Issuu on Google+

BYRON CLAY LATIMER 6364 Huntington Drive • Carlsbad, CA 92009 858-337-6952 • byronclatimer@gmail.com

PROJECT ARCHITECT / DESIGNER Dedicated, skilled and talented Project Architect with robust well balanced project portfolio including healthcare, institutional, commercial, mixed use, high density housing, telecommunication, and military installations. Adept in administering all tools available to dynamically progress design concepts through to project completion. Strong understanding of design, construction and extensive computer skills to foster effective design communication to all within the project team. Licensed California Architect #C31625 • LEED Accredited Professional: BD + C Detail Oriented • Experienced in All Project Phases • Revit Certified Experienced 3ds Max User • Construction Administration • Quality Assurance Effective Adobe Creative Suite User • Microsoft Office Suite • Proven Client Satisfaction

EDUCATION • Bachelor of Architecture, June 1995 School of Architecture, California Polytechnic State University San Luis Obispo, California

• Denmark International Study Program, August 1992 - June 1993 Royal Academy of Arts, University of Copenhagen Copenhagen, Denmark

PROFESSIONAL EXPERIENCE CARRIER JOHNSON + CULTURE INC., San Diego, California • 02/2011 - 10/2011 Project Architect Directed daily activities of project teams. Shared lead-role in weekly project meetings. Conducted exit studies and product research. Lead Construction Drawing/ Permit Submittal Drawing Packages utilizing Revit and AutoCAD. • Bridgepoint/ Ashford University: Corporate Office Tenant Improvements, San Diego, CA Co-lead projects with Project Manager for (2) Tenant Improvement packages for Ashford Education. Worked closely with all consultants including in-house interior designers and Owner’s Representative. Full project coordination including detailing and punch listing projects. Achievement: After successfully closing out the 2 projects, Ashford Education awarded a new educational campus revitalization project located in the Midwest. • Campus Point Phase 2: Corporate Lab/ Office Center, San Diego, California Worked closely with Client/ Owner’s Representative and lead-designer on meeting project goals for a large Corporate Lab/ Office Center including partial demolition and new construction. Full project coordination through City Permit Submittal Packages. 463,000 S.F. Modern Design, Atrium with Glass Skywalk, Exterior Green Roof, Vivarium at Basement and Hazardous Control Areas.


BYRON CLAY LATIMER Page Two • byronclatimer@gmail.com •

ADDITIONAL EXPERIENCE TUCKER SADLER ARCHITECTS INC., San Diego, California • 10/2005 - 07/2009 Architect/ Project Designer Designed-developed Conceptual, Schematic, and Construction Drawing Packages that conformed to project criteria. Daily activities included Product Research, Client Communication, 3d Modeling/ Animations and Production Drawing Creation. • Campus Pointe: Office and Life Science Campus, San Diego, California Modern Renovation of existing 42 Acre Site. Awarded Platinum LEED Certification for Core and Shell. New Fitness Studio, Cafe/ Bistro, Upgraded central interior walk paths and high performance glazing systems. 450,000 S.F. • San Diego Airport Terminal Two Expansion, San Diego, California “Green Inspired,” 10 new Gates, 12 Security Lanes, Expanded Concessions Area, New Roadways. Cost: Near 1 Billion Dollars. • San Diego Convention Center Expansion #2, San Diego, California 5 Acre Sky Park, Designed to energize the waterfront with Retail and Pedestrian Paths, and to reduce vehicle traffic within the project site. 225,000 S.F. Exhibit Hall Space Expansion, 100,000 S.F. Meeting Space Expansion, 80,000 S.F. Ballroom Expansion • 44th Street Village: Mixed Use Project, Phoenix, Arizona Large scale mixed use project including: Shopping, Condominium, 98 Room Boutique Hotel, Green Space with Public Meeting Space Component, and Full-Site Underground Parking. • Z Lofts: Upscale Residential Condominium Project, Scottsdale, Arizona 3 story condominium block. Loft-style living with open inner courtyard with Pool, Spa and Fitness Center. Resident Storage at Partially Subterranean Parking. • Helen Woodward Animal Center, Rancho Santa Fe, California Multi-Phase Project Including Demolition and New Construction. Phase One: New Administration Building/ Small Animal Vet Hospital. 20,000 S.F. Cost: $12,000,000. Phase Two: New Small Animal Housing Facility with Children’s Educational and Retail Space. 25,000 S.F. Cost: $10,000,000

MOON MAYORAS ARCHITECTS INC., San Diego, California • 09/2002 - 10/2005 Project Designer/ Job Captain Designer/ Co-designer on several new ground-up hospitals and major Tenant Improvements within the Western United States. Performed Quality Control, Direct Participation on all aspects of Drawings, Shop Drawing Review, Construction Administration and Project Closeout. • Carson Tahoe Regional Medical Center, Carson Tahoe, Nevada 345,000 S.F. New Hospital / 13,000 S.F. Central Plant 4 level, 144 Bed. Cost excluding Land: $84,000,000. • Mercy Gilbert Medical Center, Gilbert, Arizona 358,650 S.F. Hospital and Fitness Center. 2-3 Levels, 94 Bed. Cost excluding land: $155,000,000


BYRON CLAY LATIMER Page Three • byronclatimer@gmail.com •

ADDITIONAL EXPERIENCE MOON MAYORAS ARCHITECTS INC., Continued. • Oak Valley Hospital, Oakdale, California 122,000 S.F. New Hospital 10,000 S.F. Central Plant: 2 Levels, 144 Bed Cost excluding land: $60,000,000. • Stacey and Greg Renker Pavilion: Acute Care Facility, Rancho Mirage, California 33,850 S.F. New Hospital Addition. Designed for dignitaries, celebrities, and politicians. 15 Patient Suites, 9 Standard Rooms, Family Lounge, Guest Business Center, Library, Meditation Room, Private Dining Room with Gourmet Kitchen. Cost: $20,500,000.

SILLMAN WRIGHT ARCHITECTS, San Diego, California, • 01/2001 - 09/2002 Project Designer/ Job Captain Designed and developed conceptual packages through construction drawing sets on several concrete tilt-up office and military projects. Lead production of several design competition projects. Also ran entire project for a US Navy Western Regional “listening station.” • Camp Pendleton Indoor Fitness Facility - Camp Pendleton, California “Largest Military Fitness Center within the United States.” Fitness Areas Including Racquetball Courts, Free Weight Rooms and Indoor Basketball Court. Showers and Locker Rooms. 60,000 S.F. - LEED Certified, Cost: $10,000,000 • Mission Valley Heights Business Park, San Diego, California Office/ Light Industrial, 2 Level Concrete Tilt-Up Construction. 600,000 S.F. • Point of Presence Facility, Fleet Intelligence Training Center Pacific, San Diego, California Raised Modular Flooring for Networking Requirements and ease of adapting perceived future requirements.

STICHLER DESIGN GROUP, San Diego, California • 12/1995 - 08/1998 Job Captain/ Junior Project Designer Worked on large healthcare projects and fast paced telecommunication projects comprised of small 1-2 person teams. Invited into the International Studio which the work comprised largely of Malaysian Medical Campus work. Was a leader of 3d modeling within the firm. • Kaiser Permanente Otay Mesa Outpatient Center, Otay Mesa, California “Bedless Hospital:” A three-building facility set in a pavilion style, with 2 enclosed courtyards. 250,000 S.F. Cost: $50,000,000 • International Medical Colege: Rawang Centre for Advanced Medicine, Rawang, Malaysia Modern Large scale university including Hospital, Resident Towers, Grande Exhibition Halls, Educational Buildings. • Pacific Bell Telecommunications, Various Locations throughout Southern California. Wireless Transceiver Sites. Stealth installations including screening antennas in false facades, towers and flagpoles.

TECHNOLOGIES Revit • AutoCAD • 3ds Max • SketchUp • Photoshop Illustrator • InDesign • Microsoft Office • After Effects


Resume