Page 1

ENG

E V ER EN ERGY


PROFILE The company Ever Energy, located in Vicenza, ranks among the major Italian companies in the field of integrated design.

Thanks to thirty years’ experience, we are able to develop highly complex projects, ensuring also an accurate execution of the same through a careful analysis and control during works management. High competence, availability of our own personnel, specialized professionalism and language skills are just some of the key factors that allow us to be present not only on the domestic market but also internationally with customers having different backgrounds, from public ad-

ministrations to the major Italian credit groups, from civil to industrial and advanced services sector. Ever Energy is a leading partner of the most important Italian IT companies for the engineering and management of Data Centers and some of the largest Italian bank institutions for the management and optimization of their real estate assets.


MISSION Ever Energy has always worked with the ambition of becoming a leader in integrated design, as well as a constant reference point for technological innovation,

preparing and implementing operational and managerial models that can become best practices in the reference area, through transparent engineering methods certified by the most important international bodies.

signs of construction works with the constant attention to saving energy and reducing consumption, taking into account both the needs of the environmental and social context in which one operThe Company is active in the field ates, and the economic and finanof integrated engineering, providcial targets of the customers. ing design services for technological, electrical, thermal fluid, spe- All this is complemented by the cial and anti-fire systems, as well services offered to support the as architectural and structural de- engineering such as works management, project management, maintenance management, final testing and technical-economic consultancy.


QUALITY Ever Energy operates according to the standards set forth by the ISO 9001:2008 standard concerning Quality Management Systems,

applying the same to all production processes, from the initial meeting with the customer up to the final delivery of the project. All services strictly follow the guidelines of the standard, both from the IT point of view - and, therefore, of the management and production of the documents and

data – and in terms of the modus operandi of the staff, who are always very careful and precise in all project phases. By implementing the ISO 9001:2008 standard, Ever Energy has set itself the goal to ensure that an already excellent service could become also standardized pursuant to international standards.


The general management of Ever Energy heads the different business and management units. The peculiarity of this structure is its high flexibility; as a matter of fact, the different units interact in all the various output processes with a continuous exchange of resources and information.

GENERAL MANAGER

QUALITY & SAFETY

ACCOUNTING & ADMINISTRATION

COMMERCIAL DEPT.

SECRETARY

LEGAL DEPT.

FIRE PREVENTION

TECHNIC AL DEPT.

GENERAL SERVICES

PROJECT MANAGERS


ORGANIZATION Each operating unit is divided into different functional roles:

Order Manager

Senior Project Manager

This Manager provides for the organization of the work in all its aspects, from the definition of project output, to the management of the customer from a contractual point of view, as well as to the management of any outsourced services, to audits and design compliance checks.

This Manager provides for the sizing, positioning and calculation of systems and structures of particular importance, verifying and managing the graphical, numerical and economic aspects of the project. Such a person manages the building site during works management and sometimes accompanies the Order Manager at meetings with customers or suppliers.

Manager of the Technical Department This Manager works in close collaboration with the order manager, provides support and help to the same during negotiations and the definition of the customer’s requirements, organizes the staff of the technical department and sets the schedules and modes to provide the output for the requested service.

Junior Project Manager This Manager takes care of the graphical and numerical aspects as for the systems within his/her competence, ensuring compliance with current regulations in force and the updating of the same. This person works constantly supported by a Senior Project Manager.

Fire Prevention Manager This Manager provides for the management of fire prevention practices, collecting input data, dimensioning and drafting practices and managing relations with the entrusted bodies.


SERVICES Ever Energy can boast of a sound know-how in the various sectors of integrated design within different operating areas:

Electrotechnical systems Power center design, distribution of motive power, as well as of traditional and artistic lighting. Drawing up of Calculations and Regulatory Dossiers. Technical-economic forecast analyses. Optimization of consumption efficiency.

Thermal fluid systems Design of air conditioning and ventilation systems, as well as of water and sanitary systems and sewage systems. Drawing up of Calculations and Regulatory Dossiers. Technical-economic forecast analyses. Analysis for energy savings.

Special and fire prevention systems Design of alarm, access control, intrusion, video surveillance, monitoring, CCTV, smoke detection, and shutdown systems. Preparation of the dossier to obtain the fire prevention certificate. Drawing up of Calculations and Regulatory Dossiers. Technical-economic forecast analyses.

Data systems Design of data and telephony systems. Drawing up of Calculations and Regulatory Dossiers. Technical-economic forecast analyses.

Building works Architectural and artistic design. Design and calculation of buildings structures. Drawing up of Calculations and Regulatory Dossiers. Technical-economic forecast analyses. Analysis for energy savings.

Power plants Integrated design of plants for the production of energy from renewable sources (solar, geothermal, hydro-electric source, biomass). Integrated design of plants for the production of energy from traditional sources (gas, coal, municipal solid waste).

Data Center Integrated Data Center Design (data processing centers). Moving design. Analysis of consumption and structure to attain energy efficiency optimization. Technical-economic forecast analyses.

Furthermore, we supply a series of services that are common to all the ones previously listed: - Works Management and Works Settlement (SAL – Work Progress Statements) - Final testing and related certifications - Management of and support for the preparation of documents for calls for tenders

- Project Management - Facility Management - Risk Assessment Studies - Economic Feasibility Studies, Business Plans - Project Financing Studies


ForYou,Forever


E V ER EN ERGY

E V ER EN ERGY


PROJECTS AND

EXECUTIONS

Major projects carried out by Ever Energy divided according to different operating environments

Public Bodies Avepa Ministry of Foreign Affairs Municipality of Vicenza Italian Financial Police

Advanced Services Aliantes Palace Ponte Alto Palace Bellavista Palace Send Palace

Credit Institutions Banca di Trento e Bolzano (branches) Banca Intesa (headquarters and branches) Banca Popolare di Vicenza (branches)

Industrial Sector Rana Group Spa In tec Spa Zanella Confezioni Spa

Data Center T-Systems Italia Spa - Banca Intesa T-Systems Italia Spa - Vicenza T-Systems Italia Spa - Assago Ovitel Libya Engineering Spa T-Systems Italia Spa - ADR Spa Data Management Spa Sec Servizi Spa Raiffeisen Bank Emilia Romagna Region

Power Plants Photovoltaic power Apulia Cogeneration plant in Brindisi Gas turbine power plant in Montecchio


PUBLIC BODIES Avepa Ministry of Foreign Affairs Municipality of Vicenza Italian Financial Police


Avepa


WORKS AVEPA Headquarters CUSTOMER AVEPA (Agenzia Veneta per i Pagamenti in Agricoltura - Veneto Agency for Payments in Agriculture)

SCOPE Public Bodies PLACE Padua WORKS DESCRIPTION Design of electrical, thermal fluid, data, and special

systems as well as anti-fire practices at the new headquarters of the Agenzia Veneta per i Pagamenti in Agricoltura. During construction we were entrusted with works management and final testing. YEAR 2005 WORKS VALUE â‚Ź 7,200,000


Ministry of Foreign Affairs

WORKS Renovation of outdoor lighting of Farnesina Palace CUSTOMER Italian Ministry of Foreign Affairs SCOPE Public Bodies PLACE Rome WORKS DESCRIPTION Design of electrical systems, with re-making of the Palace outdoor lighting, paying particular attention to the artistic and architectural aspects of the building. YEAR 2003 WORKS VALUE € 500,000

Municipality of Vicenza

WORKS Renovation of the area of the Municipal Stadium of Vicenza CUSTOMER Municipality of Vicenza SCOPE Public Bodies PLACE Vicenza WORKS DESCRIPTION Integrated project for the reconstruction of the area

of the Municipal Stadium of Vicenza to be carried out on a project financing basis, aiming at renovating the stadium and creating a residential, managerial, and commercial area. YEAR 2005 WORKS VALUE € 80,000,000


Italian Financial Police

WORKS Barracks “Macchi” of the Italian Financial Police Regional Headquarters for Apulia

CUSTOMER Italian Financial Police SCOPE Public Bodies PLACE Bari WORKS DESCRIPTION Design of electrical systems, with re-making of

the palace outdoor lighting, giving particular attention to the artistic and architectural aspects of the building. YEAR 2007 WORKS VALUE € 250,000


ADVANCED SERVICES Aliantes Palace Ponte Alto Palace Bellavista Palace Send Palace


Aliantes Palace

WORKS Business Center “Palazzo Aliantes” CUSTOMER Aliantes Srl SCOPE Advanced Services PLACE Vicenza WORKS DESCRIPTION Integrated design, works management and final

testing of the business center called “Palazzo Aliantes”, with setting up of approximately 500 workstations. YEAR 2001 WORKS VALUE € 3,200,000


Ponte Alto Palace

WORKS Business Center “Palazzo Ponte Alto“ CUSTOMER Iniziativa Ponte Alto Srl SCOPE Advanced Services PLACE Vicenza WORKS DESCRIPTION Design of electrical, mechanical, fire and special

systems, as well as of anti-fire practices for the business center called “Palazzo Ponte Alto“. Intervention carried out on an area of approximately 12,000 m2 with the setting up of approximately 600 workstations. Moreover, an underground parking of approximately 3,000 m2 was built. YEAR 2010 WORKS VALUE € 11,000,000


Bellavista Palace

WORKS Business, Commercial and Residential Center “Palazzo Bellavista” CUSTOMER Bellavista Srl SCOPE Advanced Services PLACE Vicenza WORKS DESCRIPTION Integrated design, works management and final

testing of the business center called “Palazzo Bellavista”. Intervention carried out on an area of about 22,500 m2 with the construction of 6,200 m2 dedicated to the commercial activity, 5,000 m2 to the residential activity, and 2,700 m2 to the business activity. Moreover, an underground parking of 8,500 m2 was built. YEAR 2005 WORKS VALUE € 8,880,000


Send Palace


WORKS Multifunctional Center “Palazzo Send” CUSTOMER Send Srl SCOPE Advanced Services PLACE Vicenza WORKS DESCRIPTION Design of electrical, mechanical, and special systems,

as well as of anti-fire practices for the multi-purpose center called “Palazzo Send”. Intervention carried out on an area of about 37,500 m2 with the construction of 12,500 m2 dedicated to commercial activities and 25,000 m2 for business activities. Moreover, an underground parking of 15,000 m2 was built. YEAR 2006 WORKS VALUE € 9,400,000


CREDIT INSTITUTIONS Banca di Trento e Bolzano (branches) Banca Intesa (branches and headquarters) Banca Popolare di Vicenza (branches)


works management and final testing at all 800 branches of the group across the Italian territory and in some representation foreign branches. YEAR 1989 - 2004 WORKS VALUE € 16,000,000

WORKS Banca di Trento e Bolzano (branches) CUSTOMER Banca di Trento e Bolzano SCOPE Credit Institutions PLACE Trentino Alto Adige WORKS DESCRIPTION Design of electrical, mechanical, and special systems, works management and final testing at the branches of the group in the region Trentino Alto Adige. YEAR 1998 - 2001 WORKS VALUE € 8,000,000

Banca Popolare di Vicenza (branches)

Banca Intesa (branches and headquarters)

Banca di Trento e Bolzano (branches)

WORKS Banca Intesa (branches and headquarters) CUSTOMER Banca Intesa SCOPE Credit Institutions PLACE Italy, Moscow, London, New York WORKS DESCRIPTION Design of electrical, mechanical, and special systems,

WORKS Banca Popolare di Vicenza (branches) CUSTOMER Banca Popolare di Vicenza SCOPE Credit Institutions PLACE Italy WORKS DESCRIPTION Design of electrical, mechanical, and special systems,

works management and final testing at the branches of the group across the Italian territory. YEAR 2003 - 2010 WORKS VALUE € 10,000,000


INDUSTRIAL SECTOR Rana Group Spa In tec Spa Zanella Confezioni Spa


Rana Group Spa WORKS Intensive warehouse “Rana Group Spa” CUSTOMER Rana Group Spa SCOPE Industrial Sector PLACE Verona WORKS DESCRIPTION Design of electrical, mechanical, and special systems, works management and final testing of new intensive freezing cell warehouse with expansion of the production department. YEAR 2004 WORKS VALUE € 10,000,000


In tec Spa

WORKS Factory “In tec Spa” CUSTOMER In tec Spa SCOPE Industrial Sector PLACE Vicenza WORKS DESCRIPTION Integrated and architectural design, works management and final testing of the new plant of In tec Spa YEAR 2008 WORKS VALUE € 2,500,000


Zanella Confezioni Spa


WORKS Factory “Zanella Confezioni Spa” CUSTOMER Zanella Confezioni Spa SCOPE Industrial Sector PLACE Vicenza WORKS DESCRIPTION Design of electrical, mechanical, and special systems, works management and final testing of the factory.

YEAR 2002 WORKS VALUE € 500,000


DATA CENTER T-Systems Italia Spa - Banca Intesa T-Systems Italia Spa - Vicenza T-Systems Italia Spa - Assago Ovitel Lybia Engineering Spa T-Systems Italia Spa - ADR Spa Data Management Spa Sec Servizi Spa Raiffeisen Bank Emilia Romagna Region


T-Systems Italia Spa - Banca Intesa


WORKS Palazzo Centro Torri “Banca Intesa - T-Systems Italia Spa“ CUSTOMER T-Systems Italia Spa - Banca Intesa SCOPE Data Center PLACE Vicenza WORKS DESCRIPTION Design of electrical, mechanical, special, construction

management and commissioning of the new Data Center for the management of all branches of Banca Intesa and services at the palace “Torri Center”. Project Management Center, and upgrade infrastructure projects following the sale of the company from Banca Intesa Spa Italy to T-Systems. YEAR 1998 - 2010 IMPORTO LAVORI € 20,000,000


T-Systems Italia Spa - Vicenza

WORKS Headquarters “T-Systems Italia Spa” CUSTOMER T-Systems Italia Spa SCOPE Data Center PLACE Vicenza WORKS DESCRIPTION Integrated design of new Data Center of T-Systems

Italia according to the maximum Tier classification standard with moving the servers from the old operating headquarters. YEAR 2010 WORKS VALUE € 4,000,000


T-Systems Italia Spa - Assago WORKS Palazzo Mirafiori “T-Systems Italia Spa“ CUSTOMER T-Systems Italia Spa SCOPE Data Center PLACE Assago (MI) WORKS DESCRIPTION Design of electrical, mechanical, and special

systems, works management and final testing of the new Data Center for the customer service of T-Systems. Project Management of the Center and infrastructure updating projects to attain energy efficiency improvement and the reduction of energy consumption. YEAR 1998 - 2011 WORKS VALUE € 10,000,000


WORKS New Data Center and operating headquarters of “Ovitel” Libyan phone company

CUSTOMER Engineering Spa - Ovitel Lybia SCOPE Data Center PLACE Tripoli (Libya) WORKS DESCRIPTION Integrated project including the architectural part

of the new Data Center of Ovitel, Libyan phone company, with 16 MW co-generation plants to supply energy in stand-alone mode, water purification plant and operating offices to make the operating center completely independent. YEAR 2010 WORKS VALUE € 120,000,000

Ovitel Lybia


works management and final testing of the new Data Center for the management by T-Systems of the airport services of ADR Roma Spa. Moving of the servers from the old operating headquarters. YEAR 2008 WORKS VALUE € 2,500,000

WORKS Operating Headquarters “Engineering Spa” CUSTOMER Engineering Spa SCOPE Data Center PLACE Pont Saint Martin (Aosta) WORKS DESCRIPTION Technical and economic analysis for the assessment of the Data Center performance and integrated design of the infrastructure to improve the security of the service center and increase energy efficiency. YEAR 2010 WORKS VALUE € 500,000

Data Management Spa

T-Systems Italia Spa - ADR Spa Engineering Spa

WORKS Building EPUA2 Rome Airport “T-Systems Italia Spa” CUSTOMER T-Systems Italia Spa - ADR Spa SCOPE Data Center PLACE Fiumicino (Rome) WORKS DESCRIPTION Design of electrical, mechanical, and special systems,

WORKS Cittadella della Ricerca of Brindisi “Data Management Spa” CUSTOMER Data Management Spa SCOPE Data Center PLACE Brindisi WORKS DESCRIPTION Design of electrical, mechanical, and special systems, works management and final testing of the new Data Center for the customer service of Data Management at Cittadella della Ricerca in Brindisi. YEAR 2009 WORKS VALUE € 1,500,000


WORKS Operating headquarters “Raiffeisen Bank” CUSTOMER Raiffeisen Bank SCOPE Data Center PLACE Bolzano WORKS DESCRIPTION Assessment of the current Data Center for evaluating its performance, considering the opportunity to implement service security and reduce energy consumption. YEAR 2011 WORKS VALUE € 30,000

Emilia Romagna Region

its performance, considering the opportunity to implement service security and reduce energy consumption. Mapping of systems to provide a detailed maintenance plan with related SLA. YEAR 2011 WORKS VALUE € 45,000

Raiffeisen Bank

Sec Servizi Spa

WORKS Operating Headquarters “Sec Servizi Spa” CUSTOMER Sec Servizi Spa SCOPE Data Center PLACE Padua WORKS DESCRIPTION Assessment of the current Data Center for evaluating

WORKS Operating Headquarters of the Emilia Romagna Region CUSTOMER Emilia Romagna Region SCOPE Data Center PLACE Bologna WORKS DESCRIPTION Technical and economic analysis to assess the Data

Center performance, and integrated design of the infrastructure to improve the center service security and increase energy efficiency. YEAR 2010 WORKS VALUE € 1,000,000


POWER PLANTS Photovoltaic power plant Apulia Cogeneration plant in Brindisi Gas turbine plant in Montecchio


Photovoltaic power plant Apulia WORKS 1 MW photovoltaic power plant CUSTOMER Apulia Energia Srl SCOPE Power Plants PLACE Acquaviva delle Fonti (Bari) WORKS DESCRIPTION Integrated design of a 1 MW photovoltaic power plant, DIA application, works management and final testing with related applications for the connection to the national mains. YEAR 2008 WORKS VALUE â‚Ź 4,500,000


Cogeneration plant in Brindisi WORKS 2 MW vegetal oil cogeneration plant with related remote heating

network to be carried out at the Cittadella degli Studi in Brindisi CUSTOMER Euganea Energia Spa SCOPE Power Plants PLACE Brindisi WORKS DESCRIPTION Integrated design of a 2 MW vegetal oil cogeneration plant with related remote heating network to supply electricity, air conditioning and heating for the utilities of the Cittadella della Ricerca of Brindisi. YEAR 2009 WORKS VALUE â‚Ź 10,000,000


Gas turbine plant in Montecchio WORKS 780 MW turbine gas plant CUSTOMER Euganea Energia Spa SCOPE Power Plants PLACE Montecchio Maggiore (Vicenza) WORKS DESCRIPTION Integrated design of a 780 MW gas turbine plant to

be carried out in partnership with Marubeni Europower Ltd, and related VIA application. YEAR 2001 WORKS VALUE â‚Ź 800,000,000


art direction

Andrea Manticò CARATTIEPOLETTO photo

Luciano Cipullo Valter Maino print

Palladio Zannini graphic design

Sara Ippolito CARATTIEPOLETTO


EVER ENERGY SPA Viale della Pace 146, 36100 Vicenza (Italy) Ph. - Fax +39 0444 304 145 ever@ everenergy.it everenergy.it

Ever Energy - Company Profile  

Ever Energy - Green Energy for you, forever

Read more
Read more
Similar to
Popular now
Just for you