Page 1

2 0 1 1

E D M O N D

City of Edmond Water Resources F I E L DS E R V I C E S

UTILITY LINE MAINTENANC E

Public Works Utility Line Maintenance

a n n u a l

r e p o r t


Acknowledgement: The Water Resources Department wishes to acknowledge the efforts of several persons in the timely production of this document. Without their expertise, effort, and unique abilities this would not have been possible and certainly the document would not have been produced as the professional and attractive package it is. These persons are: Earl Hall, Kris Neifing, Ron Birdsong, Sam Drain, Ashleigh Clark and the Marketing Staff, Sara Cobb, Ian Peebles, Keith Stewart, Aaron Stewart, Cynthia Moore, Susan Miller, Rae Reese, and Jennifer Slack.


City Information Population Estimate

Edmond Population*

2007

2008

2009

2010

2011

78,226

79,559

81,093

81,405

83,019

Average Number of Active Accounts 2007

2008

2009

2010

2011

Water

25,221

26,228

26,260

26,756

26,957

Wastewater

26,801

27,888

27,875

28,413

28,535

Electric

33,209

34,564

34,671

35,300

35,497

*Source: 2007-10 US Census Bureau, 2011 Edmond Economic Development Authority


Table of Contents 

Section 1: Water Resources    

Section 2: Coffee Creek Wastewater Treatment Plant         

Wastewater Treatment Plant Organizational Chart 2010 Coffee Creek Wastewater Treatment Plant Report Flow Schematic Rain vs. Effluent Flow Chart Raw vs. Effluent BOD Chart Raw vs. Effluent TSS Chart Lift Station Location Map Lift Station Information Wastewater Treatment Plant Aerial View

Section 3: Water Production    

Vision, Mission Statement Summary Water System Update 2010 Water Resources Accomplishments

Water Production Organizational Chart Flow Schematic 2010 Water Production Report Edmond Water Treatment Plant  Flow Reports  Production Rations  Peak Flows  Average Daily Flows  Annual Comparisons  Pump Stations, Water Tanks, Water Towers Location Map  Distribution System Facilities Information  Water Treatment Aerial View  Water Tower Heights Water Wells  Location Map  Usage by Hours Chart  Well Statistics  Well Zones Map  Static and Pumping Level Charts  Well Permit Information

Section 4: Field Services – Utility Line Maintenance  

Field Services – Utility Line Maintenance Organizational Chart 2010 Field Services Report  Collection System Preventative Maintenance Graph  2010 By-Pass Report  2010 Stop-up List 2010 Water and Sanitary Sewer Maintenance Bonds Accepted


Section 1: Water Resources


VISION Community Focused Water and Wastewater Utilities MISSION To Meet the Water Needs of Edmond’s Customers by Providing Trustworthy Water and Wastewater Services

  

     

GOALS Maintain the Water Resources Infrastructure. Maintain Market Competitiveness Through the Use of Technology and Qualified Personnel. Continue to Provide Safe Water to Consumers and Return Clean Water to the Environment. VALUES Quality Water and Wastewater Services Customer Satisfaction and Involvement Professional, Honest Relationships with our Customers and with One Another A Team-Created, Positive, Safe and Enjoyable Work Environment Trained, Empowered Employees Sincere, Straightforward Communication


The City of Edmond has three water sources, the Garber-Wellington Aquifer, Arcadia Lake and purchased potable water from Oklahoma City. The primary water supplies are groundwater from the Garber-Wellington aquifer and surface water from Arcadia Lake. Purchasing water from Oklahoma City is a secondary source of water that was used for the first time in 2001. After treatment at the Edmond Water Treatment Plant (Arcadia Lake water) or after pumping from the wells (Garber Wellington aquifer water), potable water is conveyed to Edmond users via a city-wide distribution system. The distribution system includes storage tanks and water towers located in the Edmond area. Wastewater is transported through the wastewater collection system to the Wastewater Treatment Plant. The collection system also has nine (9) pumping stations that move wastewater to the treatment plant. After treatment at the Coffee Creek Wastewater Treatment Plant, the plant effluent is discharged into Coffee Creek. The City of Edmond’s Water Resources Department is made up of the following divisions: 

Water Production Division  Edmond Water Treatment Plant  Pumping Stations, Water Towers and Storage Tanks  Water Wells  Fifty-six wells located throughout Edmond Wastewater Treatment Division  Coffee Creek Wastewater Treatment Plant  Wastewater Lift Stations

WATER PRODUCTION EDMOND WATER TREATMENT PLANT The Water Treatment Plant Division is responsible for management, operations and maintenance of the water treatment plant, distribution system pumping stations, water storage tanks and water towers. Plant operators also monitor the distribution system water storage levels. Fifteen (15) full-time positions staff the Water Treatment Plant.

WATER WELLS GARBER-WELLINGTON WATER WELL FIELD The Garber Wellington aquifer is the source for all Edmond well water. The well system is comprised of fifty-six (56) wells and associated equipment. The Wells Division is staffed by three (3) well operators and three (3) well helpers.


WASTEWATER TREATMENT COFFEE CREEK WASTEWATER TREATMENT PLANT The Wastewater Treatment Plant Division (WWTP) is responsible for operation maintenance and management of Edmond’s wastewater treatment plant and wastewater lift stations. Treated plant effluent is discharged into Coffee Creek, a tributary of Deep Fork Creek. The facility is regulated under the National Pollution Discharge Elimination System (NPDES), which is administered by the Oklahoma State Department of Environmental Quality. The WWTP Division also operates and maintains nine (9) collection system wastewater lift stations. Five (5) personnel staff the WWTP Division. FIELD SERVICES GROUP, a DIVISION of the PUBLIC WORKS DEPARTMENT The Field Services Group is made up of the Water Line Maintenance, Wastewater Line Maintenance and Street Divisions. Sixty-six (66) personnel staff the Field Services Division.

Water Line Maintenance is responsible for maintaining Edmond’s 460 miles of water distribution lines. The following areas are functions of the division: Emergency repair of water main breaks and service line leaks Installation of new residential meters (upon request) Preventative maintenance of system valves and fire hydrants Utility line locates Meter change out program Sod and concrete replacement Updating utility maps Leak detection Wastewater Line Maintenance is responsible for maintaining Edmond’s 432 miles of wastewater collection system. The following areas are functions of the division: Preventive maintenance of the collection system Collection system blockage removal Emergency point repairs Manhole inspections Wastewater taps


Who to call: Water Resources Administration Administrative Offices

216-7675

Water Treatment Plant

Assistant Superintendent/Chief Plant Operator Operations Control Room/Lab

216-7811 216-7690

Wastewater Treatment Plant Chief Plant Operator Operations Control Room/Lab

216-7695 216-7697

Public Works: Field Services

Superintendent Administrative Office

216-7674 216-7770

Public Works: Water or Wastewater Line Problems Administrative Office

216-7770

Public Works: After Hours Water or Wastewater Line Problems After Hours Number

348-8830


Achieved 100% compliance with all regulatory parameters for drinking water quality and wastewater treatment. Water from the Arcadia Lake Water Plant was judged the best tasting in Oklahoma. Edmond will represent Oklahoma in the drinking water contest at the 2012 Southwest American Water Works Association conference. Edmond’s Arcadia Lake Water Plant was recognized as the Large Water Plant of the Year in 2010 by the Oklahoma Water Pollution Control Association (OWPCA). Edmond’s Coffee Creek Wastewater Treatment Plant was recognized as the Large Wastewater Plant of the Year in 2010 by OWPCA.


Section 2: Coffee Creek Wastewater Treatment Plant


Wastewater Treatment 2011

Fred L. Rice Water Resources Superintendent

Earl Hall Assistant Superintendent Compliance Specialist

Jennifer Slack Administrative Assistant

Kris Neifing Chief Plant Operator

Bryan Mitchell Maintenance

Brian Green Lab Tech

Tony Henderson Operator

Jim Solsbery Operator


COFFEE CREEK WASTEWATER TREATMENT PLANT Edmond’s Coffee Creek Wastewater Treatment Plant (CCWWTP) is a continuous flow activated sludge process utilizing oxidation ditches and aeration tanks for secondary treatment. It has a total design capacity of nine (9) million gallons per day. The plant is operated under an Oklahoma Pollution Discharge Elimination System (OPDES) permit, issued by the Oklahoma Department of Environmental Quality (ODEQ). In 2009 the facility received a renewed OPDES permit effective May 1. The renewed permit will be in effect for five years. During 2010 ODEQ personnel conducted five plant inspections and did not note any significant issues. The basic features of the wastewater treatment process are, screens to remove debris from raw wastewater entering the plant, aeration basins that provide for oxygenation and mixing of active microorganisms with raw sewage (the activated sludge process), a basin or clarifier to separate solids from the treated effluent, a system to return solids, also known as activated sludge, from the clarifiers back to the aeration basins and a system to waste or remove excess solids from either the basin or clarifier thus controlling the solids mass. Operational controls include, controlling the oxygen level, the rate that activated solids are returned to the aeration basins and the rate that solids are withdrawn from the process. The treatment process is designed to remove carbonaceous organic material and oxidize ammonia to nitrate. Treated water from the plant is also filtered to remove nearly all of the remaining solids, chlorinated to kill any potentially harmful microorganisms and then dechlorinated to eliminate excess chlorine that could be harmful to natural organisms in the receiving stream. The chlorination and dechlorination system is utilized for five months each year from May through September. These are the months most likely to have receiving stream recreational use. Biosolids, or sludge, that is wasted or removed from the wastewater treatment process is treated in facultative lagoons. After the sludge has spent a required amount of time in the lagoons it is tested for compliance with regulatory requirements and then land applied to local farmland for growth of second generation food crops, such as hay for stock feed. This program is defined in the plant Sludge Management Plan (SMP). The current SMP was approved by ODEQ in October 2006. The facility also has a storm water discharge permit, issued by ODEQ. This permit was issued in June 2006 and expired on May 2, 2011. A new permit is pending ODEQ action. The document requires Edmond to maintain best management practices for control and containment of materials that should not contaminate plant storm water run off. The CCWWTP Division is also responsible for the operation and maintenance of the City’s nine (9) lift stations. The lift stations convey wastewater from the collection system to the CCWWTP. The stations are currently undergoing a rehabilitation effort to ensure that they remain at full operational capacity at all times. The CCWWTP processed a total of 2,518,200,000 gallons of wastewater during 2011. Total operations and maintenance expenditures for 2010 were approximately $1,808,526. The percent removal of our major permitted parameters was above 98%. In 2011, a total of 14,125,400 gallons (2,469 dry tons) of biosolids were land applied on ODEQ approved farmland. Five (5) employees, One (1) Chief Plant Operator, One (1) Maintenance Mechanic, One (1) Laboratory Technician, and two (2) Operators operate and maintain the CCWWTP and the collection system lift stations. Staff is provided direction by the Water Resources Superintendent, Assistant Superintendent and the CCWWTP Chief Plant Operator.


Plant Influent Spring Creek Lift Station

Screening to Landfill

Plant Influent Chisholm Creek Lift Station

Influent Bar Screen

Influent Lift Station

Influent Fine Screen

Screenings To Landfill

Influent Flow Equalization Basin

Phase 1 Phase 2

First Stage Aeration Basin

First Stage Aeration Basin

First Stage Clarifier

First Stage Clarifier

Phase 3

Oxidation Ditch

Oxidation Ditch

Oxidation Ditch

Oxidation Ditch

Clarifier

Clarifier

Clarifier

Clarifier

Solids Solids

Second Stage Air Basin

Second Stage Air Basin

Solids

Effluent To Sand Filters

Solids

RAS/WAS WAS to Facultative Lagoons

Solids

Second Stage Clarifier

Second Stage Clarifier Solids Effluent to Sand Filters

Solids

RAS/WAS WAS to Facultative Lagoons

City of Edmond Coffee Creek Wastewater Treatment Plant 1600 N Midwest Blvd Edmond, OK

Flow Schematic March 1, 2011

Sand Filters (8)

Chlorination Dechlor.

To Outfall Discharge No 001

Solids


Total Precipitation Inches Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total Average

0.0 2.2 0.1 1.8 7.0 3.5 0.7 1.5 1.4 4.6 5.9 1.4 30.0 2.5

Average Effluent Flow MGD 6.1 7.1 6.8 7.0 7.4 6.9 6.4 6.1 5.8 6.8 7.8 7.4 81.6 6.8


Raw BOD mg/L

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total Average

166.3 190.7 171.6 152.0 132.3 172.9 183.4 188.3 175.1 164.3 162.3 144.5 2,003.7 166.98

Final BOD mg/L

1.4 2.0 2.6 1.5 1.1 2.4 1.2 1.0 1.0 1.2 1.2 0.8 17.4 1.45


Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total Average

Raw TSS mg/L 207.4 284.7 214.5 160.6 182.3 216.8 175.9 173.9 159.0 151.4 179.3 183.4 2,289.2 190.77

Effluent TSS mg/L 2.4 2.7 5.5 5.4 1.3 4.5 1.3 1.4 1.9 5.2 3.0 5.8 40.4 3.37


City of Edmond

Waterloo Rd Oak Tree

Oak Tree Reserve

Sorghum Mill Rd

Coffee Creek Rd

35

Coffee Creek

Chisholm Creek Covell Rd

Coffee Creek Plant WWTP

Danforth Rd

Edmond Rd

Spring Creek Fire Station 4

15th St

33rd Street

33rd St

0.5

1

35

40th Street

Memorial Rd

0

Arcadia Lake

Memorial

2 Miles

Legend Lift Station City Limits Railroad

January 14, 2009 The City of Edmond disclaims any warranty or merchantability or warranty for fitness of use for a particular purpose, expressed or implied, with respect to this data. Furthermore, the City of Edmond disclaims any responsibility for the accuracy or completeness of this data.

WWTP

Streets

Waste Water Treatment Plant

Westminster Rd

Post Rd

Douglas Blvd

Midwest Blvd

Air Depot Blvd

Sooner Rd

Coltrane Rd

Bryant Ave

Broadway

Kelly Ave

Santa Fe Ave

Western Ave

Lift Stations


Lift Station Name

CHISHOLM CREEK

COFFEE CREEK

Location

Number of Pumps

Motor HP

Pump GPM

2

150

1500

1

300

3000

3

60

900

2

25

1100

1

60

3000

¾ Mile North of Covell on Western

South side of Coffee Creek, ¼ mile east of Santa Fe Ave.

COFFEE CREEK TREATMENT PLANT

Coffee Creek Plant grounds

FIRE STATION #4

I-35 Access road, ¼ miles south of 15th Street

2

5

150

MEMORIAL ROAD

North side of Memorial, ½ miles west of I-35

2

3

75

OAK TREE

6340 North Santa Fe Ave

3

130

1100

OAK TREE RESERVE

East side of Kelly , ¾ mile past Sorghum Mill

2

20

450

1

30

1000

1

75

2000

2

125

3100

SPRING CREEK

¼ mile east of I-35 on 66 Highway

33RD STREET

South side of 33rd St, ½ miles west of I-35

2

10

75

40TH STREET

40th St between Karen and Stevens Dr.

2

30

200


Section 3: Water Production


Water Production 2011

Fred L. Rice Water Resources Superintendent

George Decher Jr. Chief Plant Operator

Jennifer Slack Administrative Assistant

Ron Birdsong Maintenance Manager Water & Wastewater

Earl Hall Assistant Superintendent Compliance Specialist

Scott Horner Operator

Terry Dale Operator

Kelly Platt Mechanical Maintenance

James Montgomery I&C Technician Maintenance

Josh Jacobs Operator

Stephen Payne Operator

Sam Drain “Well Daddy� Well Crew Leader

Sekou Brown I&C Mechanic Maintenance

Daniel Wilds Operator

Alex Opare Operator

Duane Calhoun Well Operator

Riley Akers Well Helper

Augustus Jaja Plant Lab Tech

Paul Fitzpatrick Well Operator

Keith Hernandez Well Helper

Tom Urban Lab Tech Distribution

John Whipple Well Helper

Chris Patrick Lab Tech Distribution


Wat e r T r e at m e n t P l a n t City of Edmond, Oklahoma PWSID# OK1020723 Raw Water From Arcadia Lake

Sludge

Sludge Drying Beds

West Contact Clarifiers Sludge Drying Beds Decant PS Washwater Basins

GW Well

Ozone Destruct Unit

No. 2

ODU Back Wash

To Water Distribution

Recarb Basin/Post

RM OPS 107

Filter and Operations Building

Area Office

High Lift Pump Station

Flocculating Clarifier #1

No. 1

Maintenance

LOX

Ozone Gen

ozone

Chemical

CO2

storage

Mixers Pre Ozone

RW

Screen Building

Waste Washwater No. 3

Clearwell No. 2

F.W.

GAC Pump Station

Clearwell No. 1

1

5

2

6

3

7

4

8

9 LT2 Sample Site GAC Containers

No. 4 East Contact Clarifiers

Flocculating Clarifier #2


Water Resources, Water Division, personnel continued to perform sampling and monitoring work at well sites and water distribution sites to meet all regulatory parameters and we are happy to report a 100% compliance rate for 2011. We have completed a number of projects intended to reinvest in existing infrastructure. These include painting the plant lime silos, replacing media in the plant multi-media filters, and specifying and obtaining heavy equipment to provide the capability for staff to remove processed lime sludge from drying beds. The lime sludge removal was previously outsourced. Purchasing the heavy equipment will allow Edmond to bring the lime sludge removal process in-house where costs can be better controlled. We have also completed a number of projects to enhance water production and supply for the future. These projects include: booster stations to help maintain good system pressure, improvements in water transmission and distribution lines to allow us to deliver water more effectively, the design and construction of the Breakpoint Chlorination Facility at Mitch Park (to convert Oklahoma City water to the same type of chlorine disinfectant as Edmond water), and the design and construction of the Northwest complex for water storage and distribution. In addition to the measures noted above Edmond has negotiated with Oklahoma City and has secured an agreement that will provide for the purchase of millions of gallons (up to a maximum of 15.0 million gallons per day) of water produced at Oklahoma City’s Hefner Road Water Treatment Plant. This water will be stored at, and distributed from, the Northwest complex. The Edmond area experienced a hot dry late summer by recent standards. This resulted in a higher water supply demand than has been seen in recent years. We continued to experience an increase in consumer demand for water through the rest of 2011. Edmond’s single day, peak demand, usage was 21,377,807 gallons on July 10, 2011. Voluntary water conservation measures were implemented, and thanks to the cooperation of our water customers the residence addressing system was effective.


Edmond’s Treatment Plant was constructed and completed in 1987. This facility treats water from Arcadia Lake, which provides flood control, water supply, and recreation for the Upper Deep Fork River Basin. Edmond’s facility is equipped with many treatment processes to ensure a high quality of water is produced. The Edmond Water Treatment Plant is designed to treat 12.0 MGD. Major water treatment plant upgrades were completed in 2004. The following is a brief description of the treatment process, after water from Arcadia Lake is pumped to the plant headworks: Screen building: Screens remove leaves, sticks, fish, and other large debris. Air stripping: Aeration is intended to remove certain dissolved gases in the water. It can also be used to increase the waters dissolved oxygen content, which is the first step in the removal of iron and manganese. Pre-ozone: Ozone is a better virucide than chlorine. Unlike chlorine, there are no disinfection byproducts produced. Ozonation removes color, odor, and taste. This process also oxidizes iron, manganese, sulfide, and organics. Flocculation, Clarifiers: This process gathers together the fine, light particles to form larger particles that will not readily settle or filter out of the water. The floc settles out the larger particles. Arcadia Lake raw water quality has historically been good enough to allow Edmond to forego this systems use. Chemical Building: Pebble quick lime is mixed with the water to form calcium hydroxide for softening purposes. Polymer is added as a coagulant aid. Solids Contact Clarifiers: These units are designed to allow the lime and other solids to settle out of the water after hardness reduction. Post-ozone: Ozone is a better virucide than chlorine. Unlike chlorine, there are no disinfection byproducts produced. Ozonation removes color, odor, and taste. This process also oxidizes iron, manganese, sulfide, and organics. Carbon Dioxide-Recarbonation: This process is used to lower the pH and alkalinity. It is effective in doing this, particularly in lime-softened water. Mixed Media Filters: Filtration removes small solids from the water being treated. Filtration is the process of passing water through material, such as sand, coal, granulated carbon and/or other substances to trap particles. Granulated Activated Carbon (GAC) Filtration: GAC filtration is effective for removal of many types of organic compounds, including those that can form potentially harmful byproducts after chlorination. This process removes synthetic organic compounds such as solvents, cleaning compounds, insecticides and herbicides.

The facility is operated twenty-four (24) hours per day, seven (7) days per week. Staff includes Twenty (20) employees: One (1) Chief Plant Operator, One (1) Maintenance Supervisor, one (1) Mechanic, one (1) Instrumentation and Controls Technician, one (1) Instrumentation and Controls Mechanic, six (6) Operators, three (3) Water Well Operators, three (3) Water Well Helpers, and three (3) Laboratory Technicians. The water plant is operated under the direction of the Water Resources Superintendent, Assistant Superintendent and Chief Water Plant Operator.


Water Wells Well Number Well - 3 Well - 8 Well - 9 Well - 10 Well - 11 Well - 14 Well - 15 Well - 18 Well - 19 Well - 20 Well - 21 Well - 22 Well - 23 Well - 24 Well - 25 Well - 26 Well - 27 Well - 28 Well - 29 Well - 30 Well - 31 Well - 32 Well - 33 Well - 34 Well - 35 Well - 36 Well - 37 Well - 38 Well - 39 Well - 40

Hours Ran 0.0 4,018.6 3,692.4 3,018.1 3,050.6 2,805.9 3,945.5 2,740.7 4,525.7 3,571.3 4,763.7 2,427.3 3,912.6 4,704.6 5,130.4 1,477.0 4,045.7 1,491.1 4,369.1 0.0 3,575.0 4,850.8 3,220.7 4,439.8 3,996.2 3,759.5 5,689.4 5,978.2 3,703.7 3,087.7

Gallons 0 24,566,273 39,129,630 22,180,176 30,153,933 15,730,568 34,560,422 27,495,679 31,272,250 22,399,728 32,292,078 18,699,194 29,847,146 42,727,769 49,073,387 12,379,876 43,118,926 16,855,256 48,687,308 0 30,825,133 72,120,879 36,927,888 52,331,548 33,574,677 38,272,036 59,931,365 66,346,526 45,266,775 24,668,311

Well Number Well - 41 Well - 42 Well - 43 Well - 44 Well - 45 Well - 46 Well - 47 Well - 48 Well - 49 Well - 50 Well - 51 Well - 52 Well - 53 Well - 54 Well - 55 Well - 56 Well - 57 Well - 58 Well - 59 Well - 60 Well - 61 Well - 62 Well - 63 Well - 64 Well - 65 Well - 66 Well - 67 Well - 68 Well - 69 Well - 70

Hours Ran 3,656.8 4,683.9 4,594.1 2,175.9 2,551.3 4,073.1 5,127.4 3,975.2 1,253.2 4,031.4 5,455.1 2,967.2 4,260.9 5,233.5 3,152.2 4,067.7 5,428.8 3,857.1 3,915.2 3,663.5 4,137.6 2,947.0 1,622.3 3,351.5 4,129.1 3,857.3 3,887.3 3,952.0 0.0 0.0

Gallons 39,708,054 37,561,563 40,704,296 37,222,288 24,996,339 36,089,068 43,159,520 49,064,053 12,792,154 42,696,084 52,243,808 16,469,814 41,659,391 66,737,735 40,920,783 35,562,093 87,468,630 26,055,811 26,111,956 31,710,810 48,659,481 18,843,037 6,641,010 25,033,662 27,156,075 23,975,490 22,690,806 23,845,619 0 0

Water Treatment Plant Raw Water In 2,569,967,360 Filtered Water 2,608,256,254 Finished High Lift 2,425,706,132 High Lift Return 94,219,593

Volume Comparison

Total Edmond Water Production and Purchased OKC Water Water Plant Production 2,331,486,539 Water Well Production 1,987,214,163 Total Combined Production (Gallons) 4,318,700,702 Oklahoma City Monthly Water 109,506,000 Monthly Water Total 4,428,206,702


Water Wells Well Number Well - 3 Well - 8 Well - 9 Well - 10 Well - 11 Well - 14 Well - 15 Well - 18 Well - 19 Well - 20 Well - 21 Well - 22 Well - 23 Well - 24 Well - 25 Well - 26 Well - 27 Well - 28 Well - 29 Well - 30 Well - 31 Well - 32 Well - 33 Well - 34 Well - 35 Well - 36 Well - 37 Well - 38 Well - 39 Well - 40

Hours Ran 0 278.93 271.12 168.02 258.63 0 253.21 172.43 255.94 192.06 221.5 227.53 237.73 275.52 301.62 94.56 84.63 251.53 330.48 0 224.59 285.09 0 264.16 284.21 243.7 321.17 340.51 156.16 273.69

Gallons 0 2124017 3398111 1573424 2789357 216137.1 2104829 1980117 1590266 1570712 1777384 2738553 2065396 3011693 3246226 801450.1 1067447 3449801 4572601 0 2530261 4118518 0 3633518 3415285 3650691 3327061 4405127 2087912 2462356

Well Number Well - 41 Well - 42 Well - 43 Well - 44 Well - 45 Well - 46 Well - 47 Well - 48 Well - 49 Well - 50 Well - 51 Well - 52 Well - 53 Well - 54 Well - 55 Well - 56 Well - 57 Well - 58 Well - 59 Well - 60 Well - 61 Well - 62 Well - 63 Well - 64 Well - 65 Well - 66 Well - 67 Well - 68 Well - 69 Well - 70

Hours Ran 185.66 191.71 247.88 265.64 58.36 264.61 267.85 0 0 202.93 270.61 135.07 162.6 298.54 258.27 242.56 91.01 146.26 180.92 158.97 234.46 137.25 123.65 175.11 372.62 315.17 361.79 375.24 0 0

Gallons 2682787 1680734 3187072 4555836 597107.3 3066684 2766861 0 0 2230552 3251754 945391.2 2069755 4213614 3790568 2230886 1630239 1144778 1613276 1675872 3374379 1335587 628342.6 1329274 2640507 2309869 2502192 2416493 0 0

Water Treatment Plant Raw Water In 121,701,619 Filtered Water 114,575,133 Finished High Lift 116,433,808 High Lift Return 7,637,413

Volume Comparison

Total Edmond Water Production and Purchased OKC Water Water Plant Production 108,796,395 Water Well Production 129,578,657 Total Combined Production (Gallons) 238,375,052 Oklahoma City Monthly Water 92,000 Monthly Water Total 238,467,052


Water Wells Well Number Well - 3 Well - 8 Well - 9 Well - 10 Well - 11 Well - 14 Well - 15 Well - 18 Well - 19 Well - 20 Well - 21 Well - 22 Well - 23 Well - 24 Well - 25 Well - 26 Well - 27 Well - 28 Well - 29 Well - 30 Well - 31 Well - 32 Well - 33 Well - 34 Well - 35 Well - 36 Well - 37 Well - 38 Well - 39 Well - 40

Hours Ran 0 108.15 138.53 155.57 152.06 0 286.33 162.95 295.13 86.44 320.15 130.41 271.19 253.85 302.87 51.78 121.91 117.36 155 0 119.27 259.71 0 156.6 118.66 32.81 420.35 419.4 98.67 156.29

Gallons 0 743446.4 1798604 1484530 1643268 0 2592730 1792202 1996483 679575.4 2520850 1510418 2585191 2807644 3283219 438431.8 1549067 1642397 2165956 0 1424670 3781949 0 2131679 1473649 470750.4 4339502 5310473 1281058 1494007

Well Number Well - 41 Well - 42 Well - 43 Well - 44 Well - 45 Well - 46 Well - 47 Well - 48 Well - 49 Well - 50 Well - 51 Well - 52 Well - 53 Well - 54 Well - 55 Well - 56 Well - 57 Well - 58 Well - 59 Well - 60 Well - 61 Well - 62 Well - 63 Well - 64 Well - 65 Well - 66 Well - 67 Well - 68 Well - 69 Well - 70

Hours Ran 121.38 256.39 318.26 194.47 90.97 186.25 311.46 14.5 0 229.83 292.43 48.32 178.3 316.34 390.58 226.21 371.24 119.68 176.68 131.87 187.91 49.22 32.88 38.6 150.6 131.99 162 143.2 0 0

Gallons 1653831 2232356 4073789 3300034 1071084 2152794 3159402 236052.1 0 2292775 3644648 374453.5 2292466 4435224 5630512 2077430 6454393 926267.7 1515712 1398845 2714392 489365.8 176872.6 323603.9 1081145 1026372 1186947 1005441 0 0

Water Treatment Plant Raw Water In 111,462,299 Filtered Water 114,707,684 Finished High Lift 109,610,893 High Lift Return 6,265,522

Volume Comparison

Total Edmond Water Production and Purchased OKC Water Water Plant Production 103,345,371 Water Well Production 109,867,954 Total Combined Production (Gallons) 213,213,325 Oklahoma City Monthly Water 67,000 Monthly Water Total 213,280,325


Water Wells Well Number Well - 3 Well - 8 Well - 9 Well - 10 Well - 11 Well - 14 Well - 15 Well - 18 Well - 19 Well - 20 Well - 21 Well - 22 Well - 23 Well - 24 Well - 25 Well - 26 Well - 27 Well - 28 Well - 29 Well - 30 Well - 31 Well - 32 Well - 33 Well - 34 Well - 35 Well - 36 Well - 37 Well - 38 Well - 39 Well - 40

Hours Ran 0 213.61 0 341.94 444.37 0 380.33 107.11 366.46 337.65 380.77 377.66 222.79 347.97 373.97 278.03 323.58 289.89 440.8 0 233.21 409.76 0 413.6 317.8 292.24 384.86 439.62 339.3 256.36

Gallons 0 1381545 0 3122182 4766269 0 3422620 1188829 2516622 2596632 2918553 3970290 2048240 3775508 4011070 2363940 4068907 3829094 6086573 0 2622677 5951983 0 5346840 3800924 4083385 3956886 5427010 4425189 2421565

Well Number Well - 41 Well - 42 Well - 43 Well - 44 Well - 45 Well - 46 Well - 47 Well - 48 Well - 49 Well - 50 Well - 51 Well - 52 Well - 53 Well - 54 Well - 55 Well - 56 Well - 57 Well - 58 Well - 59 Well - 60 Well - 61 Well - 62 Well - 63 Well - 64 Well - 65 Well - 66 Well - 67 Well - 68 Well - 69 Well - 70

Hours Ran 69.06 393.21 414.76 414.58 244.89 0.34 433.7 359.69 0 4.05 366.08 296.59 273.81 456.04 411.37 386.47 419.16 306.82 310.06 256.667 359.59 166.85 130.54 195.93 311.88 317.12 322.32 324.39 0 0

Gallons 945547.9 3338910 4782429 7059734 2874339 2565.6 4286602 5588099 0 47550.9 4187468 1994973 3410221 6288640 5827209 3532778 7232548 2366380 2720045 2702801 5215413 1362109 623745.7 1416302 2289897 2310378 2264447 2137410 0 0

Water Treatment Plant Raw Water In 115,771,520 Filtered Water 119,308,450 Finished High Lift 120,120,134 High Lift Return 7,599,321

Volume Comparison

Total Edmond Water Production and Purchased OKC Water Water Plant Production Water Well Production Total Combined Production (Gallons) Oklahoma City Monthly Water Monthly Water Total

112,520,813 176,911,869 289,432,682 72,000 289,504,682


Water Wells Well Number Well - 3 Well - 8 Well - 9 Well - 10 Well - 11 Well - 14 Well - 15 Well - 18 Well - 19 Well - 20 Well - 21 Well - 22 Well - 23 Well - 24 Well - 25 Well - 26 Well - 27 Well - 28 Well - 29 Well - 30 Well - 31 Well - 32 Well - 33 Well - 34 Well - 35 Well - 36 Well - 37 Well - 38 Well - 39 Well - 40

Hours Ran 0 327.16 0 292.89 438.67 0 372.87 139.03 374.1 347.74 370.75 387.53 357.52 369.29 444.24 296.61 397.05 101.46 406.41 0 327.56 362.89 95.31 389.34 320.12 350.69 461.41 480.03 375.39 345.37

Gallons 0 2250779 236874.9 2409014 4340380 180999.5 3349623 1522563 2599660 2597175 2719115 3558568 3289274 3901510 4497968 2252205 4794932 879279.9 5070024 0 3196001 5572141 1138139 4810517 3301217 4369188 4818797 5572441 4738699 3067864

Well Number Well - 41 Well - 42 Well - 43 Well - 44 Well - 45 Well - 46 Well - 47 Well - 48 Well - 49 Well - 50 Well - 51 Well - 52 Well - 53 Well - 54 Well - 55 Well - 56 Well - 57 Well - 58 Well - 59 Well - 60 Well - 61 Well - 62 Well - 63 Well - 64 Well - 65 Well - 66 Well - 67 Well - 68 Well - 69 Well - 70

Hours Ran 68.96 482.71 479.62 384.33 305.22 303.01 568.29 353.72 332.34 244.57 381.06 300.19 371.39 456.81 449.05 453.49 505.8 366.3 344.99 341.98 391.19 300.65 163.15 311.71 358.47 374.75 380.35 361.32 0 0

Gallons 987446.8 4184153 5002427 6325964 3525482 3082864 4877611 5010123 3378399 3843432 4114024 1775266 4281627 6084261 5978650 4301364 8582669 2596318 2655660 3394682 5213212 2255529 790795.2 2132973 2544314 2527500 2462528 2208580 0 0

Water Treatment Plant Raw Water In 213,154,799 Filtered Water 217,471,605 Finished High Lift 207,852,437 High Lift Return 7,937,222

Volume Comparison

Total Edmond Water Production and Purchased OKC Water Water Plant Production

199,915,215

Water Well Production

195,152,798

Total Combined Production (Gallons)

395,068,013

Oklahoma City Monthly Water

131,000

Monthly Water Total

395,199,013


Water Wells Well Number Well - 3 Well - 8 Well - 9 Well - 10 Well - 11 Well - 14 Well - 15 Well - 18 Well - 19 Well - 20 Well - 21 Well - 22 Well - 23 Well - 24 Well - 25 Well - 26 Well - 27 Well - 28 Well - 29 Well - 30 Well - 31 Well - 32 Well - 33 Well - 34 Well - 35 Well - 36 Well - 37 Well - 38 Well - 39 Well - 40

Hours Ran 0 156.57 252.04 107.84 254.34 232.11 283.84 139.62 236.52 232.79 294.83 117.79 199.48 205.47 275.83 64.51 238.18 0 200.97 0 253.41 259.38 252.64 242.65 263.67 212.09 272.73 280.81 226.88 193.27

Gallons 0 1052876 3352978 974876.8 2703097 1564283 2552748 1909741 1660789 1735699 2248063 1192510 1691975 2213980 2479328 674932.1 2905001 0 2668149 0 2717120 4314520 3869391 3296860 2947705 2875545 2879325 3313111 2971764 1760725

Well Number Well - 41 Well - 42 Well - 43 Well - 44 Well - 45 Well - 46 Well - 47 Well - 48 Well - 49 Well - 50 Well - 51 Well - 52 Well - 53 Well - 54 Well - 55 Well - 56 Well - 57 Well - 58 Well - 59 Well - 60 Well - 61 Well - 62 Well - 63 Well - 64 Well - 65 Well - 66 Well - 67 Well - 68 Well - 69 Well - 70

Hours Ran 248.05 201.6 248.68 0 138.05 285.81 221.34 263.4 278.97 216.44 278.03 206.95 192.12 295.37 256.46 247.41 309.86 254.32 229.78 222.71 234.76 151.37 130.58 152.13 117.72 125.84 128.27 129.01 0 0

Gallons 3254136 1701744 2960347 0 1318596 2828003 2047577 4051043 3119033 2597200 3191701 1375979 2285799 3448159 3705835 2228032 5339902 1911329 1907912 2236839 3156587 1360875 631833.9 1146860 886934.4 972644.6 977606 969402.4 0 0

Water Treatment Plant Raw Water In 246,140,540 Filtered Water 250,945,347 Finished High Lift 232,101,205 High Lift Return 8,147,070

Volume Comparison

Total Edmond Water Production and Purchased OKC Water Water Plant Production Water Well Production Total Combined Production (Gallons) Oklahoma City Monthly Water Monthly Water Total

223,954,135 126,138,999 350,093,135 139,000 350,232,135


Water Wells Well Number Well - 3 Well - 8 Well - 9 Well - 10 Well - 11 Well - 14 Well - 15 Well - 18 Well - 19 Well - 20 Well - 21 Well - 22 Well - 23 Well - 24 Well - 25 Well - 26 Well - 27 Well - 28 Well - 29 Well - 30 Well - 31 Well - 32 Well - 33 Well - 34 Well - 35 Well - 36 Well - 37 Well - 38 Well - 39 Well - 40

Hours Ran 0 441.69 434.86 270.21 411.88 397.35 518.07 295.48 531.12 315.63 505.16 207.39 447.03 583.44 537.81 90.13 393.21 0 394.74 0 378.99 482.2 353.63 607.21 405.92 346.29 592.71 642.77 346.43 509.33

Gallons 0 2972845 5413485 2190196 3945889 2473801 4660384 3610369 3752868 2084963 3536969 1985941 3694488 5546053 5015240 764870.7 4516244 0 5000332 0 3530688 7715281 4700944 7791024 3921200 4209400 6098456 7490397 4360991 4019253

Well Number Well - 41 Well - 42 Well - 43 Well - 44 Well - 45 Well - 46 Well - 47 Well - 48 Well - 49 Well - 50 Well - 51 Well - 52 Well - 53 Well - 54 Well - 55 Well - 56 Well - 57 Well - 58 Well - 59 Well - 60 Well - 61 Well - 62 Well - 63 Well - 64 Well - 65 Well - 66 Well - 67 Well - 68 Well - 69 Well - 70

Hours Ran 457.54 422.4 482.67 0 238.08 371.75 508.91 511.04 60.12 567.74 659.54 322.35 520.29 525.11 443.36 391.45 594.87 505.02 507.98 343.03 347.13 334.48 136.63 453.82 241.53 239 238.93 136.52 0 0

Gallons 5717549 3385096 4787723 819.2 2616916 3515839 4696825 7575527 615381.5 6449248 6802916 1958863 5524547 6869155 5885994 3152237 9947074 3557131 3570471 3267524 4345041 2345786 613190.3 3193015 1722545 1621435 1615827 1864105 0 0

Water Treatment Plant Raw Water In 297,984,083 Filtered Water 303,551,341 Finished High Lift 276,040,020 High Lift Return 7,885,869

Volume Comparison

Total Edmond Water Production and Purchased OKC Water Water Plant Production Water Well Production Total Combined Production (Gallons) Oklahoma City Monthly Water Monthly Water Total

268,154,151 222,220,351 490,374,502 214,000 490,588,502


Water Wells Well Number Well - 3 Well - 8 Well - 9 Well - 10 Well - 11 Well - 14 Well - 15 Well - 18 Well - 19 Well - 20 Well - 21 Well - 22 Well - 23 Well - 24 Well - 25 Well - 26 Well - 27 Well - 28 Well - 29 Well - 30 Well - 31 Well - 32 Well - 33 Well - 34 Well - 35 Well - 36 Well - 37 Well - 38 Well - 39 Well - 40

Hours Ran 0 714.64 710.09 580.96 728.52 696.38 722.42 594.06 739.15 719.9 710.8 558.87 651.66 724.43 713.26 519.62 689.79 0 686.47 0 726.85 729.25 710.35 743.95 730.58 715.68 721.91 734.64 743.95 740.78

Gallons 0 4028457 6277420 3403603 6815952 3404604 6236640 4903467 4903723 3849900 4300721 2466949 3987368 5369808 6504242 4392146 6540993 0 6563898 0 4620718 10705672 7491992 8040577 4462726 5592311 7641820 7625716 8779210 5062530

Well Number Well - 41 Well - 42 Well - 43 Well - 44 Well - 45 Well - 46 Well - 47 Well - 48 Well - 49 Well - 50 Well - 51 Well - 52 Well - 53 Well - 54 Well - 55 Well - 56 Well - 57 Well - 58 Well - 59 Well - 60 Well - 61 Well - 62 Well - 63 Well - 64 Well - 65 Well - 66 Well - 67 Well - 68 Well - 69 Well - 70

Hours Ran 730.73 730.09 443.24 323.3 600.16 710.72 734.17 733.52 0 743.93 737.62 659.3 740.02 735.36 742.24 695.94 708.51 669.31 654.17 729.82 715.35 689.42 325.1 724.68 613.84 630.74 615.14 594.64 0 0

Gallons 7167682 5448402 2097991 5432651 6137557 5597587 5337289 7637513 0 7558511 5711443 3071384 5706258 8776742 8067930 5436433 10987228 4299364 3256164 5022863 6639593 3389506 1075606 5225526 3679505 3109035 2904041 3043503 0 0

Water Treatment Plant Raw Water In 335,661,234 Filtered Water 343,675,258 Finished High Lift 312,275,862 High Lift Return 8,183,998

Volume Comparison

Total Edmond Water Production and Purchased OKC Water Water Plant Production Water Well Production Total Combined Production (Gallons) Oklahoma City Monthly Water Monthly Water Total

304,091,864 295,790,467 599,882,331 16,376,000 616,258,331


Water Wells Well Number Well - 3 Well - 8 Well - 9 Well - 10 Well - 11 Well - 14 Well - 15 Well - 18 Well - 19 Well - 20 Well - 21 Well - 22 Well - 23 Well - 24 Well - 25 Well - 26 Well - 27 Well - 28 Well - 29 Well - 30 Well - 31 Well - 32 Well - 33 Well - 34 Well - 35 Well - 36 Well - 37 Well - 38 Well - 39 Well - 40

Hours Ran 0 627.03 691.87 456.06 159.41 641.02 444.69 510.16 686.22 619.88 674.96 367.67 580.82 646.29 688.02 81.66 686.46 0 535.27 0 501.42 703.36 670.51 568.72 560.22 685.32 673.64 722.08 698.73 402.26

Gallons 0 2986247 5598304 2429443 1048944 2956999 3494878 3856120 4471759 2953388 3822808 1206568 3103745 4567811 6186987 691900.9 6070814 0 4203973 0 2834892 10163806 6127097 5814596 2736764 4668265 7044597 6904520 7992884 2566689

Well Number Well - 41 Well - 42 Well - 43 Well - 44 Well - 45 Well - 46 Well - 47 Well - 48 Well - 49 Well - 50 Well - 51 Well - 52 Well - 53 Well - 54 Well - 55 Well - 56 Well - 57 Well - 58 Well - 59 Well - 60 Well - 61 Well - 62 Well - 63 Well - 64 Well - 65 Well - 66 Well - 67 Well - 68 Well - 69 Well - 70

Hours Ran 674.9 631.6 610.94 426.84 504.85 667.36 696.08 644.05 0 673.51 667.66 450.67 651.9 706.42 200.85 705.03 699.1 654.4 658.41 682.31 617.98 492.47 301.01 591.38 565.36 574.04 573.77 585.62 0 0

Gallons 5478489 4525269 2748887 6662127 3527413 4909693 4676125 5990955 0 6171729 5065857 1906794 4829170 8257444 2034086 6154604 10181077 3828193 3327616 4922049 5562741 2187278 920565.4 4513064 3180405 2775925 2506242 2673834 0 0

Water Treatment Plant Raw Water In 303,751,374 Filtered Water 306,006,359 Finished High Lift 281,360,515 High Lift Return 8,273,944

Volume Comparison

Total Edmond Water Production and Purchased OKC Water Water Plant Production Water Well Production Total Combined Production (Gallons) Oklahoma City Monthly Water Monthly Water Total

273,086,571 236,022,430 509,109,001 57,241,000 566,350,001


Water Wells Well Number Well - 3 Well - 8 Well - 9 Well - 10 Well - 11 Well - 14 Well - 15 Well - 18 Well - 19 Well - 20 Well - 21 Well - 22 Well - 23 Well - 24 Well - 25 Well - 26 Well - 27 Well - 28 Well - 29 Well - 30 Well - 31 Well - 32 Well - 33 Well - 34 Well - 35 Well - 36 Well - 37 Well - 38 Well - 39 Well - 40

Hours Ran 0 509.65 571.43 336.25 0 226.97 82.43 302.29 533.19 378.4 427.6 52.42 341.83 403.4 562.05 0.07 493.82 239.23 439.58 0 210.87 586.3 426.14 485.76 392.86 428.38 636.77 648.07 321.31 2.4

Gallons 0 2807298 5276452 1978504 0 1113539 740212 2649108 3464714 2024079 2560253 69397.8 2088886 3079309 5206716 0 4676681 2008705 3858659 0 1536544 8155361 4168220 4778630 2278996 3504837 6738347 6222072 3693602 20163.7

Well Number Well - 41 Well - 42 Well - 43 Well - 44 Well - 45 Well - 46 Well - 47 Well - 48 Well - 49 Well - 50 Well - 51 Well - 52 Well - 53 Well - 54 Well - 55 Well - 56 Well - 57 Well - 58 Well - 59 Well - 60 Well - 61 Well - 62 Well - 63 Well - 64 Well - 65 Well - 66 Well - 67 Well - 68 Well - 69 Well - 70

Hours Ran 510.02 510.26 530.32 0 262.86 443.47 561.59 568.87 0 618.6 639.75 191.81 549.06 578.49 0 382.5 550.55 397.82 412.62 423.37 432.28 354.8 13.51 248.83 466.94 325.28 420.23 362.19 0 0

Gallons 4687512 3968661 3003489 0 2060705 3465926 4005270 5976910 0 5652708 5195743 821985.1 4551618 6987210 0 3494426 8084537 2394537 2181528 3328175 4202950 1911743 56041.8 1772414 2796278 1819355 2118787 1845674 0 0

Water Treatment Plant Raw Water In 275,991,960 Filtered Water 284,614,987 Finished High Lift 255,966,464 High Lift Return 8,126,460

Volume Comparison

Total Edmond Water Production and Purchased OKC Water Water Plant Production Water Well Production Total Combined Production (Gallons) Oklahoma City Monthly Water Monthly Water Total

247,840,004 171,083,465 418,923,469 34,915,000 453,838,469


Water Wells Well Number Well - 3 Well - 8 Well - 9 Well - 10 Well - 11 Well - 14 Well - 15 Well - 18 Well - 19 Well - 20 Well - 21 Well - 22 Well - 23 Well - 24 Well - 25 Well - 26 Well - 27 Well - 28 Well - 29 Well - 30 Well - 31 Well - 32 Well - 33 Well - 34 Well - 35 Well - 36 Well - 37 Well - 38 Well - 39 Well - 40

Hours Ran 0 267.59 271.26 109.15 0 262.04 325.22 120.81 213.88 121.54 356.98 0 154.66 302.54 360.48 0 206.5 227.85 286.08 0 262.11 391.83 246.86 222.83 261.11 236.95 462.05 484.97 198.83 2.03

Gallons 0 1613018 2873284 811930.2 0 1459580 2922631 1352976 1650849 709800.5 2216209 0 1080698 2499303 3320602 0 2005685 2081962 2547388 0 2147880 5684927 2957483 2381549 1667797 2330527 4999879 4950667 2346239 17445.1

Well Number Well - 41 Well - 42 Well - 43 Well - 44 Well - 45 Well - 46 Well - 47 Well - 48 Well - 49 Well - 50 Well - 51 Well - 52 Well - 53 Well - 54 Well - 55 Well - 56 Well - 57 Well - 58 Well - 59 Well - 60 Well - 61 Well - 62 Well - 63 Well - 64 Well - 65 Well - 66 Well - 67 Well - 68 Well - 69 Well - 70

Hours Ran 313.05 341.53 293.37 0 45.47 347.18 333.89 427.6 180.08 131.5 513.43 87.51 243.27 424.97 0 21.95 495.53 265.38 249.19 102.65 171.19 60.05 59.77 202.16 254.89 246.89 193.16 296.57 0 0

Gallons 3523720 2716125 2068990 0 533551 2784910 2640161 5496993 1680850 1377188 4547364 455493.8 2283622 5380295 0 193507.5 7641261 1782188 1703712 973943.1 1958083 381041.4 215508.8 1710238 1553826 1525589 1127514 1586626 0 0

Water Treatment Plant Raw Water In 263,583,659 Filtered Water 267,814,502 Finished High Lift 246,546,059 High Lift Return 8,222,743

Volume Comparison

Total Edmond Water Production and Purchased OKC Water Water Plant Production Water Well Production Total Combined Production (Gallons) Oklahoma City Monthly Water Monthly Water Total

238,323,316 116,472,607 354,795,923 128,000 354,923,923


Water Wells Well Number Well - 3 Well - 8 Well - 9 Well - 10 Well - 11 Well - 14 Well - 15 Well - 18 Well - 19 Well - 20 Well - 21 Well - 22 Well - 23 Well - 24 Well - 25 Well - 26 Well - 27 Well - 28 Well - 29 Well - 30 Well - 31 Well - 32 Well - 33 Well - 34 Well - 35 Well - 36 Well - 37 Well - 38 Well - 39 Well - 40

Hours Ran 0 216.9 108.24 65.03 73.79 163.7 137.9 70.34 147.5 87.57 222.62 0 184.01 341.49 340.09 0 173.7 149.31 167.55 0 170.74 186.41 190.17 239.25 173.45 30.8 360.7 425.22 87.58 166.63

Gallons 0 1494880 1602426 582743.3 947364.7 1080972 1241531 980297.5 1316792 629348 1581843 0 1429851 3354310 3174849 0 2048637 1643243 1959435 0 1821387 2857395 2563661 2985604 1680362 384453.6 3961308 4835795 1133983 1433849

Well Number Well - 41 Well - 42 Well - 43 Well - 44 Well - 45 Well - 46 Well - 47 Well - 48 Well - 49 Well - 50 Well - 51 Well - 52 Well - 53 Well - 54 Well - 55 Well - 56 Well - 57 Well - 58 Well - 59 Well - 60 Well - 61 Well - 62 Well - 63 Well - 64 Well - 65 Well - 66 Well - 67 Well - 68 Well - 69 Well - 70

Hours Ran 150.51 261.26 215.2 2.18 4.85 218.67 249.42 98.77 151.48 192.2 349.48 103.82 153.44 212.59 0 97.81 373.07 34.25 15.84 125.81 132.87 73.18 61.47 100.18 246.82 183.87 183.89 247.39 0 0

Gallons 1941615 2173087 2332930 57819.1 57036 2051255 2329692 1500837 1486894 2138754 3290678 690994.6 1772392 2863113 0 864313.2 6148792 265398.8 142197.3 1284895 1836694 633783.3 270711.9 893243.2 1710853 1269138 1127724 1590597 0 0

Water Treatment Plant Raw Water In 167,761,550 Filtered Water 173,283,622 Finished High Lift 163,217,926 High Lift Return 7,886,626

Volume Comparison

Total Edmond Water Production and Purchased OKC Water Water Plant Production Water Well Production Total Combined Production (Gallons) Oklahoma City Monthly Water Monthly Water Total

155,331,300 91,451,755 246,783,056 77,000 246,860,056


Water Wells Well Number Well - 3 Well - 8 Well - 9 Well - 10 Well - 11 Well - 14 Well - 15 Well - 18 Well - 19 Well - 20 Well - 21 Well - 22 Well - 23 Well - 24 Well - 25 Well - 26 Well - 27 Well - 28 Well - 29 Well - 30 Well - 31 Well - 32 Well - 33 Well - 34 Well - 35 Well - 36 Well - 37 Well - 38 Well - 39 Well - 40

Hours Ran 0 156.66 242.97 134.13 128.93 186.28 138.19 126.41 146.49 131.65 277.54 0 263.83 250.87 230.15 0 236.82 114.43 325.76 0 165.99 194.61 275.06 105.76 167.62 184.54 381.08 360.06 110.47 39.32

Gallons 0 1110866 3301691 1219730 1153412 1279653 1241597 1749890 1347725 968457.9 2089310 0 2782034 2600840 2146941 0 2874518 1320775 3990322 0 1842297 3099325 3910962 1320156 1888052 2132683 4125386 4289197 1455246 341864.7

Well Number Well - 41 Well - 42 Well - 43 Well - 44 Well - 45 Well - 46 Well - 47 Well - 48 Well - 49 Well - 50 Well - 51 Well - 52 Well - 53 Well - 54 Well - 55 Well - 56 Well - 57 Well - 58 Well - 59 Well - 60 Well - 61 Well - 62 Well - 63 Well - 64 Well - 65 Well - 66 Well - 67 Well - 68 Well - 69 Well - 70

Hours Ran 126.96 261.13 309.15 164.56 57.53 273.89 240.73 0 250.19 206.1 299.4 164.58 224.74 227.48 0 216.84 310.14 137.55 174.55 144.35 312.92 137.24 144.04 156.98 428.4 392.64 307.47 395.95 0 0

Gallons 1667737 2207026 3658222 3827305 676552 2630948 2336107 0 2511597 2336437 3240214 1098237 2651917 3133879 0 1896084 5238910 983926.7 1517662 1502321 4440396 1190435 637795.9 1377151 3069865 2708251 1896951 2503953 0 0

Water Treatment Plant Raw Water In 117,002,723 Filtered Water 112,301,966 Finished High Lift 104,180,809 High Lift Return 8,053,405

Volume Comparison

Total Edmond Water Production and Purchased OKC Water Water Plant Production Water Well Production Total Combined Production (Gallons) Oklahoma City Monthly Water Monthly Water Total

96,127,404 116,522,809 212,650,213 54,000 212,704,213


25 20 2007

15

2008 10

2009

2010

5

2011 0 Jan

Feb Mar Apr May

Million Gallons Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Maximum for Year

Jun

Jul

Aug

Sep

Oct

Nov

Dec

2007

2008

2009

2010

2011

8.3 8.4 10.5 10.1 11.7 14.4 14.7 19.8 15.1 13.7 11.1 8.6

8.6 8.8 9.4 11.5 17.9 16 20 19.3 14.6 13.8 11.5 8.5

9.4 9.3 13.1 12.1 15.3 21.9 22.1 14.8 13.6 12.3 9.9 8.3

8.8 8.0 8.7 11.3 14.3 15.6 18.7 21.2 16.8 14.3 11.6 8.3

10.7 8.5 12.9 17.0 15.3 20.8 21.4 18.7 19.0 15.2 10.7 8.1

19.8

20.0

22.1

21.2

21.4


Million Gallons 14.0 12.0 10.0 8.0 6.0 4.0 2.0 0.0 2007

2008

2009

2010

2011

Year

Gallons

2007

9,615,269

2008

10,222,949

2009

10,037,612

2010

10,640,288

2011

12,132,073


700 600 500 400

2007 2008

300

2009

200

2010 2011

100 0

January

2007 219,248,775

2008 227,818,326

2009 247,099,203

2010 231,379,703

2011 238,467,052

February

206,550,574

206,858,841

220,702,093

196,704,229

213,280,325

March

261,590,744

234,995,338

271,659,510

224,823,016

289,504,682

April

246,086,188

270,402,451

268,114,401

268,084,414

395,199,013

May

269,118,988

337,769,620

298,728,904

320,241,559

350,232,135

June

270,920,564

369,250,886

464,588,571

378,065,627

490,588,502

July

321,821,139

490,027,084

519,372,452

426,087,931

616,258,331

August

491,303,806

411,209,086

341,873,465

589,010,114

566,350,001

September

389,011,034

342,338,248

292,817,152

381,986,152

453,838,469

October

331,881,698

328,675,500

265,614,868

368,567,360

354,923,923

November

275,518,826

267,666,192

247,705,860

270,525,873

246,860,056

December

226,520,884

236,087,915

225,451,749

228,426,212

212,704,213


Anderson Rd

Westminster Rd

Post Rd

BF

PS I-35 Complex

PS

Danforth Complex

College Complex

Edmond Rd

15th St

Douglas Blvd

PS

Coffee Creek Rd

Danforth Rd

Midwest Blvd

35

NW Complex

Covell Rd

Air Depot Blvd

Sooner Rd

Coltrane Rd

Bryant Ave

Broadway

Kelly Ave

Sorghum Mill Rd

Santa Fe Ave

Western Ave

City of Edmond Water System

33rd Street Complex

PS

PS

PS

2nd Street Booster

Arcadia Arcadia Lake WTP PS

Arcadia Lake

Post Road Complex

35

PS

33rd St

0

0.5

1

2 Miles

Memorial Rd

January 14, 2009

Elevated Storage Tank BF Breakpoint Facility

The City of Edmond disclaims any warranty or merchantability or warranty for fitness of use for a particular purpose, expressed or implied, with respect to this data. Furthermore, the City of Edmond disclaims any responsibility for the accuracy or completeness of this data.

Ground Storage Tank

PS Pumping Station Water Well

Distribution Lines Transmission Line (Edmond Water) Transmission Line (OKC Water) Transmission Line (OKC Owned)


DANFORTH WATER TOWER COMPLEX CLEARWELL CAPACITY 2.0 MG CLEARWELL DIAMETER 146'-0" CLEARWELL DEPTH 17'-0" TOWER CAPACITY 0.5 MG OVERFLOW 1340 GPM 1500 each HORSEPOWER 2 each at 75 Chlorination provided to ground storage. Notes: Continuous monitoring provided. PLANT HIGH LIFT PUMP STATION CLEARWELL CAPACITY 2 each at 4.0 MG CLEARWELL DIAMETER 180' CLEARWELL DEPTH 20'

COLLEGE TOWER COMPLEX CLEARWELL CAPACITY 2.0 MG CLEARWELL DIAMETER 88' 10" Inside Dia. CLEARWELL DEPTH 42' 7.5" Liquid Depth TOWER CAPACITY 0.5 MG OVERFLOW 1340 GPM 650 each HORSEPOWER 2 each at 60 Chlorination provided to ground storage. Notes: Continuous monitoring provided. NORTHWEST COMPLEX CLEARWELL CAPACITY 2.0 MG CLEARWELL DIAMETER 125' Inside Diameter CLEARWELL DEPTH 22' 6" Liquid Depth

POST RD TOWER CAPACITY

0.5 MG

NUM. OF PUMP UNITS

OVERFLOW NUMBER OF UNITS GPM HORSEPOWER

1240 4 2 at 2,800; 2 at 5,560 2 at 250; 2 at 500

GPM 2 at 3,000; 2 at 5,000 HORSEPOWER 2 at 300; 2 at 450 I-35 BOOSTER PUMP STATION CLEARWELL CAPACITY 1.0 MG

4

Notes: Continuous monitoring provided and required. CLEARWELL DIAMETER

94" Inside Diameter

33RD STREET WATER TOWER COMPLEX CLEARWELL CAPACITY 2.0 MG CLEARWELL DIAMETER 146' 0" CLEARWELL DEPTH 17' 0" TOWER CAPACITY 0.5 MG

CLEARWELL DEPTH SHORT TOWER CAPACITY OVERFLOW TALL TOWER CAPACITY OVERFLOW

19' Liquid Depth 0.5 MG 1240 0.5 MG 1336

OVERFLOW

1340

GPM

2 at 1,530; 2 at 2,800; 2 at 6,000

GPM

2 at 1800 each

HORSEPOWER

2 at 125; 2 at 250; 2 at 400

HORSEPOWER 2 each at 100 Chlorination provided to ground storage. Notes: Continuous monitoring provided. 2ND STREET BOOSTER PUMP STATION NUMBER OF UNITS 3 GPM DESIGN CAPACITY 2,000 GPM EACH HORSEPOWER 3 each at 125

15TH STREET BOOSTER PUMP STATION NUMBER OF UNITS 3 GPM DESIGN CAPACITY 300 GPM HORSEPOWER 7.5 HP PLANT LOW LIFT PUMP STATION GPM 1 at 2,800; 4 at 2,080 HORSEPOWER 50 each


Water Tower Heights Location

Feet

PSI

College

115

50.945

Danforth

155

68.665

33rd St

155

68.665

I-35 Tall Tower

218

96.574

I-35 Short Tower

124

54.932

Post Rd

159

70.437


City of Edmond

Westminster Rd

Post Rd

Douglas Blvd

Midwest Blvd

Air Depot Blvd

Sooner Rd

Coltrane Rd

Bryant Ave

Broadway

Kelly Ave

Santa Fe Ave

Western Ave

Water Well Locations

40

Waterloo Rd

Sorghum Mill Rd

Coffee Creek Rd

35

26 61

59 Covell Rd

60

58

Danforth Rd

44

Edmond Rd

45

52

41

20

24

39

53

49 03

27

50

34 15th St

29

28

04 09

06

57

21

33rd St 38

08

37

51

55

36 31

19 43

17

14 22

48

15 12

10 18

11

25

16

46

Water Treatment Plant

30

47 54 23

42 56

62

35

63

64

Arcadia Lake

35

33

65 66 67

32

Memorial Rd

0

0.5

1

2 Miles

Legend Water Treatment Plant Water Well

January 14, 2009 The City of Edmond disclaims any warranty or merchantability or warranty for fitness of use for a particular purpose, expressed or implied, with respect to this data. Furthermore, the City of Edmond disclaims any responsibility for the accuracy or completeness of this data.

City Limits Railroad Streets

68


Water Well Number 8 109 E 5th St Well Statistics Date Drilled:

1952

Latitude/Longitude: 35.65 / -97.48 Elevation:

EQUIPMENT

Total Depth:

650'

Top Perforations:

252'

Lower Perforations:

442'

Pump Set:

400'

Electrical Controls: ABB Variable Pump: Christiansen Stages: Motor: Franklin Horsepower: Pump Install Date:

1190'

Method of Drilling:

Flow (GPM):

120 Driller: Rouner

Number of Joints: Size of Casing: 10.75" Size of Pump Column: 4" PVC/Steel Pump: 4"pvc

Cable Tool

50 1992

YEAR 2011 GALLONS PER MONTH January

2,124,017

February

743,446

March

1,381,545

April

2,250,779

May

1,052,876

June

2,972,845

July

4,028,457

August

2,986,247

September

2,807,298

October

1,613,018

November

1,494,880

December

1,110,866

4500K

General Condition: Good

Work Performed 2011:

4000K

Pulled pump and motor, video, did down hole cleaning of the casing and performed 48 hour pump test. Ordered new equipment.

3500K

Gallons

3000K 2500K 2000K 1500K

Recommendations for 2012:

1000K

Install new equipment perform routine maintenance

500K 0K

Months


Water Well Number 9 37 W 8th St Well Statistics Date Drilled:

1954

Latitude/Longitude: 35.65 / -97.48 Elevation:

EQUIPMENT

554'

Top Perforations:

228'

Lower Perforations:

425'

Pump Set:

527'

Pump: Christiansen Stages: Motor: Franklin Horsepower: Pump Install Date:

1188'

Total Depth:

Electrical Controls: ABB/VFD

Method of Drilling:

Flow (GPM):

170 Driller: Statts

Number of Joints: Size of Casing: 10.75" Size of Pump Column: 4" PVC/Steel Pump: 126' Steel,

400' PVC

Cable Tool

50 2008

YEAR 2011 GALLONS PER MONTH January

3,398,111

February

1,798,604

March

0

April

236,875

May

3,352,978

June

5,413,485

July

6,277,420

August

5,598,304

September

5,276,452

October

2,873,284

November

1,602,426

December

3,301,691

7000K

General Condition: Good

Work Performed 2011:

6000K

Performed routine maintenance

5000K

Gallons

4000K

3000K

2000K

Recommendations for 2012:

1000K

Perform routine maintenance

0K

Months


Water Well Number 10 326 N Baumann Ave Well Statistics Date Drilled:

1957

Latitude/Longitude: 35.66 / -97.47 Elevation:

EQUIPMENT

Top Perforations:

317'

Lower Perforations:

713'

Size of Pump Column: 5.5"

Pump Set:

580'

PVC/Steel Pump:

Motor: Centripro

Pump Install Date:

Driller: Rouner

719'

Pump: Christiansen

Horsepower:

1224'

171

Total Depth:

Electrical Controls: ABB/VFD

Stages:

Flow (GPM):

Method of Drilling:

Number of Joints:

27

Size of Casing: 10.75"

Cable Tool

40 2009

YEAR 2011 GALLONS PER MONTH January

1,573,424

February

1,484,530

March

3,122,182

April

2,409,014

May

974,877

June

2,190,196

July

3,403,603

August

2,429,443

September

1,978,504

October

811,930

November

582,743

December

1,219,730

3500K

General Condition: Good

Work Performed 2011:

3000K

Performed routine maintenance

2500K

Gallons

2000K

1500K

1000K

Recommendations for 2012:

500K

Perform routine maintenance

0K

Months


Water Well Number 11 1335 S Broadway Well Statistics Date Drilled:

1964

Latitude/Longitude: 35.64 / -97.48 Elevation:

EQUIPMENT

724'

Top Perforations:

355'

Lower Perforations:

722'

Pump Set:

630'

Pump: Christiansen Stages: Motor: Franklin Horsepower: Pump Install Date:

1183'

Total Depth:

Electrical Controls: ABB

Method of Drilling:

Flow (GPM):

190 Driller: Rouner

Number of Joints:

36

Size of Casing: 10.75" Size of Pump Column: 5.5" PVC/Steel Pump: 29joints

pvc 2joints steel

Cable Tool

40 2000

YEAR 2011 GALLONS PER MONTH January

2,789,357

February

1,643,268

March

4,766,269

April

4,340,380

May

2,703,097

June

3,945,889

July

6,815,952

August

1,048,944

September

0

October

0

November

947,365

December

1,153,412

7000K

General Condition: Good

Work Performed 2011:

6000K

motor failed pulled and replaced

5000K

Gallons

4000K

3000K

2000K

Recommendations for 2012:

1000K

Perform routine maintenance

0K

Months


Water Well Number 14 17 N Bryant Ave Well Statistics Date Drilled:

1969

Latitude/Longitude: 35.65 / -97.46 Elevation:

EQUIPMENT

747'

Top Perforations:

355'

Lower Perforations:

694'

Pump: Christiansen Stages:

1188'

Total Depth:

Electrical Controls: ABB/VFD

Horsepower: Pump Install Date:

Method of Drilling:

119 Driller: Statts

Number of Joints: Size of Casing: 10.75" Size of Pump Column: 4" PVC/Steel Pump: 21joints

Pump Set: Motor: Franklin

Flow (GPM):

pvc 10 steel

Cable Tool

40 2011

YEAR 2011 GALLONS PER MONTH January

216,137

February

0

March

0

April

181,000

May

1,564,283

June

2,473,801

July

3,404,604

August

2,956,999

September

1,113,539

October

1,459,580

November

1,080,972

December

1,279,653

3500K

General Condition: Fair

Work Performed 2011:

3000K

motor failed pulled and replaced

2500K

Gallons

2000K

1500K

1000K

Recommendations for 2012:

500K

Perform routine maintenance

0K

Months


Water Well Number 15 2335 S Rankin St Well Statistics Date Drilled:

1967

Latitude/Longitude: 35.63 / -97.47 Elevation:

EQUIPMENT

Driller: Statts

775'

Top Perforations:

281'

Lower Perforations:

766'

Size of Pump Column: 5.5"

Pump Set:

660'

PVC/Steel Pump:

Pump: Centrilift

Motor: PSM Horsepower:

1187'

170

Total Depth:

Electrical Controls: ABB/VFD

Stages:

Flow (GPM):

Method of Drilling:

Number of Joints:

33

Size of Casing: 10.75"

Cable Tool

60

Pump Install Date:

YEAR 2011 GALLONS PER MONTH January

2,104,829

February

2,592,730

March

3,422,620

April

3,349,623

May

2,552,748

June

4,660,384

July

6,236,640

August

3,494,878

September

740,212

October

2,922,631

November

1,241,531

December

1,241,597

7000K

General Condition: Good

Work Performed 2011:

6000K

Changed out pump line from well to main.

5000K

Gallons

4000K

3000K

2000K

Recommendations for 2012:

1000K

Perform routine maintenance

0K

Months


Water Well Number 18 817 E 2nd St Well Statistics Date Drilled:

1979

Latitude/Longitude: 35.65 / -97.47 Elevation:

EQUIPMENT

684'

Top Perforations:

291'

Lower Perforations:

662'

Pump Set:

614'

Pump: Christiansen Stages:

1180'

Total Depth:

Electrical Controls: Benshaw Softstart

Motor: Franklin

Method of Drilling:

Flow (GPM):

173 Driller: Statts

Number of Joints: Size of Casing: 10.75" Size of Pump Column: 4" PVC/Steel Pump: 25joints

pvc 10 steel

Cable Tool

Horsepower: Pump Install Date:

2011

YEAR 2011 GALLONS PER MONTH January

1,980,117

February

1,792,202

March

1,188,829

April

1,522,563

May

1,909,741

June

3,610,369

July

4,903,467

August

3,856,120

September

2,649,108

October

1,352,976

November

980,298

December

1,749,890

5000K

General Condition: Good

Work Performed 2011: Pulled pump and motor and changed out steel column pipe

4000K

Gallons

3000K

2000K

Recommendations for 2012:

1000K

Perform routine maintenance 0K

Months


Water Well Number 19 916 E 15th St Well Statistics Date Drilled:

1971

Latitude/Longitude: 35.64 / -97.47 Elevation:

EQUIPMENT

1150'

120 Driller: Statts

Total Depth:

689'

Top Perforations:

230'

Lower Perforations:

669'

Size of Pump Column: 5.5"

Pump Set:

620'

PVC/Steel Pump:

Electrical Controls: ABB Pump: Christensen/6CLC Stages:

Flow (GPM):

Motor: Franklin

Method of Drilling:

Number of Joints:

30

Size of Casing: 10.75"

Cable Tool

Horsepower: Pump Install Date:

2010

YEAR 2011 GALLONS PER MONTH January

1,590,266

February

1,996,483

March

2,516,622

April

2,599,660

May

1,660,789

June

3,752,868

July

4,903,723

August

4,471,759

September

3,464,714

October

1,650,849

November

1,316,792

December

1,347,725

5000K

General Condition: Good

Work Performed 2011: Performed routine maintenance

4000K

Gallons

3000K

2000K

Recommendations for 2012:

1000K

Perform routine maintenance 0K

Months


Water Well Number 20 580 N Kelly Ave Well Statistics Date Drilled:

1972

Latitude/Longitude: 35.66 / -97.49 Elevation:

EQUIPMENT

Driller: Statts

635'

Top Perforations:

109'

Lower Perforations:

630'

Size of Pump Column: 5.5"

Pump Set:

550'

PVC/Steel Pump:

Pump: Centrilift

Motor: Centrilift Horsepower:

1170'

135

Total Depth:

Electrical Controls: ABB VFD

Stages:

Flow (GPM):

Method of Drilling:

Number of Joints:

27

Size of Casing: 10.75"

Cable Tool

40

Pump Install Date:

YEAR 2011 GALLONS PER MONTH January

1,570,712

February

679,575

March

2,596,632

April

2,597,175

May

1,735,699

June

2,084,963

July

3,849,900

August

2,953,388

September

2,024,079

October

709,801

November

629,348

December

968,458

4000K

General Condition: Good

Work Performed 2011:

3500K

Installed new viynl coating on exterior of well house

3000K

Gallons

2500K 2000K 1500K

Recommendations for 2012:

1000K

Perform routine maintenance

500K 0K

Months


Water Well Number 21 3308 S Kelly Ave Well Statistics Date Drilled:

1972

Latitude/Longitude: 35.62 / -97.49 Elevation:

EQUIPMENT Electrical Controls: ABB/DRIVE Pump: Christenson

Total Depth:

705'

Top Perforations:

240'

Pump Set: Motor: Centripro Horsepower: Pump Install Date:

1165'

Method of Drilling:

160 Driller: Statts

Number of Joints:

29

Size of Casing: 10.75" Size of Pump Column: 5.5"

Lower Perforations:

Stages:

Flow (GPM):

567'

PVC/Steel Pump:

Cable Tool

30 2008

YEAR 2011 GALLONS PER MONTH January

1,777,384

February

2,520,850

March

2,918,553

April

2,719,115

May

2,248,063

June

3,536,969

July

4,300,721

August

3,822,808

September

2,560,253

October

2,216,209

November

1,581,843

December

2,089,310

4500K

General Condition: Good

Work Performed 2011:

4000K

Performed routine maintenance

3500K

Gallons

3000K 2500K 2000K 1500K

Recommendations for 2012:

1000K

Perform routine maintenance

500K 0K

Months


Water Well Number 22 840 S Bryant Ave Well Statistics Date Drilled:

1972

Latitude/Longitude: 35.64 / -97.46 Elevation:

EQUIPMENT

Driller: Statts

650'

Top Perforations:

130'

Lower Perforations:

585'

Size of Pump Column: 5.5"

Pump Set:

602'

PVC/Steel Pump:

Pump: PSM

Motor: PSM Horsepower:

1100'

175

Total Depth:

Electrical Controls: ABB/VFD

Stages:

Flow (GPM):

Method of Drilling:

Number of Joints:

28

Size of Casing: 10.75"

Cable Tool

45

Pump Install Date:

YEAR 2011 GALLONS PER MONTH January

2,738,553

February

1,510,418

March

3,970,290

April

3,558,568

May

1,192,510

June

1,985,941

July

2,466,949

August

1,206,568

September

69,398

October

0

November

0

December

0

4000K

General Condition: Good

Work Performed 2011:

3500K

Performed routine maintenance

3000K

Gallons

2500K 2000K 1500K

Recommendations for 2012:

1000K

Perform routine maintenance

500K 0K

Months


Water Well Number 23 2016 E 33rd St Well Statistics Date Drilled:

1973

Latitude/Longitude: 35.62 / -97.45 Elevation:

EQUIPMENT

Driller: Statts

698'

Top Perforations:

114'

Lower Perforations:

690'

Size of Pump Column: 5.5"

Pump Set:

623'

PVC/Steel Pump:

Pump: Centrilift

Motor: Centrilift Horsepower:

1145'

210

Total Depth:

Electrical Controls: ABB/VFD

Stages:

Flow (GPM):

Method of Drilling:

Number of Joints:

27

Size of Casing: 10.75"

Cable Tool

46

Pump Install Date:

YEAR 2011 GALLONS PER MONTH January

2,065,396

February

2,585,191

March

2,048,240

April

3,289,274

May

1,691,975

June

3,694,488

July

3,987,368

August

3,103,745

September

2,088,886

October

1,080,698

November

1,429,851

December

2,782,034

4000K

General Condition: Good

Work Performed 2011:

3500K

Performed routine maintenance

3000K

Gallons

2500K 2000K 1500K

Recommendations for 2012:

1000K

Perform routine maintenance

500K 0K

Months


Water Well Number 24 1309 S Kelly Ave Well Statistics Date Drilled:

1973

Latitude/Longitude: 35.64 / -97.49 Elevation:

EQUIPMENT

Driller: Statts

604'

Top Perforations:

114'

Lower Perforations:

604'

Size of Pump Column: 5.5"

Pump Set:

540'

PVC/Steel Pump:

Pump: PSM

Motor: PSM Horsepower:

1150'

210

Total Depth:

Electrical Controls: ABB/VFD

Stages:

Flow (GPM):

Method of Drilling:

Number of Joints: Size of Casing: 10.75"

Cable Tool

60

Pump Install Date:

YEAR 2011 GALLONS PER MONTH January

3,011,693

February

2,807,644

March

3,775,508

April

3,901,510

May

2,213,980

June

5,546,053

July

5,369,808

August

4,567,811

September

3,079,309

October

2,499,303

November

3,354,310

December

2,600,840

General Condition: Good

6000K

Work Performed 2011:

5000K

Performed routine maintenance

Gallons

4000K

3000K

2000K

Recommendations for 2012: 1000K

Perform routine maintenance

0K

Months


Water Well Number 25 2400 S Kelly Ave Well Statistics Date Drilled:

1975

Latitude/Longitude: 35.63 / -97.49 Elevation:

EQUIPMENT

1150'

230 Driller: Statts

Total Depth:

705'

Top Perforations:

356'

Lower Perforations:

680'

Size of Pump Column: 5.5"

Pump Set:

483'

PVC/Steel Pump:

Electrical Controls: ABB/VFD Pump: Centrilift Stages:

Flow (GPM):

Motor: Centrilift

Method of Drilling:

Number of Joints: Size of Casing: 10.75"

Cable Tool

Horsepower: Pump Install Date:

YEAR 2011 GALLONS PER MONTH January

3,246,226

February

3,283,219

March

4,011,070

April

4,497,968

May

2,479,328

June

5,015,240

July

6,504,242

August

6,186,987

September

5,206,716

October

3,320,602

November

3,174,849

December

2,146,941

7000K

General Condition: Good

Work Performed 2011:

6000K

Installed new ABB/VFD

5000K

Gallons

4000K

3000K

2000K

Recommendations for 2012:

1000K

Perform routine maintenance

0K

Months


Water Well Number 26 4116 N Santa Fe Ave Well Statistics Date Drilled:

1977

Latitude/Longitude: 35.69 / -97.51 Elevation:

EQUIPMENT

Driller: Statts

475'

Top Perforations:

154'

Lower Perforations:

398'

Size of Pump Column: 5.5"

Pump Set:

361'

PVC/Steel Pump:

Pump: Centrilift

Motor: Centrilift Horsepower:

1055'

150

Total Depth:

Electrical Controls: ABB

Stages:

Flow (GPM):

Method of Drilling:

Number of Joints:

17

Size of Casing: 10.75"

Cable Tool

50

Pump Install Date:

YEAR 2011 GALLONS PER MONTH January

801,450

February

438,432

March

2,363,940

April

2,252,205

May

674,932

June

764,871

July

4,392,146

August

691,901

September

0

October

0

November

0

December

0

4500K

General Condition: Good

Work Performed 2011:

4000K

Installed new ABB/VFD

3500K

Gallons

3000K 2500K 2000K 1500K

Recommendations for 2012:

1000K

Perform routine maintenance

500K 0K

Months


Water Well Number 27 216 S Fretz Ave Well Statistics Date Drilled:

1978

Latitude/Longitude: 35.65 / -97.49 Elevation:

EQUIPMENT

Driller: Statts

710'

Top Perforations:

200'

Lower Perforations:

585'

Size of Pump Column: 5.5"

Pump Set:

550'

PVC/Steel Pump:

Pump: PSM

Motor: PSM Horsepower:

1190'

210

Total Depth:

Electrical Controls: ABB/VFD

Stages:

Flow (GPM):

Method of Drilling:

Number of Joints:

27

Size of Casing: 10.75"

Cable Tool

60

Pump Install Date:

YEAR 2011 GALLONS PER MONTH January

1,067,447

February

1,549,067

March

4,068,907

April

4,794,932

May

2,905,001

June

4,516,244

July

6,540,993

August

6,070,814

September

4,676,681

October

2,005,685

November

2,048,637

December

2,874,518

7000K

General Condition: Good

Work Performed 2011:

6000K

Installed new ABB/VFD

5000K

Gallons

4000K

3000K

2000K

Recommendations for 2012:

1000K

Perform routine maintenance

0K

Months


Water Well Number 28 1932 N Boulevard Well Statistics Date Drilled:

1977

Latitude/Longitude: 35.67 / -97.48 Elevation:

EQUIPMENT

478'

Top Perforations:

235'

Lower Perforations:

406'

Pump: Christiansen Stages:

1150'

Total Depth:

Electrical Controls: ABB

Method of Drilling:

180 Driller: Sequoyah

Number of Joints: Size of Casing: 10.75" Size of Pump Column: 4" PVC/Steel Pump: 19joints

Pump Set: Motor: Franklin

Flow (GPM):

pvc

Cable Tool

Horsepower: Pump Install Date:

2011

YEAR 2011 GALLONS PER MONTH January

3,449,801

February

1,642,397

March

3,829,094

April

879,280

May

0

June

0

July

0

August

0

September

2,008,705

October

2,081,962

November

1,643,243

December

1,320,775

4000K

General Condition: Good

Work Performed 2011:

3500K

Pulled pump and motor, video, did down hole cleaning of the casing and performed 48 hour pump test. Ordered new equipment.

3000K

Gallons

2500K 2000K 1500K

Recommendations for 2012:

1000K

Perform routine maintenance

500K 0K

Months


Water Well Number 29 2301 N Bryant Ave Well Statistics Date Drilled:

1978

Latitude/Longitude: 35.68 / -97.46 Elevation:

EQUIPMENT

1140'

210 Driller: Statts

Total Depth:

532'

Top Perforations:

186'

Lower Perforations:

464'

Size of Pump Column: 5.5"

Pump Set:

420'

PVC/Steel Pump:

Electrical Controls: ABB/VFD Pump: Christensen Stages:

Flow (GPM):

Motor: Franklin

Method of Drilling:

Number of Joints:

20

Size of Casing: 10.75"

Cable Tool

Horsepower: Pump Install Date:

2009

YEAR 2011 GALLONS PER MONTH January

4,572,601

February

2,165,956

March

6,086,573

April

5,070,024

May

2,668,149

June

5,000,332

July

6,563,898

August

4,203,973

September

3,858,659

October

2,547,388

November

1,959,435

December

3,990,322

7000K

General Condition: Good

Work Performed 2011:

6000K

Performed routine maintenance

5000K

Gallons

4000K

3000K

2000K

Recommendations for 2012:

1000K

Perform routine maintenance

0K

Months


Water Well Number 31 2201 E 15th St Well Statistics Date Drilled:

1978

Latitude/Longitude: 35.64 / -97.45 Elevation:

EQUIPMENT

Driller: Statts

715'

Top Perforations:

250'

Lower Perforations:

695'

Size of Pump Column: 5.5"

Pump Set:

525'

PVC/Steel Pump:

Pump: PSM

Motor: PSM Horsepower:

1100'

166

Total Depth:

Electrical Controls: ABB/VFD

Stages:

Flow (GPM):

Method of Drilling:

Number of Joints: Size of Casing: 10.75"

Cable Tool

60

Pump Install Date:

YEAR 2011 GALLONS PER MONTH January

2,530,261

February

1,424,670

March

2,622,677

April

3,196,001

May

2,717,120

June

3,530,688

July

4,620,718

August

2,834,892

September

1,536,544

October

2,147,880

November

1,821,387

December

1,842,297

5000K

General Condition: Good

Work Performed 2011: Performed routine maintenance

4000K

Gallons

3000K

2000K

Recommendations for 2012:

1000K

Perform routine maintenance 0K

Months


Water Well Number 32 3740 E 40th St Well Statistics Date Drilled:

1978

Latitude/Longitude: 35.62 / -97.43 Elevation:

EQUIPMENT

Driller: Statts

705'

Top Perforations:

193'

Lower Perforations:

632'

Size of Pump Column: 5.5"

Pump Set:

588'

PVC/Steel Pump:

Pump: Centrilift

Motor: Centrilift Horsepower:

1120'

285

Total Depth:

Electrical Controls: ABB/VFD

Stages:

Flow (GPM):

Method of Drilling:

Number of Joints: Size of Casing: 10.75"

Cable Tool

100

Pump Install Date:

YEAR 2011 GALLONS PER MONTH January

4,118,518

February

3,781,949

March

5,951,983

April

5,572,141

May

4,314,520

June

7,715,281

July

10,705,672

August

10,163,806

September

8,155,361

October

5,684,927

November

2,857,395

December

3,099,325

General Condition: Good

12M

Work Performed 2011:

10M

Installed new 100hp ABB/VFD

Gallons

8M

6M

4M

Recommendations for 2012: 2M

Perform routine maintenance

0M

Months


Water Well Number 33 3650 S Coltrane Rd Well Statistics Date Drilled:

1978

Latitude/Longitude: 35.62 / -97.44 Elevation:

EQUIPMENT

1140'

160 Driller: Statts

Total Depth:

700'

Top Perforations:

212'

Lower Perforations:

560'

Size of Pump Column: 5.5"

Pump Set:

462'

PVC/Steel Pump:

Electrical Controls: ABB/VFD Pump: Christiansen Stages:

Flow (GPM):

Motor: Franklin

Method of Drilling:

Number of Joints: Size of Casing: 10.75"

Cable Tool

Horsepower: Pump Install Date:

2011

YEAR 2011 GALLONS PER MONTH January

0

February

0

March

0

April

1,138,139

May

3,869,391

June

4,700,944

July

7,491,992

August

6,127,097

September

4,168,220

October

2,957,483

November

2,563,661

December

3,910,962

8000K

General Condition: Good

Work Performed 2011:

7000K

pulled pump and motor and did down hole video, cleaned casing and ran 48 hour pump test. Installed new equipment.

6000K

Gallons

5000K 4000K 3000K 2000K

Recommendations for 2012:

1000K

Perform routine maintenance

0K

Months


Water Well Number 34 941 S Santa Fe Ave Well Statistics Date Drilled:

1978

Latitude/Longitude: 35.64 / -97.51 Elevation:

EQUIPMENT

527'

Top Perforations:

110'

Lower Perforations:

472'

Pump Set:

407'

Pump: Christensen Stages:

1125'

Total Depth:

Electrical Controls: ABB/VFD

Motor: Franklin

Method of Drilling:

Flow (GPM):

300 Driller: Statts

Number of Joints: Size of Casing: 10.75" Size of Pump Column: 5.5" PVC/Steel Pump: 407' 4"

PVC

Cable Tool

Horsepower: Pump Install Date:

2009

YEAR 2011 GALLONS PER MONTH January

3,633,518

February

2,131,679

March

5,346,840

April

4,810,517

May

3,296,860

June

7,791,024

July

8,040,577

August

5,814,596

September

4,778,630

October

2,381,549

November

2,985,604

December

1,320,156

9000K

General Condition: Good

Work Performed 2011:

8000K

Performed routine maintenance

7000K

Gallons

6000K 5000K 4000K 3000K 2000K

Recommendations for 2012:

1000K

Perform routine maintenance

0K

Months


Water Well Number 35 3809 E 15th St Well Statistics Date Drilled:

1978

Latitude/Longitude: 35.64 / -97.43 Elevation:

EQUIPMENT

Top Perforations:

198'

Lower Perforations:

518'

Size of Pump Column: 5.5"

Pump Set:

475'

PVC/Steel Pump:

Motor: Centripro

Pump Install Date:

Driller: Statts

625'

Pump: Christensen

Horsepower:

1100'

185

Total Depth:

Electrical Controls: VFD

Stages:

Flow (GPM):

Method of Drilling:

Number of Joints:

19

Size of Casing: 10.75"

Cable Tool

50 2008

YEAR 2011 GALLONS PER MONTH January

3,415,285

February

1,473,649

March

3,800,924

April

3,301,217

May

2,947,705

June

3,921,200

July

4,462,726

August

2,736,764

September

2,278,996

October

1,667,797

November

1,680,362

December

1,888,052

4500K

General Condition: Good

Work Performed 2011:

4000K

Performed routine maintenance

3500K

Gallons

3000K 2500K 2000K 1500K

Recommendations for 2012:

1000K

Perform routine maintenance

500K 0K

Months


Water Well Number 36 906 S Bryant Ave Well Statistics Date Drilled:

1979

Latitude/Longitude: 35.64 / -97.45 Elevation:

EQUIPMENT

Top Perforations:

132'

Lower Perforations:

595'

Size of Pump Column: 5.5"

Pump Set:

446'

PVC/Steel Pump:

Motor: Franklin

Pump Install Date:

Driller: Statts

599'

Pump: 7WAHC

Horsepower:

1100'

200

Total Depth:

Electrical Controls: ABB/DRIVE

Stages:

Flow (GPM):

Method of Drilling:

Number of Joints:

24

Size of Casing: 10.75"

Cable Tool

60 2007

YEAR 2011 GALLONS PER MONTH January

3,650,691

February

470,750

March

4,083,385

April

4,369,188

May

2,875,545

June

4,209,400

July

5,592,311

August

4,668,265

September

3,504,837

October

2,330,527

November

384,454

December

2,132,683

General Condition: Good

6000K

Work Performed 2011:

5000K

Performed routine maintenance

Gallons

4000K

3000K

2000K

Recommendations for 2012: 1000K

Perform routine maintenance

0K

Months


Water Well Number 37 3840 S Broadway Well Statistics Date Drilled:

1979

Latitude/Longitude: 35.62 / -97.49 Elevation:

EQUIPMENT

1160'

200 Driller: Statts

Total Depth:

700'

Top Perforations:

192'

Lower Perforations:

694'

Size of Pump Column: 5.5"

Pump Set:

599'

PVC/Steel Pump:

Electrical Controls: ABB/VFD Pump: Christensen Stages:

Flow (GPM):

Motor: Franklin

Method of Drilling:

Number of Joints:

29

Size of Casing: 10.75"

Cable Tool

Horsepower: Pump Install Date:

2010

YEAR 2011 GALLONS PER MONTH January

3,327,061

February

4,339,502

March

3,956,886

April

4,818,797

May

2,879,325

June

6,098,456

July

7,641,820

August

7,044,597

September

6,738,347

October

4,999,879

November

3,961,308

December

4,125,386

8000K

General Condition: Excellent

Work Performed 2011:

7000K

Performed routine maintenance

6000K

Gallons

5000K 4000K 3000K 2000K

Recommendations for 2012:

1000K

Perform routine maintenance

0K

Months


Water Well Number 38 4016 S Kelly Ave Well Statistics Date Drilled:

1980

Latitude/Longitude: 35.62 / -97.49 Elevation:

EQUIPMENT

Top Perforations:

116'

Lower Perforations:

772'

Size of Pump Column: 5.5"

Pump Set:

636'

PVC/Steel Pump:

Motor: Franklin

Pump Install Date:

Driller: Statts

797'

Pump: 7WAHC

Horsepower:

1160'

175

Total Depth:

Electrical Controls: ABB/VFD

Stages:

Flow (GPM):

Method of Drilling:

Number of Joints:

30

Size of Casing: 10.75"

Cable Tool

60 2009

YEAR 2011 GALLONS PER MONTH January

4,405,127

February

5,310,473

March

5,427,010

April

5,572,441

May

3,313,111

June

7,490,397

July

7,625,716

August

6,904,520

September

6,222,072

October

4,950,667

November

4,835,795

December

4,289,197

8000K

General Condition: Good

Work Performed 2011:

7000K

Performed routine maintenance

6000K

Gallons

5000K 4000K 3000K 2000K

Recommendations for 2012:

1000K

Perform routine maintenance

0K

Months


Water Well Number 39 2337 W 15th St Well Statistics Date Drilled:

1980

Latitude/Longitude: 35.64 / -97.51 Elevation:

EQUIPMENT

515'

Top Perforations:

182'

Lower Perforations:

460'

Pump Set:

404'

Pump: Christensen Stages: Motor: Centripro Horsepower: Pump Install Date:

1125'

Total Depth:

Electrical Controls: Square D

Method of Drilling:

Flow (GPM):

200 Driller: Statts

Number of Joints:

18

Size of Casing: 10.75" Size of Pump Column: 5.5" PVC/Steel Pump: 420' PVC

Cable Tool

40 2010

YEAR 2011 GALLONS PER MONTH January

2,087,912

February

1,281,058

March

4,425,189

April

4,738,699

May

2,971,764

June

4,360,991

July

8,779,210

August

7,992,884

September

3,693,602

October

2,346,239

November

1,133,983

December

1,455,246

10M

General Condition: Good

Work Performed 2011: Installed viynl coating to exterior of the well house.

8M

Gallons

6M

4M

Recommendations for 2012:

2M

Perform routine maintenance 0M

Months


Water Well Number 40 1045 W Waterloo Rd Well Statistics Date Drilled:

1980

Latitude/Longitude: 34.72 / -97.50 Elevation:

EQUIPMENT

Driller: Statts

465'

Top Perforations:

160'

Lower Perforations:

437'

Size of Pump Column: 5.5"

Pump Set:

340'

PVC/Steel Pump:

Pump: PSM

Motor: PSM Horsepower:

1080'

185

Total Depth:

Electrical Controls: ABB/VFD

Stages:

Flow (GPM):

Method of Drilling:

Number of Joints:

16

Size of Casing: 10.75"

Cable Tool

40

Pump Install Date:

YEAR 2011 GALLONS PER MONTH January

2,462,356

February

1,494,007

March

2,421,565

April

3,067,864

May

1,760,725

June

4,019,253

July

5,062,530

August

2,566,689

September

20,164

October

17,445

November

1,433,849

December

341,865

General Condition: Good

6000K

Work Performed 2011:

5000K

Performed routine maintenance

Gallons

4000K

3000K

2000K

Recommendations for 2012: 1000K

Perform routine maintenance

0K

Months


Water Well Number 41 1516 W Danforth Rd Well Statistics Date Drilled:

1981

Latitude/Longitude: 35.66 / -97.50 Elevation:

EQUIPMENT

583'

Top Perforations:

200'

Lower Perforations:

490'

Pump Set:

508'

Pump: Christensen Stages: Motor: Franklin Horsepower: Pump Install Date:

1150'

Total Depth:

Electrical Controls: ABB/DRIVE

Method of Drilling:

Flow (GPM):

225 Driller: Statts

Number of Joints: Size of Casing: 10.75" Size of Pump Column: 5.5" PVC/Steel Pump: Certiloc

Cable Tool

50 2009

YEAR 2011 GALLONS PER MONTH January

2,682,787

February

1,653,831

March

945,548

April

987,447

May

3,254,136

June

5,717,549

July

7,167,682

August

5,478,489

September

4,687,512

October

3,523,720

November

1,941,615

December

1,667,737

8000K

General Condition: Good

Work Performed 2011:

7000K

Performed routine maintenance

6000K

Gallons

5000K 4000K 3000K 2000K

Recommendations for 2012:

1000K

Perform routine maintenance

0K

Months


Water Well Number 42 3721 S Bryant Ave Well Statistics Date Drilled:

1981

Latitude/Longitude: 35.62 / -97.46 Elevation:

EQUIPMENT

Driller: Statts

690'

Top Perforations:

294'

Lower Perforations:

676'

Size of Pump Column: 5.5"

Pump Set:

600'

PVC/Steel Pump:

Pump: Centrilift

Motor: Centrilift Horsepower:

1160'

175

Total Depth:

Electrical Controls: ABB/VFD

Stages:

Flow (GPM):

Method of Drilling:

Number of Joints:

29

Size of Casing: 10.75"

Cable Tool

46

Pump Install Date:

YEAR 2011 GALLONS PER MONTH January

1,680,734

February

2,232,356

March

3,338,910

April

4,184,153

May

1,701,744

June

3,385,096

July

5,448,402

August

4,525,269

September

3,968,661

October

2,716,125

November

2,173,087

December

2,207,026

General Condition: Good

6000K

Work Performed 2011:

5000K

Performed routine maintenance

Gallons

4000K

3000K

2000K

Recommendations for 2012: 1000K

Perform routine maintenance

0K

Months


Water Well Number 43 2524 Hidden Valley Rd Well Statistics Date Drilled:

1981

Latitude/Longitude: 35.63 / -97.47 Elevation:

EQUIPMENT

Top Perforations:

210'

Lower Perforations:

632'

Size of Pump Column: 5.5"

Pump Set:

560'

PVC/Steel Pump:

Motor: Centripro

Pump Install Date:

Driller: Statts

700'

Pump: Christensen

Horsepower:

1130'

225

Total Depth:

Electrical Controls: Toshiba

Stages:

Flow (GPM):

Method of Drilling:

Number of Joints:

29

Size of Casing: 10.75"

Cable Tool

40 2008

YEAR 2011 GALLONS PER MONTH January

3,187,072

February

4,073,789

March

4,782,429

April

5,002,427

May

2,960,347

June

4,787,723

July

2,097,991

August

2,748,887

September

3,003,489

October

2,068,990

November

2,332,930

December

3,658,222

General Condition: Good

6000K

Work Performed 2011:

5000K

Performed routine maintenance

Gallons

4000K

3000K

2000K

Recommendations for 2012: 1000K

Perform routine maintenance

0K

Months


Water Well Number 44 2008 W Edmond Rd Well Statistics Date Drilled:

1981

Latitude/Longitude: 35.65 / -97.51 Elevation:

EQUIPMENT

510'

Top Perforations:

202'

Lower Perforations:

466'

Pump: Christiansen Stages:

1105'

Total Depth:

Electrical Controls: ABB/VFD

Pump Set: Motor: Franklin

Method of Drilling:

Flow (GPM):

270 Driller: Statts

Number of Joints:

20

Size of Casing: 10.75" Size of Pump Column: 5.5" PVC/Steel Pump:

Cable Tool

Horsepower: Pump Install Date:

2011

YEAR 2011 GALLONS PER MONTH January

4,555,836

February

3,300,034

March

7,059,734

April

6,325,964

May

0

June

819

July

5,432,651

August

6,662,127

September

0

October

0

November

57,819

December

3,827,305

8000K

General Condition: Good

Work Performed 2011:

7000K

Pulled pump and motor, video, did down hole cleaning of the casing and performed 48 hour pump test. Ordered new equipment.

6000K

Gallons

5000K 4000K 3000K 2000K

Recommendations for 2012:

1000K

Perform routine maintenance

0K

Months


Water Well Number 45 1508 W Danforth Rd Well Statistics Date Drilled:

1982

Latitude/Longitude: 35.67 / -97.50 Elevation:

EQUIPMENT

Top Perforations:

265'

Lower Perforations:

542'

Size of Pump Column: 5.5"

Pump Set:

509'

PVC/Steel Pump:

Motor: Centripro

Pump Install Date:

Driller: Statts

570'

Pump: Christensen

Horsepower:

1160'

133

Total Depth:

Electrical Controls: ABB/VFD

Stages:

Flow (GPM):

Method of Drilling:

Number of Joints:

24

Size of Casing: 10.75"

Cable Tool

30 2010

YEAR 2011 GALLONS PER MONTH January

597,107

February

1,071,084

March

2,874,339

April

3,525,482

May

1,318,596

June

2,616,916

July

6,137,557

August

3,527,413

September

2,060,705

October

533,551

November

57,036

December

676,552

7000K

General Condition: Good

Work Performed 2011:

6000K

Performed routine maintenance

5000K

Gallons

4000K

3000K

2000K

Recommendations for 2012:

1000K

Perform routine maintenance

0K

Months


Water Well Number 46 709 N University Dr Well Statistics Date Drilled:

1982

Latitude/Longitude: 35.66 / -97.47 Elevation:

EQUIPMENT

Top Perforations:

200'

Lower Perforations:

585'

Size of Pump Column: 5.5"

Pump Set:

525'

PVC/Steel Pump:

Motor: Centrapro

Pump Install Date:

Driller: Statts

590'

Pump: Christensen

Horsepower:

1180'

150

Total Depth:

Electrical Controls: ABB/VFD

Stages:

Flow (GPM):

Method of Drilling:

Number of Joints:

36

Size of Casing: 10.75"

Cable Tool

40 2008

YEAR 2011 GALLONS PER MONTH January

3,066,684

February

2,152,794

March

2,566

April

3,082,864

May

2,828,003

June

3,515,839

July

5,597,587

August

4,909,693

September

3,465,926

October

2,784,910

November

2,051,255

December

2,630,948

General Condition: Good

6000K

Work Performed 2011:

5000K

Installed new ABB/VFD

Gallons

4000K

3000K

2000K

Recommendations for 2012: 1000K

Perform routine maintenance

0K

Months


Water Well Number 47 1601 Ridgecrest Rd Well Statistics Date Drilled:

1984

Latitude/Longitude: 35.63 / -97.60 Elevation:

EQUIPMENT

1125'

150 Driller: Hemphill

Total Depth:

720'

Top Perforations:

180'

Lower Perforations:

620'

Size of Pump Column: 5.5"

Pump Set:

550'

PVC/Steel Pump:

Electrical Controls: ABB/VFD Pump: ESP Stages:

Flow (GPM):

Motor: ESP

Method of Drilling:

Number of Joints:

27

Size of Casing: 10.75"

Rotary

Horsepower: Pump Install Date:

2011

YEAR 2011 GALLONS PER MONTH January

2,766,861

February

3,159,402

March

4,286,602

April

4,877,611

May

2,047,577

June

4,696,825

July

5,337,289

August

4,676,125

September

4,005,270

October

2,640,161

November

2,329,692

December

2,336,107

General Condition: Good

6000K

Work Performed 2011:

5000K

Installed new ABB/VFD Installed new vinyl coating on exterior and rehabilitated the well head.

Gallons

4000K

3000K

2000K

Recommendations for 2012: 1000K

Perform routine maintenance

0K

Months


Water Well Number 48 520 E 9th St Well Statistics Date Drilled:

1984

Latitude/Longitude: 35.64 / -97.47 Elevation:

EQUIPMENT

720'

Top Perforations:

180'

Lower Perforations:

620'

Pump: Christensen Stages:

1130'

Total Depth:

Electrical Controls: ABB/DRIVE

Motor: Franklin

Flow (GPM):

Pump Set:

605.2'

Method of Drilling:

Rotary

175 Driller: Hemphill

Number of Joints:

28

Size of Casing: 12.75" Size of Pump Column: 5.5" PVC/Steel Pump:

Horsepower: Pump Install Date:

2010

YEAR 2011 GALLONS PER MONTH January

0

February

236,052

March

5,588,099

April

5,010,123

May

4,051,043

June

7,575,527

July

7,637,513

August

5,990,955

September

5,976,910

October

5,496,993

November

1,500,837

December

0

8000K

General Condition: Good

Work Performed 2011:

7000K

Pulled pump up 100'

6000K

Gallons

5000K 4000K 3000K 2000K

Recommendations for 2012:

1000K

Perform routine maintenance

0K

Months


Water Well Number 49 1122 N Boulevard Well Statistics Date Drilled:

1985

Latitude/Longitude: 35.67 / -97.48 Elevation:

EQUIPMENT

Driller: Henkle

600'

Top Perforations:

210'

Lower Perforations:

534'

Size of Pump Column: 5.5"

Pump Set:

529'

PVC/Steel Pump:

Christiansen

Stages:

1205'

185

Total Depth:

Electrical Controls: ABB/VFD Pump:

Flow (GPM):

Motor: Franklin

Method of Drilling:

Number of Joints:

22

Size of Casing: 12.75"

Air Rotary

Horsepower: Pump Install Date:

YEAR 2011 GALLONS PER MONTH January

0

February

0

March

0

April

3,378,399

May

3,119,033

June

615,382

July

0

August

0

September

0

October

1,680,850

November

1,486,894

December

2,511,597

3500K

General Condition: Good

Work Performed 2011:

3000K

Pulled pump and motor and videoed, cleaned casing and ran 48 hour pump test, ordered and installed new equipment. Rehabilitated the well head.

2500K

Gallons

2000K

1500K

1000K

Recommendations for 2012:

500K

Perform routine maintenance

0K

Months


Water Well Number 50 720 W Edmond Rd Well Statistics Date Drilled:

1985

Latitude/Longitude: 35.65 / -97.49 Elevation:

EQUIPMENT

1160'

150 Driller: Henkle

Total Depth:

600'

Top Perforations:

200'

Lower Perforations:

500'

Size of Pump Column: 5.5"

Pump Set:

515'

PVC/Steel Pump:

Electrical Controls: ABB/VFD Pump: Christensen Stages:

Flow (GPM):

Motor: Centripro

Method of Drilling:

Number of Joints:

25

Size of Casing: 12.75"

Air Rotary

Horsepower: Pump Install Date:

2008

YEAR 2011 GALLONS PER MONTH January

2,230,552

February

2,292,775

March

47,551

April

3,843,432

May

2,597,200

June

6,449,248

July

7,558,511

August

6,171,729

September

5,652,708

October

1,377,188

November

2,138,754

December

2,336,437

8000K

General Condition: Good

Work Performed 2011:

7000K

Performed routine maintenance

6000K

Gallons

5000K 4000K 3000K 2000K

Recommendations for 2012:

1000K

Perform routine maintenance

0K

Months


Water Well Number 51 3308 S Boulevard Well Statistics Date Drilled:

1985

Latitude/Longitude: 35.62 / -97.48 Elevation:

EQUIPMENT

Driller: Henkle

670'

Top Perforations:

200'

Lower Perforations:

670'

Size of Pump Column: 5.5"

Pump Set:

610'

PVC/Steel Pump:

Pump: PSM

Motor: PSM Horsepower:

1170'

225

Total Depth:

Electrical Controls: ABB/VFD

Stages:

Flow (GPM):

Method of Drilling:

Number of Joints:

29

Size of Casing: 12.75"

Air Rotary

60

Pump Install Date:

YEAR 2011 GALLONS PER MONTH January

3,251,754

February

3,644,648

March

4,187,468

April

4,114,024

May

3,191,701

June

6,802,916

July

5,711,443

August

5,065,857

September

5,195,743

October

4,547,364

November

3,290,678

December

3,240,214

7000K

General Condition: Good

Work Performed 2011:

6000K

Performed routine maintenance

5000K

Gallons

4000K

3000K

2000K

Recommendations for 2012:

1000K

Perform routine maintenance

0K

Months


Water Well Number 52 850 W Danforth Rd Well Statistics Date Drilled:

1986

Latitude/Longitude: 35.67 / -97.49 Elevation:

EQUIPMENT

1180'

140 Driller: Henkle

Total Depth:

590'

Top Perforations:

210'

Lower Perforations:

486'

Size of Pump Column: 5.5"

Pump Set:

491'

PVC/Steel Pump:

Electrical Controls: Benshaw Softstart Pump: Christensen Stages:

Flow (GPM):

Motor: Centripro

Method of Drilling:

Number of Joints:

24

Size of Casing: 12.75"

Air Rotary

Horsepower: Pump Install Date:

2008

YEAR 2011 GALLONS PER MONTH January

945,391

February

374,454

March

1,994,973

April

1,775,266

May

1,375,979

June

1,958,863

July

3,071,384

August

1,906,794

September

821,985

October

455,494

November

690,995

December

1,098,237

3200K

General Condition: Good

Work Performed 2011:

2800K

Performed routine maintenance

2400K

Gallons

2000K 1600K 1200K 800K

Recommendations for 2012:

400K

Perform routine maintenance

0K

Months


Water Well Number 53 326 W Danforth Rd Well Statistics Date Drilled:

1986

Latitude/Longitude: 35.67 / -97.49 Elevation:

EQUIPMENT

Driller: Henkle

535'

Top Perforations:

210'

Lower Perforations:

520'

Size of Pump Column: 5.5"

Pump Set:

490'

PVC/Steel Pump:

Pump: Centerlift

Motor: Centerlift Horsepower:

1190'

250

Total Depth:

Electrical Controls: ABB/VFD

Stages:

Flow (GPM):

Method of Drilling:

Number of Joints:

20

Size of Casing: 12.75"

Air Rotary

46

Pump Install Date:

YEAR 2011 GALLONS PER MONTH January

2,069,755

February

2,292,466

March

3,410,221

April

4,281,627

May

2,285,799

June

5,524,547

July

5,706,258

August

4,829,170

September

4,551,618

October

2,283,622

November

1,772,392

December

2,651,917

General Condition: Good

6000K

Work Performed 2011:

5000K

Performed routine maintenance

Gallons

4000K

3000K

2000K

Recommendations for 2012: 1000K

Perform routine maintenance

0K

Months


Water Well Number 54 1640 E 33rd St Well Statistics Date Drilled:

1986

Latitude/Longitude: 35.62 / -97.46 Elevation:

EQUIPMENT

Top Perforations:

210'

Lower Perforations:

638'

Size of Pump Column: 5.5"

Pump Set:

557'

PVC/Steel Pump:

Motor: Centripro

Pump Install Date:

Driller: Henkle

652'

Pump: Christensen

Horsepower:

1160'

215

Total Depth:

Electrical Controls: ABB/VFD

Stages:

Flow (GPM):

Method of Drilling:

Number of Joints:

24

Size of Casing: 12.75"

Air Rotary

50 2008

YEAR 2011 GALLONS PER MONTH January

4,213,614

February

4,435,224

March

6,288,640

April

6,084,261

May

3,448,159

June

6,869,155

July

8,776,742

August

8,257,444

September

6,987,210

October

5,380,295

November

2,863,113

December

3,133,879

10M

General Condition: Good

Work Performed 2011: Installed new viynl coating on exterior of well house

8M

Gallons

6M

4M

Recommendations for 2012:

2M

Perform routine maintenance 0M

Months


Water Well Number 55 501 Pepperdine Ave Well Statistics Date Drilled:

1992

Latitude/Longitude: 35.62 / -97.47 Elevation:

EQUIPMENT

675'

Top Perforations:

248'

Lower Perforations:

590'

Pump Set:

650'

Pump: Christiansen Stages: Motor: Franklin Horsepower:

1162'

Total Depth:

Electrical Controls: ABB

Method of Drilling:

Flow (GPM):

225 Driller: Henkle

Number of Joints:

65

Size of Casing: 12.75" Size of Pump Column: 4" PVC/Steel Pump:

Rotary

60

Pump Install Date:

YEAR 2011 GALLONS PER MONTH January

3,790,568

February

5,630,512

March

5,827,209

April

5,978,650

May

3,705,835

June

5,885,994

July

8,067,930

August

2,034,086

September

0

October

0

November

0

December

0

9000K

General Condition: Good

Work Performed 2011:

8000K

Pulled pump and motor, video, did down hole cleaning of the casing and performed 48 hour pump test. Ordered new equipment.

7000K

Gallons

6000K 5000K 4000K 3000K 2000K

Recommendations for 2012:

1000K

Perform routine maintenance

0K

Months


Water Well Number 56 3831 Marked Tree Dr Well Statistics Date Drilled:

1992

Latitude/Longitude: 35.62 / -97.45 Elevation:

EQUIPMENT

640'

Top Perforations:

226'

Lower Perforations:

620'

Pump: Christensen Stages: Motor: Franklin Horsepower: Pump Install Date:

1130'

Total Depth:

Electrical Controls: ABB/DRIVE

Flow (GPM):

Pump Set:

567.7'

Method of Drilling:

Rotary

175 Driller: Henkle

Number of Joints:

63

Size of Casing: 12.75" Size of Pump Column: 5.5" PVC/Steel Pump:

60 2008

YEAR 2011 GALLONS PER MONTH January

2,230,886

February

2,077,430

March

3,532,778

April

4,301,364

May

2,228,032

June

3,152,237

July

5,436,433

August

6,154,604

September

3,494,426

October

193,508

November

864,313

December

1,896,084

7000K

General Condition: Good

Work Performed 2011:

6000K

Rehabilitated the well head

5000K

Gallons

4000K

3000K

2000K

Recommendations for 2012:

1000K

Perform routine maintenance

0K

Months


Water Well Number 57 2204 Aurora Rd Well Statistics Date Drilled:

2001

Latitude/Longitude: 35.63 / -97.51 Elevation:

EQUIPMENT

525'

Top Perforations:

220'

Lower Perforations:

490'

Pump Set:

475'

Pump: Chirstensen Stages:

1120'

Total Depth:

Electrical Controls: ABB/VFD

Motor: Franklin

Method of Drilling:

Flow (GPM):

350 Driller: Henkle

Number of Joints: Size of Casing: 10.75" Size of Pump Column: 4" PVC/Steel Pump:

Rotary

Horsepower: Pump Install Date:

2010

YEAR 2011 GALLONS PER MONTH January

1,630,239

February

6,454,393

March

7,232,548

April

8,582,669

May

5,339,902

June

9,947,074

July

10,987,228

August

10,181,077

September

8,084,537

October

7,641,261

November

6,148,792

December

5,238,910

General Condition: Good

12M

Work Performed 2011:

10M

Performed routine maintenance

Gallons

8M

6M

4M

Recommendations for 2012: 2M

Perform routine maintenance

0M

Months


Water Well Number 58 2175 W Covell Rd Well Statistics Date Drilled:

2001

Latitude/Longitude: 35.68 / -97.51 Elevation:

EQUIPMENT

425'

Top Perforations:

256'

Lower Perforations:

405'

Pump Set:

340'

Pump: Christensen Stages: Motor: Centripro Horsepower: Pump Install Date:

1100'

Total Depth:

Electrical Controls: ABB/VFD

Method of Drilling:

Flow (GPM):

140 Driller: Henkle

Number of Joints: Size of Casing: 10.75" Size of Pump Column: 4" PVC/Steel Pump:

Rotary

30 2008

YEAR 2011 GALLONS PER MONTH January

1,144,778

February

926,268

March

2,366,380

April

2,596,318

May

1,911,329

June

3,557,131

July

4,299,364

August

3,828,193

September

2,394,537

October

1,782,188

November

265,399

December

983,927

4500K

General Condition: Good

Work Performed 2011:

4000K

Performed routine maintenance

3500K

Gallons

3000K 2500K 2000K 1500K

Recommendations for 2012:

1000K

Perform routine maintenance

500K 0K

Months


Water Well Number 59 3336 N Santa Fe Ave Well Statistics Date Drilled:

2001

Latitude/Longitude: 35.69 / -97.51 Elevation:

EQUIPMENT

425'

Top Perforations:

254'

Lower Perforations:

396'

Pump Set:

387'

Pump: Christensen Stages: Motor: Franklin Horsepower: Pump Install Date:

1140'

Total Depth:

Electrical Controls: ABB/VFD

Method of Drilling:

Flow (GPM):

120 Driller: Henkle

Number of Joints: Size of Casing: 10.75" Size of Pump Column: 4" PVC/Steel Pump:

Rotary

50 2005

YEAR 2011 GALLONS PER MONTH January

1,613,276

February

1,515,712

March

2,720,045

April

2,655,660

May

1,907,912

June

3,570,471

July

3,256,164

August

3,327,616

September

2,181,528

October

1,703,712

November

142,197

December

1,517,662

4000K

General Condition: Good

Work Performed 2011:

3500K

Performed routine maintenance

3000K

Gallons

2500K 2000K 1500K

Recommendations for 2012:

1000K

Perform routine maintenance

500K 0K

Months


Water Well Number 60 2932 Shortgrass Rd Well Statistics Date Drilled:

2002

Latitude/Longitude: 35.68 / -97.48 Elevation:

EQUIPMENT

385'

Top Perforations:

216'

Lower Perforations:

360'

Pump Set:

320'

Pump: PSM Stages:

1167'

Total Depth:

Electrical Controls: ABB/VFD

Motor: PSM

Method of Drilling:

Flow (GPM):

171 Driller: Henkle

Number of Joints: Size of Casing: 10.75" Size of Pump Column: 4" PVC/Steel Pump:

Rotary

Horsepower: Pump Install Date:

2006

YEAR 2011 GALLONS PER MONTH January

1,675,872

February

1,398,845

March

2,702,801

April

3,394,682

May

2,236,839

June

3,267,524

July

5,022,863

August

4,922,049

September

3,328,175

October

973,943

November

1,284,895

December

1,502,321

General Condition: Good

6000K

Work Performed 2011:

5000K

Performed routine maintenance

Gallons

4000K

3000K

2000K

Recommendations for 2012: 1000K

Perform routine maintenance

0K

Months


Water Well Number 61 828 Ascot Well Statistics Date Drilled:

2002

Latitude/Longitude: 35.69 / -97.47 Elevation:

EQUIPMENT

475'

Top Perforations:

232'

Lower Perforations:

460'

Pump Set:

366'

Pump: Christensen Stages:

1193'

Total Depth:

Electrical Controls: ABB/VFD

Motor: Centripro

Method of Drilling:

Flow (GPM):

200 Driller: Henkle

Number of Joints: Size of Casing: 10.75" Size of Pump Column: 4" PVC/Steel Pump:

Rotary

Horsepower: Pump Install Date:

2008

YEAR 2011 GALLONS PER MONTH January

3,374,379

February

2,714,392

March

5,215,413

April

5,213,212

May

3,156,587

June

4,345,041

July

6,639,593

August

5,562,741

September

4,202,950

October

1,958,083

November

1,836,694

December

4,440,396

7000K

General Condition: Good

Work Performed 2011:

6000K

Performed routine maintenance

5000K

Gallons

4000K

3000K

2000K

Recommendations for 2012:

1000K

Perform routine maintenance

0K

Months


Water Well Number 62 5001 E 15th St Well Statistics Date Drilled:

2005

Latitude/Longitude: 35.64 / -97.42 Elevation:

EQUIPMENT

442'

Top Perforations:

300'

Lower Perforations:

412'

Pump: Christensen Stages:

1083'

Total Depth:

Electrical Controls: ABB/VFD

Pump Set: Motor: Franklin

Method of Drilling:

Flow (GPM):

340.8'

100 Driller: Layne

Number of Joints:

16

Size of Casing: 10.75" Size of Pump Column: 4" PVC/Steel Pump:

Air Rotary

Horsepower: Pump Install Date:

2010

YEAR 2011 GALLONS PER MONTH January

1,335,587

February

489,366

March

1,362,109

April

2,255,529

May

1,360,875

June

2,345,786

July

3,389,506

August

2,187,278

September

1,911,743

October

381,041

November

633,783

December

1,190,435

3500K

General Condition: Good

Work Performed 2011:

3000K

Performed routine maintenance

2500K

Gallons

2000K

1500K

1000K

Recommendations for 2012:

500K

Perform routine maintenance

0K

Months


Water Well Number 63 5655 E 15th St Well Statistics Date Drilled:

2005

Latitude/Longitude: 35.64 / -97.41 Elevation:

EQUIPMENT

420'

Top Perforations:

214'

Lower Perforations:

392'

Pump: Christensen Stages:

1075'

Total Depth:

Electrical Controls: ABB/VFD

Pump Set: Motor: Franklin

Method of Drilling:

Flow (GPM):

340.8'

90 Driller: Layne

Number of Joints:

16

Size of Casing: 10.75" Size of Pump Column: 4" PVC/Steel Pump:

Air Rotary

Horsepower: Pump Install Date:

2010

YEAR 2011 GALLONS PER MONTH January

628,343

February

176,873

March

623,746

April

790,795

May

631,834

June

613,190

July

1,075,606

August

920,565

September

56,042

October

215,509

November

270,712

December

637,796

General Condition: Good

1200K

Work Performed 2011:

1000K

Performed routine maintenance

Gallons

800K

600K

400K

Recommendations for 2012: 200K

Perform routine maintenance

0K

Months


Water Well Number 64 6401 E 15th St Well Statistics Date Drilled:

2005

Latitude/Longitude: 35.64 / -97.40 Elevation:

EQUIPMENT

420'

Top Perforations:

214'

Lower Perforations:

416'

Pump: Christensen Stages:

1085'

Total Depth:

Electrical Controls: ABB/VFD

Pump Set: Motor: Franklin

Method of Drilling:

Flow (GPM):

362.1'

200 Driller: Layne

Number of Joints:

17

Size of Casing: 10.75" Size of Pump Column: 4" PVC/Steel Pump:

Air Rotary

Horsepower: Pump Install Date:

2010

YEAR 2011 GALLONS PER MONTH January

1,329,274

February

323,604

March

1,416,302

April

2,132,973

May

1,146,860

June

3,193,015

July

5,225,526

August

4,513,064

September

1,772,414

October

1,710,238

November

893,243

December

1,377,151

General Condition: Good

6000K

Work Performed 2011:

5000K

Performed routine maintenance

Gallons

4000K

3000K

2000K

Recommendations for 2012: 1000K

Perform routine maintenance

0K

Months


Water Well Number 65 10570 E 15th St Well Statistics Date Drilled:

2007

Latitude/Longitude: 35.64 / -97.34 Elevation:

EQUIPMENT

Stages:

192'

Lower Perforations:

470'

Pump Set:

451'

Motor: Centripro

Method of Drilling:

130 Driller: Layne

Number of Joints:

Top Perforations:

Pump: Layne

Horsepower:

500'

Total Depth:

Electrical Controls: ABB

Flow (GPM):

Size of Casing: 10.75" Size of Pump Column: 4" PVC/Steel Pump:

Air Rotary

25

Pump Install Date:

YEAR 2011 GALLONS PER MONTH January

2,640,507

February

1,081,145

March

2,289,897

April

2,544,314

May

886,934

June

1,722,545

July

3,679,505

August

3,180,405

September

2,796,278

October

1,553,826

November

1,710,853

December

3,069,865

4000K

General Condition: Good

Work Performed 2011:

3500K

Performed routine maintenance

3000K

Gallons

2500K 2000K 1500K

Recommendations for 2012:

1000K

Perform routine maintenance

500K 0K

Months


Water Well Number 66 2200 S Post Rd Well Statistics Date Drilled:

2007

Latitude/Longitude: 35.63 / -97.34 Elevation:

EQUIPMENT

Stages:

200'

Lower Perforations:

466'

Pump Set:

451'

Motor: Centripro

Method of Drilling:

130 Driller: Layne

Number of Joints:

Top Perforations:

Pump: Layne

Horsepower:

500'

Total Depth:

Electrical Controls: ABB

Flow (GPM):

Size of Casing: 10.75" Size of Pump Column: 4" PVC/Steel Pump:

Air Rotary

25

Pump Install Date:

YEAR 2011 GALLONS PER MONTH January

2,309,869

February

1,026,372

March

2,310,378

April

2,527,500

May

972,645

June

1,621,435

July

3,109,035

August

2,775,925

September

1,819,355

October

1,525,589

November

1,269,138

December

2,708,251

3500K

General Condition: Good

Work Performed 2011:

3000K

Performed routine maintenance

2500K

Gallons

2000K

1500K

1000K

Recommendations for 2012:

500K

Perform routine maintenance

0K

Months


Water Well Number 67 2900 S Post Rd Well Statistics Date Drilled:

2007

Latitude/Longitude: 35.63 / -97.35 Elevation:

EQUIPMENT

Stages:

220'

Lower Perforations:

510'

Pump Set:

493'

Motor: Centripro

Method of Drilling:

130 Driller: Layne

Number of Joints:

Top Perforations:

Pump: Layne

Horsepower:

540'

Total Depth:

Electrical Controls: ABB

Flow (GPM):

Size of Casing: 10.75" Size of Pump Column: 4" PVC/Steel Pump:

Air Rotary

25

Pump Install Date:

YEAR 2011 GALLONS PER MONTH January

2,502,192

February

1,186,947

March

2,264,447

April

2,462,528

May

977,606

June

1,615,827

July

2,904,041

August

2,506,242

September

2,118,787

October

1,127,514

November

1,127,724

December

1,896,951

3200K

General Condition: Good

Work Performed 2011:

2800K

Performed routine maintenance

2400K

Gallons

2000K 1600K 1200K 800K

Recommendations for 2012:

400K

Perform routine maintenance

0K

Months


Water Well Number 68 10539 E 33rd St Well Statistics Date Drilled:

2007

Latitude/Longitude: 35.62 / -97.34 Elevation:

EQUIPMENT

Stages:

222'

Lower Perforations:

494'

Pump Set:

493'

Motor: Centripro

Method of Drilling:

130 Driller: Layne

Number of Joints:

Top Perforations:

Pump: Layne

Horsepower:

540'

Total Depth:

Electrical Controls: ABB

Flow (GPM):

Size of Casing: 10.75" Size of Pump Column: 4" PVC/Steel Pump:

Air Rotary

25

Pump Install Date:

YEAR 2011 GALLONS PER MONTH January

2,416,493

February

1,005,441

March

2,137,410

April

2,208,580

May

969,402

June

1,864,105

July

3,043,503

August

2,673,834

September

1,845,674

October

1,586,626

November

1,590,597

December

2,503,953

3200K

General Condition: Good

Work Performed 2011:

2800K

Performed routine maintenance

2400K

Gallons

2000K 1600K 1200K 800K

Recommendations for 2012:

400K

Perform routine maintenance

0K

Months


69 67 65 63 61 59 57 55 53 51 49 47 45 43 41 39 37 35 33 31 29 27 25 23 21 19 15 11 9 3


City of Edmond

Waterloo Rd

Sorghum Mill Rd 35

A

Coffee Creek Rd

Covell Rd

Danforth Rd

B

Edmond Rd

C

15th St

D

33rd St

Arcadia Lake 35

E

Memorial Rd

0

0.5

1

2 Miles

Legend City Limits Railroad

January 14, 2009 The City of Edmond disclaims any warranty or merchantability or warranty for fitness of use for a particular purpose, expressed or implied, with respect to this data. Furthermore, the City of Edmond disclaims any responsibility for the accuracy or completeness of this data.

Streets

Water Well Zone A

Water Well Zone B

Water Well Zone C Water Well Zone D Water Well Zone E

Westminster Rd

Post Rd

Douglas Blvd

Midwest Blvd

Air Depot Blvd

Sooner Rd

Coltrane Rd

Bryant Ave

Broadway

Kelly Ave

Santa Fe Ave

Western Ave

Water Well Zones


Zone A (North of Danforth Road) 1200 1000 800 600

Static

400

Pumping

200 0 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011

Zone B (Danforth Road to Edmond Road) 1200 1000 800 600

Static

400

Pumping

200 0 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011

Zone C (Edmond Road to Fifteenth Street) 1200 1000 800 Static

600

Pumping

400 200 0 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011


Zone D (Fifteenth Street to Thirty-Third Street) 1000 800 600

Static

400

Pumping

200 0 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011

Zone E (Thirty-Third Street to Memorial Road) 1000 800 600

Static

400

Pumping

200 0 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011


Permit Statistics OWRB Permit No. 19551287 19551288 19740466

Wells Under This Permit

8, 9 2, 3, 4, 5, 6, 7 (All removed from service) 10, 11, 14, 15 (12, 16, 17 removed from service)

Acres Under Permit

Acre Feet per Year

Million Gallons per Year

0*

638

208

0*

1,915

624

0*

2,234

728

19740205

18, 19, 20, 21, 22, 23, 24, 39

0*

2,553

832

19770789

26, 27, 28, 29, 32, 33, 42, 46, 47, 48, 49, 50, 51, 52, 53, 54, 55, 56

8,290

5,745

1,872

19780508

40

144

319

104

19830664

25, 30, 31, 34, 35, 36, 37, 38, 41, 43, 44, 45

3850

3,830

1,248

20000514

57, 58

367

734

239

20010575

59

278

555

181

20010576

60, 61

131

261

85

20040566

62, 63, 64

447

894

291

20050573

65, 66, 67, 68

320

640

209

13,827

20,318

6,621

TOTALS:

*Per OWRB Records These Permits Do Not Specify Acreage


Section 4 Field Services


2011 FIELD SERVICES UTILITY LINE MAINTENANCE

Keith Stewart Superintendent

Guy Cuccio Wastewater Division Supervisor

Aaron Stewart Water Division Supervisor

Josh Beck Maintenance

Hunter Hill Maintenance

Gene Tiller Maintenance

Julio Luna Maintenance

Felix Derousselle Maintenance

Larry Mathews Maintenance

Gus Johnson Maintenance

Scott Rohrer Maintenance

Kurtis Kennedy Maintenance

BJ Judkins Maintenance

Jason Pirkle Maintenance

Bud Cartwright Maintenance

Joe Scamman Maintenance

Jarrold Stephens Maintenance

Josh Jarnagin Maintenance

Bobby Gunter Maintenance

Cody Ayers Maintenance

Les McKey Maintenance

Jimmy Stegall Maintenance

Mike Bingham Maintenance

Richard Allen Maintenance

Ed Prock Maintenance

Tom Messer Maintenance

Bobby Weedn Maintenance

Jeremy Kelly Maintenance

Mike Pickle Maintenance

George McHone Maintenance

Russell Stanford Maintenance

Kriston Bartz Maintenance

Gary Triplett Maintenance


PUBIC WORKS FIELD SERVICES Field Services is made up of four divisions; Water Line Maintenance, Wastewater Line Maintenance, Street Maintenance and Traffic. The department as a whole employs 66 individuals, with the Field Services Superintendent’s responsibilities being split between the divisions. The water, wastewater and street groups have been cross trained in the various job functions of each group. This has allowed the department to staff for normal demand, but be able to respond, in force, to peak demand. The Administrative staff, which has also been consolidated, functions much the same way as operations. Field Services is still responsible for the health and well-being of City of Edmond customers by providing quality water and removing wastewater in a safe, efficient manner. Field Services prides itself on its excellent customer service. It is never a pleasant experience to have a water leak in your front yard or have a blockage in the wastewater line, but through excellent customer service and positive attitude we strive to make these experiences as painless as possible.


PUBIC WORKS FIELD SERVICES WATER LINE MAINTENANCE History of the Water Line Maintenance Division goes back to 1889 when the first water well was hand dug in Edmond. The first tower was constructed in 1909 at 27 W. Third Street. Beginning with only a couple of people, the Water Line Maintenance Division grew to 28 employees in 1984. Since then the area of responsibility has continued to expand but manpower has been downsized through better management practices and technological advances. Water Line Maintenance Division is comprised of twenty (19) positions, which includes eighteen (18) public health professionals and one (1) supervisor. The Water Line Maintenance Division’s function is maintaining Edmond’s 463 miles of water distribution system, 4140 hydrants in the fire protection system and 27,897 residential and commercial meters. In the last year there were 11.24 miles of new water line added to the distribution system. The Division is responsible for the following main areas:


PUBIC WORKS FIELD SERVICES Emergency repair of water main breaks and service line leaks - Every call Water Line Maintenance receives is treated as an emergency, until crews are on site and make an informed decision of the severity of the leak. If the leak is an immediate threat to health or property, emergency locates will be called in and the repair will be made as quickly and safely as possible. If the leak is not an immediate threat to health or property, forty-eight (48) hour locates will be called in, and the leak scheduled as time permits. Water Line Maintenance repaired 55 main breaks in the last year. Installation of new residential meters - There are currently two options for new services to be installed in the City of Edmond. Contractors can choose to have Water Line Maintenance install the service line; setter and meter can or have a contractor install the service. All parts installed for new services must be purchased from and approved by Utility Line Maintenance. If the resident chooses to have a contractor install the service, Utility Line Maintenance inspects the quality of work and physically installs the meter after the inspection. Last year Water Line Maintenance installed 234 new meters and contractors installed 176 new residential and commercial meters. Preventative maintenance of system valves and fire hydrants – Preventative maintenance is the backbone of any good water distribution system. Currently Water Line Maintenance has two employees performing preventative maintenance on valves and one employee performing preventative maintenance of fire hydrants. In the last year numerous valves have been found buried, missing or non-functional. Water Line Maintenance is working diligently to rectify the valve situation throughout the system. Throughout the previous year Water Line Maintenance has inspected and operated 8,794 valves and 3,120 fire hydrants. Perform utility line locates to minimize the damage to City of Edmond’s water and wastewater utilities due to excavation around the utilities. In the last year, Water Line Maintenance actually located 3,338 requests for utility line locates. Maintain fifteen (15) year meter change out program. In the last year 837 meters were changed out. Water Line Maintenance is currently conducting testing on the meters that are removed to ascertain what time frame would provide the lost/benefit ratio. Street Maintenance continues to replace sod and concrete that is removed by the Water Line Maintenance crews. It was determined the department could perform the work more efficiently, productively and maintain a better-finished product than an outside contractor. Continue updating of all utility maps. Accurate mapping is one of the most useful tools at our disposal. When working with maps on a daily basis, the employees are constantly finding discrepancies between the maps and what is actually in the system. When these problems are found it requires a joint effort with Management Information System (MIS) to make the corrections to ensure that we have the best possible data that we can get. Leak detection is a large part of the preventative maintenance program conducted throughout Water Line Maintenance. Numerous leaks have been located while they are still small and repaired that would normally not have been found until they were large enough to be noticed. This also aids in tracking unaccounted water.


PUBIC WORKS FIELD SERVICES WASTEWATER LINE MAINTENANCE Wastewater Line Maintenance history started when the division was created in 1972. Before then, the Sanitation Department was responsible for taking care of problems in the collection system. The line maintenance division worked out of the old City Garage barn at 27 W. Third Street, which is now demolished. Over the years three buildings were constructed at 100 N. Kelly, which became the site for the Wastewater Line Maintenance Division. In 1994 the division was moved back to 27 W. Third. Wastewater Line Maintenance is comprised of (14) positions, which include thirteen (13) public health professionals and one (1) supervisor. The function of the Wastewater Line Maintenance Division is maintaining Edmond’s 423 miles of gravity mainline, 22 miles of force main, 3 siphon sewers, and 10,723 manholes. The surface area of the collection system is 36,591 acres. In the last year there were 5.96 miles of new wastewater lines added to the collection system. The division is responsible for the following main areas:


PUBIC WORKS FIELD SERVICES Wastewater Line Maintenance performs preventative maintenance of the collection system daily by four (4) basic methods, hydraulic cleaning, video inspection, mechanical root removal and chemical root control. Wastewater Line Maintenance strives to be proactive in its preventative maintenance program. In the last year Wastewater Line Maintenance hydraulically cleaned 419,163 feet of collection system, performed video inspection of 188,482 feet of collection system and performed mechanical root removal on 128,899 feet of wastewater lines. In addition, 123,453 feet of the collection system was chemically treated for roots. The chemical treatment was performed by an outside contractor. Collection system blockage removal is treated as an emergency on every call that is received. Wastewater Line Maintenance treats blockages as emergencies because crews need to be on site to determine what the problem is and what needs to be done to rectify the situation. There are a number of ways to remove blockages in the collection system, but the two most common are hydraulic cleaning and mechanical sawing. In the last year Wastewater Line Maintenance removed 105 blockages from the collection system, and had a total of 68 Sanitary Sewer Overflows or 15.28 per 100 miles of collection system. Emergency and point repairs are also made throughout the collection system. Point repairs are sometimes as simple as a cracked joint of pipe to slight offsets in the bells of the pipes where they go together to emergency repairs which usually constitute a total failure in the system (collapsed line). In the last year Wastewater Line Maintenance made 37-point repairs. Manhole inspections are conducted to ensure the integrity, stability and cleanliness. Manholes should be free of any waste and grit that may accumulate in the opening. There were 2,344 manholes inspected during the year, and 46 manholes were either raised or repaired.


2011 BY PASS REPORT ADDRESS AND MANHOLE ID NUMBER 2108 Smiling Hills Blvd. M/H # 26294 2704 Fairfield Dr. M/H # 19329 3531 Wynn Circle M/H # 20448 3500 Smoky Hollow Rd M/H # 24512 2413 Bent Trail Rd. M/H # 19043 1312 Fox Lake Lane M/H # 22995 1701 S. Rankin St. M/H # 25934 2113 Raintree Rd. 400 W. Edmond Rd. M/H # 21958 401 E. 13th St. Coffee Creek Rd. & Santa Fe Ave. 620 W. Danforth Rd. M/H # 27511 3816 Jim Robinson (cleanout) 301 Dennis St. M/H # 21912 22 E. 2nd St. (cleanout) 729 Howard Ct. 512 Cinnamon Dr. M/H # 21200 1015 Locust Lane (cleanout) 825 W. 8th St. M/H # 22014 3709 Walking Sky Rd. M/H # 22955 1305 Knights Bridge Rd. M/H # 22873 1006 Castle Rd. (cleanout) 301 Meadow Lake Dr. M/H 21658 901 Sandhurst Dr. (cleanout) Danforth Rd. & Homestead Blvd. M/H # 18759 2513 Tredington Way M/H # 24109 2916 Woodhollow Trail M/H # 18983 500 S. State St. lot #17 M/H # 22115 817 Brett Dr. (cleanout) 23 E. 21st St. M/H # 20655 136 Ann Arbor (cleanout) 712 Pine Oak Dr. M/H # 25626 600 Lilac Dr. 507 S. Boulevard M/H # 22234 1020 N. Blackwelder (cleanout) 1300 Cedar Ridge Rd. (cleanout)

DATE 1/3/2011 1/4/2011 1/6/2011 1/7/2011 1/8/2011 1/8/2011 1/10/2011 1/14/2011 1/24/2011 1/26/2011 2/3/2011 2/10/2011 2/10/2011 2/13/2011 2/19/2011 2/26/2011 3/24/2011 3/26/2011 4/5/2011 4/16/2011 4/27/2011 5/4/2011 5/6/2011 5/8/2011 5/13/2011 5/16/2011 5/20/2011 5/20/2011 5/31/2011 6/2/2011 6/17/2011 6/17/2011 6/18/2011 6/23/2011 6/27/2011 6/28/2011

ESTIMATED GALLONS 1,000 50 200 3,000 2,000 1,500 1,500 100 100 100 165,000 100 20 500 100 300 100 50 300 2,000 5,000 100 30 50 2,000 500 2,000 800 100 500 50 200 3,000 300 300 100

REASONS Roots and grease Grease and debris Grease and debris Roots and grease Roots and grease Grease and debris Debris Roots Roots and debris Roots Broken line Grease Roots Roots and debris Collapse 4" service line Roots Roots Roots Debris Roots Damage main Roots Roots Grease and debris Debris Debris Roots Roots and rags Roots Roots and debris Roots and debris Roots, debris & rags Broken pipe Roots and rags Roots Roots


2011 BY PASS REPORT (Continued) ADDRESS AND MANHOLE ID NUMBER 603 S. Littler Ave M/H # 78387 729 S. Littler Ave. M/H # 78643 1801 Edgewood Dr. M/H # 79049 2702 S. Broadway (cleanout) 3408 Smoky Hollow Rd. M/H # 24511 1709 Canary Ct. M/H # 23535 1015 E. Hurd St. M/H #25435 3205 Rankin Terrace M/H # 26107 1812 Fox Hunt Lane (cleanout) 811 Sunny Brook Dr. M/H # 22601 817 Brett Dr. (cleanout) 150' west of Santa Fe & south side Coffee Creek (broken pipe) 3400 Creek Spur Rd. (equipment problem) 930 S. Boulevard (private property) 425 Jacob St. (M/H # 25331) 1212 East Dr. (inside of house) 220 & 320 E. 14th St. (inside of house) 40th St. Lift Station (WWTP) 1800 Geeta Rd. (cleanout) 2204 Brookhaven Dr. M/H # 79035, 22580 & 22579 2528 Antelope Circle M/H # 19058 3325 E. 33rd St. M/H # 20422 2708 E. 33rd St. 1404 E. 9th St. M/H # 25754 151 Brad. St. M/H # 21962 620 W. Danforth Rd. M/H # 27511 2713 Woodbury Rd. (cleanout) 412 S. Bryant Ave. (private manhole) 188 E. 33rd St. M/H # 20422 2113 Bent Twig Rd. M/H # 24840

DATE

ESTIMATED GALLONS

REASONS

7/2/2011 7/17/2011 7/22/2011 7/26/2011 8/6/2011 8/9/2011 8/23/2011 9/12/2011 9/28/2011 10/13/2011 10/14/2011 10/25/2011

100 50 1,000 500 1,500 9,000 500 200 10 4,000 20 500

Roots Roots Roots Grease Roots and grease Roots and grease Roots and grease Roots and debris Roots Roots and debris Roots Broken pipe

11/1/2011 11/2/2011 11/4/2011 11/7/2011 11/8/2011 11/8/2011 11/8/2011 11/8/2011

23,580 200 5,000 1,000 500 8,400 500 65,000

Equipment problem Debris Debris, rags & plastic bags Roots and debris Grease Equipment problem Roots and debris Roots

11/13/2011 11/13/2011 11/14/2011 11/17/2011 11/17/2011 12/5/2011 12/6/2011 12/9/2011 12/15/2011 12/25/2011

1,500 1,000 40,000 100 30,000 1,000 500 1,000 1,000 500

Roots and debris Grease and debris Damage main Debris Grease and debris Grease Roots and grease Debris Grease and debris Roots


2011 Wastewater Bypass Manholes & Addresses Investigated ! (

! (

! (! ( ! ! ( (

! (

! ( ! (

! ( ! (

! (

( !! ! ( (

! ( ! ( ! ( ! ( ! ( (! ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ( !! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ! ( ( !! (

! (

! (

! ( ! (


2011 STOP-UPS Stop Up Address 2108 Smiling Hills Blvd. 917 State St. 2704 Fairfield Dr. 3531 Wynn Circle 3500 Smoky Hollow Rd. 2413 Bent Trail Rd. 1312 Fox Lake Lane 1701 S. Rankin St. 2113 Raintree Rd. 400 W. Edmond Rd. 401 E. 13th St. Coffee Creek Rd. & Santa Fe Ave. 20 S. Bryant Ave. 620 W. Danforth Rd. 3816 Jim Robinson Rd. 301 Dennis St. 22 E. 6th St. 729 Howard Ct. 2012 Mistletoe Ct. 525 N. University 2116 Ridgecrest Dr. 2124 Trailwood Rd. 2903 Wanetta Ave 825 W. 8th St. 1007 Northbrook Ave. 401 Lanes Turn 427 Chartrand Ave. 4500 Steven Dr. 3709 Walking Sky Rd. 817 Harward Ct. 2220 S. Broadway Ave. 1305 Knights Bridge Rd. 18 N. Trail Ridge Rd. 1006 Castle Rd. 301 Meadow Lake Dr. 901 Sandhurst Dr. 608 Nimrod

Date 1/3/2011 1/4/2011 1/4/2011 1/6/2011 1/7/2011 1/8/2011 1/8/2011 1/10/2011 1/14/2011 1/24/2011 1/26/2011 2/3/2011 2/4/2011 2/10/2011 2/10/2011 2/13/2011 2/19/2011 2/26/2011 3/7/2011 3/29/2011 3/30/2011 3/30/2011 4/1/2011 4/5/2011 4/6/2011 4/7/2011 4/8/2011 4/9/2011 4/16/2011 4/17/2011 4/22/2011 4/27/2011 5/3/2011 5/4/2011 5/6/2011 5/8/2011 5/12/2011

Manholes Inspected 2108 Smiling Hills Blvd. # 26294 917 State St. # 22068 2704 Fairfield Dr. # 19329 3527 & 3531 Wynn Circle # 20449 & 20448 3500 Smoky Hollow Rd # 24512 2413 Bent Trail Rd # 19043 1305 Fox Lake Lane # 22995 1701 S. Rankin St. # 25531 & 25920 2113 Raintree Rd. # 24396 400 W. Edmond Rd. # 21958 401 E. 13th St. #25550 & 25546 Broken line 20 S Bryant Ave. # 23860 & 23861 620 W Danforth Rd. # 27511 3816 Jim Robinson Rd. # 26222 301 Dennis St. # 21912 22 E. 6th St. # 22208 729 Howard Ct. # 22057 2012 Mistletoe Ct. # 23560 & 23518 525 N. University # 25424 2116 Ridgecrest Dr. # 25732 & 25894 2124 Trailwood Rd. # 23909 & 23879 2903 Wanetta Ave # 26099 & 26098 825 W. 8th St. #22014 1007 Northbrook Ave. # 24794 401 Lanes Turn # 21707 & 21708 427 Chartrand Ave. # 25304 & 25386 4500 Steven Dr. # 23307 3709 Walking Sky Rd. # 22955 817 Harward Dr. # 26265 2220 S. Broadway Ave. # 20622 1305 Knights Bridge Rd. # 22873 18 N. Trail Ridge Rd. # 19029 1006 Castle Rd. # 25311 301 Meadow Lake Dr. # 21658 908 Sandhurst Dr. # 24092 508 & 608 Nimrod # 21152 & 21169


2011 STOP-UPS (Continued) Stop Up Address Danforth Rd. & Homestead Blvd. 2513 Tredington Way 2916 Woodhollow Trail 500 S. State St. lot # 17 521 W. 10th St. 301 Meadow Lake Dr. 817 Brett Dr. 23 E. 21st St. 136 Ann Arbor 712 Pine Oak De. 600 Lilac Dr. 507 S. Boulevard 1020 N. Blackwelder 1300 Cedar Ridge Rd. 3705 Springhill Dr. 603 S. Littler Ave. 1809 Godhania Rd. 729 S. Littler Ave. 1801 Edgewood Dr. 1805 Craig Blvd. 2702 S. Broadway 548 E. 28th St. 1516 Jupiter Circle 3408 Smoky Hollow Rd. 1709 Canary Ct. 1024 Hunters Glen Circle 1015 E. Hurd St. 1407 S. Littler Ave. 1805 Council Bluff 1701 Somerset Ave. 1008 Mercury Circle 3205 Rankin Terrace 1409 Fox Lake Lane 1010 Irvine Ct. 1812 Fox Hunt Lane 224 W. Wayne St. 108 N Baumann Ave.

Date 5/13/2011 5/16/2011 5/20/2011 5/20/2011 5/24/2011 5/25/2011 5/31/2011 6/2/2011 6/17/2011 6/17/2011 6/18/2011 6/23/2011 6/27/2011 6/28/2011 6/29/2011 7/2/2011 7/6/2011 7/17/2011 7/22/2011 7/26/2011 7/27/2011 8/1/2011 8/2/2011 8/6/2011 8/9/2011 8/14/2011 8/23/2011 9/8/2011 9/8/2011 9/9/2011 9/12/2011 9/12/2011 9/20/2011 9/26/2011 9/28/2011 9/30/2011 10/5/2011

Manholes Inspected Danforth Rd. & Homestead Blvd. # 18759 2513 Tredington Way # 24109 2916 Woodhollow Trail # 18983 500 S. State St. lot # 17 # 22115 525 W. 10th St # 21967 301 Meadow Lake Dr. # 21658 817 Brett Dt. # 26141 23 E. 21 St St. # 20655 136 Ann Arbor # 20540 712 Pine Oak Dr # 25626 Broken pipe 507 S. Boulevard # 22234 1016 N. Blackwelder # 25154 1300 Cedar Ridge Rd. # 26181 3705 Springhill Dr. # 24679 603 S. Littler Ave. #78387 1809 Godhania Rd # 19825 729 S. Littler Ave. # 78643 1801 Edgewood Dr. # 79049 1805 Craig Blvd. # 21093 2702 S. Broadway # 20557 548 E. 28th St. # 26029 1508 & 1520 Jupiter Circle # 18660 & # 18603 3408 Smoky Hollow Rd. # 24511 1709 Canary Ct. # 23535 1025 Bankside Circle # 19274 1015 E. Hurd St. # 25435 1407 S. Littler Ave. # 22091 & # 22088 1805 Council Bluff # 24567 1701 Somerset Ave. # 26892 1008 Mercury Circle # 18596 3205 Rankin Terrace # 26107 1409 Fox Lake Ln 1010 Irvin Ct. # 19435 & # 19434 1812 Fox Hunt Lane # 21456 224 W. Wayne # 21723 108 N. Baumann Ave. # 25213 & # 25436


2011 STOP-UPS (Continued) Stop Up Address 2000 E. 15th St. 1101 S. Rankin 811 Sunny Brook Dr. 817 Brett Dr. 1304 Brookwood Circle 606 E. 27th St. Coffee Creek & Santa Fe Ave. 3200 Kelsey Dr. 3400 Creek Spur Rd. 2008 Shilstone Way 425 Jacob St. 1212 East Dr. 220 & 320 E. 14th St. 1800 Geeta Rd. 2204 Brookhaven Dr. 2528 Antelope Circle 3325 E. 33rd St. 2708 E. 33rd St. 525 N. University 151 Brad St. 1404 E. 9th St . 1108 Edwards 620 W. Danforth Rd 2713 Woodbury Rd. 3200 Kelsey Dr. 188 E. 33rd St. 3300 Round Barn Rd. 825 W. 1st St. 2824 Indian Grass Ct. 2113 Bent Twig Rd. 2317 Springhill Dr.

Date 10/5/2011 10/6/2011 10/13/2011 10/14/2011 10/18/2011 10/24/2011 10/25/2011 10/28/2011 11/1/2011 11/2/2011 11/4/2011 11/7/2011 11/8/2011 11/8/2011 11/8/2011 11/13/2011 11/13/2011 11/14/2011 11/17/2011 11/17/2011 11/17/2011 12/1/2011 12/5/2011 12/6/2011 12/8/2011 12/15/2011 12/21/2011 12/22/2011 12/23/2011 12/25/2011 12/27/2011

Manholes Inspected 2000 E. 15th St. # 24442 & # 24443 1101 S. Rankin # 25836, # 26972 & # 25837 811 Sunny Brook Dr. # 22601 817 Brett Dr. # 26141 1304 Brookwood Circle # 24754 & # 24752 606 E. 27th St. # 26059 Coffee Creek & Santa Fe Ave. broken pipe 3200 Kelsey Dr. # 26090 & # 26089 Air relief valve 2008 Shilstone Way # 24502 & # 24501 425 Jacob St. # 25331 1212 East Dr. # 25557 220 & 320 E. 14th St. #22097 & # 22098 1800 Geeta Rd. # 19836 2204 Brookhaven Dr. # 79035, 22580 & 22579 2528 Antelope Circle # 19058 3325 E. 33rd St. # 20422 Damage main 525 N. University # 25419 & # 25420 151 Brad St. # 21962 1404 E. 9th St. # 25754 1108 Edwards # 25231 & 25232 620 W. Danforth Rd. # 27510 & 27511 2713 Woodbury Rd. # 24081 3200 Kelsey Dr. # 26088 & # 26089 188 E. 33rd St. # 20422 3300 Round Barn Rd. # 22787 825 W. 1st St. # 19919 & # 19922 2824 Indian Grass Ct. # 78110 & #78111 2113 Bent Twig Rd. # 24402 2317 Springhill Dr. # 24661 & # 24665


! (

2011 Wastewater Stop Ups Manholes Investigated ! ( ! (! ( ( ! ( ! ! ( (!

! (! (

! (

! (

! ! ( ( ! ! ( (

! ( ! (! (! (

( !! ! ( ( ! (

! (! ( ( !! (

! ( ! ( ! (

( ! (!

! (! (

! (

! (! (! ! (! ( ( ! ( ! (

! (

( !! (

( ! (! ( ( ! ! ( ! ! ( ! ! ( ( ! ! (( ( (! !! ( ! (

! (! ( ! !( (

! (

! (

! ( ! ( ! ( ! ( ! ( ! ( ( ! ! (! ( ( ! ! ! ( (! ( (! ! ( ! ( ! ( ! ( ! ( ! ( ! (! ( ! ( ( (! ( ! ! (! ! ( ( ! ! ( ! ( ! (! ( ! ( ( ! (! ! ( ! ( ! ( ! ( ! ( ( ! (! ! ( ! ( ! ( ! ( ! ( ! (

! (

! (


Water Lines Name of Project 15th St WL (Henderson to Territories) Air Depot Waterline Repair at Spring Creek Arbor Creek 3 Bristol Office Park 2 Centennial at Iron Horse Covell & Sooner Waterline Cross Timbers Northeast Office Park Deerfield 2nd Faith Bible Church

Project Number

24"

18"

14"

WC090005 WC100003

300

PR100004 SP100023 PR100014

12"

Sanitary Sewer 10"

3,366

10

20

10 2,164 960 1,014

2,695

PR090011

6"

1,073

680 539

WC090001

8"

18"

18"

80 891

12"

10"

8"

492

2,693 1,630 1,472

2,394

673

36

1,350

PR080043 SP080009

774

54

1,154

325 186

1,051

Golden Gate at Twin Bridges 3

PR080021

9,916

7,175

150

Integris Health Edmond 1

SP080023

3,319

2,138

142

Kelly Ave WL & SS Relocation, Danforth to Coffee Creek Rd

WC090005

630

1,190

140

878

1,400

680

80

460

Market Square 2 at Covell Village McBride Clinic - fire line & hydr Offices at 33rd Street Sanitary Sewer Creek Crossing, Phase 1 Sanitary Sewer Creek Crossing, Phase 2 Tuscany Villa 4

11,105

PR110001

6"

EP110002

2,335

2,132 670

11,088 1,310

277

PR090014

1,776

771

CD100004 CD100007

113

PR080011 Subtotals

1,548 11,105

3,366

300

21,622

0

20,573

1,142 2,381

2,335

0

3,556

2,132

23,281

0

2011 Water Resources Annual Report  

2011 annual report for the Water Resources Department.