Construction Process: 1- SS304 Joints and Timber Poles are fabricated offsite 2- Surveyor locates the start of ‘grid’ 3- Rectangular grid is projected over terrain in order to locate points using Microsoft Kinect software. 4- Markers are placed at each point to mark hole 5- Holes are dug at each marker point, ensuring correct depth and angle 6- Each pole is placed into the holes and filled with crushed gravel backfill and a clay plug to prevent water damage.