Project on the improvement and extension of the system of potable water treatment for the people of Charaña Water harvesting project – Khotañas municipality of Charaña Forestation project on “espina de mar” (plant species group), Charaña municipality Interconnected Charaña – tripartite electrification project, Charaña municipality Digging of an exploration well – to be used to meet the basic potable water needs of the Charaña population Construction and installation of 43 shallow wells with hand pumps in the six Ayllus (agricultural communities) of the Charaña municipality Trout farming pilot project – Charaña municipality Project related to animal health campaign – Charaña municipality Water intake (bocatomas) in the Caquena River

See figure 21. Water intake in Bocatoma River, Caquena [Annex, page 97] 6.3

Final study of Botijlaca–Campero–Rosario road

A final study was carried out on the 106 km-long Botijlaca-Rosario road. The study concerned the improvement of the section indicated, filling the present roadway with gravel or ballast, except for the Coro Coro stretch, where an alternative road of Sucre was considered. A geometrical improvement, following the design standards, was provided by the National Road Service. El Botijlaca-Coro Coro stretch is part of route 1511 of the departmental network, whereas the Coro Coro-Campero stretch belongs to routes 15191515-1450 of the municipal network. Nine (9) bridges will be constructed, namely: 1. 2. 3. 4. 5. 6. 7. 8. 9.

Chulluma, at 3.8 km from Botijlaca. Komankollo, at 7.08 km from Botijlaca. Colorado, at 9.4 km from Botijlaca. Calajahuira, at 23 km from Botijlaca. Viscachani, at 27.9 km from Botijlaca. At 45.8 km from Botijlaca. At 62.4 km from Botijlaca. At 90.4 km from Botijlaca, before arriving at Rosario. Rosario, at 92.6 km from Botijlaca.

These bridges are 4 m in width (one lane), sidewalks of 0.7 m and kerbs of 0.25 m in height 6.4

Electrification projects

The ALT carried out electrification studies to support the communities living in the area where the Desaguadero River dredging was to take place. Rural electrification in the towns of Ayllus Chijcha, Chijcha, Parina Arriba, Parina Baja, Aguallamaya, Janqujaqi Baja, Hiruitu Urus, San Pedro de Tana, and in District 4 Jesus de Machaca, the town of Viacha. -

Rural electrification in the agricultural communities of Ayllu Yaru Ingavi – Chouqe, in the jurisdiction of Jesús de Machaca, the town of Viacha.