Page 1

“The passage”

Performance Architecture 2012


“The Passage�

Contents 0- Abstract 0.1- Key words 1- Introduction 2- Conceptual description 3- Description of the implementation of the project 3.1- Detailed description of the installation 3.2- Interaction 3.3- Area of the installation 3.4- Acessories 3.5- Accomplishment 3.6- Calendar 3.7- Budget 4- Technical description 4.1- Technique 4.2- Basic Technical requirements 4.3- Lighting and electrical installation 4.4- Technical requirements (equipment) 4.5- Cleaning and maintenance 4.6- Detailed description of the components 4.7- Troubleshooting 5- References

Performance Architecture 2012

1


“The Passage�

0- Abstract Concerning the challenge Performance Architecture, we propose a public art installation consisting on a structure that on the inside will allow the passage of the interactors. system of capture and amplification of sound that amplify the steps and sound made by the people inside.

0.1- Key words

-

Sound; Interaction; Privacy; Unknown

Performance Architecture 2012

2


“The Passage�

1- Introduction Here will be presented all the concept of the structure, all the construction process and the accomplished steps till the final piece. And also will be here presented the total budget of the structure, his implementation (with a detailed description), material of the installation, maintenance, technical drawings, electric installation and interactivity. Describes also the chosen place to the piece implementation.

Performance Architecture 2012

3


“The Passage”

2- Conceptual description The public art project for the challenge “Guimarães 2012 – European capital of culture”, aims to explore the interest of the people with the unknown object, by it’s exterior futurist structure, without any window or tips of what’s going on in the inside, and by the inside sound installation that will confuse the spectator in the sense that she will be confused by the multiplied sounds recorded from her own steps and voice. We want to appeal to the unknown, showing that it’s like a natural instinct, the human wish to know beyound the unknown, desiring to enter into the privacy of the other and controlling the reality that surrounds him. We’ve chosen this concepts because of the busy social life that our society live and the fact that nowadays we can’t have full privacy, everyone in society can be known and exposed. This project is the result of a creative partnership between multimedia artists and architectors.

Performance Architecture 2012

4


“The Passage”

3- Description of the project implementation

sors that will turn on the lights during their passage. For the maintenance of this project, the inside have to be clean 3 times a week and the outside 1 time a week. For the maintenance of this work of ublic art, the inside have to be clean 3 times a week and don’t have to be clean outside. The transport of the aluminum passage will be done by a company of metallurgy that makes the transportation and the installation since it’s a structure of a big dimension and it have to be welded. The lights, sensors and sound system, have to be purchased on the internet or in the shop and the installation will be made by an electrician and the

The installation of the passage will be a parallelepiped with 2,5m width and height, and 10m length and the two doors will have 1m width and 2m height. It will be constructed with concrete molds, showing a contemporary architecture but a bit primitive giving at the same time a unfinished environment, to give more dinamic to the people movements we placed mismatched entries, the inside would be black and the floor will have a aluminum plate to make more sound and also will have two antechamber to block exterior sounds sound system by a sound technical. and give the structure more effect. On the inside To build the structure will be necessary to wait it would have 4 columns, 2 on each side that will about one week to have all the material available. being reproducing the sound captured by the microphone and amplifier that would amplified the sounds made by the people that enter on the inside. When they enter, they could hear their sound and the other peoples sound, reproduced in real time. By day the light will be turn off and the passage would be only illuminated by the sun light and by night would have next to the doors movement senPerformance Architecture 2012

5


“The Passage�

3.1- Detailed description of the installation

Performance Architecture 2012

6


“The Passage”

3.2- Interaction

Performance Architecture 2012

7


“The Passage”

3.3- Acessories (inside of the structure) DIAGRAL motion detector row DM320 119,70 € IVA inc

3 lights (Pack 3 focos de encastrar) 14,95€

Protected Area: 22 m, 10 °

-

- Security of electronic detection filter - Test button with indicator light -Position flat or angled (except for protection of the corridor) with or without a label - Self-protection to the opening or break (assembly unlabeled) - Autonomy of 2 years, batteries supplied - 5 year warranty Diagral

3 x 50 W. GU10. IP23. Trainable. ø 8 cm. Brushed Nickel.

http://www.aki.pt

http://www.pixmania.com

Performance Architecture 2012

8


“The Passage”

ONKYO RECEIVER ONKYO TX-NR609 699 € IVA inc

M-AUDIO Colunas HiFi Studiophile AV30 de M-AUDIO 89 € IVA inc

BLACK - Ref: 10250652

Ref : 00079027

Description of the produt:

Description of the produt:

A / V receiver with 7 x 7.2 Continuous 160W (6 ohms), HDMI 1.4 3D Technology WRAT (Low Negative Feedback), structure DTS-HD Master Audio, Dolby TrueHD, SACD and Multi-CH Number of items: 2 PCM, DTS-HD Express, Dolby Pro Logic IIz, THX Select 2 Composition 2 Columns Plus 4 Audio Processing Modes for Gaming: Rock, Sports, Autifalantes front Action, RPG, a D-sub input (15 pin) RGB Computer, 6 inPower (W): Amplifier 15 watts per channel puts, 1 HDMI (v. 1.4a) with processing audio / Video (3D), “upscaling” Qdeo, OSD via HDMI, 6 analog audio inputs, 1 Number of Woofers: 1 output, component video switching (2 inputs and 1 output), Woofers diameter (in mm): 3 “ 2 coaxial digital inputs, 2 optical input, Ethernet port for Number of Tweeters: 1 “streaming “audio files (MP3, WMA, WMA Lossless, FLAC, Tweeters diameter (in mm) 3 / 4 “ WAV, Ogg Vorbis, AAC, and LPCM), Internet radio (Last. fm, Napster, and vTuner) Updates” Firmware “via Ethernet and USB , Audyssey 2EQ system calibration, system optimization for compressed audio files, Universal Gateway in http://www.pixmania.com/ one cable for connecting iPod or DAB System, “Pure Audio”, Zone 2 amplifiers and preamplifiers, programmable control, Dimensions : 435 x 174 x 328 mm (WxHxD) 11.3 kg http://www.pixmania.com/pt Performance Architecture 2012

9


“The Passage”

Audio Technica U853R

• signal-to-noise ratio: 70 dB, 1 kHz at 1 Pa • phantom power requirements: 11-52V DC, 2 mA typical • switch: Flat, roll-off • weight (mikrophone): 0.5 oz (14 g) 299€ IVA inc • weight (power module): 2.9 oz (81 g) • dimensions (microphone): 1.34” (34.0 mm) long, 0.48” (12.2 mm) diameter • dimensions (power module): 3.66” (92.9 mm) long, 0.74” (18.9 mm) diameter • output connector (power module): integral 3-pin XLRM-type Features: • cable: 25.0’ (7.6 m) long (permanently attached • element: Fixed-charge back plate, permanently to microphone), 0.13” (3.2 mm) diameter, 2 conpolarized condenser ductor shielded cable with TA3F-type connector • polar pattern: cardioid • frequency response: 30-20000 Hz • low frequency roll-off: 80 Hz, 18 dB/octave • open circuit sensivity: -39 dB (11.2 mV) re 1V http://www.musicstore.com/pt_PT at 1 Pa • impedance: 250 ohms • maximum input sound level: 139 dB SPL, 1 kHz at 1% T.H.D. • dynamic range (typical): 115 dB, 1 kHz at Max SPL

Performance Architecture 2012

10


“The Passage�

3.4- Acomplishment Each material have their own transport due to their maintenance and installation. The structure will be constructed with concrete molds and the floor will have a aluminum plate, the inside would be black. The structure will be constructed by a company and the transport of the aluminum floor will be done by other company of metallurgy that makes the transportation and the installation and the lights, sensors and sound system, have to be purchased on the internet or in the shop and the installation will be made by an electrician and the sound system by a sound technical. For the maintenance of this work of public art, the inside have to be clean 3 times a week and don’t have to be clean outside.

Performance Architecture 2012

11


“The Passage”

3.6- Calendar

Day 40–End of the Dossier A3

Day 1 – speculation about the Project studying the follow keywords: Urban Interaction, multidisciplinary, temporary structures, consciousness body, Performance, artistic Responsibility , Public art, Body and space, art, socio-cultural differences, social critical, reinvention of public space .

Day 42- Notification of pré-selected

Day 67– Delivery of the painel A1

Day 77– Notification of the winners; conference

Day 177– Beginning of the Project construc tion

Day 184–End of the Project construction

Day 4 – preliminary investigation Day 10 – Formulation of the first hypothesis Day 15 – Investigation of technical solutions

Day 188– Public presentation of the interactivity

Day 20 – hypothesis text Day 26 – Presentation of a work plan Day 30 – Critical reflexion Day 36 – Reflexion about the materials of visualization, the project and the budget Performance Architecture 2012

12


“The Passage”

3.7- Budget

Performance Architecture 2012

13


“The Passage”

4- Technique Project: “Performance architecture – Guimarães 2012 – Capital of culture” Coordinative institution: Guimarães 2012 – Capital of Culture Project Team: Multimedia and Plastic arts students Architect School of Education (Beja), Polytechnic Instituteof Beja [ESEB-IPB] Responsible technician: Digital Arts teatcher

Management of the project: - All the members of the team work at the same time, with the same requirements and the same objective. -During the project the members collaborate and work with coordination, delivering and controlling the tasks between them. Objective of the project: Creation of a structure of public art for the contest “Performance architecture – Guimarães 2012 , Capital of culture”.

Performance Architecture 2012

14


“The Passage�

4.1- Lighting and electrical installation

Performance Architecture 2012

15


“The Passage�

4.2- Technical requirements (equipment)

4.3- Cleaning and maintenance

Material required: - Concrete molds -1 aluminum plates (10m:2.50m) - 6 lights - 4 sound columns -Sound captor, -Sound amplifier - Electrical connectors - Movement sensor

The cleaning of this work will be: Inside cleaning- 3 times a week

Performance Architecture 2012

16


Dossier Artes digitais  

Dossier artes digitais projecto, guimaraes