I M PALA WAR E H O U S I N G BULK CONCENTRATE STORAGE FACILITY

MANZANILLO, COLIMA. MEXICO


Impala Warehousing 37 acre Development, including: • Corporate Offices Building • High Tech Laboratory & Sampling Dock • 50,000 m² enclosed storage • 100,000 m² open area storage • Shops & Warehouse for Operation’s fleet maintenance • 6 Scale Weighting Stations linked to the data network

• Fuel Station with 40,000 Lt Diesel capacity


Impala Warehousing

• 8 meter high perimeter wall • Fiber Optic Telecommunications • High Tech Global CCTV Closed Circuit Television System • Hydrant based Fire Fighting System • 1,500 KVA Power Substation with Emergency Power generation at full charge

• 500 KVA Laboratory Power Substation with Emergency Power generation at full charge • Complex wide Storm drainage Treatment Plant • Precast High flow Storm Trenches system that performs pre-decantation, reinforced grids to support loaded eighteen wheelers transit • 5 Wash Bays with high pressure washing system for incoming and outgoing trucks


30,000 m² structure for Copper storage Foundation 550 tonns of reinforcement steel 7,750 m³ of concrete in 15 meter deep piles @ 1.20 m average diameter 10 inch concrete slab reinforced with high strenght thermofused 3/8" steel rebar, executed in 50 days Structure 2,250 tonns of A-50 structural steel 5,000 m² roofed storage area delivered to the client every 4 weeks, without affecting the operational functionality Complete storage facility delivered in 6 months Transport, Sandblast, Painting and installation of up to 200 tonns of A-50 structural steel on a typical week KR-18 Sheet metal roofing, 180° joint, fully waterproof system


10,000 m² structure for Zinc storage Foundation 34 tonns of reinforcement steel

250 m³ of concrete in 15 meter deep piles @ 1.0 meter average diameter 10 inch concrete slab reinforced with high strenght thermofused 3/8" steel rebar, executed in 20 days

Structure 880 tonns of A-50 structural steel Complete storage facility delivered in 3 months KR-18 Sheet metal roofing, 180° joint, fully waterproof system


2,500 m² enclosed storage facility for precious metals Foundation 10 tonns of reinforcement steel 120 m³ of premixed concrete 10 inch concrete reinforced with high strenght thermofused 3/8" steel rebar, executed in 3 days

Structure 450 tonns of A-50 structural steel Complete storage facility delivered in 3 months KR-18 Sheet metal roofing, 180° joint, fully waterproof system


5,000 m² Isolated Lead storage facility Foundation 40 tonns of reinforcement steel

300 m³ of premixed concrete Precast concrete wall system conforms interior material holding bays 10 inch concrete reinforced with high strenght thermofused 3/8" steel rebar Structure 1,000 tonns of A-50 structural steel Completely isolated storage design facility, All Lead is contained within, isolated from the rest of the complex This facility is still under construction KR-18 Sheet metal roofing, 180° joint, fully waterproof system


Fuel Station 40,000 lt Diesel capacity 2 Wheel loader simultaneous fueling capacity Facility constructed under PEMEX’s standards

Electronically controlled Fuel supply, linked to the main data infrastructure Burst proof Enclosure


Precast division, Perimeter Walls

Each piece has 1 meter wide and 11 meters high Each one is constructed with 5.5 m³ of premixed concrete and 350 kg of reinforcement steel 110 m² of perimeter wall installation in just 12 hours

620 pieces conform Impala Warehousing’s perimeter


Precast Division, Architectural Wall

2 meter high architectural wall 20 m² installed per day 300 pieces installed at Impala Warehousing

2,100 m² of concrete parking lot slab, enclosed with precast architectural walls, installed in only 21 days


Precast Division, Tankreto Independant precast cistern system 12,000 liter storage capacity, with the ability to adjoin pieces for increased storage capacity if required

5.5 m³ of premixed concrete with 150 kg of reinforcement steel 1’128,000 liter capacity installed at Impala Warehousing


Precast Division, Storm Trenches

2.36 m. wide by 3 m. long precast pieces Up to 42 Linear meters Installed each day High speed flow capacity Galvanized Reinforced heavy load Grids Easy cleaning


Precast Division, Custom design “J� shaped storm trenches that allow predecantation process by retaining suspended solids in the storm system

Column Protectors to maximize the storage space and avoid accidental bumps to the structure Movable Precast Walls to divide storage areas with ease Precast Custom solutions include Post anchors, SuperPost footings. Manholes and registers, Shade areas and service shacks and booths help shorten the construction timeframe


General Power Substation 1,500 KVA installed capacity 2@750 KVA transformers, each backed up with a 750 KVA emergency diesel generator, joined together in a redundant system that allows maintenance services without electrical interruptions that may affect operations The building has 120 m続 of premixed concrete with 6 tonns of reinforcement steel, built in 30 days All the equipment was installed in only 6 days


700 m² Corporate Offices 1,670 m³ premixed concrete 140 tonns of reinforcement steel 450 m² of Landscaping areas 5 executive meeting rooms 80 person Canteen / Dining room CCTV & Data Sitte for the Complex Completed in 4 Months


Maintenance Shops & Parts Warehouse

800 m² Maintenance facility Parts warehouse Mezzanine with 1 ton/ m² capacity Fully equipped shops and maintenance areas, including compressed air system and oil change ramps 450 m³ premixed concrete

40 tonns of reinforcement steel KR-18 Sheet metal roofing, 180° joint, fully waterproof system


Lockers, Showers & Restrooms 80 m続 premixed concrete 14 tonns of reinforcement steel Laundry Area Shower & Dressing rooms Locker room 24 hr service facility To be Completed in 3 Months


Sampling Dock & Laboratory 800 m² High tech facility Sampling dock with 6 truck simultaneous capacity Fully equipped sampling pre-testing stage, Air extraction and dust recolection process Fully equipped Lab, also with Air extraction and dust recolection process 250 m³ premixed concrete 20 tonns of reinforcement steel Sampling dock has KR-18 Sheet metal roofing, 180° joint, fully waterproof system


Re-Weighting Station & Panoramic Supervisor Office

Full Operation views Strategically placed 45 m続 premixed concrete

8 tonns of reinforcement steel


Support Areas 4 access/egress exchangeable lanes each with a Weighting Scale and a hidrojet Washbay tunnel to expedite Operations, fully integrated to the Fiber Optic Data network and Particle removal treatment plants to completely clean the water emission Particle removal treatment plants to completely clean the water emission

Wastewater treatmant plants Fire Fighting pressurized system Presurized Irrigation system


OTHER ACTIVE PROJECTS Santa Rosa Dam Power Plant , CFE 01 year Maintenance Contract

Cleanup, sandblasting and rustproofing of upper impeller shield and upper turbine shield.

Sandblasting and rustproofing of spillway floodgates


Agua Prieta Dam Power Plant , CFE 01 year Maintenance Contract

Fabrication, galvanized rustproofing and installation of main intake’s metallic 65 ton grating


Puente Grande Dam Power Plant , CFE

01 year Maintenance Contract