +971 6 5573039

Registered Office: 23, White Castle 34-35 Union Park, Chembur Mumbai- 400 071. India Tel: +91 22 2520 1210 Fax: +91 22 2520 1220

Delhi/NCR: Tel: +91 124 423 4211 Fax: +91 124 423 4212

USA Contact: 11200 Westheimer Road Suite 760 Houston Texas 77042. USA Tel: +1 713 255 0250 Fax: +1 713 255 0251 Email: pgs@commtelnetworks.com

Kolkata: Tel: +91 33 4400 0770 Fax: +91 33 4400 0555 Vadodara: Tel: +91 265 305 9673

062014.500

For more information on how Commtel can deliver customized solutions, please call:

Powered by the 3C Commitment


The Highlights  Deterministic traffic engineering to sustain critical applications over Optical Ethernet backbone.  Synergistic client-vendor approach to meet the 7 month delivery timeline while fulfilling stringent design specifications and meeting every deadline.

Project design had to be absolute. Meeting invariable timelines was a must. Commtel engineered a reliable solution for below freezing conditions to win a customer for life. The Task Commtel's global project implementation capabilities got further strengthened when it secured an international assignment from a global EPC. The task at hand was to equip a section of 4,000 square kilometers gas field with its gas processing facility, infrastructure and pipelines with a state of the art, converged digital telecommunication system. Commtel attained this prestigious and strategically important turnkey implementation project in the Central Asian region, and was chosen to establish a high availability fibre based telecommunication backbone which enabled provisioning of CCTV surveillance systems, LAN and state of the art digital EPABX system to provide voice, video and data services. The eventual scope of this project was to provide a seamless, Optical Ethernet based digital communication highway over the entire field area for the customer.

 Successfully integrated a hybrid, IP based, EPABX system deployed over multiple sites using SIP based trunks while working with the OEM for the first time.  All field equipments were temperature controlled using heater with thermostat and fan filter arrangements to work even in subzero conditions.  Translation of all project and system documents in local language.

The Challenge Accomplishing a project for a customer who holds the world's second largest natural gas reserves comes with its own set of extremities and stimulating situations. To start with, this fast track project had extremely stringent timelines to meet. Rigorous design specification keeping in view the international standards, abbreviations and translation of the same in local language saw considerable investment of time and effort. Commtel engineers had their task cut out to meet deadlines even when design evolution was constantly taking place. Identifying and finalizing equipment and systems that worked in subzero temperatures was a first for Commtel. Goalposts kept changing due to dynamic requirements both at EPC and end users level.

The Solution     

The gas development project in consideration managed 10 billion cubic meters per annum (bcma). Interconnected vast orbit of highly volatile and critical functions. An overarching execution plan to ensure consistency of approach and effective utilization of resources. Timely generation and approval of entire design documents, paving way for successful execution. The telecom package comprised of vast array of systems comprising of LAN/WAN System from CISCO having 76 RITTAL cabinets.  PELCO based surveillance system along with passive copper and fibre cabling infrastructure from 3M. Partnered for the first time with ISKRATEL for the EPABX system.  Commtel provided detailed design engineering, procured the entire fleet of systems, integrated them at its Sharjah facility and shipped it to the site in just under 7 months from the date of award, meeting all the project deadlines.

The Benefits Commtel has been ever-committal to surpass boundaries, improvise and innovate when it comes to delivering a project. Commtel through its meticulous planning, detailed design execution capabilities and precisely accurate multiple systems integration has won another customer for life. Known for its reliable and quality solution, Commtel brought together a team of in-house experts who executed the project with immaculate detail, saving considerable time and effort. The team engaged with the customer at a very different level with round the clock availability in person for elaborate discussions and approvals. Such level of sustained engagement led to on time project delivery, fulfilling customer's expectations in every manner. In keeping the customer up-to-date with the progress at every project stage, Commtel demonstrated exquisite co-ordination and project management skills. Due to compressed project schedule the entire fleet of sub-systems was flown in through air instead of sea faring them to our systems integration centre, saving crucial time and meeting scheduled deadlines. Factory Acceptance Test for the entire telecommunication package and Integrated Factory Acceptance Test were accomplished without any punch points. Commtel's such eye to detail approach has always augured well for the customer, making it a fruitful experience at both ends.


The Highlights  Deterministic traffic engineering to sustain critical applications over Optical Ethernet backbone.  Synergistic client-vendor approach to meet the 7 month delivery timeline while fulfilling stringent design specifications and meeting every deadline.

Project design had to be absolute. Meeting invariable timelines was a must. Commtel engineered a reliable solution for below freezing conditions to win a customer for life. The Task Commtel's global project implementation capabilities got further strengthened when it secured an international assignment from a global EPC. The task at hand was to equip a section of 4,000 square kilometers gas field with its gas processing facility, infrastructure and pipelines with a state of the art, converged digital telecommunication system. Commtel attained this prestigious and strategically important turnkey implementation project in the Central Asian region, and was chosen to establish a high availability fibre based telecommunication backbone which enabled provisioning of CCTV surveillance systems, LAN and state of the art digital EPABX system to provide voice, video and data services. The eventual scope of this project was to provide a seamless, Optical Ethernet based digital communication highway over the entire field area for the customer.

 Successfully integrated a hybrid, IP based, EPABX system deployed over multiple sites using SIP based trunks while working with the OEM for the first time.  All field equipments were temperature controlled using heater with thermostat and fan filter arrangements to work even in subzero conditions.  Translation of all project and system documents in local language.

The Challenge Accomplishing a project for a customer who holds the world's second largest natural gas reserves comes with its own set of extremities and stimulating situations. To start with, this fast track project had extremely stringent timelines to meet. Rigorous design specification keeping in view the international standards, abbreviations and translation of the same in local language saw considerable investment of time and effort. Commtel engineers had their task cut out to meet deadlines even when design evolution was constantly taking place. Identifying and finalizing equipment and systems that worked in subzero temperatures was a first for Commtel. Goalposts kept changing due to dynamic requirements both at EPC and end users level.

The Solution     

The gas development project in consideration managed 10 billion cubic meters per annum (bcma). Interconnected vast orbit of highly volatile and critical functions. An overarching execution plan to ensure consistency of approach and effective utilization of resources. Timely generation and approval of entire design documents, paving way for successful execution. The telecom package comprised of vast array of systems comprising of LAN/WAN System from CISCO having 76 RITTAL cabinets.  PELCO based surveillance system along with passive copper and fibre cabling infrastructure from 3M. Partnered for the first time with ISKRATEL for the EPABX system.  Commtel provided detailed design engineering, procured the entire fleet of systems, integrated them at its Sharjah facility and shipped it to the site in just under 7 months from the date of award, meeting all the project deadlines.

The Benefits Commtel has been ever-committal to surpass boundaries, improvise and innovate when it comes to delivering a project. Commtel through its meticulous planning, detailed design execution capabilities and precisely accurate multiple systems integration has won another customer for life. Known for its reliable and quality solution, Commtel brought together a team of in-house experts who executed the project with immaculate detail, saving considerable time and effort. The team engaged with the customer at a very different level with round the clock availability in person for elaborate discussions and approvals. Such level of sustained engagement led to on time project delivery, fulfilling customer's expectations in every manner. In keeping the customer up-to-date with the progress at every project stage, Commtel demonstrated exquisite co-ordination and project management skills. Due to compressed project schedule the entire fleet of sub-systems was flown in through air instead of sea faring them to our systems integration centre, saving crucial time and meeting scheduled deadlines. Factory Acceptance Test for the entire telecommunication package and Integrated Factory Acceptance Test were accomplished without any punch points. Commtel's such eye to detail approach has always augured well for the customer, making it a fruitful experience at both ends.


Seamless integration of mission critical application in subzero temperatures  

Case Study

Advertisement