Page 3

2

Chapter 1 Skyscrapers with the length of 600 ft Skyscrapers with the length of 400 ft Skyscrapers with the length of200 ft

Conclusion of Maps Conclusion of Maps

1935

1925 POOR

SALINITY DAM

1920

NON-VISIBLE

SOME VISIBLE

GOOD

VISIBLE

The general conclusion ofRegion the South Florida overlayed mapsScale depict the 1”:12000’ tensions happening between the settlement of man and the reconstitution of nature. Therefore, tension resides in the point where they intertwine, whether it deals with issues of inhabitation or issues of voyeurism and transparency.

Masters Studio Project: Miami [2100]  

A studio project led by Marilys Nepomechie focused on the issues of Sea Level Rise in Miami. The project suggests a rather extreme yet logic...

Advertisement