This  document  contains  our  complete  technical  needs.  A  specific  light  plot  will  be  developed  for   each  venue  after  My  !Laika  will  receives  house  tech  specs.  We  are  anyway  open  to  adapt  and/or   reduce  our  needs  depending  by  the  means  offered  by  the  organization.       Duration  of  the  show  :  about  50  minutes     Presentation  of  the  touring  team  :     Salvatore  Frasca  :  juggler   Philine  Dahlmann  :  flyier   Elske  Van  gelder  :  base   Eva  Ordonez  Benedetto  :  trapeze  artist   Alessandro  Angius  :  sound  and  light  technician   Olivier  Bourreau  :  manager  

 

  Working  times  and  staff  needs:  

  The  team  will  arrive  two  days  before  the  show’s  day    

The  eve  (day  -­‐1)  :      

morning  :  scenography  installation,  lights  focusing.  

  1  light  technician   1  light  technician  assistant       afternoon  :  light’s  scenes  creation,  sound  check     1  sound  technician,   1  light  technician  assistant     or   1  light  technician  (this  last  one  in  case  of  having  a  light  desk  that  our  technician  doesn’t  operate   with  rapidity  (es.  Grand  Ma,  Vector  etc.).  We  please  you  to  communicate  us  in  advance  the  light   desk  model  available.  

  The  day  of  the  show  :      

morning  :  finalization  of  the  previous  phases    

afternoon  :  rehearsal    

evening  :  show  

  (optional)  One  technician  at  the  stage’s  side  in  intercom  connection  with  the  control  desk.    


The  company  needs  2  hours  of  physical  warming  up    on  the  stage  or  in  an  adjacent  room  or  in  an   easily  reachable  place,  cooled  or  warmed  depending  by  season  and    outside  temperature,  and  at   exclusive  use.     Working  times  and  staff  needs  will  considerably  change  in  case  the  plot  is  not  hung  and  circuited   and  the  p.a.  is  not  set  up  prior  to  company  arrival.     The  show  prefers  a  frontal  vision.  In  case  of  a  circular  disposition  of  the  public  (as  in  an  arena  or  in   a  circus  tent)  it  will  be    good  to  foresee  an  eventual  reduction  of  the  sitting  places,  to  agree   depending  on  the  situation.    

Important  info  :    

During  the  show  some  cigarettes  are  smoked  and  a  smoke  machine  is  used.  In  case  there  is  a   problem  with  one  or  both  these  elements  you  are  pleased  to  inform  us.  

   

Stage  needs  :  

  It’s  necessary  the  total  darkness  during  the  show  ,  the  light  focusing  phase  and  the  creation  of   light’s  scenes.     Minimum  dimensions  of  the  stage  :   .width  :  9  meters     .depth  :  8  meters     .height  :  5  meters     We  need  :   .wooden  floor  equal  and  at    level  with  dance  carpet  on  it   .Curtains  ’italian  style  ‘,  with  4  ways,  the  first  of  which  looking  from  the  public  hall  will  be  used  for   artist’s  passage.   .Black  back  stage  curtain    

        Depending  on  the  stage  and  the  backstage's  appearance  the  company  could  anyway  decide  to   perform  without  curtains.  


Sound  needs  :    

Control  desk  :     In  the  public  hall.  the  sound  desk  should  be  positioned  at  the  left  side  of  the  light  desk,  leaving   between  them  50  centimetres  for  the  positioning  of  a  usb  controller  Akai  Apc  49  and  a  computer,   both  in  our  possession.    

      We  need  :     1  sound  mixer    with  12  inputs  with  the  following  specs  :  2  semi  parametric  eq  per  channel,  2  aux   prefader,1  aux  post  fader,  1  send  for  the  subs  and  1  stereo  output.     4  channels  of  graphic  eq  31  bands  (2  for  p.a.,  2  for  monitors  on  stage)     1  reverb     3  single  channel  compressors     1  channel  gate     (all  this  can  be  replaced  by  a  digital  audio  mixer  as  Yamaha  01r96  or  Yamaha  Ls9  or  others)     1  active  d.i.  box       Channels  list  :     1                    Table   2                    Ampli  Tronics   3                    Ampli  Marshall   4                    Cello   5                    Flute   6                    Copy  or  split  of  channel  2   7                    Micro  ambient  L   8                    Micro  ambient  R  


9/10      Computer   11/12  Mp3  player     Our  company  brings  all  the  microphones  and  the  cables  to  get  to  the  stage  box  that  will  be  placed   at  the  right  side  of  the  stage  by  the  hosting  organisation,  excluding  the  ambient  mike’s  cables.      

                                                                       Ambient  mic  positions                     P.a.    

We  ask  for  a  good  quality  sound  diffusion  system,  assuring  a  complete  covering  of  the  public  area,   without  buzz  and/or  background  noise.     It  must  be  a  two  ways  system,  with  subs  and  satellites  separated  and  independently  operated   from  the  sound  desk.     We  need  two  monitors,  one  on  the  left  and  the  other  in  the  right  part  of  the  scene,  independents.     All  the  audio  equipment  must  be  set  up  for  the  beginning  of  the  afternoon  working  shift  on  the  eve   of  the  show,  day-­‐1.        

Hangings  :    

Trapeze  :  

  2  hanging  points  (1  and  2  in  the  plan  below)  each  of  them  having  the  possibility  to  hold  150  kg  of   weight.   They  will  be  placed  in  this  way  :   both  of  the  points  at  a  depth  of  2,50/3,50  metres  from  proscenium  ;   the  point  2  at  the  horizontal  centre  of  the  scene  (at  a  equivalent  distance  from  the  right  and  from   the  left  border  of  the  scene,  and  the  point  1  must  be  shifted  by  1,10  metres  at  the  left  side  of  it.        


Chandelier  :  

  Our  chandelier  has  a  weight  of  12  kilograms.  Every  hanging  point  (3  and  4  in  the  plan  below)   should  have  a  50  kilos  holding  capacity,  seen  that  the  chandelier  makes  a  braked    (by  stop  at  point   5)  fall  1,50/  2  meters.   Its  best  position  is  at  2,3,50  meters  from  proscenium,  a  little  closer  to  the  public  than  the  trapeze.   The  rope  (at  point  5)  needs  to  be    tied  to  a  stop  that  holds  its  weight  (metal/wood  bars  in  the  wall,   wooden  bar  screwed  in  the  floor,  counterweights  etc.).  Please  provide  us  with  an  adequate  stop   system  and/or  material  for  making  it  during  the  set  up.   The  company  provides  rope  and  pulleys  starting  from  the  stop.  

 


Light  needs:  

  A  48  channels  light  desk  with  sequential  scenes     (Avab  Etc  Presto  or  similar  is  preferred)    

Projectors:  

  9  profiles  zoom  28-­‐54˚     8  profiles  zoom  13-­‐42˚     2  par  64  cp62  or  cp61  1000  watt  (depending  by  the  exact  position  of  the  projectors)     33  PC  1  Kw     1  ACL  Bar  (2X4)     Needed  power:  43  (42  +  public  lights)  2  Kw  dimmer  channels  

    Colour  filters:  

  6  -­‐  Lee  141  PC     8  -­‐  Lee  179  PC     2  -­‐  Lee  201  PAR64       1  -­‐  Lee  106  profile  13-­‐42°     1  -­‐  Lee  118  profile  13-­‐42°     2  -­‐  Lee  119  PC   2  -­‐  Lee  101  PC   1  -­‐  Lee  101  profile  28-­‐54°                                


Light plot

26 L141

38

23

26

L179

L141

29

23

27

24

27

24

28

25

28

L179

L141

L179

L141

L179

L141

L179

L141

L119

35

L179

L179

39

armchair

L118

31

21

ht.1,5mt. 36

25

ht.1,5mt. L119

37

L179

35

piano 30

42

L101

14 15

8

41

chandelier 7

230V 16 A (schuko)

trapeze

40

20

230V 16 A (schuko)

9

32

33

L201

4

6

16

5

17 13

4

22

diapositive projector

16

34

L106

L201

L101

18 19 11

10

ht.1,5mt.

5

L101

3

1

43

2

12

1

2

3

house

Accessories company

3

floor base

ACL

PAR CP62

profile 24-55

PC 1000W

profile 13-42

barn doors

!


vue 3D

26 27

29 23

28 24

21

25

8

7

31 30 14

40 6

4

36

15

20 38

35 16 5

17

4 13

22

16 12

32

2

18

19

11

3

10 5

1

39 37 35

34

33

 


Dressing  rooms   Please  provide  adequate,  private  dressing  space  for  4  people  with  easy  access  to  stage.   The  company  requires  private  rest  rooms  that  are  not  accessible  to  the  public  and  not  shared  with   other  acts.    Dressing  rooms  should  be  equipped  with  mirrors,  lights,  wardrobe  racks,  &  amenities.                            

   


techincal rider mylaika