Development & Engineering Services Newsletter March 17, 2014 City of Bryan 300 South Texas Avenue Bryan, Texas 77803

March 17, 2014 Volume 2, Issue 3

Building: Dangerous Structures With a 140+ year history, Bryan has an old housing stock. Pro-active removal of dilapidated structures can lead to more aesthetically pleasing, safer neighborhoods, property value stabilization and/or improvement and private re-investment in older neighborhoods of the City. The City of Bryan, like many Texas cities, has an adopted a Dangerous Structures Ordinance which can be found in the Bryan Code of Ordinances Chapter 14. The Dangerous Structures Ordinance provides a just, equitable, and practicable method to protect the health and safety of the public where dilapidated structures can endanger the life, limb, health, morals, property, safety or welfare of the general public or occupants. Whenever a structure is reported to the City as being possibly dangerous, the Building Services and Fire Departments will make an initial site visit and attempt to contact the property owner for further investigation, to help determine if the structure is, in fact, dangerous. In determining if a structure is dangerous, the following criteria that are part of the adopted ordinance are being considered:

The building, structure, or any part thereof is liable to partially or fully collapse. The structure, or any part thereof, was constructed or maintained in violation of any provision of the City's building code, or any other applicable ordinance or law of the city, county, state or federal government.

The foundation or the vertical or horizontal supporting members are 25 percent or more damaged or deteriorated.

The structure has improperly distributed loads upon the structural members, or they have insufficient strength to be reasonably safe for the purpose used.

The structure, or any part thereof, has been damaged by fire, water, , wind, vandalism, or other cause to such an extent that it has become dangerous to the public health, safety, and welfare.

The structure is un-secured or does not have adequate light, ventilation, or sanitation facilities as required by the City's building and/or plumbing codes.

Whenever a structure is found to meet one or more of the criteria outlined in the ordinance, the City notifies the property owner and requests a time to meet and discuss repairs or solutions. When adequate response is not received, , the Chief Building Official can request a public hearing before the City’s Building and Standards Commission. The Commission is made up of 5 citizens of Bryan who are appointed by the City Council to hear and make determinations regarding unsafe structures. During 10 annual meetings, Commissioners review cases presented to them by City staff. At least 2 months before a Commission meeting, the property owner is formally notified in writing and asked to submit plans and estimates for repairs and

a timeline to complete repairs. A second meeting notice is mailed typically 5-6 weeks prior to the meeting. Following a public hearing, during which both the City and the property owners present their evidence, the Commission makes a determination whether or not the structure is unsafe and, if found unsafe, consider any and all available remedies, including, but not limited to, ordering repair or demolition, vacation of the property, securing the property, and/or shutting off public utilities. Since October 2010, the Building and Standards Commission has considered more than 200 properties. In about 90 percent of the cases, structures were found to be dangerous and too damaged to be feasible to repair. In about 60 percent of the cases where structures that were ordered to be demolished were then removed by property owners. The City Council has committed funds to engage a contractor to remove dangerous structures in those cases where a property owner fails to comply with the Commission’s order. Since October 2010, the City contracted to have over 40 dangerous structures removed from Bryan neighborhoods. For more information about the City’s substandard structure abatement process, ordinance requirements, Building and Standards Commission meeting, or to report an apparent dangerous structure, please contact the Building Services Department at 979-209-5030.

Inside this issue: Dangerous Structures

1

City of Bryan Capital 2 Improvements Program or Plan (CIP) Apache Helicopter Demonstration at Coulter Airfield

3

Frequently Asked Planner-On-Call Questions

3

City of Bryan Calendar

4

Development Stats

Insert


D e v e lop me n t & E ngi ne e r i ng Se r v i c e s Ne w sle tte r Ma r c h 17, 20 14

Engineering: City of Bryan Capital Improvements Program or Plan (CIP) A Capital Improvements Plan (CIP) is a multi-year flexible plan outlining the goals and objectives regarding public facilities for the City of Bryan. This plan includes the development, modernization, or replacement of physical infrastructure facilities. For a project to be defined as a capital improvement project it must be at least $200,000 in cost, be nonrecurring, provide at least 5 years of benefit and be an addition to the City’s assets. Capital improvement projects can be roads, utilities, technology improvements, and municipal facilities. In 2008, the City of Bryan began developing a sustainable CIP process for the City. The process includes maintaining a project database, evaluating and ranking projects based on uniform criteria, fitting those projects into limited fiscal funds and self-evaluation of the process. The first 5 year CIP to use this process was adopted by the Bryan City Council on June 28, 2008. Since that time, four additional 5 year CIPs have been adopted on May 6, 2009, July 27, 2010, August 23, 2011 and most recently on September 10, 2013. In 2012 the Council approved a biennial CIP process that we currently follow where updates occur to the database of projects in the even fiscal years and a new CIP is proposed and adopted in odd fiscal years. Because of this change there was not an adoption of a CIP program in FY 12. The goal from the development of a 5-year CIP is a plan that outlines the projected infrastructure improvement needs of the city to assist in the planning and budgeting process. This plan will include a summary of the improvements, an estimated cost, a schedule for the improvements, and the source of funding for the project. The CIP will prioritize the identified projects into yearly plans based on functional and project categories. Because the city’s goals and resources are constantly changing, this plan is designed to be re-evaluated periodically to reaffirm or reprioritize the capital improvement projects. The prioritization of the eligible projects is done by a CIP ranking system. Each potential project must first be classified as a CIP project according to the definition above. If the above criteria are met, the project will be given areas of emphasis score, citizen survey/feedback score and a Page 2

financial, technical, and regulatory score. These scores will be combined, producing a CIP score for the project. Based on this CIP score the projects will be ranked and then assigned to a year for funding over the next five years. Projects having a higher CIP score are generally to be funded ahead of lower scoring projects but financial constraints may dictate otherwise (ie a top ranked project may exceed the available budget for a particular year and may be skipped over for another highly ranked project). The components and scoring scale that make up the areas of emphasis score, citizen survey / feedback score, and financial, technical, and regulatory score are included below: Areas of Emphasis (60%)

Image (20%)

Infrastructure (20%)

Growth (10%)

Health/Public Safety (10%)

Citizen Survey / Feedback (20%)

Citizen Survey and Public Input (20%)

Financial, (20%)

Technical

and

by staff based on the available funding and project ranking. The schedules will determine where each project fits in the 5 year plan. This will be based on the priority of the project, funding availability and how it correlates with other CIP projects. The final CIP document will be produced based on the evaluation of the CIP Score, Project Type, Funding, and Schedule. This is an annual process that results in a new 5 year CIP forecast every 2 years. In this process the funding for the first 2 years is solidified and the remaining years are a projection of where we are headed and are less firm and could change with changing priorities. This CIP process gives staff consistent direction on projects on which to focus and keeps the City planning ahead for upcoming projects. Every other year, in an odd numbered fiscal year, the projects will be ranked and a new 5 year CIP will be prepared by staff, reviewed and approved by Council. In the even numbered fiscal years the database will be updated and public input documented and the self-evaluation of the process performed identifying any changes to be proposed to Council.

Regulatory

External Funding (5%)

Impact on Operational Budget (5%)

Regulatory Compliance (5%)

Timing / Location (5%)

Project types competing for the funding will include streets and paving, sidewalks, facilities, parks and miscellaneous. The following types of projects are not included in this ranking system and are individually ranked on a technical basis following specified masterplans for each type of infrastructure: water, wastewater, electrical, storm water / drainage and traffic signals. Each year, funds for CIP projects will be limited based on the City’s financial status and bonding capabilities. Projects identified in the CIP may be funded by different sources. A few of the different funding options for the CIP include General Obligation (GO) Bonds, Revenue Bonds, Certificates of Obligation (COs), Direct Funding (cash), Cooperative Efforts and Grants. Project schedules will be developed

Links to the current CIP can be found on the top of the City of Bryan main web page at http://www.bryantx.gov/. Anyone can provide input regarding Capital Projects at the following online submission page http://www.bryantx.gov/forms/cip.html If you have questions, please contact Paul Kaspar with the City of Bryan Engineering Department at 979-209-5030.

Want to know what is happening in Development and Engineering Services? Stay up-to-date by signing up for our free listserv! Sign up online at: www.bryantx.gov → City Government → Planning and Development → Popular Links: DevLink Listserv

Have you recently done business with the City of Bryan? Leave us your feedback by taking our customer service survey! https://www.surveymonkey.com/s/DevServ_BryanTx


D e v e lop me n t & E ngi ne e r i ng Se r v i c e s Ne w sle tte r Ma r c h 17, 20 14

Coulter Airfield: Apache Helicopter Demonstration for Johnson Elementary Students

On February 21, 2014 a Boeing AH-64 Apache helicopter arrived at Coulter Airfield for a Johnson Elementary School 4th grade field trip. This event was a motivational demonstration for the students who were about to take the State of Texas STAR test. If you have any questions about Coulter Airfield, you may contact Airport Manager James Brown at brownj@bryantx.gov or at 979-209-5233. Photos: (Top Left) City staff members James Brown, Airport Manager, and Carmen Mulvaney, Community Services Project Assistant, with the pilots of the Apache helicopter. (Top Right) Dr. Thomas Wallis, BISD Superintendent, is interviewed by local media regarding the field trip.

Planning: Frequently Asked Planner-On-Call Questions Question: Am I allowed to build a carport on my property to have more covered parking? Answer: In order to answer this question, there are several pieces of information that you will need to know before City staff can help determine if adopted City standards will allow you to install a new carport on your lot:

you with questions.

answering

the

remaining

Carports, just like any other new building or structure (e.g., house, shed, carport, pergolas), are subject to building code requirements and minimum building setback requirements that the City has adopted. In most residential neighborhoods of Bryan, minimum building setbacks are as follows:

25-feet from the front property line;

What are the dimensions of the proposed carport?

7.5-feet from side and rear property lines; and

Where on your property do you wish to install the carport?

15 feet from side property lines adjacent to another street

What are the minimum building setbacks on my property?

Are there any platted or deeded easements (e.g., public utility or drainage easements)?

You will need to provide the answers to the first two questions and City staff can assist

By limiting the locations of buildings on a lot, minimum building setback regulations help reduce the danger of conflagration, ensure that there is adequate room for emergency access between and around the properties, provide access to utilities, and improve street visibility. Building setback requirements also help provide a minimum degree of open

space, privacy, space for maintenance on a home, predictability in development, and stability to a neighborhood. City staff can help you find out if there are any easements on your property that may interfere with the planned carport construction. These easements could be for public utilities, overhead electrical, or stormwater drainage. In some cases, a property survey prepared by a registered land surveyor may be required to help identify the remaining buildable area on your property where a carport could be installed. Before the carport can be built, you will need to apply for, and be granted, a building permit from the City of Bryan. If you have any questions about carports, new building contraction, minimum building setbacks, easements, or building permit requirements, please contact the Development Services Department office at 979-209-5030 and ask for the Planner-OnCall. Page 3


D e v e lop me n t & E ngi ne e r i ng Se r v i c e s Ne w sle tte r Ma r c h 17, 20 14

March 2014 SUN

MON

TUE

WED

THU

FRI

SAT 1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

April 2014 SUN

MON

TUE 1

WED 2

THU 3

FRI 4

SAT 5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

May 2014 SUN

MON

TUE

WED

THU 1

FRI 2

SAT 3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

City Holiday—Office closed City Council Meeting—Council Chambers, 300 S. Texas Avenue Planning and Zoning Commission Meetings Historic Landmark Commission Meetings Zoning Board of Adjustment Meetings Building and Standards Commission Every Tuesday

Page 4

Site Development Review Committee (due Wednesday by noon)


Below is the building report spreadsheet which contains building permit information for all projects permitted through the City of Bryan. The first row is a month-by-month comparison based on the current year and the past year. The next row is a year-to-date total of all permits and their project value. These values are also available online at www.bryantx.gov under the Building Services department. If you have any questions, please call the Building Services Department at 979-209-5010.

City of Bryan - Building Report DECEMBER 2013

DECEMBER 2012

Permit Type

Total

Value

Permit Type

Total

Value

Residential-Single Family

10

$2,738,575.00

Residential-Single Family

9

$3,281,258.00

Residential - New 2 Unit Bldgs

1

$137,148.00

Residential - New 2 Unit Bldgs

0

$0.00

Residential - New 3-4 Unit Bldgs

0

$0.00

Residential - New 3-4 Unit Bldgs

0

$0.00

Residential - New 5+ Unit Bldgs

0

$0.00

Residential - New 5+ Unit Bldgs

1

$858,792.00

Residential - Add/Alter/Reno

27

$267,078.00

Residential - Add/Alter/Reno

58

$438,827.16

Manufactured Homes

2

$30,000.00

Manufactured Homes

7

$221,000.00

Demolition

13

$0.00

Demolition

19

$0.00

Commercial - New Construction

1

$120,000.00

Commercial - New Construction

2

$770,000.00

Commercial - Add/Alter/Reno

11

$2,062,290.00

Commercial - Add/Alter/Reno

8

$1,690,260.00

Swimming Pools

1

$30,000.00

Swimming Pools

2

$124,180.00

Signs

8

$0.00

Signs

10

$0.00

TOTALS

74

$5,385,091.00

TOTALS

116

$7,384,317.16

JANUARY-DECEMBER 2013

JANUARY-DECEMBER 2012

Permit Type

Total

Value

Permit Type

Total

Value

Residential-Single Family

180

$36,118,073.00

Residential-Single Family

170

$33,558,700.80

Residential - New 2 Unit Bldgs

11

$1,785,860.00

Residential - New 2 Unit Bldgs

3

$310,308.00

Residential - New 3-4 Unit Bldgs

6

$890,916.00

Residential - New 3-4 Unit Bldgs

0

$0.00

Residential - New 5+ Unit Bldgs

186

$25,868,910.00

Residential - New 5+ Unit Bldgs

41

$4,183,869.94

Residential - Add/Alter/Reno

540

$4,590,053.65

Residential - Add/Alter/Reno

701

$5,495,190.83

Manufactured Homes

89

$2,566,479.00

Manufactured Homes

56

$1,136,640.00

Demolition

97

$0.00

Demolition

144

$0.00

Commercial - New Construction

43

$54,939,442.00

Commercial - New Construction

69

$62,892,916.00

Commercial - Add/Alter/Reno

211

$17,682,803.20

Commercial - Add/Alter/Reno

150

$10,864,839.78

Swimming Pools

43

$1,043,689.00

Swimming Pools

18

$903,880.00

Signs

182

$0.00

Signs

139

$0.00

TOTALS

1588

$145,486,225.85

TOTALS

1491

$119,346,345.35


City of Bryan - Building Report FEBRUARY 2014

FEBRUARY 2013

Permit Type

Total

Value

Permit Type

Total

Value

Residential-Single Family

25

$4,093,526.00

Residential-Single Family

25

$4,633,676.00

Residential - New 2 Unit Bldgs

3

$999,534.00

Residential - New 2 Unit Bldgs

0

$0.00

Residential - New 3-4 Unit Bldgs

0

$0.00

Residential - New 3-4 Unit Bldgs

0

$0.00

Residential - New 5+ Unit Bldgs

0

$0.00

Residential - New 5+ Unit Bldgs

0

$0.00

Residential - Add/Alter/Reno

24

$87,870.00

Residential - Add/Alter/Reno

51

$458,521.20

Manufactured Homes

11

$380,448.00

Manufactured Homes

4

$96,800.00

Demolition

3

$0.00

Demolition

16

$0.00

Commercial - New Construction

4

$1,024,534.00

Commercial - New Construction

2

$3,585,000.00

Commercial - Add/Alter/Reno

13

$8,242,680.00

Commercial - Add/Alter/Reno

11

$505,820.00

Swimming Pools

0

$0.00

Swimming Pools

1

$58,650.00

Signs

14

$0.00

Signs

17

$0.00

TOTALS

97

$14,828,592.00

TOTALS

127

$9,338,467.20

JANUARY-FEBRUARY 2014

JANUARY-FEBRUARY 2013

Permit Type

Total

Value

Permit Type

Total

Value

Residential-Single Family

38

$7,758,311.00

Residential-Single Family

33

$6,289,036.00

Residential - New 2 Unit Bldgs

3

$999,534.00

Residential - New 2 Unit Bldgs

0

$0.00

Residential - New 3-4 Unit Bldgs

0

$0.00

Residential - New 3-4 Unit Bldgs

0

$0.00

Residential - New 5+ Unit Bldgs

0

$0.00

Residential - New 5+ Unit Bldgs

1

$1,370,400.00

Residential - Add/Alter/Reno

60

$458,962.00

Residential - Add/Alter/Reno

86

$647,611.00

Manufactured Homes

19

$560,448.00

Manufactured Homes

13

$312,450.00

Demolition

13

$0.00

Demolition

26

$0.00

Commercial - New Construction

8

$1,554,534.00

Commercial - New Construction

4

$3,922,080.00

Commercial - Add/Alter/Reno

25

$9,596,880.00

Commercial - Add/Alter/Reno

31

$4,797,612.20

Swimming Pools

1

$35,000.00

Swimming Pools

1

$58,650.00

Signs

20

$0.00

Signs

38

$0.00

TOTALS

187

$20,963,669.00

TOTALS

233

$17,397,839.20

March 2014  