Page 1

NSW 209 architecte Quennscliff NSW 2096 c.vergnolle@gmail.com c.vergnolle@gmail.com portfoilio 1/12 Greycliff street/Queenscliff Charlotte Vergnolle portfoilio 1/12 Greycliff street

Charlotte Vergnolle

architect

0481 341 417

1/12 Greycliff street/Queenscliff NSW 2096 c.vergnolle@gmail.com portfolio


High School Education Bayonne

educational

Project Use Location Square footage Budget Office Client Role

High School Public Equipment Bayonne 4 000 m2 8M € ALC Architects Council of Pyrénées Atlantiques Architect


03

Elévation 1.20

120 5

LEGENDE : 1/ Composition des parois 1.1 - Bardage ajouré Douglas 21X72mm 1.2 - Contrelatte 27mm 1.3 - Lattage 27mm 1.4 - Isolation extérieure LDR 60mm + tasseau 60X60 mm 1.5 - OSB 3 12mm 1.6 - Isolation LDR 140 mm 1.7 - Cadre bois 45X145 mm 1.8 - Pare vapeur 1.9 - Rail métallique + isolant 1.10 - Parement plaque de plâtre BA18

265

4

2/ Encadrement panneaux médium peint 27mm qualité E1 R30 3/ Faux plafond suspendu

04

4/ Châssis aluminium fixe à RPT dim : 120X264 cm vitrage type 44.2/16/44.2

Détail 1.5

5/ Aérateur motorisé type Sonovent 6/ Panneau cloisoir de plénum en médium peint 13mm, clipsé sous ossature de calage en Pin classe II cadre démontable par clipsage

1.10 1.9 1.8

Intérieur

2

02

Plan

1.7

1.20

1.6

3

115

3

1.5 Screen

1 4

116 120

Exterieur

1.4 1.3 1.2 1.1

phase :

date :


87 Housing units active In Sustainable facades District

Multi residential

Logements traversants

Ensoleillement été

Ensoleillement Hiver

Project Use Location Square footage Budget Office Client Role

87 Housing units Residential Bordeaux 7 000 m2 8M €HT (without landscape) Patrick Arotcharen Architect Bordeaux City & Bouygues Immobilier Architect


>>>

ION ISTRAT T ADMIN NEMEN ENSEIG ERIE INFIRM OLAIRE SC E VI

High School orientation Villa Fall - Signage playground Educational

���������

>>> >>>

>>>

Project Use Location Square footage Budget Office Client Role

>>>

�����������

������������������

������������

����� ����

ATION R T S I N ADMI ENT M E N G ENSEI ������������ ERIE M R I F IN ������������ LAIRE IV E SCO

TION NISTRA ADMI ENT GNEM ENSEI ERIE INFIRM E OLAIR VIE SC

>>>

>>>

>>>

�������

>>> >>>

ADMINISTRATION

������

ENSEIGNEMENT

����������

VIE SCOLAIRE

>>>

ION ISTRAT ADMIN ENT GNEM ENSEI ERIE INFIRM LAIRE VIE SCO

>>>

>>> >>>

ION ISTRAT ADMIN ENT GNEM ENSEI ERIE INFIRM LAIRE VIE SCO

INFIRMERIE

>>>

�������������� �����

>>>

>>> >>>

ATION R T S I N T ADMI EMEN N G I E ENS ERIE INFIRM E LAIR IV E SCO

Signage for High School Public Equipment Biarritz 3 940 m2 6,4M €HT (100 000€ for signage) Patrick Arotcharen Architect Pyrénées Atlantiques Council Assistant Architect/Graphist

The office delivered the Villa Fall school project september 2012. The client asked for an additionnal signage translated in 3 languages to guide the students. The signage project was inspired by the painted games on the kids’ playground. It appeared as a good answer TION tight budget, the ludic for TRAthe S I N I and the long term T ADM environmment EMEN to time. I created a N G I resistance E ENS ERIE set FofIRMsimples colored lignes for IN E each department to follow like OLAIR C S E I V a treasure hunt. The signage would be done by september 2013.

��������

>>>

>>>


��������������������������

�����������������������

>>> BUREAUX ����������������� Accueil Principal Principal adjoint Secrétariat Intendance

������������������������

���������������� ��������������� �������������� �������������� ION ISTRAT ADMIN ENT GNEM ENSEI ERIE INFIRM LAIRE VIE SCO

>>>

�������

>>>

����������������

>>>

>>> >>>


ATION R T S I N ADMI MENT E N G I ENSE ERIE INFIRM E LAIR IV E SCO


‘‘ ’’ The window frame protection was rehabilitated using the 19th century rules of Art according to the historical classification of the building.

Historical Monuments Historical Monuments Rehabilitation Rehabilitation

Heritage building

Project Use Location Square footage Budget Office Client Role

Roof Frame rehabilitation Office Paris 550 m2 450 000 €HT Société BVE LCL Bank Coordinator in metal carpentry


Production Creation of a curtain wall Metal carpentry company and a roof frame Heritage building

Project Use Location Square footage Budget Office Client Role

Curtain wall with smoke ejection frames Office Paris 550 m2 450 000 €HT Société BVE LCL Bank Coordinator in metal carpentry


Lycée Marianne - Marianne Lycée Hospitality school Hospitality school Educational

Project Use Location Square footage Budget Office Client Role

Fireproof window frame in Facade Educational Montpellier - m2 315 000 €HT Société BVE Fuksas architects Coordinator in metal carpentry

Our company was elected to produce the complex fireproof window frame. In deed, the façade is made out of triangulated plans using non singular angles. It was pre designed and pre produced in Paris and delivered to the building site 800km away.


Orientation Desks Retail / Hospitality Paris Airport

Retail/Hospitality

Project Use Location Square footage Budget Office Client Role

3 Tourism front office desks Hospitality Paris Airport CDG 30 m2 315 000 â‚ŹHT Atelier SOA Council of Paris / Ile de France Interior Designer


Orientation Desk Retail / Hospitality Louvre Museum Paris

Retail/Hospitality

Project Use Location Square footage Budget Office Client Role

Tourism orientation desk Hospitality Louvre Museum 250 m2 550 000 €HT Atelier SOA Council of Paris / Ile de France Interior Designer

It’s impossible to touch the structure of Le Louvre museum. For this orientation desk, we decided to create an envelop, that would extend the layout of the pyramid lobby. The project is conceived as a theater decor, like a skin protecting the existing building.

COUPE AA PROJET ech 1.50 ème




‘‘

D’abord

un comptable, puis un écrivain, et enfin un architecte. Ils forment l’équation saisissante de trois penseurs, Charles Fourier, Roland Barthes et Sergio Bernardes. Pardelà leurs apparentes différences, ce qui tombe c’est l’expérimentation. Ils ouvrent une scène possible qui s’attache à décrire le monde, en une réflexion qui opère dans le champ de l’expérimentation. Expérimenter l’organisation des passions, la structure du langage ou l’agencement de l’espace et de la matière, revient à interroger « l’objectivable » par son image « sensible » ou le signifié par le signifiant. Chacun, à sa manière - et dans son univers -, agit en ce sens pour tenter de déchiffrer la société et les mécanismes qui la soustendent. Chez Barthes, c’est la langue qui est dénoncée en tant que structure servile : « cet objet, en quoi s’inscrit le pouvoir, de toute éternité humaine, c’est : le langage – ou pour être plus précis, son expression obligée : la langue ». Aussi, partant de ce principe, peut-on considérer que tout objet ou mécanisme appelle une structure de langage renvoyant à un champ restreint de référents. Cette structure, tant Fourier que Bernardes

se l’approprient autour de la question du pouvoir dans l’espace « trans-social ». Dès lors, comment se dégager d’une structure servile afin de se projeter dans une reformulation libre des objets et des idées ? Quel processus, interrogeant le sens, permettrait de passer à l’acte ? Devant ce questionnement, la démarche sensible et originale des trois figures que nous rapprochons ici fait sens sous la plume de Bernard Stiegler. Le penseur du « passage à l’acte » mentionne en effet qu’en philosophie, cette action « aurait un rapport avec une expérience radicale des limites » ; pour l’énoncer en termes marxiens, ce serait « poursuivre l’interprétation de l’être par sa transformation – dans le devenir » . Une expérience des limites donc ; point de convergence de trois pensées radicales, où nous voudrions ancrer notre propos en montrant comment Sergio Bernardes, architecte, se saisit de la question d’un pouvoir, à la fois aliénant et structurant pour produire du sens dans un système de pensée apparemment clos...


‘‘

The reflection is organized around the figure of fragmentation; from the architectural gesture to the object. the project is spread accordingly to a division in time, in space and even matter; in other words, it is considering the project like a set of heterogeneous cultures to produce a coherent unit. In between design and architecture, the tested device expresses a procedure.


Experimentation High performance concrete REK Research

Project Realisation of a continuous concret casting Location Versailles - Lyon Client Vicat - ENSA/V Budget sponsoring Production 4 days Study 4 months Year 2010


Experimentation High performance concrete Pocahontas

Research/Teaching

‘‘

Project Client Students Production Study Year Role

Realisation of 12mX6m concrete structure Vicat - ENSA/V 25 15 days 4 months 2009 Teacher

Using the patent of the engineer H.Deneux from the start of the 20th century, we’re questioning the process of invention : the structure is using the fabrication process of the wood, applied to the concret. It’s giving birth to an hybrid object that could as well be a façade or a roof. Overhole, inventing wouldn’t be refinding something that already exists with contemporary tools?

’’


Experimentation High performance concrete Tommy Burns Research/Teaching

Project Realisation of a wall 5mX0,2mX2m moulded in concret moulds Client Vicat - ENSA/V Students 32 Production 5 days Study 3 months Year 2011 Role Teacher


Youth Hostel and School projects residential units Ensa/V

School project

Project Year Location Square footage

Youth Hostel and residential Units Licence 3 Paris 6 000m2


City Hall School projects Ensa/V

School project

Project Year Location Square footage

City HAll Licence 3 Paris 3 000m2

City Hall Ensa/V


Painting Lithography Personal productions Lithography Painting


1/12 Greycl portfoilioCharlotte Vergnolle contact :

/Queenscliff NS

0481 341 417

c.vergnolle@gmail.com

Portfolio  

Extract of recent works

Advertisement