Page 70

Figure 2-10 299) Figure 2-10 above is known as a ________, which is helpful for scheduling activities when some must be completed before others can begin. A) market-product grid B) project schedule C) BCG matrix D) Gantt chart E) sales response function 300) Which of the following tasks shown in Figure 2-10 above must be done sequentially rather than concurrently? A) 1 and 2 B) 2 and 3 C) 3 and 4 D) 5 and 7 E) 6 and 7 301) The key to all scheduling techniques is to A) avoid scheduling tasks that can be done concurrently. B) avoid tasks that must be done sequentially. C) make sure to allow a 20 percent delay factor to account for contingencies. D) assign responsibility for end results to the entire group rather than a single individual. E) distinguish tasks that must be done sequentially from those that can be done concurrently.

69 Copyright 2019 Š McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill Education.

Profile for mansour.m83m

Test Bank for Marketing 14th Kerin  

Test Bank Marketing 14th Edition Kerin 2019 (Test Bank Download) (9781259924040) (1259924041). Instant access. All chapter are included. All...

Test Bank for Marketing 14th Kerin  

Test Bank Marketing 14th Edition Kerin 2019 (Test Bank Download) (9781259924040) (1259924041). Instant access. All chapter are included. All...