CASSIDAY LOVE ARCHITECTURE PORTFOLIO


PRESTAGE FOODS, IOWA FACILITY EPSTEIN - 2016-2018 - INDUSTRIAL COMMERCIAL OFFICES A design-build project of an industrial processing facility had the need for 50,000 square feet of commercial office space. Space was allocated for both open and private offices for various departments to serve the facility as well as a 2-story atrium to welcome clients.


4'-0"

2 ID - ELEVATION - LOBBY - EAST SCALE: 1/2" = 1'-0"

GM-12A

PT-1

PT-1

OPEN TO CORRIDOR

GM-12A

3'-4 1/4"

GM-12A

3'-4 1/4"

GM-12A

3'-4 1/2"

3'-5 1/4"

9'-0"

4

4

A7-106

A7-106

SIM.

TYP.

STOREFRONT TO R&D KITCHEN

LOBBY W100

5

A7-106

TYP.

4'-0 1/8"

OPEN TO CORRIDOR

GM-12A

3'-5 1/4"

BY OTHERS

WOOD DOOR WITH LITE

WC-2

DOOR TO HR

3 2 1

GM-12A

12.01.2017 10.06.2017 09.22.2017

NO.

SEMITRANSPARENT FILM

ISSUANCE 25 ISSUANCE 20 ISSUANCE 19

REVISIONS/ISSUANCES

DATE

WC-2

8'-6"

RECEPTION DESK, SEE I8-102 7'-2"

W156B

8'-0"

6'-0"

STAIR RAILING SYSTEM, SEE ARCHITECTURAL DRAWINGS

OPEN TO CORRIDOR

Architecture Interiors Engineering Construction

PT-1

Chicago New York Bucharest Warsaw

3'-7"

600 W. Fulton Street Chicago, IL 60661-1259 T 312.454.9100

NOTE: www.epsteinglobal.com

3'-2"

3'-3"

NUMBER: SEE PROJECT ELECTRICAL DRAWINGS FOR 15376 MORE DETAILS AND MANAGER: LIGHT FIRXTURES PROJECT J.CHOCHOLA DIMENSIONS. D. SRETENOVIC ARCH/ENG:

9'-4"

As indicated

12/4/2017 12:52:18 PM

SCALE:

Checker

CHECKED BY:

KEY NOTE SCHEDULE I2-205

1 ID - ELEVATION - LOBBY - WEST SCALE: 1/2" = 1'-0"

WK

WL

CB

MEP / FP Engineer

Structural Engineer

Civil Engineer

Architect

Owner

EPSTEIN 600 West Fulton Chicago, IL 60661 312.454.9100

EPSTEIN 600 West Fulton Chicago, IL 60661 312.454.9100

EPSTEIN 600 West Fulton Chicago, IL 60661 312.454.9100

EPSTEIN 600 West Fulton Chicago, IL 60661 312.454.9100

PROJECT LOCATION: PRESTAGE FOODS OF IOWA 3183 Highway 17 Eagle Grove, Iowa 50533

WM CC

6

A4-104

NOTE: SCREEN PROJECTOR BY OTHERS. INTERIOR ELEVATIONS PENDANT LIGHT FIXTURES ABOVE RECEPTION TO BE SUSPENDED 8'-0" AFF.

◊ 1 2

PRESTAGE FOODS OF IOWA

SEAL

©

I6-201

2016 A. Epstein and Sons International, Inc. All rights reserved.

WN C12 W4 W5

9' - 0" GYP-01

9' - 0" GYP-01

B

B

B

EQ

EQ

EQ

C EQ

C

CORRIDOR W241

B

B

STAIR 7 ST07-2

B

EC

9' - 0" APC-01

3'-6"

4'-4"

B

EQ

C

F

J

B

EQ

C

B

C

C

EQ

R&D KITCHEN AND MEAT SHOWROOMC W200

5'-0"

9'-10"

C

W6

OS3

C

8'-0"

C

C

6'-0"

C

6'-0"

C

6'-0"

C

6'-0"

C

6'-0"

C

C

6'-0"

6'-4"

6'-0"

W6.2

EQ

EQ

(22'-6" ABOVE LEVEL 1 FINISH FLOOR) T_6' O_1

S

T_2' T_4'

C

3'-3"

S

EQ

3'-3"

T_4'

T_6' T_2'

T_2'

T_4'

6

I8-202

O_1

O

I8-202

O_1

9' - 0" WD-1

(22'-6" ABOVE LEVEL 1 FINISH FLOOR)

O_1

O

T_4'

O_1

O_1

2

O_1

O_1

T_4'

1'-10" 1'-1" 7"2"6"1'-1" 6'-4"

EQ

EQ

4

O_1

9' - 0" WD-1

C

?

9' - 0" GYP-01 EQ

OS3 C

C

3

I8-202 O_1

C

1'-0"

?

4'-0"

3'-0" C

4'-0"

3'-0" C

6'-4"

3'-0" C

1'-9"

9' - 0" GYP-01

6'-0"

3'-0" C

LOBBY W100

C

6'-0"

3'-0"

EQ

1'-0"

B

C

1'-6"

C

TOILET W209A

EQ

OS3

C EQ

C

9' - 0" GYP-01 C 6'-0"

6'-4"

B

9' - 0" APC-01

2'-0" C

6'-0"

5'-0"

OS3

C

1'-3"

6'-0"

EQ

B

9' - 0" APC-01 B

C

I8-201

E

C

TRAINING ROOM W232

O_1

O_1

O 3'-0"

EQ B 6'-0"

C

6'-0"

C

6'-0"

C

6'-0"

C

6'-0"

C

6'-0"

5

6'-0"

I8-201

W7

3 2 1

12.21.2017 10.06.2017 09.22.2017

NO.

ISSUANCE 26 ISSUANCE 20 ISSUANCE 19

REVISIONS/ISSUANCES

DATE

Architecture Interiors Engineering Construction

Chicago New York Bucharest Warsaw

FINISH NOTES:

1. ALL INTERIOR WALL, CEILING FINISHES, FLOOR COVERINGS ANDStreet TRIM TO COMPLY 600 W. Fulton WITH 2009 IBC CHAPTER 8. Chicago,AND IL 60661-1259 2. ALL PARTITIONS ALL GYPSUM BOARD CEILINGS BE PAINTED 1 PRIME COAT T SHALL 312.454.9100 AND 2 FINISH COATS. USE ADDITIONAL FINISH PAINT COATS AS NECESSARY AT DARKERwww.epsteinglobal.com PAINT COLORS. 3. ALL PAINT MATERIALS SHALL BE APPROVED EQUAL TO PRODUCTS AS INDICATED ON THE FINISH SCHEDULE ON SHEET I5-201. 4. PAINT SCHEDULE INDICATES COLOR AND GENERAL FINISH ONLY. CONTRACTOR TO USE APPROPRIATE FINISHING SYSTEM FOR EACH SUBSTRATE AS NEEDED. 5. ALL WALLS TO RECEIVE SATIN OR EEGSHELL PAINT TO BE FINISHED TO LEVEL 4 GYP FINISH. 6. HOLLOW METAL FRAMES TO BE PAINTED TO MATCH ADJACENT WALL FINISH, SEMIGLOSS FINISH, U.N.O. 7. STRAIGHT BASE SHALL BE INSTALLED AT CARPETED AREAS AND COVED BASE SHALL BE INSTALLED AT AREAS WITH RESILIENT FLOORING. REFER TO FINISH SCHEDULE FOR MORE INFORMATION. 8. ALL FLOOR SLABS SHALL BE PATCHED, LEVELED AND PREPARED AS REQUIRED TO RECEIVE NEW FLOORING MATERIAL. 9. REFER TO SHEET I8-203 FOR FLOORING TRANSITION DETAILS. 10. ALL WALLS TO BE PT-1 IN COLOR WITH WALL BASE RB-1, UNLESS NOTED OTHERWISE ON THE FINISH PLANS AND/OR FINISH SCHEDULE. 11. ALL CMU WALLS IN CORRIDORS AND HALLWAYS TO BE CMU-1. SEE FINISH SCHEDULE FOR MORE INFORMATION. 12. EXPOSED DECK AND ALL EXPOSED EQUIPMENT TO BE PATCHED/PAINTED PT-1, AT LUNCH ROOM BLACK. 13. CONTRACTOR TO VERIFY ALL SQUARE FOOTAGES IN FIELD PRIOR TO ORDERING MATERIALS, AND INCLUDE 10% OVERSTOCK FOR CUTTING, FITTING AND OWNER ATTIC STOCK. A. Epstein and NOT Sons International, Inc. All rights reserved. © 2016 14. MAXIMUM CARPET PILE HEIGHT SHALL

15376

PROJECT NUMBER:

EB

EA

EC

ED

EE

EF

EGCACA

CB

PROJECT MANAGER:

CC

ARCH/ENG:

E5

W1 RCP - LEVEL 2 1 ENLARGED

1/4" = 1'-0"

W2

W1

EB

EC

K4

MEP / FP Engineer

Structural Engineer

Civil Engineer

Architect

Owner

EPSTEIN 600 West Fulton Chicago, IL 60661 312.454.9100

EPSTEIN 600 West Fulton Chicago, IL 60661 312.454.9100

EPSTEIN 600 West Fulton Chicago, IL 60661 312.454.9100

EPSTEIN 600 West Fulton Chicago, IL 60661 312.454.9100

PROJECT LOCATION: PRESTAGE FOODS OF IOWA 3183 Highway 17 Eagle Grove, Iowa 50533

IT SERVER ROOM W234 VCT-2

TROLLEY STORAGE W235 SC-2

K5

W3

HARVEST FLOOR OPERATIONS W237 VCT-1

FUTURE OFFICE EXPANSION W236 VCT-1

RECORDS STORAGE W233 VCT-1

UP

PRESTAGE FOODS OF IOWA

CUT MANAGER OFFICE W230 VCT-1

TRAINING ROOM W231 VCT-1

HARVEST MANAGER OFFICE W238 VCT-1

STAIR 8 ST08-2 SC-2

C10

W2

SEAL

C10

5

W3

CUT FLOOR OPERATIONS W229 VCT-1

TRAINING ROOM W232 VCT-1

Checker

CHECKED BY:

SCALE: 1/4" = 1'-0"

ENLARGED CEILING PLAN - LEVEL 2

I2-205

EXCEED 1/2", TYPICAL. 15. MAXIMUM TRANSITION HEIGHT BETWEEN 2 DIFFERENT FLOOR FINISHES NOT TO EXCEED 1/2", TYPICAL. 16. ALL FLOORING TRANSITIONS TO OCCUR AT CENTERLINE OF DOORS OR AS INDICATED ON THE FINISH PLANS. 17. WERE MILLWORK IS BEING INSTALLED PROVIDED FLOOR FINISH UNDERNEATH; ALL THE WAY TO THE BACK WALL. 18. SEE ELEVATIONS FOR ADDITIONAL FINISH INFORMATION. 19. SEE DETAIL ON I8-203 FOR TYPICAL WALL TILE EDGE.

FLOOR FINISH KEY CPT-1

C10.5

C10.5

CPT-2

FT-1

FT-2

C11

PT-2

SALES MANAGER W215 CPT-2

PT-2

COPY / SUPPLY ROOM W216 VCT-1

PT-2

MEDIUM CONFERENCE ROOM W218 VCT-1

PT-2

IT MANAGER W219 CPT-2

C11 UNISEX ADA TOILET W245 FT-2

C12

STORAGE W246 SC-2

OFFICE W214 CPT-2

3

WOMEN'S RESTROOM W207 FT-2

PT-2

PT-2

CONTROL OFFICE W212 CPT-2

GUEST OFFICE W221 CPT-2

RF-5

7 ST07-2 SC-2

CONTROLLER MANAGER W222 CPT-2 PT-2

OPERATIONS MANAGER W210 CPT-2

ACCTG. MANAGER W223 CPT-2

W6.2

PT-2

PT-2

R&D MANAGER W224 CPT-2

REF.

CORRIDOR W243 CPT-1

MEN'S RESTROOM W206 2 FT-2

PLANT MANAGER W209 CPT-2

PT-8 over PT-2

W7

PANTRY W228 VCT-1

BREAKOUT SPACE W227 CPT-2

WA

WB

WC

WD

WE

WF

WG

WH

3

R&D KITCHEN AND MEAT SHOWROOM W200 FT-1

NOTE: WT-3 ON WALL TO 6'-0" AFF. SEE ELEVATIONS FOR MORE DETAILS. WT-4 ON WALL TO 6'-0" AFF. SEE ELEVATIONS FOR MORE DETAILS. WT-2 ON WALL TO 6'-0" AFF. SEE ELEVATIONS FOR MORE DETAILS. PT-8 OVER PT-2. WC-3 ON BOTH SIDES SEPARATION WALL.

W6

W6.2

2

OPEN TO BELOW

TOILET W209A FT-1

4

2

CONF. PANTRY W202 VCT-1

2

PT-2

COLLABORATIVE AREA W225 CPT-2

KEY NOTE SCHEDULE I5-102 ◊ 1

REF.

4 5

LARGE CONFERENCE ROOM W203 CPT-1/CPT-2

PT-2

OPERATIONS MANAGER W211 CPT-2

OPEN OFFICE W226 CPT-1

SUPPLY ROOM W201 VCT-1

W5

WC-1

1

PT-2

PT-2

KJ W6

ELEC ROOM W204 SC-2

STORAGE W205 SC-2

SC-2

VCT-1

W4

UPSTAIR

1

1

FT-3

C12 JC W208 SC-3

3

PLANNING MANAGER W213 CPT-2

SALES MANAGER W217 CPT-2

UNISEX ADA TOILET W244 FT-2

PT-2

CORRIDOR W241 VCT-1

K6 W4 W5

W7

STORAGE W228A SC-2

WJ

WK

WL

WM

WN

3 2 1

NO.

12.01.2017 10.06.2017 09.22.2017

DATE

ISSUANCE 25 ISSUANCE 20 ISSUANCE 19

REVISIONS/ISSUANCES

Architecture Interiors Engineering Construction

Chicago New York Bucharest Warsaw

600 W. Fulton Street Chicago, IL 60661-1259 T 312.454.9100

www.epsteinglobal.com

PROJECT NUMBER: PROJECT MANAGER: ARCH/ENG: SCALE:

CHECKED BY:

1 FINISH PLAN - WELFARE LEVEL 2

15376 J.CHOCHOLA

D. SRETENOVIC

As indicated Checker

SCALE: 1/8" = 1'-0"

MEP / FP Engineer

Structural Engineer

Civil Engineer

Architect

Owner

EPSTEIN 600 West Fulton Chicago, IL 60661

EPSTEIN 600 West Fulton Chicago, IL 60661

EPSTEIN 600 West Fulton Chicago, IL 60661

EPSTEIN 600 West Fulton Chicago, IL 60661

PROJECT LOCATION: PRESTAGE FOODS OF IOWA 3183 Highway 17

FINISH PLAN - WELFARE LEVEL 2

PRESTAGE FOODS

J.CHOCHOLA

D. SRETENOVIC

SCALE:

E5

PT-2

GED RCP - LEVEL 2 - TRAINING ROOM

C

PT-2

B

EQ

B

12/4/2017 12:51:35 PM

OS3

C

C

TYP.

C 1'-6" B

C

4

TYP.

CORRIDOR W243

2

W3

B

C

2'-9"

I8-202 ?

I 3'-0"

3'-0"

B

F

6'-0"

CA-01

6'-5"

OS3

I

C

6'-0"

B

6'-0"

C

B EQ

MEN'S RESTROOM W206 6'-0"

I 3'-0"

B

C

J

OS3

VIF

4

I8-201 TYP.

F OS3

7"2"10" 8"2"1'-5" 1'-3"

B

9' - 0" APC-01

C

6'-0"

F

TYP. B

C

9' - 0" APC-01

I8-202

OS3

CONF. PANTRY W202

C LARGE CONFERENCE ROOM W203

C

C

C 6'-0"

TYP.

2

3'-10" C

OS3

C C

C EQ

2

I8-202

9' - 0" GYP-01

B

9' - 0" GYP-01

B

9' - 0" APC-01

B

U

4'-6"

7' - 1" GYP-01

3

C C

EQ

B

TRAINING ROOM W231

1'-4"

B

B

4'-2"

I8-201

6'-0"

OS3

C

6'-0"

N

C

OS3

6'-0"

C

4'-0"

6'-0"

B 9' - 0" APC-01

OS3

2'-3" EQ

C

13'-9"

6'-0"

EQ

OS3

3'-2"

B

U U OS3

C

OS3 OS3

B

EC

2'-2"

B

8'-0"

SUPPLY ROOM W201

6'-0"

EQ

EQ

9' - 0" GYP-01

9' - 0" APC-01

C

EQ

WOMEN'S RESTROOM W207 B

2'-2"

JC W208

ELEC ROOM W204 5'-8"

EQ

STORAGE W205

U

EQ

W2

B

F8

F8

4'-1"

2

I8-202 TYP.

B

3'-2"

UNISEX ADA TOILET W244

EQ

EF

EQ

WG

UNISEX ADA TOILET W245


LA QUINTA CHICAGO LOUNGE EPSTEIN - 2016 - LOBBY AND LOUNGE RENOVATION The renovation of La Quinta Chicago’s lobby and lounge. The aim was to bring patrons in outside of just hotel guests to use the lounge and bar. Partnered with Getty’s Group, a bar was added, a swimming pool was converted into a fitness room, rooms renconfigured in the lobby, and new finishes were added.


CENTER AT 3'-2" A.F.F.

3

A-701

LAMINATE, SEE ID SCHEDULE

ELECTRICAL OUTLET CENTER AT 3'-2" A.F.F.

8" 4"

1'-8"

TV

ELECTRICAL/USB OUTLET

BAR A C B D A C B D A C B D A C B D C235 B D A C B D A C B D A C B D A E C F D E C F D E C F D E C F D

HW-01, REFER

I

L

J

K

I

L

J

K

I

L

J

K

I

L

J

K

I

K

3'-2"

I

L

J

K

I

L

BAR SIDE BEYOND

J

K

I

L

J

K

I

L

113'-10"

SHS LOUNGE SIDE

SF-02 (REFER TO ID SCHEDULE) ON 1/2" AND 1/4" SUBSTRATE

11 3/4"

3 5/8"

MEDIUM DENSITY FOAM 2'-0"

HW-01, SEE ID SCHEDULE

1 1/2"

ELECTRICAL OUTLET

5"

7"

45"

TL-04, REFER TO ID SCHEDULE AND DWGS

XXX.XXX.XXXX

LINE OF BAR EQUIPMENT; SEE F&B CONSULTANT PACKAGE

5'-0" 4'-0"

B

FIBER REINFORCED PLASTIC PANEL ADHERED TO GYP BOARD; COORD COLOR AND PATTERN WITH INTERIOR DESIGNER

10

A-701

3'-9"

COORDINATE POWER WITH OPERATIONS

WD-01, SEE ID SCHEDULE

6"

3" SCALE: 3/4" = 1'-0"

SCALE: 1 1/2" = 1'-0"

BAR SIDE

2'-0"

5'-0"

WD-01, SEE ID SCHEDULE 4'-0"

4 BAR - NORTH WALL

1'-0"

MEP / FP Engineer

Structural Engineer "

SCALE: 1/4" = 1'-0"

3"

ST-02, SEE ID SCHEDULE

1'-8"

1'-8"

2'-6"

600 W Fulto Chicago, IL 312.454.910

5/8" GYPSUM BOARD; MOLD AND MOISTURE RESISTANT ON BOTH SIDES

MT-01, REFER TO ID SCHEDULE

T

C R

HW-02, REFER TO ID SCHEDULE

LEVEL 2 113'-10"

LOUNGE

NOTE -SAFE -EXIST

3 SECTION AT ADA BAR SCALE: 1 1/2" = 1'-0"

FOOD AND BEVERAGE

INTERIORS

MEP / FP Engineer

NAME Address Address XXX.XXX.XXXX

THE GETTYS GROUP 55 W. Wacker Dr. Chicago, IL 60601 312.836.1111

EPSTEIN 600 W Fulton Street Chicago, IL 60661 312.454.9100

Architect of Record

C M

1 KE

LEVEL 1 100'-0"

11 3/4"

LAMINATE, SEE ID SCHEDULE

1'-6"

BAR DIE WALL B

LAMINATE, SEE ID SCHEDULE

1'-8"

MEP /

1/4" = 1'-0"EPSTEIN

L-15B; REFER TO LIGHTING SPECIFICATIONS

COORDINATE BACK RECEPTION DESK EQUIPMENT W/ OPERATIONS PRIOR TO FABRICATION

LINE OF FINISHED FLOOR

LOUNGE SIDE

LIGHTING SPECIFICATIONS

4" METAL STUD; MIN 24" OC

ST-02, SEE ID SCHEDULE

SEALANT ON BOTH SIDES

BAR 235

2 ENLARGE

INTERIORS L-15; REFER TO

THE GETTYS GROUP SCALE: HW-01, 55 W. Wacker Dr. SEE ID Chicago, ILSCHEDULE 60601 312.836.1111

TL-04, REFER TO ID SCHEDULE AND DWGS.

MT-01, REFER TO ID SCHEDULE

HW-02, REFER ST-02 ON BACK, SEE ID TO ID SCHEDULE SCHEDULE

1'-6"

SCALE: 1" = 1'-0"

SCALE: 1 1/2" = 1'-0"

METAL FRAMING; AS REQUIRED

LAMINATE, SEE ID SCHEDULE

MT-01, REFER TO ID SCHEDULE

4" METAL RUNNER LAMINATE, SEE ID CHANNEL SCHEDULE

3/4" 3"

2"

SCALE: 1 1/2" = 1'-0"

MT-01, SEE ID SCHEDULE

SF-02 (REFER TO ID SCHEDULE) ON 1/2" AND 1/4" SUBSTRATE

STAINLESS NAME DRINK RAIL; SEE Address F&B CONSULTANT PACKAGE Address

MT-01, SEE ID SCHEDULE LEVEL 1 100'-0"

3 SECTION AT A

L-16, REFER TO LIGHTING SPECIFICATIONS

4"

7 3/4"

DETAIL THROUGH RECEPTION DESK STORAGE 5 SECTION 4 RECEPTION AT DINING BANQUETTE AT 9 SECTION 7 SECTION

INTERIORS

1'-8"

LAMINATE, SEE ID SCHEDULE

2'-3 1/4"

30"

7"

4"

ELECTRICAL OUTLET INTERLAM PANELS TO BE SILICONED

SCALE: 1/4" = 1'-0"

METAL FRAMING; AS REQUIRED

L-15B, REFER TO LIGHTING SPECIFICATIONS

TO FRONT OF CABINETS

3"

1 1/4"

3"

1 1/2" 6" 3/4" 18"

3'-9" 2'-3 1/4"

ADJUSTABLE SHELF

BAR SIDE

FOOD AND BEVERAGE

3'-6"

3/4"

11 3/4"

A

5'-0"

FOOD AND BEVERAGE

C R

4 BAR - NORTH WALL

2'-0" COORD W/ID

5/8" GYPSUM 1'-0" BOARD; MOLD AND MOISTURE RESISTANT ON BOTH SIDES

VENTILATION GAP

10/31/2016 5:50:27 AM

4" COORD W/ID

2 1/2"

4'-0"

1 1/2"

2'-5 3/4"

4"

1'-1 1/2"

11 3/4" 3"

4'-0"

LEVEL 2 113'-10"

7 SECTION AT BAR DIE WALL

SCALE: 1 1/2" = 1'-0" L-15; REFER TO LIGHTING SPECIFICATIONS

6" METAL STUD; MIN 24" OC

WOOD FINISH, SEE IDCORD CHASE FROM COUNTERTOP 3 3/8" 2" SCHEDULE

2'-2"

HW-02, REFER TO ID SCHEDULE

6"

3'-4 1/2"

4 3/4"

10"

5'-0"

2"

E SIDE

FINISH

M KE

MT-01, REFER TO ID SCHEDULE T

LINE OF FINISHED FLOOR

SCALE: 1 1/2" = 1'-0"

MEDIUM DENSITY FOAM

ALL

MT-01, REFER TO ID SCHEDULE

SHS LOUNGE SIDE WOOD

SF-02 (REFER TO ID SCHEDULE) ON 1/2" AND 1/4" SUBSTRATE

2'-0"

BASE, SEE ID DWGS

L-15B; REFER TO LIGHTING SPECIFICATIONS

SEALANT ON BOTH SIDES

8 SECTION AT ADA BAR

B

1'-6"

TL-04, REFER TO ID SCHEDULE AND DWGS. C

MT-01, REFER TO ID SCHEDULE

BAR DIE WALL BEYOND

LOUNGE SIDE

SCALE: 1" = 1'-0"

1" PADDING

FIBER REINFORCED 100'-0" PLASTIC PANEL ADHERED TO GYP BOARD; COORD COLOR AND PATTERN WITH INTERIOR DESIGNER

BACK BAR COOLER

A-701 SPECIFICATIONS

9 SECTION AT DINING BANQUETTE 1'-4"

D FINISH

MOLD AND MOISTURE RESISTANT ON BOTH SIDES

LEVEL 1

ELECTRICAL OUTLET

HW-02, REFER TO ID SCHEDULE

SCALE: 3/4" = 1'-0"

1" PADDING

4" METAL STUD; MIN 24" OC

A5/8" GYPSUM BOARD;

LINE OF BAR EQUIPMENT; SEE F&B CONSULTANT PACKAGE MIRROR

SCHEDULED TV FINISH

BAR SIDE BEYOND

10 BAR SHELF DETAIL

1'-0"

2 1/2" SCHEDULED COUNTERTOP MATERIAL ON 1/2"BAR BACK AND 1/4" SUBSTRATE

4" METAL RUNNER CHANNEL

5 BAR - BEHIND BAR

D OP ON 1/2" UBSTRATE

HW-01, SEE ID SCHEDULE

SEE F&B CONSULTANT PACKAGE

5/8" GYPSUM BAR BOARD; SHELVING MOLD AND MOISTURE MILLWORK RESISTANT ON BOTH SIDES

LEVEL 2 113'-10"

SCALE: 1/4" = 1'-0"

7 3/4"

LINE OF FINISHED FLOOR

4"

BASE, SEE ID DWGS

ELECTRICAL OUTLET

L-15; REFER TO LIGHTING SPECIFICATIONS

STAINLESS DRINK RAIL; SCALE: 1/4" = 1'-0"

VARY

TL-04, REFER TO ID SCHEDULE AND DWGS

METAL FRAMING; AS REQUIRED

5 BAR - BEHIND BAR

SCHEDULED L-15B, REFER TO 12 FINISH BEYOND LIGHTING

3 3/8"

2"

7"

WOOD FINISH, SEE ID SCHEDULE

8"

BAR 235

7"

1'-3 3/4"

A-701

BAR 235

L-16, REFER TO LIGHTING SPECIFICATIONS

4"

2'-0"

1/2" 6" METAL2STUD; MIN 24" OC

10

DASHED LINES INDICATE PLACEHOLDER FOR KITCHEN EQUIPMENT, REFER TO KITCHEN CONSULTANT DWG'S FOR ADD'L INFO

BACK BAR 1" PADDING COOLER

1'-8"

1 1/4"

SF-02 (REFER TO ID SCHEDULE) ON 1/2" AND 1/4" SUBSTRATE

METAL FRAMING; AS REQUIRED

3

2'-0" COORD W/ID

3'-6"

LEVEL 2 113'-10"

B

ELECTRICAL OUTLET

SCALE: 1/4" = 1'-0"

AT RI LOUNGE 3'-0"

4"

1 1/2"

3'-9"

L

4 BAR - NORTH W

A-701

METAL FRAMING; AS REQUIRED

2'-10" MAX

I

CONTINUOUS LEDGER

4'-0"

G

1" PADDING

HW-01, SEE ID SCHEDULE ELECTRICAL OUTLET

BOTTLE STEP

2'-5 3/4"

G

2 1/2"

AT RI LOUNGE 3-'6"

3"

D

4 3/4"

C R

SCALE: 1 1/2" = 1'-0"

L-15; REFER TO LIGHTING SPECIFICATIONS

GLASS PANE BACKSPLASH, SEE ID SCHEDULE

T

8 SECTION AT ADA BAR

SCALE: 1/4" 3/4" ==1'-0" 1'-0" SCALE:

LT-22

BACK BAR COOLER

LEVEL 2 113'-10"

LEVEL 2 113'-10"

5DETAIL OF BAR - IN FRONT BAR SHELF 10BAR 6

LIGHT SHELF SYSTEM 1'-4" FOR BLOCKING SHELVING

10 KE A-701

3'-4 1/2"

SCALE: 1/2" = 1'-0"

4" COORD W/ID

11 BAR - FINISH TILE PLACEMENT

C M

B

TOLEVEL ID SCHEDULE 2

4"

K

2'-10"

J

2'-6 1/4"

L

2'-3 1/4"

D

SCALE: 1/4" = 1'-0"

COUNTER

B

B D A F D E H F E I G J K I

6AT BAR - IN FRONT OF BARA

SCHEDULED ADAFINISH SERVICE

2'-6"

12

3'-2" 3'-6"

2 1/2"

ELECTRICAL SCHEDULED COUNTERTOP OUTLET CENTER MATERIAL ON 1/2" 3'-2" A.F.F. AND 1/4" SUBSTRATE

SCALE: 1 1/2" = 1'-0"

3'-6"

I

10/31/2016 5:50:27 AM

J

1'-8" A-701

3'-2"

HW-02

3"

E

H

10

2'-10" MAX

ELECTRICAL OUTLET

3'-6"

MT-01

LF SECTION

C

VARY

DA-701 E C F D TO ID SCHEDULE F D SCHEDULED E C F FINISH D E C F D E C F D BAR C F D E C E DIE WALL H F G E E E E E H F G E H F G E H F G E HBEYOND F F G E H F G F F F G H G H G BEYOND MT-01, REFER TO F G H F G E H E G E H F G E H F G E H F G E F G E HH F F 2'-0" F E H E E G H G H J H I G J H I GOF FINISHED J H I G J H I G J H I G G J H I G J I G J H I G J H I G LINE ID SCHEDULE H I G J H I H I G FLOOR J H I G J H I G J H I G J G J H I H I G J H I G J H I G J L J K I L J K I L J K I L J K I L J K I J K I L J L K L K I L K I I J J HW-02, REFER

CEPTION STORAGE

C

SCALE: 1/4" = 1'-0"

12 BAR SHELF SECTION

DASHED LINES INDICATE PLACEHOLDER FOR KITCHEN EQUIPMENT, REFER TO KITCHEN C B D A C B A C B D A C B D A D DWG'S A C B 10 D A C 11 B D A C B C B D A CONSULTANT ADD'L F F D E C E C F D C F FOR D C INFO E E A-701 F E C D E C D1'-3E3/4"C 3F5/8"D E C F D FA-701

TL-04.A-L

3/4" = 1'-0"

2 1/2" METAL FRAMING; AS REQUIRED

CONTINUOUS LEDGER

1'-8" HW-01

2'-6 1/4"

BOTTLE STEP

10

A-701

5 BAR - BEHIND

A

AT RI LOUNGE 3'-0"

GLASS PANE BACKSPLASH, SEE ID SCHEDULE

SCHEDULE STEEL TUBE MT-01, SEE ID SCHEDULE

2'-0"

B

LT-22

WOOD VENEER ST-02 ON BACK, SEE ID

AT RI LOUNGE 3-'6"

LAMINATE, SEE ID SCHEDULE

11 A-701

LIGHT SHELF SYSTEM BLOCKING FOR SHELVING

Design Architect

1 LEVEL 1 ENL SCALE: 3/4" = 1'-0"

Owner

GLA WAS


CLEMSON MEMORIAL STADIUM - RENOVATION AECOM - 2014/2015 - CLUB & SUITE RENOVATION As a part of Clemson University’s Memorial Stadium renovation, the AECOM design team had the task of relocating the press and suites on the south side of the stadium, making designated levels for the suites/press and club. This move focusing on the suites and club, was to create an enhanced experience, especially for suite and club-holders.


Suites were added and given an updated interior design, while still maintaining its connection with Clemson University. The overall club was subdivided into smaller club spaces to provide for seating and food areas. The club is designed to connect with the surrounding nature of Clemson University’s campus (it is known for its forestry program) in a modern way with its finish materials,. This is in order to provide a more high-end experience for its patrons.


PRESIDENT'S SUITE

SHARED PANTRY

ELEVATED PLATFORM WITH DRINK RAIL

LIQUOR LOCKER

LIQUOR LOCKER

FOOD TABLES

PANTRY BAR HEIGHT DRINK TABLES

PANTRY

ENTRY

My role as a member of the team was to assist the project designer and other associate team members through the Schematic Design, Design Development, Construction Document phases. Through the duration of these phases, my responsibilities included 3D modeling in Revit forOVERALL both and proposed PLAN existing - SOUTH - CLUB LEVEL II STATE PROJECT NO. H12-9916-SG 15 DECEMBER 2014 CLEMSON UNIVERSITY MEMORIAL STADIUM SUITE RENOVATIONS design ideas, creating and refining drawings, and assistance in the design and development process.


URBAN EDGES - DEVELOPMENT OF A CIVIC SPACE Kansas State University - 2014 - Graduate Design Studio Group Project with Brett Fast, Calleigh Freise, and Taryn Klein A year-long group project was divided into two parts: 1. Research and Site Analysis 2. Redesign, to approach the revitalize the under-utilized and disconnected Washington Square Park in downtown Kansas City. Research and site analysis was conducted to gain better understanding of the site and its context in order to make well-informed design decisions.


This design approach focused on capitalizing on the existing location and views, resulting in a design that had activated edges and a centralized open lawn. The purpose of having activated edges and an open lawn was based on precedents and existing usage, therefore various programming amenities were allocated to the edges to insure activated edges while leaving the open lawn flexible for various uses.


2013 Land Uses

Parcel Ownership Business Owned Parcels

Individually Owned Parcels

City/County Owned Parcels

As a part of the research and site analysis process, maps and diagrams were generated in order to gain an understanding of Washington Square Park and its context. By creating maps such as land use, change in number of households, and parcel ownership, one can begin to understand the surrounding area and be better equipped in approaching the design process. It is also important to study the current uses of the park to see how it is already utilized programmatically. Research was conducted on various case studies and Kansas City Parks as well to understand important programming amenities that could be translated to the park. An inventory of the amenities was taken and reflected in diagrams to show the relationship and popularity of the amenities.


OPEN LAWN

OPEN LAWN

FIXED SEATING

PLAZA

FIXED SEATING RECREATIONAL GAMES

TRANSPORTATION ACCESS

WATER FEATURE

RESTROOMS

PLAZA

VIEWING AREAS

RECYCLING

PARKING

GARDENS

AMPHITHEATER

GARDENS

ART INSTALLATIONS

EVENT SEATING

RECYCLING

ART INSTALLATIONS

FOOD

MOVABLE SEATING

PLAYGROUND EQUIPMENT

WATER FEATURE TRANSPORTATION ACCESS

PARKING

VIEWING AREAS

RESTROOMS RECREATIONAL GAMES

PAVILION

MOVABLE SEATING

PAVILION

PLAYGROUND EQUIPMENT

FOOD

Case Studies Amenity Connections

OPEN LAWN

Kansas City Parks Amenity Connections

OPEN LAWN

FIXED SEATING

TRANSPORTATION ACCESS ART INSTALLATION

GARDENS

PLAZA

RECYCLING

PLAYGROUND EQUIPMENT

RECREATIONAL GAMES

PAVILION

WATER FEATURE

PARKING

RESTROOMS

EVENT SEATING

MOVABLE SEATING

VIEWING AREAS

ART INSTALLATION

PARKING

RESTROOMS

FIXED SEATING

TRANSPORTATION ACCESS

VIEWING AREAS

FOOD

Washington Square Park Amenity Connections

EVENT SEATING

PLAZA

RECYCLING

RECREATIONAL GAMES

MOVABLE SEATING

PLAYGROUND EQUIPMENT

GARDENS

PAVILION

WATER FEATURE

FOOD

Washington Square Park Potential Amenity Connections


art walk flexible open lawn transit hub

plaza/event space

The allocation of the programming of the park was subdivided into four parts: transit hub, flexible open lawn, art walk, and plaza/event space. These spaces were drawn from a series of diagrams taking into account contextual connections such as transportation, views, and nearby amenities.


ACTIVATE WEST EDGE THROUGH SPATIAL CONNECTIONS

ACTIVATE THE EAST AND WEST EDGES THROUGH CONNECTING THE SOUTH EDGE

THE FLEXIBLE, OPEN LAWN ALLOWS FOR OPTIMAL VIEWING

ACTIVATE EAST EDGE THROUGH SPATIAL CONNECTIONS: MAKING GRAND GRAND

RESULTING PARTI FROM ACTIVATING THE THREE EDGES. THIS CREATES A FLEXIBLE, OPEN LAWN.

NEIGHBORHOOD LOOP CONNECTIONS DERIVED FROM INCORPORATING AN ART WALK CONNECTED TO THE CROSSROADS AS WELL AS CONNECTING TO UNION STATION AND CROWN CENTER

ACTIVATE BOTH THE EAST AND WEST EDGES

RESULTING PARTI FROM ACTIVATING THE THREE EDGES. THIS CREATES A FLEXIBLE, OPEN LAWN.

RESULTING PARTI FROM ACTIVATING THE THREE EDGES. THIS CREATES A FLEXIBLE, OPEN LAWN.


The transit hub includes a transit stop, beer garden, and a Korean War Memorial Plaza. The flexible open lawn includes an open lawn and a bioswale. The plaza/ event space consists of a pavilion with a cafe and remained open for various events such as a farmers’ market. The art walk has a viewing deck in close proximity of food truck parking, an art walk for various types of installations, and a playscape area.


2018 Design Portfolio  
2018 Design Portfolio  