Appendix 10 FIGURE 2-10 Gantt chart for scheduling a term project that distinguishes sequential and concurrent tasks. Three students (A, B, and C) are assigned to two or three of these tasks, with all of them writing the final report. The chart also lists the planned period of work and the actual period of work for each task. 1. Construct, test on friends, and complete a final draft of a questionnaire. Actual completion weeks 1 through 3. 2. Type the final questionnaire. Planned completion date weeks 3 through 5. 3. Randomly select the names of 200 students from the school directory. Planned completion date weeks 3.5 through 5. 4. E-mail questionnaires. Planned completion date weeks 4 through 5. 5. Monitor completed questionnaires. Planned completion date weeks 6 through 8.5. 6. Analyze data from completed questionnaires. Planned completion date weeks 7 through 9. 7. Write final report. Planned completion date weeks 5.5 through 9.5. 8. Type and submit final report. Planned completion date weeks 10 through 11.

Return to slide ŠMcGraw-Hill Education.

Profile for mansour.m83m

Solutions for Marketing 14th Kerin  

Solutions Marketing 14th Edition Kerin 2019 (Solutions Manual Download) (9781259924040) (1259924041). Instant access. All chapter are includ...

Solutions for Marketing 14th Kerin  

Solutions Marketing 14th Edition Kerin 2019 (Solutions Manual Download) (9781259924040) (1259924041). Instant access. All chapter are includ...