Stormwater Pollution Prevention Plan

v. locations where additional or different BMPs are needed, and the reason(s) why. e. A description of stormwater discharged from the site. The inspector shall note the presence of suspended sediment, turbid water, discoloration, and/or oil sheen, as applicable. f. Any water quality monitoring performed during inspection. g. General comments and notes, including a brief description of any BMP repairs, maintenance or installations made as a result of the inspection. h. A statement that, in the judgment of the person conducting the site inspection, the site is either in compliance or out of compliance with the terms and conditions of the SWPPP and the permit. If the site inspection indicates that the site is out of compliance, the inspection report shall include a summary of the remedial actions required to bring the site back into compliance, as well as a schedule of implementation. i.

Name, title, and signature of the person conducting site inspection; and the following statement: "I certify that this report is true, accurate, and complete, to the best of my knowledge and belief'.

C. Turbidity/Transparency Sampling Requirements 1. Sampling Methods/Effective Dates a. Beginning October 1, 2006, if construction activity will involve the disturbance of 5 acres or more, the Permittee shall conduct turbidity sampling per Condition S4.C. b. Beginning October 1, 2008, if construction activity will involve greater equal to 1 acre, but less than 5 acres of soil disturbance, the Permittee shall transparency sampling or turbidity sampling per Condition S4.C. 2.

than or conduct

Sampling Frequency a. Sampling shall be conducted at least once every calendar week, when a discharge of stormwater (or authorized non-stormwater) from the site. shall be representative of the flow and characteristics of the discharge.

there is Samples

b. When there is no discharge during a calendar week, sampling is not required. c. Sampling is not required outside of normal working hours or during unsafe conditions. If a Permittee is unable to sample during a monitoring period, the Discharge Monitoring Report (DMR) shall include a brief explanation.