Page 1

TSPLOST Projects

Tier 1 Medlock Bridge Road Capacity Project (Chattahoochee River to McGinnis Ferry Road) Medlock Bridge Road Map

This project will overlay, widen and restripe Medlock Bridge Road to increase vehicle capacity and provide congestion relief for its entire length in the city from four lanes to six lanes from the Chattahoochee River to McGinnis Ferry Road.

Project Details Scope Location

From Chattahoochee River to McGinnis Ferry Rd Johns Creek

Length

5.4 miles

Project Cost Estimate

ge R d

Medlock Bridge Road Aerial

id

ge

Rd

lock

Br

Med

at e

Brid

St

Engineering Cost

$500,000

Right-of-Way Cost

$250,000

Construction Cost

$9.25 million

CITY TSPLOST FUNDS:

$10 million Project Status

Current Roadway

Design

In Progress

ROW

2017

Construction

2018

Environmental

Not started

Project Timeline Ready for Construction

2018

Anticipated Length of Construction

18 months

LEARN MORE

• Visit JohnsCreekGA.gov/TSPLOST • 678.512.3200 • info@JohnsCreekGA.gov


TSPLOST Projects

Tier 1 State Bridge Road Widening

Between Medlock Bridge Road and Chattahoochee River State Bridge Road Map

This project will line up with Gwinnett County widening of Pleasant Hill Road and complete widening from four to six lanes from east City limits to west to increase vehicle capacity and congestion relief.

Project Details Scope Location

From Medlock Bridge Rd to Chattahoochee River Johns Creek

Length

1 mile

Project Cost Estimate

State Bridge Road Aerial

ge R d Brid

Right-of-Way Cost

$200,000

Construction Cost

$3.5 million

$4 million

e at

Project Status

ge

d ri

B

lock

$300,000

CITY TSPLOST FUNDS:

St d

R

Med

Engineering Cost

Current Roadway

Design

In progress

ROW

2017

Construction

2017

Environmental

Not needed

Project Timeline Ready for Construction

2017

Anticipated Length of Construction

12 months

LEARN MORE

• Visit JohnsCreekGA.gov/TSPLOST • 678.512.3200 • info@JohnsCreekGA.gov


TSPLOST Projects

Tier 1

Medlock Bridge at State Bridge Improvements Medlock Bridge & State Bridge Road Map

This project will make improvements to the intersection of Medlock Bridge and State Bridge Road to improve delays at the intersection and increase operational efficiancy. Proposed improvements are being studied and several alternatives will be publicly vetted to find an engineering solution to improve congestion at this highly traveled and centrally located intersection.

Project Details Scope

Medlock Bridge Rd at State Bridge Rd Johns Creek

Location

Project Cost Estimate

Medlock Bridge & State Bridge Road Aerial

ge R d Brid

$1.5 million

Right-of-Way Cost

$500,000

Construction Cost

$6 million

CITY TSPLOST FUNDS:

$8 million

St

at e

Med

lock

Engineering Cost

Current Roadway

B

rid

ge

Project Status

R

d

Design

In progress

ROW

2018

Construction

2019

Environmental

Not needed

Project Timeline Ready for Construction

2019

Anticipated Length of Construction

18 months

LEARN MORE

• Visit JohnsCreekGA.gov/TSPLOST • 678.512.3200 • info@JohnsCreekGA.gov


TSPLOST Projects

Tier 1 Jones Bridge Road Widening McGinnis Ferry Road to Douglas Road Jones Bridge Road Map

This project will widen Jones Bridge Road from two to four lanes between Douglas Road to McGinnis Ferry Road and will line up with Brookwood Road widening in Forsyth County and is designed to provide increased capacity and congestion relief. The project may include improvements such as sidewalks, trails and landscaping.

Project Details Scope Location

From McGinnis Ferry Rd to Douglas Rd Johns Creek

Length

1.5 miles

Project Cost Estimate Right-of-Way Cost

$750,000

Construction Cost

$6.25 million

Jones Bridge Road Aerial

Jo ne s

Br

id

ge

Rd

CITY TSPLOST FUNDS:

Current Roadway

$7 million Project Status Design

In Progress

ROW

2017

Construction

2018 / 2019

Environmental

Not needed

Project Timeline Ready for Construction

2018

Anticipated Length of Construction

18 months

LEARN MORE

• Visit JohnsCreekGA.gov/TSPLOST • 678.512.3200 • info@JohnsCreekGA.gov


TSPLOST Projects

Tier 1 Jones Bridge Road Widening

Phase 1: Waters Road to Buice Road; Phase 2: Buice Road to State Bridge Road Jones Bridge Road Map

This project will widen Jones Bridge Road from two to four lanes between Waters Road and State Bridge Road and may include improvements such as sidewalks, trails and landscaping. Phase 1 will include improvements between Waters Road to Buice Road. Phase 2 will include improvements between Buice Road to State Bridge Road. This project is designed to provide increased capacity and congestion relief.

Project Details Scope Location

From Waters Road to State Bridge Road Johns Creek

Length

1.7 miles

Project Cost Estimate Jones Bridge Road Aerial

ge

s e n

id r B

d R

Jo

Engineering Cost

$250,000

Right-of-Way Cost

$3.25 million

Construction Cost

$7.5 million

CITY TSPLOST FUNDS:

$11 million Project Status Design

Current Roadway

Ph 1: In progress; Ph 2: 2017 Ph 1: In progress; Ph 2: 2018 Ph 1: 2017 Ph 2: 2019 Not needed

ROW Construction Environmental

Project Timeline Ready for Construction

2017 / 2019

Anticipated Length of Construction

18 months

LEARN MORE

• Visit JohnsCreekGA.gov/TSPLOST • 678.512.3200 • info@JohnsCreekGA.gov


TSPLOST Projects

Tier 1

McGinnis Ferry Road Capacity Improvements

This is a regional capacity enhancement project includes widening of McGinnis Ferry Road from two lanes to four lanes and may include improvements such as sidewalks, trails and landscaping. The project is jointed funded by GDOT, Forsyth County, Alpharetta and Johns Creek and is designed to provide increased vehicular capacity and congestion relief.

McGinnis Ferry Road Map

Project Details Scope

From Union Hill Rd to Sargent Rd Johns Creek, Forsyth, Alpharetta, & Milton 4.5 miles

Location Length

Project Cost Estimate

McGinnis Ferry Road Aerial

Mc

Gi

nn

is

Fe r

ry

Rd

Engineering Cost

$2 million

Right-of-Way Cost

$3.8 million

Construction Cost

$24.1 million

Other Costs

$6.1 million

CITY TSPLOST FUNDS:

$5.5 million*

*This would be a joint project funded by GDOT, Forsyth County, Alpharetta and the City of Johns Creek ($5.5 million). *Note: $8 million contingency set-aside from Johns Creek TSPLOST funds if HB170 not applicable.

Current Roadway

Project Status Design

In Progress

ROW

TIP/Other secured funding

Construction

TIP/Other secured funding

Environmental

Started

Project Timeline Ready for Construction

18 months

Anticipated Length of Construction

24 months

LEARN MORE

• Visit JohnsCreekGA.gov/TSPLOST • 678.512.3200 • info@JohnsCreekGA.gov


TSPLOST Projects

Tier 1

Haynes Bridge Road Capacity Improvements Haynes Bridge Road Map

The Haynes Bridge Corridor extends from Old Alabama and connects Johns Creek neighborhoods to schools, GA 400, employment centers, and additional commercial uses. This project, conducted jointly with Alpharetta, widens the two lane section to four vehicle lanes and may include bike lanes, sidewalks, trails and landscaping and is designed to provide conjestion relief and increased compacity.

Project Details Scope Location

From Mansell Rd to Old Alabama Rd Johns Creek, Alpharettta

Length

2 miles

Project Cost Estimate

Haynes Bridge Road Aerial

Ha

yn

es

Br

id

ge

Rd

Engineering Cost

$1 million

Right-of-Way Cost

$1 million

Construction Cost

$8 million

CITY TSPLOST FUNDS:

$5 million* *This would be a joint project between the City of Alpharetta ($5 million) and the City of Johns Creek ($5 million).

Project Status Current Roadway

Design

2017

ROW

2018

Construction

2019

Environmental

Not Needed

Project Timeline Ready for Construction

18 months

Anticipated Length of Construction

18 months

LEARN MORE

• Visit JohnsCreekGA.gov/TSPLOST • 678.512.3200 • info@JohnsCreekGA.gov


TSPLOST Projects

Tier 1

Bell Road / Boles Road Corridor Operational & Safety Improvements This project includes operational improvements on Bell Road and Boles Road to provide better sight lines ease of movement and may include improvements such as turn lanes, sidewalks, trails and a bridge replacement.

Bell / Boles Corridor Road Map

Project Details Scope

Location

From Medlock Bridge Rd to McGinnis Ferry Rd & from Abbotts Bridge Rd to Bell Rd Johns Creek

Length

4.5 miles

Project Cost Estimate

Bell / Boles Road Aerial

Engineering Cost

$800,000

Right-of-Way Cost

$1 million

Construction Cost

$5.2 million

CITY TSPLOST FUNDS:

s e l

Rd

Bo

Current Roadway

B

l l e

d R

$7 million Project Status Design

2019

ROW

2020

Construction

2021

Environmental

Not needed

Project Timeline Ready for Construction

Not Available

Anticipated Length of Construction

Not Available

LEARN MORE

• Visit JohnsCreekGA.gov/TSPLOST • 678.512.3200 • info@JohnsCreekGA.gov


TSPLOST Projects

Tier 1

Barnwell Road at Holcomb Bridge Road Intersection Improvements Barnwell Road at Holcomb Bridge Road Map

This project includes dual left turn lanes, a through lane, and a right-turn lane on Barnwell Road at SR 140 / Holcomb Bridge Road designed to improve safety and operations at the intersection and reduce backup conjestion. This project may include improvements including bike lanes, sidewalks, trails, landscaping and a pedestrian bridge over Hogan’s Creek.

Project Details Scope Location

From Holcomb Bridge Rd to Hogan’s Creek Johns Creek

Length

0.45 miles

Project Cost Estimate

Barnwell Road at Holcomb Bridge Road Aerial

Engineering Cost

Not Available

Right-of-Way Cost

$500,000

Construction Cost

$2.5 million

CITY TSPLOST FUNDS:

H

ol

co

m

d R l

b

Br

r a

B

id

ge

el nw

$2.5 million Project Status

Rd

Current Roadway

Design

In progress

ROW

2018

Construction

2019

Environmental

Not started

Project Timeline Ready for Construction

2019

Anticipated Length of Construction

18 months

LEARN MORE

• Visit JohnsCreekGA.gov/TSPLOST • 678.512.3200 • info@JohnsCreekGA.gov


TSPLOST Projects

Tier 1

New Location Road in Tech Park

This project will construct a new 2-lane roadway to connect Bell Road to Johns Creek Parkway to provide additional connectivity and transit alternatives off of connecting roads. This project may include improvements such as sidewalks, trails and landscaping.

New Location Road Map

Project Details Scope Location

From Bell Rd to Johns Creek Parkway Johns Creek

Length

0.5 miles

Project Cost Estimate Construction Cost

Medl ock B ridge Rd

New Location Road Aerial

$2.5 million

CITY TSPLOST FUNDS:

$2.5 million

B

Project Status

el

Design

In progress

ROW

2017

Construction

2019

Environmental

Not needed

lR

d

Project Timeline Ready for Construction

2019

Anticipated Length of Construction

12 months

LEARN MORE

• Visit JohnsCreekGA.gov/TSPLOST • 678.512.3200 • info@JohnsCreekGA.gov


TSPLOST Projects

Tier 2

State Bridge Road Widening

Kimball Bridge Road to Medlock Bridge Road State Bridge Road Map

This project will widen State Bridge Road from four to six lanes between Kimball Bridge and Medlock Bridge to provide incrreased vehicular capacity and congestion relief and will include improvements such as sidewalks, landscaped medians and turn lanes. This project aligns with the City of Alpharetta’s project to widen Old Milton Parkway.

Project Details Scope Location

From Kimball Bridge Rd to Medlock Bridge Rd Johns Creek

Length

3.6 miles

Project Cost Estimate

State Bridge Road Aerial

Engineering Cost

$500,000

Right-of-Way Cost

$500,000

Construction Cost

$7 million

CITY TSPLOST FUNDS:

St

at e

Br

id

ge

Rd

$6 million

*Note: The project will include an additional $2 million in state and/or federal funding.

Project Status

Current Roadway

Design

2019

ROW

2020

Construction

2021

Environmental

Not needed

Project Timeline Ready for Construction

2021

Anticipated Length of Construction

24 months

LEARN MORE

• Visit JohnsCreekGA.gov/TSPLOST • 678.512.3200 • info@JohnsCreekGA.gov


TSPLOST Projects

Tier 2

Bridge Improvements This project includes maintenance work and widening to accommodate pedestrians, bicycles, and may improve future compacity.

Johns Creek Map

Project Details Scope

Bridge Improvements

Location

Johns Creek - Citywide

Project Cost Estimate Engineering Cost

$500,000

Construction Cost

$1.5 million

Bridge Aerial

CITY TSPLOST FUNDS:

$2 million Example of a Current Bridge

LEARN MORE

• Visit JohnsCreekGA.gov/TSPLOST • 678.512.3200 • info@JohnsCreekGA.gov


TSPLOST Projects

Tier 2

Old Alabama Road Capacity

Nesbit Ferry Road to Old Alabama Connector This project will widen Old Alabama Road from Nesbit Ferry Road to Old Alabama Connector to provide increased capacity and congestion relief and may include improvements such as sidewalks, trails and landscaping.

Old Alabama Road Map

Project Details Scope Location

From Old Alabama Connector to Nesbit Ferry Rd Johns Creek, Roswell

Length

0.55 miles

Project Cost Estimate Engineering Cost

$200,000

Right-of-Way Cost

$200,000

Construction Cost

$2.6 million

Old Alabama Road Aerial

CITY TSPLOST FUNDS:

Old Alabama Rd

$3 million Project Status

Current Roadway

Design

2017

ROW

2017

Construction

2018

Environmental

Not needed

Project Timeline Ready for Construction

2018

Anticipated Length of Construction

12 months

LEARN MORE

• Visit JohnsCreekGA.gov/TSPLOST • 678.512.3200 • info@JohnsCreekGA.gov


TSPLOST Projects

Tier 3

Barnwell Road Corridor Improvements This project will include funding for intersection safety enhancements throughout the corridor and pedestrian accommodations extending Barnwell Road from Holcomb Bridge Road to Old Alabama Road.

Barnwell Road Map

Project Details Scope

From Hogan’s Creek to Redcoat Way 1.75 miles

Length

Project Cost Estimate Engineering Cost

$1 million

Right-of-Way Cost

$3 million

Construction Cost

$3.5 million

Barnwell Road Aerial

CITY TSPLOST FUNDS:

H

ol

$1.5 million

co

*Note: The project will include an additional $6 million in state and/or federal funding.

m

b

Br

id

ge

Rd

r a B

l l e nw

Rd

Current Road

Project Status Design

2018

Right-of-Way

2019

Construction

2020

Environmental

Not needed

Project Timeline Ready for Construction

2020

Anticipated Length of Construction

18 months

LEARN MORE

• Visit JohnsCreekGA.gov/TSPLOST • 678.512.3200 • info@JohnsCreekGA.gov


TSPLOST Projects

Tier 3

Nesbit Ferry Corridor Improvements This project will widen Nesbit Ferry Road north of Scott Road and provide a center turn lane for safety and operational improvments and conjestion relief south of Scott Road for safety and operational improvements and congestion relief. This project may include improvements such as turn lanes, sidewalks, trails and landscaping. It is a joint project with the City of Roswell.

Nesbit Ferry Road Map

Project Details Scope Location

From Holcomb Bridge Rd to Old Alabama Rd Johns Creek, Roswell

Length

2.1 miles

Project Cost Estimate

Nesbit Ferry Road Aerial

Engineering Cost

$500,000

Right-of-Way Cost

$1.5 million

Construction Cost

$5 million

Ne

CITY TSPLOST FUNDS:

er r it F

sb

$500,000

d yR

*Note: The project will include an additional $6.5 million in state and/or federal funding.

Project Status Current Road

Design

2018

ROW

2019

Construction

2020

Environmental

Not needed

Project Timeline Ready for Construction

2020

Anticipated Length of Construction

18 months

LEARN MORE

• Visit JohnsCreekGA.gov/TSPLOST • 678.512.3200 • info@JohnsCreekGA.gov


TSPLOST Projects

Tier 3

Bridge Replacement This project replaces two bridges on Old Alabama Road where it crosses Johns Creek and a tributary of Johns Creek. These two bridges are nearing the end of their useful lives and their replacement is a safety project and may improve future compacity and may improve future capacity.

Johns Creek Map

Project Details Location

Johns Creek

Project Cost Estimate Engineering Cost

$500,000

Right-of-Way Cost

$500,000

Construction Cost

$2 million

Bridge Aerial

CITY TSPLOST FUNDS:

$300,000 Project Status

Example of Current Bridge

Design

2018

ROW

2019

Construction

2020

Environmental

Not needed

Project Timeline Ready for Construction

2020

Anticipated Length of Construction

18 months

LEARN MORE

• Visit JohnsCreekGA.gov/TSPLOST • 678.512.3200 • info@JohnsCreekGA.gov


TSPLOST Projects

Tier 3

Sidewalk & Trail Enhancements This project consists of sidewalks, trails and pedestrian bridges throughout the City. The city has developed a $58 million city-wide sidewalk network that is prioritized by safety, proximity to school walking routes, and overall connectivity.

Example of Current Sidewalks

Project Details Location

City-wide

CITY TSPLOST FUNDS:

$3 million

Sidewalk & Trail Network with Gaps Recommended to be Built Sidewalk & Trail Network November 2015 We b b R d

ur

n

R

d

9

kw

y

141

d

W

dw

P kw

ard

Pe

y

W

yn g

nn

ate

is

Tr

Fe

r

a g e Ct

D ns ow D

od e

r D

1

14 SR

Rd ta

Rd

d R l el B

r

dg

Te

k

Ln

k al W

t D r

Rive

r es

n Dr o

M or g

R

eg a l

Fo

T

C

L a h o n t a n Pa s s

K emp Rd

am s e Ln h

L on

Ta c o n i c

em

g

per D ri ve

A

ont Ct

ay

W

P e n n b r o ok

ay

W n do n

r

d

lv B R e

e dg

Pe

W h i t e s to n e

l a n d on

ll

o

ro B

e

em

Te r r a c e w

Dr

ne

C h as

ok

Be

C

s to

e

ir O l br ic

Ln

n le i gh

s r Cr e

Ho

lley

C abana D r

ge R d

Bri d

d lv B l

y

ia

w d H

tr us

ck

dlo Me

for

tree

Indus

P

tria l

h eac

tre

In

e

d

Blvd

es D r

H

ill

120

Dr

u

l

B

Fe rr y

H oy

ana W ay

w

y

Legend Existing Sidewalk Existing Trail

u

b

P

kw

y

rd

Under Construction by Developer

fo

Su Gaps Approved and Funded ga rl o

Bu

cl

w

y

W. A de n

P nt

Hil

l Rd

af

P

k w to be Built Gaps Recommended y

l B lv d

e Rd

la k

Gaps Identified

120

Bu

fo

rd

Hw

Johns Creek

y

City Limits Counties

1 inch = 1,518 feet

141

0

y

d D

ce

Dr

n

Ru

.5

1

1.5

w

Miles

Surrounding Area Map Bartow

n

Vi

st

P

ia ar

.25

H

Atlanta Atlanta Athletic Athletic Club Club

d

oo

or

W

uf

n

B

se

r

el

a Bl u f f Dr

d H wy

Rd

H

y

c h t r e e I n d u s t r ia

P

lk

Ct

Xi

Wa

w

H

c hs Sm t

d lo

k C

c

i

er

se Cl

y

uf

d or

P ea

e

w

iv

Et c h i ng O v e r l o o k

ll

ng

Va

r

t es

R

ge

r P ar k D M a rs h

id Br k oc

Forsyth

Cherokee

75

19

575

985

Polk

285

tr i a l e Ind us

htre

Carroll

Douglas

Fulton 85

H

u

fo

Jackson

Coweta

Fayette

• Visit JohnsCreekGA.gov/TSPLOST • 678.512.3200 • info@JohnsCreekGA.gov

Clayton

Barrow

285

Walton

DeKalb

w

y

Peac

Pe

Gwinnett

Cobb

Paulding 20

B

LEARN MORE

Johns Creek

400

Atlanta

rd

Hall

85

Blvd

dl Me

wy Pk e re

Bu

Existing Crosswalk

r s h i n g er

h i t ne y

W aits

La k

n

He

e

er

Gw Ful in ton ne tt

W

d

ht

l

l

Ve n t

ck B ridg

at

Me

hw

lu

N o rt

W

r

Rd

er

ay

e

iv

R

ac

ia

P

B ri s n st

a

co

merour Su m

Dr

B

Ct

For Gwinsyth net t

tl A ld O

r Ci

l

Co

Va

La k

d g

id

se

l

Wi

La k F ge

C

Gr oo m

ace

Pl

L

ive Dr

l Tr

ss Pa t rs hu

G le n

no

Ma

M

e

in

r nt r y D

B uf o r

Ch

l

Walh am Gr v

y Wa

Rd ge

n

wy k Dr

on

Dr

ns

d

ru

ro

B

V i c t o ri a n Ln

H i gh g a t e M a n o r C t

B ra nha m F

d L n dg

el

ck B rid Medlo

m

km

on

Ca

r D lk

t t s Wa Abbo k

oo Bla

c k br Wa

x

t

h

as

e

C

A r ncl iff e Ct

nth am C t Be

Dr

ke Forr s e

t

J oh

E bi

Ln

n Rd n si

L

C r e e k s i d e P a rk Pt

ton

ing Arl

an

C Tr ns

w

at H

ay

W

os

Cr n ri

e

re l au

n L ok

L i nb r o ik d s Dr

K

C o l e h er n

Pe ach

t Hill R d

ra

e

tr

o ochee Ri ver

t

an

ir

lu

H

Old Al abama Rd

Va

s Pa k

Pl O xbo

e Trc e

r lb il

il W

l

F ire

Dr

Dr

Ln H a v e rh i l l d ay H

na

on ic

Dr

r

t B ar

M i l l wi ck

wi c k sh

r

D

Ma g

Plant ati on D r

Mo rt ons C ir

r ro

Bu t t e rc up T rc l C

nt Hu

l R d

r uil

l V rl

We

r B lf rto n ve Ti

r nD B ar ks t o

ma

e G len

Ct

u

as

rs C ir

re

us

Ple

C

om

C h a t ta h

e

L a ur e

lW

Br i g h t m o re

Su n s e t M a p l

ol M a gn ia C i

Co

s ne Jo

A

ll e

rk Pl

b r y pa

D te

Oa

Dr ge

am

e Rd

M ill

t h e rb y W a

d W e l l in gton R

ha n d l e

Dr ak N.

lla

y Dr

Gl en F err

ap

ri B

s

ne Jo r Ci ia ol

n

ag M

d R e

W

dg ri B id

id Br

S a d dl e

Dr

e

B a r d ol i

B

rd fo

Ox

l L

il

L ak e D r F al l s

n L y

b u s s o n Tr c e

Au

t D r N . Mo un

r o ok

M oun t Dr

La ke

M i l l Dr

o k s h ir e

O x f o r d M i ll

s ne

Jo Talism an D r

Na t u r e

Sp

a D r

viv A lma

e L n g

id R y ne

a sa Dr

Rd ge

ge

id

Br le

Br

dd

Sa

s ne Jo

R s L n te Ga

Cir

d ow

a

at

P

r D

n rs

We

P

Ln ge R id

oney

St

Ro w Ct

Pe

C

h more Dr

La

L

t Bl uf f C

t re e C o rne

ht

d In

y

M o unt R us

Ln

Vin ca Ct

Fox Rd ge id

Br s ne Jo

r B e

d

B r o k en W i on B rid ge D r

Dr ek re C

Rd n vi

Al

y tr

ro

kw

C lubl a n

l T rc

Perimeter Perimeter School School

D

i d g e Walk

B

D

b

Ti m b e r s t o n e R d

Ln F r azie r Fir

ill Dr

Ri d

rl

Tr c e

w

o kholl o o

yck Casw

E l

R

Re

i s f ree D r

ac

P

ow

ay

af

nb

Dr

Sag

lo

Rd

Chattahoochee Chattahoochee River River National National Recreation Recreation Area Area -- McGinnis McGinnis Ferry Ferry

ar

ai

River River Trail Trail Middle Middle School School

ug

ng

gh

ach

r

S

R

B ro o k C t

a rm R d y F

to

t o hc v e C

d e R

b Pkwy

to l

Ri v e r Tr a

D

ac

dg

An aheim Dr

Pe

Bri

si

141

Pe

ve

rs

Clu

d

140

al

Ri

ge

os

Rd

141

rw

Ro

Feathe r S ound Ct

t

h

L ad

Ci

N ell ie

er s

ut

w

an

Tr l

y

lo

Shakerag Shakerag Park Park

Hw

be

Pl

M c G i n n i s F e r ry R d

br

un

h

um

t ss C

Em

ay Mo n t c l a i r W

Rd

120

a

Br

ry R d

t

ll

y lo r R d P o l l y Ta

ll Be

g e C l ub

as

Yu ko n D r

o

is F er

rC

Be

dge Rd Br i

Be ll R d

Chattahoochee Chattahoochee River River National National Recreation Recreation Area Area -- Abbotts Abbotts Bridge Bridge

l Dr

le

wy

s

le s R d

ce

ay

ry

P

R od Rd

er

e

Bo

rl ad T

Gl

R og

Rd

Ln

cr

nn

e

Shakerag Shakerag Elementary Elementary School School

cr ee R d

e

Pk

g

Gi

Pl

B ol s t

og

a

idg

t

r

Fire Fire Station Station #62 #62

Br

on

y

R

se

Ci

e

m

k

m a w al

sh

at

er

stvi e

St

n Cr gs t o

Rd

in

l Kn o l l c r e s t B v

nt

Mc

K

e s te

Tr

W

W

nt

S ou th

e

e

t eC

Dri v

e

C

re

t le

to

st L a k

iv

g

Kel

Pl ace

est

C a v e nd i

Wa y

Ca s

Bann erga te D r

r

b

R

g

Hom

e

ra

u

Wa y

Rd

For r

Dina

Chattahoochee Chattahoochee River River National National Recreation Recreation Area Jones Bridge Area - Jones Bridge

e Xi n

a ll

r

ge

ga

D

w

Rd

Cr

ld

il

nt

el

O

g

ou

id

o

C ou

.

in

w

rn

le y C r e e k D r

d

lam il

r n D

R

C

ir C

Tw

ce

B ri s

Bui

Dr

te

ro

Ba

ne

nh vo

K

au

ri

V

nio

r

W

O tl ey

y

el

e

t o n X i ng et

S

B e l l e mo

ur

ar

ss

S

a ug

Bell-Boles Bell-Boles Park Park

d Boles R gl a ss H py

La

D

r

i ve r

ha

C

m

B

e

D

bu

ke

es

k R d

Dr

G i r v a n Ri d g

lly

ua

Iv

ee

gh

120

Dr

t

Bell

Pl

S

g

ot

l

a

c As

en

ei

S w ee t C r

ook

Win d i n

ll

Gl

re ee t S t

hi

Ln

ac

w

B ay

d

ta

141

B

le

Fry

nt

Ol m ste d

Br

Dr

Q

rm

Old Al aba

rv

R

for d C t

ey

Pl

m

o

D

Ln

t Ave

n

Henley

h Tr l

W ol

Dr dg e

d

i

y

R

Rd

Ct

State State Bridge Bridge Crossing Crossing Elementary Elementary School School

er

Wa

Ba

L u d w e ll

La

Fa

S ai

Johns Johns Creek Creek High High School School

d

om

e

R u g gle

ne

Northview Northview High High School School

s

ilb r

Pl

Gant on Dr

st o

i n t Rd

ub

t

S he

n lto

D

Po

Qu a

Rd

rry

te k s a d Xin

d

n

r

son

Vin

ve

e nc l

le

rs

With

u

Fe

is Ginn

R

G

kh

Ci

Ct

Dr

ro

O v e r l oo k

ad

l

Ln

Ha w

Dr

on

Par k

h

re

el

141

Dr

gt

F e r n ly

T

av

d

o

rr

R

r

o

B

or

tw

ba

ew

in

sb

er

Mc

B elcr es t

df

es

r

141

e

N

Rd

Bellt oll Ct

te

se

ei g h ts

Fire Fire Station Station T e n bu r y Wa y #61 #61 Tim son Ln Medlock Medlock Bridge Bridge Elementary Elementary e s Hi l l C t School School G

r ry

C

Wa y

a

y

o w ns

Fe

S t a p l e f o r d Ln

d ge R

H

is

e

Gr andvie w Sq

120

ol o g

D

rid tt s B

ke La

Rd

Te c h n

141

Rd

inn

kh

ge

cG

ld

Be l l m o o re P a r k L n

A

R

m

ta

ot

n

ke

e fi

Johns Johns Creek Creek Municipal Municipal Court Court

b b ott s M i ll D r

so

M

oo

id

Abbo

n

s

id

il

r ld D

Br

Br

P

Par

W

f ie

S

ha

n

s Rd ld

ck D r

ns X ing

Av

ay

n so

Med l o

Joh

h yt rs n Fo ulto F

t ts

Trc e

e

R

d

bo

od D

to

on r

ry

a

C

S

rs

n or Ct Ma

ok L n

R

l

l

or

ld

to n

Dr

e ll

Ln

Ln

ta

W

rin

Dr Go

de

ds

O

Pa i ef

pi

r

Ab

in

ay

y Ct

or

ro

Bir

Rd Te

Hl

W

W

pe Ston

ay

tsk

Apsl ey W

lu

r C

t

w

ai

o Ln

R

rry

Rd ie

Fer

L ak e

R

yd

n

R e d l io n

r

s ch

S

e

G

Cr

E

D

St atio n D r

Lo

Pr

d

es

o t t s w e l l Dr

t

Fe

Rd

spit e

The The Standard Standard Club Club

op

r

Ct

nis

141

A b b o t ts

at

e

Gin

wy

E.

Findl e y C

n Ct

D

Pk

Findley Findley Oaks Oaks Elementary Elementary School School

er F a r m W a y

on Th Ru n

or

bb

s

S

Don

rs y

k

e Cre

F

n

Dr

W o ods

ni

a

Fi ndl

W

Pa

Co

Mc

s

Johns Johns Creek Creek City City Hall Hall

Ct

120

E to

n

o

L

r

in

C

A

ke

ey

Ln

m

P r o m is e

Hi

dge

ingh a

Emory Emory Hospital Hospital at at Johns Johns Creek Creek

Pro

Tr i ll um

ar

Rd

Bri

eig h Dr

Dr

ce

Sk

C h a t t a h ooc h e e R ive r

es

g

n

Wa

dg

Tr

r ge

Jon

Ho

k

S o n g B r e e z e Tr c e

ad

Ri

i n

ro

d

em

ss

r r ia ge P a

ar

n Ct

to

tts B ridge Rd

d

s Cree k Ct

Stet h

E

e

Ct

n

b Ru

e

R

Hl

e rl

t

d

Wr e

Ro st

am

ern

ev

le

t

s Vi

ng

hn

Xi

Rd

L

vi

re

C

tu

w

hn

G

cG

C

te

Dr

A

Fo

ge

Old Sou t h

Jo

Co

t

M

af

a

R

Dr y Dr

Cir

nu

t Rd

en Sarg

St

ge re

k e tr ail D r

rt o n Rd

n R dg

id

Nati

y

wy

Do

on

i n d Tr c e

er

n it hb a nk L

Ln

D

vice

w

ew

id ri

Ta y l o r R

Cv

al

ev

C l a ph a

d Red Bir

r

Rd

nd

Le

re

Br

r n D

B ri dgem or

e n s Wa lk

s

D

Fo

l

in o

y L a

Dr

lc dg

s

S

Ch

r

d

ri

tt

ers

ay

D

o B

ar

R ed

ft

ng t o n C v

b

D

ay

S er Pa rk onal

sh

Pk

l

te

ns

vi

y C

bo

R o y ce

ps

Dr

a

J o h n s C r ee k

D

lon

Blf

Sa n

Co

y

N ib l i c k D r

e

m

e

Mo

t o n C r es

r

im n

Roswell

m

ol

Abbotts Abbotts Hill Hill Elementary Elementary School School

s i de D r D on a

ub W a y

W

y

e O l d Cl

Ch

M

w fi eld Ct

T

a s W

Blf

De

l

S

Rivermont Rivermont Golf Golf and and Country Country Club Club ubs

ew

Dr

r r wa y R i d g e D

vi

Co

v

re

Dr Fa i r

Fa i

ro

b Pe m e r t o n

Mal

S.

e

Northeast Northeast // Spruill Spruill Oaks Oaks Library Library

y

nc Ba

Ln

ell S t

r

w

Nil e

nc

y

de

er

D

v

ry

e

Ri

i n t La

n

Ch

er

S

a

i s X

Ct

F

Gr a n d

r

o

l

Ln

C it ad e

r

Ri

wy

e

Rd

Autrey Autrey Mill Mill Preserve Preserve and and Heritage Heritage Center Center

e

a

e

Rh in e D r

Pk

bo

nn

W

t

l

erb

R i v e rm o n t

Rd

ir

Dr

e as

e

a

r

S

Ab

ic

u

t R dg

Hendron Pl

ts

Ha

ig h t L n

k

ee

Cr

s

t

Pl

on

nin gto

Rid g e Dr

Chattahoochee Chattahoochee High High School School

Ta

ot

nk

a

Poin l ls

Rd

P

r

na c Dr

rk

G len

D

W

y Ln

sh

li c

Ct

nk

l Tr

Autrey Autrey Mill Mill Middle Middle School School

Ca rl i sl e Ln

o

D

ki

Pa Ch ase

be

l ft

bu

C

D

D e w p o i nt

O l d A l ab ama R d er

es

Bu

W

Barnwell Barnwell Elementary Elementary School School

St u a r

Tu c k

Eagle

Ch

y

L

ood

M ac

N es bit Pl

o

ge

C rb o r e a l t

ge T r l

Ga t s b y

lw

Ab

gd

id

ri d

De

y Ln

r

n

Dr

rd N

D

rbr id g e

e

Li

e

Ct

ur

120

Rd

r

ic

l s R i d ge D

W o od

in

Ln

tr

ch t o n S t

pe

He pplew hi t e

be

m

Fa l

y

er

W

b st

e

w

C ul

am L n gh

We s

r R d

Ln

Dr

k

i rr u s D r

M ort on

Dr

Gaid rew

s

M

un

Cha

K e t t er in g

i

h

l Pl

ar

A

M e rr

i ng

n

m

k B r i d g e Tr l Oa

nt Blv d

s Moo r ar q u e s

n

ws

M e a do

Sh

d

do

141

wy

Cir

g n o lia

ro u g h

t P kwy

l la

Ja m o

ns

oo

N. H

Taylor Taylor Road Road Middle Middle School School

Dr

yl o

dru

ou

rn T

R e dc o a t Wa y

s

o

d a cr aig

A u try Fa ll s D r

tb

ge

d

es

o rd P

L ir ac C t

R

Rd W

Ogee chee D r

C an

Bu

Rd

a

il l

ce

ea

A sc a lo

db r o o

lla

ia

i ll

Way

Dr

ding

D

Mu re

Be

on

M

m

cl

y Aut r

ba

B ox f

Byer s Rd

Stre a m

n

r

n Fa l l s L a

An

Rd

Mi l l C t

r

e

la

h un

a Pl

M

Pk

ks

Oa

v en

Ov e r h ill B

W in

Jo

Mo rton R d

Li

at

Rd

H

H

rgess H

we

al

o

A

Hedg eclif f C t

d e R

h

d y R Ar b

e W a te r s B

Pt

s Br id g

ld

od

use C m ho

l Grv

ui

R

l

ld

or

K in gs

B ur

P

ls gh Fal

Jon e

d s G a r d e n Ln

A

r

O

Ta

State State S t Bridge Bridge a t e B Park Park r

Hi

rs

nd

Holy Holy Redeemer Redeemer Catholic Catholic School School

nk

Ma

ay

F

Mer gans er

D

Le

ehu t Dr

All ee El m D r

n

a ulan C t

i nt R egis Dr

ne

G

ton e D r

v

d ama R

e Le

Gu i l d h a l

G

err Ne sbit F

Sa

V id

Bu

ro

t

O

e

r

A

n

rr y L n

C

te

b r i d g e Ct

Pi

dg e W a y

n

at

Newtown Newtown Park Park

Mount Mount Pisgah Pisgah Christian Christian School School

Fe

Tu

Br a

u

to

R

l

es

n

L o n g Pt e

el

Alab ld

y

Fire Fire Station Station #63 #63

L

Wa

ge

ck h a m

id

ro

R

w

Rd

ge

ir

a f Ct

I

y

st

B

Ive y O a k s

a c y Tr c e

rid

B

ri

Jon

e

Rd

Pine y

es

Bar s

Ol d

dge

nd

L

ri s B la

Dolvin Dolvin Elementary Elementary School School

nt

C

Dr

id

r

C

er

ia Pi n e

yne od

En

r it

d

d

Candac raig

e

Ln

Ha Haynes

Wo

e w H eg

Ne

e ag

n

B

g

Bri

in

idg

n

H il l g

s

D

ge

rg

la

Br

Ln

Vi

S t illr

Jo

es

r

id

Avia

e W il l o w M

i ex

Dr

a te Dr

pr

ge

S umm e r

Ag Ln

id

C ir

G len D r

d

Vi e w D r

er

E dgeh ill

Pl

R

io n

n iso

Bye r

l

id

st R

Pl

ow

s

lony

er

Co

Sum m

at

v

N.

ar H ve

ad

W

va Wo o d l Ct

S.

n Wood s Ln to g

Sargent Rd

st

Ved

e l l M il l D r

a m s hi l

Br t Va l a i s C

r

La n c e

th e r

t e d t Tr c e

a

dP t te

on y Tr l

d ian Vi lla ge

d

D

o w Me i ll

ea

ns

n e Dr

w

Ha

a

Ros

low T

te

In

R

Ocee Ocee Park Park

e

B

Rd

ic

ll

e

Bu

ba

g ri d

n Squ are Dr

c Tr

St

S

to

H

ge

ol

Rd

po

p

Oaks D r

e

m

W

Ha

l ton

Bro o k h

idg

n

W

Ab

Rd

ge Mi

ll

Ocee Ocee Elementary Elementary School School Northside Northside Urgent Urgent Care Care

Kim

Trl

mo n s L n

Cir

Asp e n

ge

im

b

a

id Br

Br

Br

nd

Pi

id 400

19

L

Ln

Br

R wy

K

all

li a

Rd

Rd

all

Pk

120

mb

.

o

ge

mb

n

sl

B

ey

Ad

120

d

Ki

m

la s

r id

Ki

120

lt o

Se

M

n

ug

B

k

Mi

s

ag

Do

b

Alpharetta

d

ni

Ln

Rd

19

Ol

in s

r ry

r Te

wn Do

ve

e

W eb

Big Cre e

G

er

idg

400

120

et M

Pr e s

Br

b B ri d g e Rd

O l d Mi l t o n P kw y

e Ci r

Fe

e Cre k D r

Web

ns

u

ns

e

er v

es

le

ge

Pr

d S

d

R

c

sh

M

ewo

ey

19

b

Rd

ar

ll D r nco r d H a

Co

tl Be n

H a ll Dr

S t eve

Web

rry

Vi c

A

Iv e

e

y

W

Gi

l

400

R

re

kw

Mc

y

y

y rd Pkw

y

w Pk

dwar d

w

kw Win

Academy S t

ht

Pk

P

dwa

Win

dge Rd

ac

in

dw

P

d

d

ar

ar

dw

dw

in

in

ar

W

W

in

E a s th a v en P l a c e

Co

P

19

Cir

gb

400

Milton

20

Rockdale 75

Henry

Newton

Created/Altered: 11/24/15

G:\Infrastructure\SidewalksTrails\SidewalkTrailNetworkCurrent_2015_el_v1.mxd


TSPLOST Projects

Tier 3

Findley Road Extension This project seeks to improve east-west connectivity by extending the 2-lane Findley Road across Medlock Bridge and Lakefield Drive to Johns Creek Parkway. This project may include improvements such as sidewalks, trails and landscaping. This project is designed to provide alternate route options and connectivity off of Medlock Bridge Road.

Findley Road Extension Map

Project Details Scope Location

From Medlock Bridge Rd to Johns Creek Parkway Johns Creek

Length

0.5 miles

Project Cost Estimate

Findley Road Aerial

Engineering Cost

$250,000

Right-of-Way Cost

$2.25 million

Construction Cost

$5 million

CITY TSPLOST FUNDS:

$500,000

*Note: The project will include an additional $7 million in state and/or federal funding.

Project Status

Current Road

Design

2018

ROW

2019

Construction

2020

Environmental

Not needed

Project Timeline Ready for Construction

2020

Anticipated Length of Construction

18 months

LEARN MORE

• Visit JohnsCreekGA.gov/TSPLOST • 678.512.3200 • info@JohnsCreekGA.gov


TSPLOST Projects

Tier 3

Old Alabama Road Road Widening

Jones Bridge Road to Buice Road

This project will widen Old Alabama Road from two to four lanes between Jones Bridge Road and Buice Road and provide increased capacity and congestion relief and may include improvements such as sidewalks, a landscaped median and turn lanes. It would complete the Old Alabama Road Corridor from its eastern limit at Medlock Bridge Road.

Old Alabama Road Map

Project Details Scope Location

From Jones Bridge to Buice Rd Johns Creek

Length

3.4 miles

Project Cost Estimate

Old Alabama Road Aerial

Engineering Cost

$1 million

Right-of-Way Cost

$1 million

Construction Cost

$5 million

CITY TSPLOST FUNDS:

Old

Ala

bam

Current Road

aR d

$2 million

*Note: The project will include an additional $5 million in state and/or federal funding.

Project Status Design

2019

ROW

2020

Construction

2021

Environmental

Not needed

Project Timeline Ready for Construction

2021

Anticipated Length of Construction

18 months

LEARN MORE

• Visit JohnsCreekGA.gov/TSPLOST • 678.512.3200 • info@JohnsCreekGA.gov


TSPLOST Projects

Tier 3

Resurfacing Program Johns Creek Map

This project will resurface roadways throughout the City. In 2011, a consultant drove a specially equipped vehicle down each of Johns Creek’s streets to gauge their conditions. Using that data as a guide, the Public Works staff developed a repaving plan for the City’s subdivisions. The physical survey of city streets revealed that many of the streets had a substandard Pavement Quality Index (PQI), a scale developed by the Corps of Engineers to measure cracking, potholes, rutting, weathering and other factors. Low PQI scores reflect poor condition of pavement. The lower the PQI score, the higher the ranking when scheduling the repaving. View the Neighborhood Repaving Plan on the City website, www.JohnsCreekGA.gov.

Resurfacing in Johns Creek

Project Details Scope

Multiple Locations

Location

Johns Creek

CITY TSPLOST FUNDS:

$1 million Resurfacing in Johns Creek

Resurfacing in Johns Creek

LEARN MORE

• Visit JohnsCreekGA.gov/TSPLOST • 678.512.3200 • info@JohnsCreekGA.gov


TSPLOST Projects

Tier 3

Medlock Bridge Road Transit Related Signal Enhancements

This project will upgrade software and signal requipment along Medlock Bridge Road to allow buses to obtain a green light as they enter a signalized intersection.

Medlock Bridge Road Map

Project Details Scope Location

From Chattahoochee River to McGinnis Ferry Rd Johns Creek

Length

5.4 miles

Project Cost Estimate Construction Cost

CITY TSPLOST FUNDS:

$500,000

Medl ock

Bridg

e Rd

Medlock Bridge Road Aerial

$2 million

Example of Current Traffic Signal

Current Road

LEARN MORE

• Visit JohnsCreekGA.gov/TSPLOST • 678.512.3200 • info@JohnsCreekGA.gov


TSPLOST Projects

Tier 3

Transportation Alternatives Johns Creek Map

This project would explore alternative transportation methodologies and advanced technologies as well as transit options.

Project Details Scope

Transportation improvements within City Parks Johns Creek - city wide

Location

CITY TSPLOST FUNDS:

$1 million

Tier 3

Connected Vehicle Infrastructure Johns Creek Map

This project would examine potential uses of connected/ autonomous vehicles and potentially install pilot infrastructure.

Project Details Scope

Multiple Locations

Location

Johns Creek - city wide

CITY TSPLOST FUNDS:

$500,000 LEARN MORE

• Visit JohnsCreekGA.gov/TSPLOST • 678.512.3200 • info@JohnsCreekGA.gov

Profile for City Johns Creek

TSPLOST projects visuals and details  

This document details each of the TSPLOST projects in Tier 1, Tier 2 and Tier 3.

TSPLOST projects visuals and details  

This document details each of the TSPLOST projects in Tier 1, Tier 2 and Tier 3.