Page 1

Coline Masson ENSA MARSEILLE PORTFOLIO


FOREWORD This portfolio includes part of the plastic and architectural projects done during my first three years of studies at the National School of Architecture of Marseille, France.

3


THE ESHERICK HOUSE

Project analysis and Reading Pavilion The aim is to analyze the Esherick villa, built from 1959 to 1961 by Louis Kahn in order to propose a library project consistant with the existing one and which will be attached to the villa. The project starts from a square right-of-way. The villa is developed on two floors with an alternance between serving space and served space. Facing the street, it appears as a closed parallelepiped, built in the mass, preserving its aspect of closed box. On the garden side, the villa opens towards the outside and benefits from a luminous contribution on the whole of its front

N

1 st Bachelor degree 2017 | Individual project The Esherick House, Philadelphie Architectural project | Villa analysis

4


The library is a space of serenity, a restful and reduced space that makes it possible to find oneself. In his design work, Louis Kahn uses the square. I started from this geometric shape for the extension of the library. Then, the interest focused on the garden and the opening of the box in order to keep a privileged relationship with the outside world. As the light must be diffused, the corners of the square have been broken so that this light is reflected on the walls before indirectly lighting the room. The entrance to the library is suggested by a beam of light that is filtered through the traffic corridor. This corridor allows the alternation between serving and served space and connects the house to the library. The wandering implies a spatial tension between discovering and hiding spaces. The walk ends in the library which is structured around a central island and peripheral areas that allows to frame the space and extend it outwards.

Windows

Storages

Section Light

1 st Bachelor degree 2017 | Individual Project The Esherick House, Philadelphie Architectural project | Reading room

5


BEING IN TRANSITION AND LOOKING TO THE HORIZON Inserting in the hollow

The project concerns the expandition of a public access to the sea and the construction of a restaurant under the cornice Kennedy in Marseille. In the transitional space between the city and the sea, a swimming pool is located : “ Le Club des Dauphins �, which has limited living spaces opened to the sea. The main objective of the project consists in revitalising the site and renewing contact between people and the sea by setting up an architectural route. The public space expands and closes like the waves hitting the rocks.

N

N

Ground floor plan

Master plan

N

First floor plan

South-West front

1 st Bachelor degree 2017 |Individual project La Corniche, Marseille Architectural project | Create an architectural course

6


The aim is to design a restaurant that will be connected to the architectural route previously developed. The restaurant emerges from the circular ramps. The kitchen and pantry are dug under the Corniche while the restaurant is located under the upper ramp. The restaurant’s shape is a natural adaptation to the existing route. When seated at the table of the restaurant, the horizon is contemplated through windows positioned at eye-level.

Restaurant front

Restaurant plan

Section A

Section B

1 st Bachelor degree 2017 | Individual project La Corniche, Marseille Architectural project | Relating to context | Restaurant project

7


BUILDING WITH THE LANDSCAPE Living on the slope

The idea is to create a residency for an artist family on the Cassis peninsula. The project takes place on a steep slope. Two words enabled me to support the project: - entertaining : idea of stacking games of inverted cubes that create an architectural space, - oriented: guideline that gives to see the whole landscape. For the room distribution, the project is based on a system of modules established according to uses. The more use is frequent, the bigger the space. Seven cubes are split into three different modules. To adapt the levelling, cubes are at different levels and interconnected by a traffic corridor. Interior equipments and storages are integrated in the walls or in the corridor’s traffic area. This allows a complete view on the landscape. N

N

Location Plan

Master plan

E N T E R T A I N I N G

2 nd Bachelor degree 2017 | Individual project La presqu’île, Cassis Architectural project | Work with the landscape O R I E N T E D

8


West front

West section of the living room

Ground floor plan Plan

1/50e

9


Surface=38m² Surface ’=16m² Surface totale au sol =54m²

4m

7,7 m S

7,8

S’

m

2

,3 Surface=38m² m Surface ’=16m² Surface totale au sol =54m² 4m

7,7 m S

7,8

S’

m

2,3

m

Surface=38m² Surface ’=16m² Surface totale au sol =54m²

4m

7,7 m S

BUILDING WITH THE CITY 7,8

Between intimacy and “extimity”

S’

m

2,3

m

The aim is to create a small collective complex located on the heights of the Panier district in Marseille. Project location is at the crossroads of flows. The problem encountered is that there is no appropriation of space. Then, the goal is to revitalize the place by creating a building which allows community life. To take up the dynamic shape of the square generated by the asymmetry of the buildings, the project breaks one of its angles to guide passers-by towards the collective. Since the plot is narrow, two duplex apartments are built. The ground floor serves as a meeting place for the inhabitants of the neighbourhood. The front is designed in quincunx to highlight the intimacy and “extimity” relationship. The project suggests seeing what happens through walls without making it explicit thanks to oriented openings. Each floor has a terrace to enjoy the outdoor views while being protected from the street. Circulating spaces are located along the closed walls, in the extension of the external circulating staircase. N

4m48 2m62 1m57 0m

East front -0m70

-1m40

-2m

Master plan

2 nd Bachelor degree 2018 | Individual project Le Panier, Marseille Architectural project | Living in community

North front

10


East section

N

Ground floor plan

N

First floor plan

North section

N

Second floor plan

11


THE SCHOOL OF SOUNDS A music school on Felix Barret square

A music school at the Préfecture site in Marseille, at the American Embassy plot. It marks a new axiality, perpendicular to the Préfecture and aims to enhance the fountains’ public space, located at the crossroads of flows. This project is born from a massive block which, by the breakthrough, favours the passage and opening to the city. The circulating spaces (linked to the flows and interactions) create an architecture of plateaus and highlight the frame of the project. This frame ( pots from 5m to 8m) is a way to respond to lightness and being a transition between intimate and open spaces. Modular blocks are used to define modular rooms and spaces for the program. The ground floor is a large square which serves as a public gathering space with fireplace, exhibitions and ticket office. On the three upper storeys rises an amphitheatre, with the secretariat administration and access for artists (R+1), the sound archives (R+2) and the teacher’s area (R+3). The two upper storeys (R+4 and R+5) are both opened to the public for the Library and Cafeteria, but are mainly intended for students. A surrounding crown encircles the entire building to increase its lightness, favour views and create a route that is connected to the city. In continuity with the existing, the project is in concrete. A box floor system is used to support the roof of the slabs and storeys.

West front

Master plan

2 nd Bachelor degree 2018 | Individual project La Préfecture, Marseille Architectural project | The equipment

North front

12


+ 0m -

125

A

+- 0,5m

125,5 A

+ 1m 126

B

B +- 1,5m

126,5

+ 2m -

127

A

A

+ 0m -

+ 0m -

125

125

+- 0,5m

+- 0,5m

125,5

125,5

A

A

A

B

A

A

+ 1m -

+ 1m -

126

A

126

A

B

B

+- 1,5m

+- 1,5m

126,5

126,5

+ 2m -

+ 2m -

127

B

B

127

B

B

A

A

A

A

B

A

A

A

A

A

A

A

B

A

A

B

B

B

B

B

B

B

B

B

B

+ 0m -

+ 0m -

+ 0m -

125

125

125

+- 0,5m

+- 0,5m

+- 0,5m

125,5

125,5

125,5

A

A

A A

B

B

A

+ 1m -

+ 1m -

126

126

126

B

B

B

B B

A

A

A

A

A

A

B

B

A

A

A

A

B

First floor plan

B

B

+- 1,5m

+- 1,5m

126,5

126,5

+ 2m -

+ 2m -

+ 2m -

127

127

127

A

B

B

B

+- 1,5m

126,5

A

A

B

A

+ 1m -

A

A

A

A

A

A

A

A

A

A

A

A

A A

A

B

A

A

B

B

B

B B

B

Second floor plan

B

B

B

B

B

B

Third floor plan

A

B

B

B

B

B

B

A

B

A

B

A

A

B

Fourth floor plan

A

A

B

A

B

B

B

B

Fifth floor plan

A A

B

B

B

A

B

A

B

B

13

B

B


MEET THE INTIMITY IN A CROWDED ROUNDABOUT Housing in Mazargues

The goal is to create a housing unit on the roundabout site of Mazargues, in Marseille. The project’location introduces itself as a city entrance landscape, defined by different types of buildings and a major traffic road. The shape of the building emerges from a parallel alignment to the boundaries of the plot : two heterogeneous and partially enclosed blocks reduce the noises rom the main avenue and contain open green spaces. The buildings rise in an horizontal partition, highlighting the base, cornice, floors and roof. To remind the minerality of the site, the project is concrete-made and then covered with plaster. For the program, the North Block ground, floor and roof are public spaces encouraging the organization of events to stimulate the neighbourhood life. The two buildings are composed of thirty residential units including twenty T3, eight T4 and two T6. Appartments are open view or angled depending on their position in the floor and follow a frame of 6m X 12m. The living spaces are facing South and the night REALISE AREALISE L'AIDE D'UN A L'AIDE PRODUIT D'UNAUTODESK PRODUIT AUTODESK VERSION ETUDIANT VERSION ETUDIANT spaces are facing North. This dynamizes the fronts on streets, closed and ordered by the position of openings and fronts on courtyards through loggias, balconies and terraces on the interior nature spaces. REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

3 rd Bachelor degree 2018-2019 | Individual project Le rond point de Mazargues, Marseille Architectural project | Housing in an urban site

REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

Pente 18%

REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

14


13

REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

20

28

Plan R+1 et R+3

20 VIDE

Pente

12

VIDE

Plan RDC

Plan R+1

Plan R+2 et R+4 REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

Plan R+1

37 VIDE

15

13

REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

Plan RDC 13

37 31

13

28 24

24

REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

Plan RDC 31

REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT 23


CENTRE DE CREATION CHOREGRAPHIQUE CHOREOGRAPHIC CREATIVE CENTER

Scénographie du spectacle sur le site de la Viste / Scenography of spectacle on the Viste’s site

The aim of this project is to revitalize the popular and isolated city in the Viste sector and the former Mirabeau barracks by creating a cultural and artistic center that takes into account the value of the area. The topography, pedestrian paths and landscaped area are the main assets of the site, but its lack of planing makes it difficult for pedestrians to access this area. The project is located in the heart of the neighbourhood and reinvests the separation area between users and the park on the hill. It is a semi-buried building that is affirmed in length and which is connected by pathways to the ground floor of the buildings’ bars. The circulation area for cars is replaced by a landscaped path. It is with this body’s itinerary in space that the idea of a choreographic center emerged, which thinks the movement of the body through ramps, platforms, interior gardens and an urban square on the roof. The structure of the project is light, it is a system of a 50 x 50 concrete beam pillar, covered with a wooden floor. The building consists of 4 levels, including 3 underground levels which are the Lower Ground Floor and the Upper Ground Floor as spaces open to the public while the Intermediate level is a private space for artists and dancers. To remain with this idea of fluidity in the pedestrian movements, long ramps connect the different floors. The light is provided by different patios that also offers the possibility to occupy the vegetation space. REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

3 rd Bachelor degree Année 2019 | Individual project Secteur de la Viste et de l’ancienne caserne Mirabeau, Marseille Architectural project | Choreographic creative center REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

16


REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

Reloger habitants bâtiment D

Pente

Jardin

Vestiaires 49m2 Double hauteur sur salle de répétition 200m2

Salle de danse 106m2

Salle de danse 81m2

Patio 60m2

Scène 70m2 Salle de Spectacle 415m2 323 places

REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

Pente 15%

Salle de répétition double hauteur 200m2

Accès parking R-1

Consignes

Accueil et foyer

Entrée du public

Placard pour costumes 33m2

Vestiaires 69m2

Loges d'artistes 120m2

Salle de danse 106m2

REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

Accès restaurant

REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

Reloger habitants bâtiment D

Patio 190m2

REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

Lower Ground Floor Services médicaux du bâtiment D

Intermediate Ground Floor

REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

Reloger habitants bâtiment D

REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

Terrasse Restaurant

Patio 100m2

REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

Résidence d'artistes

Cours de service (livraison) et accès parking

24m2 REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

24m2

Espace commun

Résidence d'artistes

Bar d'été

REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

Pôle administratif 160m2

Upper Ground Floor

Roof Floor

REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

17


INSIDE OUT CSEPEL Urban planing and design area

If we put Csepel on a scale relative to the city of Budapest, the industrial area located on the south, cuts the Danube in half and has a real strong importance in the economic development of the city. It represents 200 hectares, which is immense and with a distance of 8 km from the city center, the northern part of this site is easily accessible. The project is located on the North Eastern part of Csepel. Thanks to his rectangular urban grid, it makes the space clearly understandable. The railway, the main road and bike roads easily connect the site to the rest of the city. The main idea is to create a continuity of public space between industries and citizens. For this reason, we decided to open the East front and make it attractive to citizens by creating a showroom that encourages them to continue their way through the various areas of the site. The two main entrances, located at the border, present a real potential to extend the city’s public space up to the industrial area. Most of the 55 buildings (73%) are industrial and the remaining 27% are leisure and commercial activities (education, sport center, showroom, multifunctional hall, entertainment and restaurant). They are linked to raise pedestrian walkways, landscapes and public space. Together, they revitalize the surrounding area.

1 st Master degree 2019 | Group project Csepel MĹąvek, Budapest Architectural project | Urban planning and design area

18


匀栀漀眀爀漀漀洀 刀攀猀琀愀甀爀愀渀琀 倀愀爀欀 䴀甀氀琀椀昀甀渀挀琀椀漀渀愀氀 栀愀氀氀 伀伀挀攀

䐀漀爀洀 䤀渀搀甀猀琀爀礀 匀瀀漀爀琀 挀攀渀琀攀爀 䔀渀琀攀爀琀愀椀渀洀攀渀琀 䈀愀爀 䔀搀甀挀愀琀椀漀渀

19


g r a s p the body

’s articulation to the object blurs its limits... ... it’s a weave that grips and constrain the

2 nd Bachelor degree 2018 | Group project Plastic art project | Construction of an unidentified object

20


HOUSE IN MOLEDO Edouardo Souto De Moura

The project consists in appropriating the structure, the luminous and acoustic ambiences of the House in Moledo by making plans, sketches, calculations and models.

Master plan

Ground oor plan

Sketches

Landscape section

2 nd Bachelor degree 2017 | Group project Technology project | Villa analysis

21


ARCHITECTURE AND URBAN PLANNING UNIVERSITY Vilanova ARTIGAS / Carlos CASCALDI

The project consists in analysing the atmosphere, thermal, climatic, acoustic and luminous features as well as the comfort of the building by producing interviews, plans, sketches calculations and models.

Master plan

Roof plan

Roof module

2 nd Bachelor degree 2018 | Group project Architecture and Urban Planning University, Sao Paulo Projet de technologie | Analyse constructive et architecturale

Comfort zone

22


23 REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

REALISE A L'AIDE D'UN PRODUIT AUTODESK VERSION ETUDIANT

North East Front

South East cross-section


RTN - EMERGENCY HOUSING IN PARAGUAY

EMERGENCY HOUSING IN PARAGUAY

RTN - EMERGENCY HOUSING IN PARAGUAY

HOUSE ADAPTATION DEPENDING ON THE NEEDS

RESSOUR

House extension and assembly create collective spaces

Material, constructi

G IN PARAGUAY 0

0 1m

1m 2m

2m

1m

0

2m

THE GROWTH OF THE HOUSE

Basic house with two modules and its extended version

RTN - EMERGENCY HOUSING IN PARAGUAY 0

0

1m

1m

2m

2m

USE WHAT

HOUSE ADAPTATION DEPENDING ON THE NEEDS

Rain water collectio

RESSOURCES

House extension and assembly create collective spaces

Material, construction schedule, and budget for one house Cladding

Planning for the construction of one house by 4 persons

Ventilation

Activity

Slicker

Concrete making and casting Fondation drying Earth pannels making Earth pannels drying Assembly of the wooden structure Assembly of the roof Assembly of floor Assembly of pannels Cladding Making and applying of earth coating

1 1.5 1 5 5 7 7 7.5 8 9

Foundations Timber structure Roof (sheet metal) Wooden floor Cladding outside and earth coating inside Water butt system Openings Sanitary furniture Total

Budget in € 70€ 420€ 70€ 70€ 40€ 50€ 80€ 30€ 830€

Straws Slicker

Composition: - 3 earth volumes - 2 water volumes

Primary earth coating

Composition: - 3 earth volumes - 2 sand volumes - 1.5 straw volumes - 1.5 water volumes

0

0 1m

1m 2m

Finish earth coating

2m

1m

0

Basic house with two modules and its extended version

0

1m

1m

2m

2m

0

HOUSE ADAPTATION DEPENDING ON THE NEEDS

House extension and assembly create collective spaces

1m

2m

1m

0

Planning for the construction of one house by 4 persons

Slicker

2m

1m

0

Beginning Duration

2m

ROOM BATHRM KTCH 2m

USE WHAT NATURE OFFERS

Days 1

2

3

4

Primary earth coating

Composition: - 3 earth volumes - 2 sand volumes - 1.5 straw volumes - 1.5 water volumes

Foundations Timber structure Roof (sheet metal) Wooden floor Cladding outside and earth coating inside Water butt system Openings Sanitary furniture Total

Basic house with two modules and its extended version

2m

Rain water collection and self-ventilation of the inhabitat through its floor

Budget in € 70€ 420€ 70€ 70€ 40€ 50€ 80€ 30€ 830€

5

6

7

5

6

8

Assembly of floor Assembly of pannels Cladding Making and applying of earth coating

7 7.5 8 9

Total

Budget in € 70€ 420€ 70€ 70€ 40€ 50€ 80€ 30€ 830€

Budget Distribution 8% 51% 8% Foundations 8% Timber structure Roof (sheet metal) 5% Wooden floor 6% Cladding outside and earth coating inside 10% Water butt system 4% Openings Sanitary furniture 100%

Finish earth coating

0

1m

0.5 0.5 1 1

Budget Distribution 8% 51% 8% 8% 5% 6% 10% 4% 100%

USE WHAT NATURE OFFERS

Rain water collection and self-ventilation of the inhabitat through its floor

2m

Out-of-school project 2018 | Group project Competition ARCHsharing “EMERGENCY HOUSING IN PARAGUAY”

4

Composition: - 3 earth volumes - 1 sand volumes - 4 straw volumes - 1 water volume

LIVING 2m

8

Rain water collection and self-ventilation of the inhabitat through its floor

1 0.5 Concrete making and casting 1.5 3.5 Fondation drying RESSOURCES 1 4 Earth pannels making Material, construction schedule, and budget for one house 5 3 Earth pannels drying Cladding Planning for the construction of one house by 4 persons 5 2 Assembly of the wooden structure Ventilation Activity Beginning Duration Days 2 3 1 7 0.5 Assembly of the roof Slicker 1 0.5 Concrete making and casting 7 0.5 Assembly of floor 1.5 3.5 Fondation drying Straws 7.5 0.5 Assembly of pannels 1 4 Earth pannels making Slicker 5 3 Earth pannels drying Composition: 8 1 Cladding - 3 earth volumes - 2 water volumes 5 2 Assembly of the wooden structure 9 1 Making and applying of earth coating 7 0.5 Assembly of the roof

THE GROWTH OF THE HOUSE

1m

7

USE WHAT NATURE OFFERS

Composition: - 3 earth volumes - 1 sand volumes - 4 straw volumes - 1 water volume

1m

6

Budget Distribution 8% 51% 8% 8% 5% 6% 10% 4% 100%

Activity

Finish earth coating

2m

0

5

Slicker

Composition: - 3 earth volumes - 2 sand volumes - 1.5 straw volumes - 1.5 water volumes

0

4

Ventilation

Composition: - 3 earth volumes - 2 water volumes

2m

3

Cladding

Primary earth coating

1m 2m

2

Material, construction schedule, and budget for one house

Straws HOUSE ADAPTATION DEPENDING ON THE NEEDS

0 1m

Days 1

RESSOURCES

House extension and assembly create collective spaces

0

0.5 3.5 4 3 2 0.5 0.5 0.5 1 1

Composition: - 3 earth volumes - 1 sand volumes - 4 straw volumes - 1 water volume

2m

THE GROWTH OF THE HOUSE

0

Beginning Duration

24

7

8


PHOTOGRAPHS

25


coline.masson@marseille.archi.fr

Profile for Coline Masson

Architecture portfolio  

This portfolio includes part of the plastic and architectural projects done during my first three years of studies at the National School of...

Architecture portfolio  

This portfolio includes part of the plastic and architectural projects done during my first three years of studies at the National School of...

Advertisement