11.8.3 Port Lands Street Analysis Summary Commissioners
Carlaw
Villiers
Pro Unwin
Bridges a gap in the Martin Goodman Trail Martin Goodman Trail at Cherry St between the Waterfront and Leslie St
Connects To
Martin Goodman Trail at Cherry St and at Leslie St
None
Activities & Destinations
Shipping channel turning basin, Cirque de Soleil site
Shipping channel turning basin
None
None
50 km/h
50 km/h
50 km/h (not posted)
50 km/h (not posted)
At Cherry: 5,622 At Don Roadway: 4,420 At Carlaw: 6,149 At Leslie: 3,631
At Commissioners: 6,149
No data
No data
2 lanes each direction
2 lanes each direction
Two-way
Two-way
Two separate, parallel two-way sections
Two-way
16.5 m to 26.1 m
14.3 m to 14.7 m
North Side: 11.2 m to 12.6 m South Side: 8.4 m to 9.1 m
7.1 m to 7.9 m
None
None
None
None
Both sides, all day
No parking
Both sides, all day
None
Posted Speeds Traffic Volumes (8hr intersection counts) Number of Travel Lanes After Effects Directionality (two-way un less otherwise noted
Road Width Existing Bike Infrastructure Parking
102
2 lanes each direction 1 lanes in each direction