Page 1

sio

te ks ls

ar na lW or

ieb

er Pr of es

ch


About Me

EDUCATION Bachelor of Science in Interior Design with Honors University of Texas at San Antonio Graduated Cum Laude May 2014 Full Time Honor Roll Deans List 2013 WORK EXPERIENCE PBK Architects November 2018 - Present Interior Designer (Intern) Method Architecture November 2016 - November 2018 Designer I

Cherie Bartels

AMB Architects July 2015 - July 2016 Interior Design Associate

Objective:

Ford, Powell & Carson Interior Design Intern - Spring ‘14

bartelscherie@gmail.com 281.638.5225

Seeking a position as an Intermediate Designer at a firm specializing in Corporate, Education, Healthcare, or Hospitality Design

2

H-E-B Grocery 2007 - Present Pharmacy Care Representative ORGANIZATIONS International Interior Design Association: 2016-2018 Professional Member


SKILLS Scale of Knowledge: 1<-------------------------> 10 3D Modeling: Google Sketchup Rendering Software Vray SU Podium Enscape Photo Editing & Project Layout Software Adobe InDesign Adobe Illustrator Adobe Photoshop Drafting Software ArchiCAD Revit AutoCad Productivity Software Microsoft Excel Microsoft P.P. Microsoft Word INTERESTS & HOBBIES Researching and playing new board games Having game nights with my friends and in-laws Taking my dogs to the park QUALITIES Passionate about design and how it affects people Loves Networking events Absorbs new technology and information quickly Self-Starter & Team Player

3


CT ED

LE

SE

4

PR

EC TS

OJ


.01

STEAM Allied Health Higher Education Finishes Furniture

.02

UH Wortham Poolhouse Residential Exterior Finishes

.03

Intex Flooring Industrial Office Tenant Improvement

.04

Heat Transfer Specialists Industrial Mixed-Use

.05

Baileson Brewing Co. Industrial Microbrewery Adaptive Reuse

.06

Weiser Insurance Group Industrial Office Tenant Improvement

5


.01

Project Scope: 160,000 S.F. New Higher Education STEAM & Allied Health building. Full furniture package to be included in scope. Completed: Estimated December 2020 Challenges: Getting the client to settle on their program requirements. Additionally this was my first complex finish and furniture project, therefore the project itself was a challenge Highlights: The 3Form art wall designed on the DNA analysis method GEL Electrophoresis My Role: Select and Present Interior Finishes and Furniture Provide all interior drawings for IFC set

STEAM Allied Health

College of the Mainland

GENERAL FINISH LEGEND NOTES 1. ALL FINISH MATERIALS SHALL MEET THE FLAME SPREAD RATINGS PER THE BUILDING CODE. 2. REFER TO INTERIOR ELEVATIONS FOR SPECIFIC MATERIAL LOCATIONS. 3. PAINT ALL EXPOSED STRUCT. MEMBERS, STRUCT. DECK, DUCTWORK, DIFFUSERS, PIPING, CONDUIT, EQUIP. HOUSINGS, LIGHT FIXTURE HOUSINGS, CABLE SUPPORTS, CABLE TRAYS, EQUIP. SUPPORTS, HANGERS, ETC. TO MATCH ADJACENT SURFACES. 4. PAINT ALL NON-FACTORY FINISHED EXPOSED METAL. 5. REFER TO TYPICAL FLOORING TRANSITION DETAILS FOR FLOORING MATERIAL TRANSITIONS. 6. ALL FLOORING TRANSITIONS AT DOORS SHALL BE LOCATED UNDER THE DOOR IN THE CLOSED POSITION, U.N.O. 7. PROTECT ALL FINISHED FLOORING SURFACES FROM DAMAGE DURING ALL CONSTRUCTION PHASES. 8. PROVIDE AND INSTALL BULLNOSE TRIM AT ALL TRANSITIONS FROM CERAMIC WALL TILE TO OTHER MATERIAL U.N.O. 9. REFER TO REFLECTED CEILING PLANSGRAPHIC FOR CEILING HEIGHTS. ARTS GRAPHIC 10. ALL ELECTRICAL DEVICE COVERS ARE TO BE WHITE U.N.O. LAYOUT ARTS 11. ALLGRAPHIC CARPET PATTERNS TO RUN PARALLEL TO CORRIDOR, U.N.O. 137 12. PAINT ALL HOLLOW METAL DOOR FRAMES TO MATCH ADJACENT WALL BASE U.N.O. 143 145TO BE PAINTED, U.N.O. 13. ALL GYP. WALLS

149

LANDSCAPE

ARTS STRUCTURAL

150

A.2

B

C

D

E

F

G

COMPUTER SCIENCE

STAIR A

152

1SA

142

144-1

AF-1 RESILIENT ATHLETIC FLOORING RE: FINISH SCHEDULE

H

ROBOTICS 148

FLUID APPLIED FLOORING - TYPE 1 COMPUTERFF-1 SCIENCE INFO TECH RE: FINISH SCHEDULE

146

144

FF-2 FLUID APPLIED FLOORING - TYPE 2 RE: FINISH SCHEDULE 1

FF-3 FLUID APPLIED FLOORING - TYPE 3 - ESD RE: FINISH SCHEDULE

DENTAL EXAM

125-10

125-11

DENTAL SUITE 125-1 OFFICE PAN XRAY PLOTTER/ WORKROOM

LOUNGE

ENGINEERING DRAFTING

135

133

131

127

MEPT

125-2

LOBBY

VIDEO/AUDIO PRODUCTION

125

WORK AREA

125-4

125-5

MECHANICAL STORAGE MANAGER 125-7 125-6 125-3

LEAF

UP STAIR B

A PBK COMPANY

1SB

CORRIDOR 129 JAN

SERVER

140

138-1

STEAM / ALLIED HEALTH BUILDING 22

ELEC

A

DENTAL EXAM

125-9

PBK.com

DALLY + ASSOCIATES 9800 RICHMOND AVE. SUITE 460 HOUSTON, TX 77042 713-337-8881 P 713-337-8882 F VERDANT 26310 OAKRIDGE DR. ,SUITE 3 THE WOODLANDS, TX 77380 832-861-9014 P DALLY + ASSOCIATES 9800 RICHMOND AVE. SUITE 460 HOUSTON, TX 77042 713-337-8881 P 713-337-8882 F 11 Greenway Plaza, Suite 1510 Houston, TX 77046 E NG INEE RS 713-940-3300 P 713-961-4571 F TX Firm: F-18672

FOR FULL DETAILS PRINT SET IN COLOR

FINISH FLOOR MATERIALS LEGEND IDF SERVER

DENTAL EXAM

125-8

PBK Architects, Inc.

THE WOODLANDS 10200 Grogans Mill Road, Suite 230 The Woodlands, TX 77380 281-528-1697 P 281-882-2385 F TX Firm: F-1608 CIVIL

LOBBY 1200 N. AMBURN BUILDING 22 TEXAS CITY , TEXAS 77591 100% CD - ISSUE FOR CONSTRUCTION

STUDENT AREA

ARCHITECT

DENTAL EXAM

6 / A2.31B

6 / A2.31A

1200 N. Amburn Rd. Texas City, TX 77591

INFO TECH 138

WOMEN'S

132 MEN'S

DRAFTING

DRAFTING

136

134

128

ELEV B

MECH

ELEV B

126

ENGINEERING DRAFTING

MDF

130

121

124 ELECTRICAL 122 IT CLOS 120-1

CLASSROOM (30) 119

*Refer to drawing set for full example

FF-4 FLUID APPLIED FLOORING - TYPE 4 - ESD RE: FINISH SCHEDULE

6 / A2.31B 21 A2.34

24 A2.36

LECTURE HALL (100)

CPT-1, CARPET, TYPE 1 - GREY RE: FINISH SCHEDULE

24 A2.34

CPT-2, CARPET, TYPE 2 - COLOR FIELD RE: FINISH SCHEDULE

AUDIO RECORDING

117

PLAN NORTH

STUDENT MEETING

CHECKED BY:

149 CPT-1

CPT-2

CPT-3

149-1

LVT-2

GRAPHIC ARTS LAYOUT

GRAPHIC ARTS 145

GRAPHIC ARTS 137

143 LVT-1

CPT-2

CHECKED BY:

Checker

LVT-1

STUDENT AREA

LVT-1

VIDEO/AUDIO PRODUCTION

135-1

135

FT-3

FT-2

FT-1

LVT-1, LUXURY VINYL TILE, TYPE 1 RE: FINISH SCHEDULE

LVT-1

FT-2

150

STAIR A

SERVER

FT-1

142

144-1

1SA

FF-2

JAN 140

CB

LVT-2

146

LVT-1

LVT-1

LVT-3

LVT-3

LVT-2

LVT-2

INFO TECH 144 LVT-1

ELECTRICAL

ELEV A CLASSROOM (30) 105

RS-1, RUBBER STAIR TREAD, TYPE 1 RE: FINISH SCHEDULE

138 LVT-1

8

LVT-3 LVT-2

136 LVT-1

LVT-2

PC-3: 1ST FLOOR EAST WING ACCENT PAINT

9

LVT-1

DRAWN BY:

CLIENT

PC-4: 1ST FLOOR WEST WING ACCENT PAINT

COLLEGE OF THE MAINLAND

MEETING

PROJECT NUMBER

101

PC-5: 1ST FLOOR CLASSROOMS ACCENT PAINT

10

PC-6: 2ND FLOOR EAST WING ACCENT PAINT

PC-9: 3RD FLOOR EAST WING ACCENT PAINT PC-10: 3RD FLOOR WEST WING ACCENT PAINT

18261 August 23, 2019

DATE REVISIONS

No. 1 2

Description ASI #1 ASI #3

Date 8/23/19 9/13/19

PC-11: 3RD FLOOR CLASSROOMS ACCENT PAINT

12

STAIR C

PC-12: GREENSCREEN PAINT VWC-1: VISUAL DISPLAY WALL COVERING AWP: ACOUSTICAL WALL PANELS, RE: ELEVATION

6 A2.34

AWP-11: WALL MOUNTED ABSORBER PANEL - WOOD AWP-12: WALL MOUNTED ABSORBER PANEL - WOOD SW1: FULL HEIGHT SHEET WALL COVERING SW2: UNDER COUNTER SHEET WALL COVERING SW3: NURSING SHEET WALL COVERING WPT-1: TACKABLE WALLCOVERING

WT-3: CERAMIC ACCENT TILE - PURPLE WT-4: CERAMIC ACCENT TILE - BLUE CSF: CORNER GUARD

100

100% CD - ISSUE FOR CONSTRUCTION

FIRST FLOOR FINISH PLAN - AREA 'A'

WT-2: CERAMIC ACCENT TILE - NAVY

29 PM

Enlarged Finish Plan 1st Floor Area A

103 August 23, 2019

PC-2: GRAY ACCENT PAINT

DRAFTING 134

CLASSROOM (30)

102

WALL FINISH LEGEND

LVT-3

DRAFTING

INFO TECH

ls\Documents\18261_COM STEAM AH_A19_cbartels.rvt

3 A2.34

1/8" = 1'-0"

106

Architect

138-1

PC-8: 2ND FLOOR CLASSROOMS ACCENT PAINT

6

108

FT-6, FLOOR TILE, TYPE 6 - RESTROOM RE: FINISH SCHEDULE

PC-7: 2ND FLOOR WEST WING ACCENT PAINT

FINISH PLAN - FIRST FLOOR AREA A

JAN

104 7

CB

DRAWN BY:

COMPUTER SCIENCE

148

152

9/20/2019 2:03:06 PM

C:\Users\cbartels\Documents\18261_COM STEAM AH_A19_cbartels.rvt

LVT-3

ROBOTICS

112

MEN'S

CLASSROOM (60)

LVT-2

COMPUTER SCIENCE

R/R

107

LVT-3, LUXURY VINYL TILE, TYPE 3 RE: FINISH SCHEDULE

SERVER

LVT-2

6

110

LVT-3

LVT-3 LVT-2

6 / A2.31B 6 / A2.31C

115

Other

CORRIDOR

FT-2

FF-4

CLASSROOM (40)

CLASSROOM (30)

FT-2 FF-4

IDF

118

WOMEN'S

LVT-2, LUXURY VINYL TILE, TYPE 2 RE: FINISH SCHEDULE

129

FF-3

RECEIVING/STORAGE

4

FT-1

133

LVT-2

ELEC

IDF 116

CPT-8, CARPET, TYPE 8 - WALK-OFF RE: FINISH SCHEDULE

PLOTTER/ WORKROOM

FT-1

FF-4

FIRE RISER 114

6

FT-1

C

CPT-4,CPT-5,CPT-6,CPT-7 - ACOUSTICAL RE: FINISH SCHEDULE

135-2 AUDIO RECORDING

CPT-3

FT-2

TRUE NORTH

CONTROL

CPT-4, CPT-5, CPT-6, CPT-7

LVT-3

ENGINEERING DRAFTING

KEY PLAN

135-3

Checker

LVT-3 LVT-2

109

B

2

CPT-3, CARPET, TYPE 3 - BLUE RE: FINISH SCHEDULE

CPT-3

CORRIDOR

120

A

(ORIGINAL PAPER SIZE: ARCH E1 30"x42")

A2.31A

UP

Overall 1st Floor Finish Plan


STEAM Allied Health

Student Area Finishes

Rendered Furniture Plan

Furniture

7


18

8"

6" 4" 6" 6" 6"

PC-1

8"

PC-1

6"

8"

2' - 8" 1' - 2"

2' - 4"

2' - 8" 1' - 6"

2' - 4"

PC-2

12' - 3 3/4" 2' - 0"

11' - 2 1/2"

CJ

CJ

120-1

12' - 8 1/2" 1' - 6" 1' - 0"

AWP-6

AWP-9 AWP-5

AWP-4

1200 N. AMBURN

TRUE NORTH

KEY PLAN

0' - 0"

120B

W1

26 A5.02 2' - 0"

1' - 1"

13

Other

Acoustical Wall Panel Elevation

PC-1

8"

6" 4"

1' - 4"

17

LECTURE HALL (100) 120

INTERIOR ELEVATION W. - LECTURE HALL 1/4" = 1'-0"

AWP-7

AWP-1

PLAN NORTH

3'-6"

0' - 6" W1

PC-1

PC-1

1 A5.13

1' - 4 1/4"

51° 110.

3' - 7"

AWP AWP 5' - 7 1/4"

AWP-1

AWP-8 AWP-5 AWP-4

STEAMAWP-6 / ALLIED HEALTH AWP-10 BUILDING 22 AWP-7

J A

6' - 5"

ACOUSTICAL WALL PANELS IN RANDOM PATTERN

PC-2

° 137.40

22 A4.05

1' - 9"

2' - 4"

AWP-3

6"

6"

1'-0"

5' - 6"

AWP-2

AWP-6

3'-0"

AWP-1 3'-0"

AWP-1

AWP-1

AWP-5 AWP-4

AWP-8 AWP-7

AWP-10

AWP-7

AWP-6

2'-0"

AWP-8

1'-0"

6"

EQ

AWP-6 AWP-10

AWP-9

AWP-1

6"

TILE PATTERN REPEAT

W1

1' - 6"

2' - 8"

AWP-3

AWP-7 AWP-1 AWP-6

AWP-2

AWP-6

AWP-9

AWP-1

AWP-8 AWP-5 AWP-4

8"

1'-0"

AWP-5 AWP-9

AWP-1 AWP-8

AWP-6

EQ

CJ

1'-0"

CJ

5' - 10"

5' - 0"

2' - 0"

ELEVATION - LECTURE HALL ACOUSTICAL PANELS 1/2" = 1'-0"

26310 OAKRIDGE DR. ,SUITE THE WOODLANDS, TX 77380 832-861-9014 P D 9800 RICHMOND AVE. SUITE 4 HOUSTON, TX 77042 713-337-8881 P 713-337-888 11 Greenway Plaza, Suite 1510 Houston, TX 77046 713-940-3300 P 713-961-4571 TX Firm: F-18672

12 A4.05

18 A4.05

6" 6" 6" 4" 6" 6" 6"

MEPT

D 9800 RICHMOND AVE. SUITE 4 HOUSTON, TX 77042 713-337-8881 P 713-337-888

1'-0" 1'-0"

AWP-5

EQ

AWP-4

AWP-4

AWP-6 AWP-6 AWP-1

4" 4" 6"

AWP-7 AWP-10

AWP-9 AWP-8

AWP-1

AWP-1 AWP-8

AWP-6 AWP-9

8"

10" 2"

AWP-4

AWP-5

6" 4" 4"

AWP-1

8"

11 OPP. HAND 17

A4.05

5

11

1' - 2"

AWP-3

1'-0"

AWP-6

AWP-6

AWP-1 AWP-8

AWP-6 6" 4" 6"

35' - 7 7/8"

PC-2

4" 6"

LANDSCAPE

STRUCTURAL

AWP

PC-2

CIVIL

Tiered Lecture Hall AWP-8

AWP-10 8"

AWP-6

6" 2"

6"

AWP-3

AWP-5

AWP-7

AWP-7

AWP-6

AWP-4

AWP-10

AWP-1

AWP-4

AWP-6 AWP-10 AWP-8

AWP-2

AWP-3

AWP-1

AWP-5

AWP-7

AWP-1

EQ

5' - 6"

PC-1

CJ

AWP

INTERIOR ELEVATION W. - LECTURE HALL 1/4" = 1'-0"

THE WOODLANDS 10200 Grogans Mill Road, Su The Woodlands, TX 773 281-528-1697 P 281-882-2385 F TX Firm: F-1608

Acoustical Wall Panel Detail

1/2" = 1'-0"

26 A5.02

5' - 0"

3' - 0"

6' - 0"

4' - 0"

2'-0"

5 3/4" 10 1/4" 2" 6" 2'-6" 1'-9"

COLUMN

AWP-9

1'-0"

AWP-1 AWP-7 AWP-4

AWP-10

AWP-2

AWP-6

AWP-3

AWP-1

AWP-8

AWP-4

AWP-6 AWP-10

AWP-9 AWP-7

AWP-4

AWP-1

AWP-5

AWP-1

AWP-4 AWP-10

AWP-7

AWP-6

AWP-2

AWP-8 AWP-3

AWP-1

AWP-5

AWP-7

AWP-1

AWP-10

AWP-7

AWP-6

AWP-4

AWP-2

2'-0"

AWP-6 AWP-10

AWP-9

AWP-4

AWP-1

1'-0" 1'-0"

1'-0"

AWP-5

AWP-8

AWP-10

6' - 0"

5' - 0"

3' - 0"

5' - 0" 5' - 0"

AWP-7

AWP-6 AWP-8

AWP-6 3'-0"

AWP-9

AWP-1

AWP-8 AWP-5

AWP-3

AWP-6

AWP-8

AWP-7 AWP-1

AWP-2

AWP-6

AWP-9

AWP-1

AWP-8 AWP-5

AWP-3

AWP-6

AWP-8

AWP-7 AWP-1

AWP-2

AWP-6

AWP-9

AWP-1

AWP-8 AWP-5

AWP-3

1'-0"

AWP-6

4" 3"

6" 4" 8" 4" 8" PBK 4"

ARCHITECT

2 A5.13

48' - 9"

5' - 0"

3' - 0"

5' - 0" 3' - 0"

5' - 0"

4' - 0"

6' - 0"

17

PC-1

AWP-9

8"

8"

R

PC-1

8' - 0 5/8"

AWP-4

4"

8" 4" 6"

4 A5.13

SJH

AWP-7

8"

1' - 4"

AWP-2

AWP-5

CJ

CJ

1' - 2"

6" 4"

2' - 4"

8"

AWP-7

AWP-4

1' - 2"

6"

6" 4"

4' - 5 1/4"

5' - 0" 6"

1' - 6"

2' - 4"

1' - 2" 6" 4" 6"

1/2" = 1'-0"

AWP-1

KLW, CB, VG

6"

1' - 2"

6"

PC-1 CJ

AWP-1

2' - 8"

8"

2' - 4"

6"

ELEVATION - LECTURE HALL ACOUSTICAL PANELS

AWP-10

8

2' - 8"

3' - 0" 8"

8"

6" 4" 8" 4" 8" 4" 6"

K

W1

3' - 4"

6"

AWP-7

W1

CHECKED BY:

6"

1' - 2"

2' - 4"

2' - 8"

1' - 2"

1' - 6"

3' - 4"

2' - 4"

SJH

CHECKED BY:

6" 4" 6"

6"

8"

18

8"

AWP-6

PC-1

1'-9"

1.3

4" 6"

1'-6"

4' - 0"

AWP-7

AWP-9

AWP-10 PC-2

EQ

ENLARGED ELEVATION W. - LECTURE HALL ACOUSTICAL PANELS

1' - 4 1/4"

PC-2

CJ

22 AWP-5 A4.05

3' - 7"

ACOUSTICAL WALL PANELS IN RANDOM PATTERN

AWP-9

5' - 0"

3' - 0"

4' - 0"

6' - 0"

CJ

PC-1

8"

10

5' - 0"

3' - 0"

PC-1

AWP-4

5' - 0" 5' - 0"

AWP-9

AWP-7

AWP-1

AWP-7

AWP-9 3' - 0"

AWP-9

AWP-10

4"

1/2" = 1'-0"

1' - 6"

AWP-5 AWP-6

6' - 0"

AWP-9

8"

1'-0"

AWP-6

AWP-1 AWP-8 AWP-6 AWP-4

AWP-6

AWP-9

AWP-1

10"

ENLARGED ELEVATION W. - LECTURE HALL ACOUSTICAL PANELS

J

AWP-7

4"

22

5' - 6" TILE PATTERN REPEAT

22

8"

2"

6" 4"

AWP-9

8"

10"

4" 6"

10" 0"2" 6"

8"

6"

4" 6"

1'-6"

8"

10" 2" 10" 2"

4"

2'-0"

8"

AWP-6

6" 4"

1'-6"

8"

10"

4" 6"

AWP-6

8"

AWP-9

4" 6"

AWP-1

8"

AWP-8 AWP-5

4"

AWP-3

8"

6"

2"

6" 4"

2'-0"

5 3/4" 10 1/4" 2" 6"

AWP-7

2'-6"

AWP-9

10" 2" 1'-6" 6"

AWP-1

8"

AWP-7 AWP-1

1'-9"

AWP-6

EQ

AWP-1 AWP-2

8"

6" 4" 6"

COLUMN

AWP-1

6" 6" 4" 6"

8"

CJ

1'-0" 3'-0" 8"

COLUMN

AWP-6

1'-0" 3'-0"

AWP-10 3'-0" 1'-0"

Finishes

4" 4" 6"

CJ

6"

CJ

8"

AWP-10

EQ

AWP-1

Rendered Furniture Plan

EQ 4" 6" EQ

8" 4" 4" 6"

AWP-8

EQ

CJ

AWP-2

EQ 4" 6" EQ

GENERAL CASEWORK NOTES: 1. REFER TO SHEETS A8.01 AND A8.02 FOR CASEWORK TYPES 2. REFER TO A12 SHEETS FOR EQUIPMENT SCHEDULES 3. REFER TO G0.50 FOR TOILET ACCESSORY LEGEND 4. REFER TO SHEETS A2.30A AND A2.30B FOR INTERIOR FINISH LEGEND 5. BASIS-OF-DESIGN FOR ALL UPPER CASEWORK/MILLWORK SHALL BE DETAIL 17, U.N.O. 6. BASIS-OF-DESIGN FOR ALL LOWER CASEWORK/MILLWORK SHALL BE DETAIL 8, U.N.O.

AWP

VWC-1

Architect


STEAM Allied Health

Rendered Furniture Plan Lounge GENERAL FINISH LEGEND NOTES 1. ALL FINISH MATERIALS SHALL MEET THE FLAME SPREAD RATINGS PER THE BUILDING CODE. 2. REFER TO INTERIOR ELEVATIONS FOR SPECIFIC MATERIAL LOCATIONS. 3. PAINT ALL EXPOSED STRUCT. MEMBERS, STRUCT. DECK, DUCTWORK, DIFFUSERS, PIPING, CONDUIT, EQUIP. HOUSINGS, LIGHT FIXTURE HOUSINGS, CABLE SUPPORTS, CABLE TRAYS, EQUIP. SUPPORTS, HANGERS, ETC. TO MATCH ADJACENT SURFACES. 4. PAINT ALL NON-FACTORY FINISHED EXPOSED METAL. 5. REFER TO TYPICAL FLOORING TRANSITION DETAILS FOR FLOORING MATERIAL TRANSITIONS. 6. ALL FLOORING TRANSITIONS AT DOORS SHALL BE LOCATED UNDER THE DOOR IN THE CLOSED POSITION, U.N.O. 7. PROTECT ALL FINISHED FLOORING SURFACES FROM DAMAGE DURING ALL CONSTRUCTION PHASES. 8. PROVIDE AND INSTALL BULLNOSE TRIM AT ALL TRANSITIONS FROM CERAMIC WALL TILE TO OTHER MATERIAL U.N.O. 9. REFER TO REFLECTED CEILING PLANS FOR CEILING HEIGHTS. 10. ALL ELECTRICAL DEVICE COVERS ARE TO BE WHITE U.N.O. 11. ALL CARPET PATTERNS TO RUN PARALLEL TO CORRIDOR, U.N.O. 12. PAINT ALL HOLLOW METAL DOOR FRAMES TO MATCH ADJACENT WALL BASE U.N.O. 13. ALL GYP. WALLS TO BE PAINTED, U.N.O.

ARCHITECT

PBK Architects, Inc.

THE WOODLANDS 10200 Grogans Mill Road, Suite 230 The Woodlands, TX 77380 281-528-1697 P 281-882-2385 F TX Firm: F-1608 CIVIL

LANDSCAPE

STRUCTURAL

MEPT

PBK.com

DALLY + ASSOCIATES 9800 RICHMOND AVE. SUITE 460 HOUSTON, TX 77042 713-337-8881 P 713-337-8882 F VERDANT 26310 OAKRIDGE DR. ,SUITE 3 THE WOODLANDS, TX 77380 832-861-9014 P DALLY + ASSOCIATES 9800 RICHMOND AVE. SUITE 460 HOUSTON, TX 77042 713-337-8881 P 713-337-8882 F 11 Greenway Plaza, Suite 1510 Houston, TX 77046 E NG INEE RS 713-940-3300 P 713-961-4571 F TX Firm: F-18672

LEAF

131 29 A2.37

FF-1 FLUID APPLIED FLOORING RE: FINISH SCHEDULE

FF-2 FLUID APPLIED FLOORING RE: FINISH SCHEDULE

FF-3 FLUID APPLIED FLOORING RE: FINISH SCHEDULE

FF-4 FLUID APPLIED FLOORING RE: FINISH SCHEDULE

Enlarged Tile Plan ENLARGED FINISH FLOOR PLAN - LOUNGE

Finishes

CPT-1, CARPET, TYPE 1 - GREY RE: FINISH SCHEDULE

1200 N. AMBURN BUILDING 22 TEXAS CITY , TEXAS 77591 100% CD - ISSUE FOR CONSTRUCTION

FINISH FLOOR MATERIALS LEGEND

LOUNGE

STEAM / ALLIED HEALTH BUILDING 22

A PBK COMPANY

FOR FULL DETAILS PRINT SET IN COLOR

Furniture

1/4" = 1'-0"

CPT-2, CARPET, TYPE 2 - COLOR FIELD RE: FINISH SCHEDULE

A

B

9


P2-GP3 11-1/2" x 46" P2-GP5 11-1/2" x 46" P3-GP2 7" x 46" P3-GP3 7" x 46" P3-GP5 7" x 46" P4-GP4 5" x 46" P4-GP6 5" x 46"

ARCHITECTURALLY EXPOSED STRUCTURAL STEEL; REFER TO STRUCTURAL TILE AS SHOWN IN FINISH PLAN

DECORATIVE SCREW W/ 1/2" NEOPRENE GASKET FOR STANDOFF CONCRETE PLINTH; REFER TO STRUCTURAL

GP3 GP5 GP2 GP3 GP5 GP4 GP6

23 8 40 2 3 45 32

71 MEPT

71

REFER TO SPECIFICATIONS FOR PANEL THICKNESS & COLOR DESCRIPTIONS

STEEL TUBE, REFER TO STRUCTURAL

RESIN PANEL

22

ALL - PLINTH/STEEL TUBE INTERFACE

STEAM / ALLIED HEALTH BUILDING 22

METAL SLEEVE

ART WALL - RESIN PANEL ATTACHMENT DETAIL 3" = 1'-0" 24 A5.20

15 A5.20

P

Q 4' - 0"

R 4' - 0"

4' - 0"

S

T

4' - 0"

U

4' - 0"

V

4' - 0"

4' - 0"

4' - 0"

2' - 5 1/2"

FULLY GROUT CHAMFER AT PLINTH EDGES

6"

1' - 6"

2' - 0 1/2"

CONCRETE PLINTH; REFER TO STRUCTURAL 1' - 6"

36' - 6"

DENSE FOAM INFILL; REFER TO STRUCTURAL

7' - 3 1/8"

36' - 6"

25

6"

5 5/16"

5 3/4"

FIRST FLOOR 0"

1' - 6"

AESS-1

PLAN NORTH

AESS-1

KEY PLA

15

RGED STAIR C - FIRST FLOOR PLINTH

ART WALL - PLINTH DETAIL 1 1/2" = 1'-0"

24 A6.11

3"

3"

P3-GP2

P1-GP3

P3-GP2

3"

P2-GP2 P1-GP3

3" 3" 3" 3 1/8" 5'-4" 6 1/2" 3" 3" 3" 3" 4" 4" 1'-8"

COLLEG

P2-GP3

DATE

3"

P2-GP3

P4-GP6 P4-GP4 P3-GP2

REVISIONS

P1-GP5

No.

1'-6"

15

P2-GP5

P2-GP5

P2-GP2

P3-GP2 P3-GP2

P1-GP3 P3-GP2 P1-GP5

100% CD - IS

SP IN ASS

24 A5.20

36'-6"

(ORIGI

A5.20

Finishes 10

ALL - WEST ELEVATION

5

3Form Art wall

ART WALL - SOUTH ELEVATION 1/4" = 1'-0"

D

3"

1'-8" 3" 3" 3"

P4-GP6 P4-GP4 P3-GP2

P4-GP4 P4-GP4 P4-GP6

3" 3" 3"

11" 3 1/8"3" 2'-5" 3" 3" 3" 3" 5" 3" 3" 4" 1'-6 1/2"

P2-GP3

P4-GP4 P4-GP4 P4-GP6

22 A5.20

1' - 6"

10 1/8"

P2-GP2

P2-GP2

P2-GP2

P2-GP2

P1-GP5

P4-GP6 P4-GP4 P3-GP2

P4-GP4

P2-GP2 1'-0"

3"

P2-GP2

P3-GP2

3"

P1-GP5 P2-GP5

P2-GP2

P3-GP2 P4-GP4 P4-GP6

Stair C 1st Floor

2'-8"

3'-3"

3"

P2-GP3

P3-GP2

3" 3"

P4-GP6 P4-GP4 P3-GP2

3"

3" 3" 2'-3 1/2" 1'-7" 3 1/8"3" 3" 3" 3" 3"

3 1/8"3" 3" 3"

P2-GP3

P1-GP5

P4-GP4 P4-GP4 P4-GP6

P2-GP3

2'-6"

P2-GP3

P2-GP3

P3-GP3

3"

P4-GP6 P4-GP4 P3-GP2

P2-GP2

P4-GP6 P4-GP4 P3-GP2

2'-10"

P4-GP6 P4-GP4 P3-GP2

3" 3" 3"

3'-4"

2'-4"

P4-GP4 P4-GP4 P4-GP6

P4-GP4

3" 5" 3"

4" 4"

P4-GP4 P4-GP6

P3-GP2

3"

P4-GP4

P2-GP3

3" 4" 4"

P3-GP2

P2-GP3

P3-GP2

2'-5 1/2"

P4-GP4

3" 4" 8"

1'-0 1/2" 4"

P2-GP3

5"

3'-1 1/2"

P3-GP2

P4-GP6 P4-GP4 P3-GP2

3" 3" 3"

P4-GP6 P4-GP4

3"

2'-0"

P3-GP2 P4-GP4 P4-GP6

P2-GP3

7 1/2"

P2-GP3

3" 10 1/2"

3" 10 1/2" 3" 2'-11" 3 1/8" 3" 3" 3" 3"

P4-GP6 P4-GP4 P3-GP2

P3-GP2 P4-GP4 P4-GP6

P2-GP5

3"

P1-GP5

P3-GP2 P4-GP4 P4-GP6

P2-GP5

3"

P3-GP2

P3-GP2

3"

P3-GP2

P2-GP3 3"

P1-GP5

3" 3"

3"

P1-GP2 3"

P3-GP2

P4-GP4 P3-GP5

P2-GP3

P4-GP4 P4-GP6

P1-GP3

3"

2'-8"

1'-0 5/8"

P2-GP2

P3-GP2

3" 3" 3"

P1-GP5 P2-GP5

P3-GP5

3"

2'-4"

P2-GP3

P3-GP2

P2-GP3

3" 3"

3"

P2-GP5

1'-1" 3"

P2-GP3

P4-GP6 P4-GP4

P3-GP5

3'-5"

2'-3 1/8" 3" 3" 1'-1" 4" 4"

P4-GP4 P4-GP6

3"

3"

P2-GP3

3"

P4-GP6 P4-GP4 P3-GP2

P1-GP5 P1-GP3 3" 3"

P4-GP4

1'-8"

P4-GP4 P4-GP4 P4-GP6

P2-GP2 P2-GP5

P3-GP2

3" 3" 4" 4"

P2-GP3

3"

P1-GP5

P2-GP3

3"

P4-GP6 P4-GP4 P3-GP2

P2-GP2

3" 3" 3"

3" 4" 4" 3" 3" 3"

1'-8"

33'-10 1/4"

33' - 0"

P4-GP4 P4-GP4 P4-GP6

P2-GP3

1' - 6"

34' - 6"

P2-GP3

P4-GP4

2'-6"

P2-GP2

3"

6 1/2" 3" 3"

P3-GP2

P4-GP6 P4-GP4 P3-GP2

1'-5 1/2" 5" 3"

3" 5" 1'-5 1/2" 3"

P4-GP6 P4-GP4

P4-GP6 P4-GP4 P3-GP2

P3-GP2 P4-GP4 P4-GP6

2'-9 1/2"

P3-GP2 P4-GP4 P4-GP6

P3-GP2 P4-GP4 P4-GP6

3 1/8"3"

P3-GP2

3'-3"

P3-GP3

5'-4"

3 1/8" 3" 3" 3"

Furniture

2

ART WALL - EAST ELEVATION 1/4" = 1'-0"

1

Rendered Furniture Plan

ART WALL - AXONOMETRIC

A


STEAM Allied Health

Stair C 3rd Floor

Rendered Furniture Plan Furniture 11


.02 Wortham Poolhouse

Project Scope: Renovation of existing Pool and Landscaping. New Poolhouse with Pergola and custom mosaic tiling. Completed: In pricing Challenges: Finding mosaic tiles to match existing Italian tiles Highlights: The new mosaic gives the backyard a refreshed look while maintaining its historic value. My Role: Match existing tiles and design similiar mosaic pattern

1505 South Blvd. Houston, TX 77006

12

Floor Plan


Wortham Pool House

Existing Tile Mosaic Option 1

Existing Tile

Mosaic Option 2 13


.03

Intex Flooring

Project Scope: 5,000 S.F. office build-out in new tilt-wall shell building. Completed: August 2018 Challenges: New sprinkler system impacted budget heavily Highlights: Special emphasis on open ceilings with wooden clouds in product library at the heart of the space My Role: Construction Drawings and details

8316 N. Willow Place Dr. Houston, TX 77070

Floor Plan 14


Intex Flooring

Conference Room

Product Library

15


.04

Heat Transfer Specialists

Project Scope: 3,000 S.F. office build-out in an existing metal building. Completed: February 2018 Challenges: Project consisted of office, studio apartments and an aircraft hangar all under one roof. Building was also non-sprinklered. Highlights: Special emphasis on walking into the office and being able to see through to the hangar. My Role: Schematic Design, Construction Drawings & Finishes

9550 Max Conrad Dr. Spring, TX 77379

16

Floor Plan


PL-2 24" DEEP DRAWERS WITH HORIZ. PULL

OPEN

OPEN

TENANT PROVIDED DW

TRASH

24" DEEP ADJ. SHELF

DEEP W/ INSULATED PIPES 8" T-5 BACKSPLASH 24" DEEP ADJ. SHELF

3/8" = 1'-0"

FRAMED MIRROR

12

T-3

16

SS-1 COUNTER

N +24 N +24

N +24 N +24

15/A2.04

SS-3 SOLID SURFACE FLOATING COUNTER

RECESSED OPENING

A2.04

UNDERMOUNT SINK

SS-1 SOLID SURFACE PL-2 24" DEEP DRAWERS WITH HORIZ. PULL

OPEN

PL-2 PULL OUT DRAWER FOR TRASH BIN 12

SIDE MOUNTED FULL EXTENSION DRAWER GLIDES HEAVY DUTY WITH BALL BEARING SPECIFICATIONS

24" DEEP ADJ. SHELF EXCEPT AT KNEE SPACE

FINISHED FLOOR T-3

3/8" = 1'-0" ISLAND BACK ELEVATION

FRONT ELEVATION TION 16 3/8" = 1'-0" 15 = 1'-0"

ISLAND PLAN 3/8" = 1'-0"

11

3/8" = 1'-0"

SS-2 SOLID SURFACE

FINISHED FLOOR T-1

Lounge Millwork Elevation

16

12

MAXIMUM SINK DEPTH - 6 1/2" ALL FAUCET HANDLES - LEVER TYPE

3/8" = 1'-0"

PILOT LOUNGE MILLWORK SECTION 3/8" = 1'-0"

M3

EXTENSION DRAWER GLIDES HEAVY DUTY WITH BALL BEARING SPECIFICATIONS

CLEAR TEMPERED GLASS

N +24 N +24

N +24 N +24

BUTT-JOINT GLAZING

PL-1 COUNTERTOP

2" CLEAR ANODIZED ALUMINUM FRAME

12 A2.04

POCKET DOOR

TOILET ROOM

M-1 CORRUGATED METAL FRONT

14

3/8" = 1'-0"

3/8" = 1'-0"

PL-2 PULL OUT DRAWER FOR TRASH BIN

M1 ISLAND FRONT ELEVATION

10

3/8" = 1'-0"

16

B

W/D R/R

U/C REF

OPEN

OV

TRASH

REF

W

11

11 L

OPEN

24" DEEP ADJ. SHELF

CLOSET

CONFERENCE ROOM MILLWORK

REF STUDIO

M1

STUDIO MECHANICAL

PILOT LOUNG

CONFERENCE/HANGAR GLASS WALL ISLAND BACK ELEVATION 12 2 3/8" = 1'-0" 3/8" =M1 1'-0"

EXPOSED CEILING

PILOTS LOUNGE RESTROOM ELEVATION

CORRUGATED SHEET METAL WALL M-1 6'-0" WIDE x 4'-0" TALL TEMPERED GLASS EXTERIOR WINDOW @ 36" A.F.F. 2" CLEAR ANODIZED ALUMINUM RACO FRAME

MILLWORK SECTION

14/A2.04

= 1'-0"

FLOOR T-3

R/R

GLAZING SUBJECT TO HUMANElevations IMPACT LOADS AND IN ALL HAZARDOUS LOCATIONS SHALL Lounge Island PILOT LOUNGE MILLWORK SECTION COMPLY WITH I.B.C, SECTION 2406 (INCLUDING 2406.1, 2406.2, & 2406.3). STOREFRONT GLASS BEDROOM R/R 7RESISTANT GLASS. DOORS AND ADJACENT GLASS PANELS SHALL BE3/8" SAFETY/IMPACT = 1'-0"

PL-1 COUNTERTOP

15

CLEAR SIDE MOUNTED FULLTEMPERED GLASS EXTENSION DRAWER GLIDES BUTT-JOINT GLAZING HEAVY DUTY WITH BALL BEARING SPECIFICATIONS

3/8" = 1'-0"

Luxury Vinyl Tile Milliken: Fine Line

Carpet Tile SCHEDULED LVT Bentley: Arcade Legend

LVT 2" CLEAR ANODIZED ALUMINUM FRAME

16

N +24 N +24

N +24 N +24

2" CLEAR ANODIZED METAL BAR ALUMINUM FRAME FRONT M-1

PLAM: Lounge Cabinets Formica: Folkstone

M

A2.04

BUTT-JOINT GLAZING

MD2

Countertops: Lounge Dekton: Orix

HERCULITE DOOR

Backsplash: Lounge Pantheon: Calm Chevron 12

8 A2.03 *REFER TO PLAN FOR EXACT LOCATIONS

14

PL-2 SHELVES

6'-1 7/8"

24" DEEP ADJ. SHELF

PL-1 VERTICAL SURFACES

CLEAR TEMPERED GLASS SS-1 SOLID SURFACE

PL-2 END PANEL N

TION

EXISTING GUARDRAIL

11 L

W/D

D

ISLAND PLAN

11 L

REF PL-2 24" DEEP DRAWERS WITH HORIZ. PULL OV.

SCHEDULED LVT

Conference Millwork ISLAND SECTION 15 SCHEDULED TILE 3/8" = 1'-0"

11 L

SS-1 SOLID SURFACE

OV.

CORRIDOR POCKET DOOR

B PAN.

FINISHED FLOOR

WALK-IN SHOWER

M3

EXISTING GUARDRAIL 11 L

KITCHEN/LIVING 4" BRUSHED ALUMINUM WIRE PULL AND LOCKSET TYPICAL M2 SS-1 COUNTER 24" DEEP ADJ. SHELF EXCEPT AT KNEE SPACE

24" DEEP ADJ. SHELF

FIELD SUBWAY PL-1 VERTICAL SURFACES TILE T-2

BREAKROO PILOT LOUNGE MILLWORK 3 3/8" = 1'-0"

7

B SIDE MOUNTED FULL

14/A2.04

METAL BAR FRONT M-1

PILO

12

ALL SURFACES TO BE PLASTIC LAMINATE UNLESS OTHERWISE NOTED

A2.04

CORRUGATED SHEET METAL WALL M-1T-3 ACCENT TILE

F FL

PL-2 VERTICAL SURFACES U/C REF FINISHED FLOOR SCHEDULED LVT FLOOR

APRON

PILOTS LOUNGE RESTROOM ELEVATION

16

EXPOSED CEILING

PT-1

36" WIDE KNEE SPACE 19" DEEP W/ INSULATED SS-3 COUNTERTOP PIPES 8" T-5 BACKSPLASH PL-3 24" DEEP ADJ. SHELF 12" DEEP ADJ. SHELF

TENANT PROVIDED DW

DROP CEILING

SS-1 SOLID SURFACE

FIXED PLATE AND NO SHELF AT SINK

POCKET DOOR

FINISHED FLOOR

Pilots Lounge R/R Elevation

4

3/8" = 1'-0"

GC TO CONFIRM SIZING OF ALL TENANT PROVIDED APPLIANCES PRIOR TO PURCHASE AND INSTALL OF MILLWORK

RECESSED OPENING

A2.04

PILOTS LOUNGE RESTROOM ELEVATION

PT-1

T-3

4" BRUSHED ALUMINUM WIRE PULL AND LOCKSET TYPICAL

FLOOR DRAIN

TRASH

24" DEEP ADJ. SHELF

FINISHED FLOOR T-1

T-2 OPEN

T-2

DROP CEILING

SHOWER CONTROLS WALL MOUNTED FAUCET

BREAKROOM MILLWORK

ALL SURFACES TO BE PLASTIC LAMINATE UNLESS OTHERWISE NOTED

7/A2.04

16

MAXIMUM SINK DEPTH - 6 1/2" ALL FAUCET HANDLES - LEVER TYPE GC TO CONFIRM SIZING OF ALL TENANT PROVIDED APPLIANCES PRIOR TO PURCHASE AND INSTALL OF MILLWORK

7/A2.04

ISLAND BACK ELEVATION

15/A2.04

= 1'-0"

Heat Transfer Specialists

FINISHED FLOOR

RAIN STYLE SHOWER HEAD

LED VANITY LIGHTING

TION

PL-2 VERTICAL SURFACES

APRON

PL-2 PULL OUT DRAWER FOR TRASH BIN

ADA GRAB BARS

A2.04

FLOOR

CONFERENCEDRAIN ROOM MILLWORK

EXTERIOR WINDOW

GLAZING SUBJECT TO HUMAN IMPACT LOADS AND IN ALL HAZARDOUS LOCATIONS SHALL COMPLY WITH I.B.C, SECTION 2406 (INCLUDING 2406.1, 2406.2, & 2406.3). STOREFRONT GLASS DOORS AND ADJACENT GLASS PANELS SHALL BE SAFETY/IMPACT RESISTANT GLASS.

10

GLAZING SUBJECT TO HUMAN IMPACT LOADS AND IN ALL HAZARDOUS LOCATIONS SHALL COMPLY WITH I.B.C, SECTION 2406 (INCLUDING 2406.1, 2406.2, & 2406.3). STOREFRONT GLASS

ISLANDDOORS SECTION AND ADJACENT GLASS PANELS SHALL BE SAFETY/IMPACT RESISTANT GLASS.

17

CONFERENCE/HANGAR ISLAND PLAN


Breakroom

Hangar/Conference

18


Heat Transfer Specialists

Conference Room

Breakroom/Entry

19


.05

Baileson Brewing Co.

Project Scope: Convert an existing auto service center into a microbrewery. Completed: September 2017 Highlights: Indoor/Outdoor space was important and this was achieved by using glass front overhead doors for an open feel. My Role: 3D model for sketch Software: Sketch Up

2322 Bissonnet St. Houston, TX 77005

1st: 3D Model Built Space

20

2nd: Hand Render


Baileson Brewing Co.

1st: 3D Model Built Space

2nd: Hand Render

21


.06

Weiser Insurance Group

Project Scope: 5,000 S.F. office remodel in an existing metal building Completed: August 2018 Highlights: Open office with exposed ceilings My Role: 3D model and renderings Software: Revit & Enscape

1500 Bingle Rd. Houston, TX 77055

22

Floor Plan


Weiser Insurance Group

Breakroom

Bullpen

23

Profile for Cherie Bartels

Professional Portfolio 2019  

This is my Current Professional Work examples portfolio.

Professional Portfolio 2019  

This is my Current Professional Work examples portfolio.

Advertisement