LIGHT INSTALLATION GUIDELINES for AZEK Premier

AZEK Trademark

Page 1 Page

Please read all instructions completely before starting any part of the installation. •

AZEK Lighting may not be suitable for every application and it is the sole responsibility of the installer to be sure that AZEK Lighting is used for its intended purpose. Since all installations are unique, it is also the installer’s responsibility to determine specific requirements in regards to each gate application.

Building codes vary by locale. Please consult all applicable codes before beginning project.

In the case of new deck construction be sure to read entire install guide to ensure proper planning for lighting prior to deck build.

Lighting shall not be installed within 10 feet (3 meters) of a pool, spa or fountain.

User must determine which posts will receive power based on rail lengths and trimmed LED strips for custom sized rails.

The AZEK gauge wire can be buried a maximum of 6” for routing under deck or other obstacles.

AZEK components and wire are designed for outdoor use and have been tested for system performance. AZEK cannot stand behind the product if non-AZEK wire or other components are substituted.

WARNING: Electric shock is always possible when working with electricity. This can cause serious personal injuries or death. Electrical shorts can also cause fires and property damage. Always make sure the electrical outlet you are plugging into is grounded.

Please contact your AZEK dealer to order additional lengths of wire for connection of the lighting.

AZEK Building Products recommends that all applications be reviewed by a licensed architect, engineer, or local building official before installation. If you have any questions or need further assistance, please call AZEK Customer Service at 877-ASK-AZEK (877-275-2935) or visit our website at www.azek.com.

Tools Required

Utility Knife

Wire Strippers

#2 Phillips Drive Bit

Router

Wire Cutters

1/4 Router Bit

Voltage Meter

Use of Hanger for Wire Snake

2.

1. Level

Drill

Phillips Screw Driver

Hardware and Parts

Tape Measurer

1/16” & 1/4” Miter/Chop Saw (80 tooth fine tipped Drill Bit carbide finish blade)

3. 4.

Valance Pack

Lighted Rail Kit

Post Caps Villa Post Cap

Island Post Cap

LED extrusions (24” long PVC) (2) Valance covers

LED strips (6’ or 8’ sections)

w/ screws (#6 x 1/2” long)

Top Housing Lens

Top Housing PCB

#6 1/2” long

Power Pack 12 Gauge wire

PCB

LED strips LED elements

(20) Wire nuts

Junction box

2 Bus Bars

LED strips are available in standard 6’ and 8’ lengths 6 FT

TIP: Be sure to cut at only designated areas

Waterproof coating

Section A-A

8 FT A A

Transformer

(either 35 watt or 200 watt)

12V+

12V+

12V-

12V-

Bottom Housing

Lens

Bottom Housing

Layout Overview (New Construction or Retrofitting with a Pre Assembled Deck) AZEK Lighting is designed for use with the PREMIER and TRADEMARK Rail products. The following are samples of lighting layout showing fixture placement and wiring routes. When laying out the wiring for your deck, keep the following in mind: The following illustrations show various methods for installing both lighted rail and/or lighted post caps.


LIGHT INSTALLATION GUIDELINES for AZEK Premier

Layout Overview Lighted Post Caps

AZEK Trademark

Page 2

Spider layout for lighted Post Caps (x10) Illuminated Post Cap

Example 2 Villa Post Cap

x 12

x 52

35 Watt Transformer

35 Watt Transformer

GFI

Spider Layout The spider potentially requires easy access to the underside of a deck and thus is more likely in new installations. The transformer provided should not deliver more than 80% of its rated wattage. Calculate the total wattage of your layout using the following values. Villa Post Cap draws 0.53 watts, Island Post Cap draws 2.2 watts.

Example 1 Island Post Cap

Transformer

Junction Box

12 Gauge Wire

Example 1: A maximum of 12 lighted Island Post Caps can be powered using a 35 watt transformer. 35 watts x 80% = 28 watts. 28 watts ÷ 2.2 watts per cap = 12.72 or 12 caps. Example 2: A maximum of 52 lighted Villa Post Caps can be powered using a 35 watt transformer. 35 watts x 80% = 28 watts. 28 watts ÷ 0.53 watts per cap = 52.83 or 52 caps. 12 Gauge Wire

post caps Layout Overview Lighted Post Caps

Split Chain For decks with limited access to underside of deck.

Example 1

Example 2 Villa Post Cap

x 12

x 52

35 Watt Transformer

35 Watt Transformer

GFI Transformer

The transformer provided should not deliver more than 80% of the its rated wattage. Calculate the total wattage of your layout using the following values. Villa Post Cap draws 0.53 watts, Island Post Cap draws 2.2, Example 1: A maximum of 12 lighted Island Post Caps can be powered using a 35 watt transformer. 35 watts x 80% = 28 watts. 28 watts ÷ 2.2 watts per cap = 12.72 or 12 caps.

12 Gauge Wire

Island Post Cap

Split Chain for Lighted Post Caps (x10) Illuminated Post Cap

12 Gauge Wire

Junction Box

4x4 wood post must be at least 2 inches below the top of the sleeve to accommodate wiring.

12 Gauge Wire

Example 2: A maximum of 52 lighted Villa Post Caps can be powered using a 35 watt transformer. 35 watts x 80% = 28 watts. 28 watts ÷ 0.53 watts per cap = 52.83 or 52 caps. Requirement: Each powered 12 ga. wire from the transformer can drive a maximum of (10) lighted Post Caps. 12 Gauge Wire

Layout Overview Lighted Rail

The transformer provided should not deliver more than 80% of its rated wattage. 80% of 200 Watt = 160 Watts max. Calculate the total wattage of your layout using the following value. LED strip draws 1.5 watts per foot. NOTE: Each 12Ga Power line can drive no more than 24’ of chained LED strips (four 6’ or three 8’ segments) Maximum of 106’ of LED strips total can be powered by the supplied 200 watt transformer, when not combined with lighted Post Caps.

Under Top Rail Lighting Power to post sequence using standard 6’ and 8’ LED strip lengths 6 FT

6 FT

6 FT

12 Gauge Wire

6 FT

8 FT

12 Gauge Wire

8 FT

12 Gauge Wire

8 FT

12 Gauge Wire

Power to post sequence when LED strip is cut to custom size Cut Termination 5 FT

Cut Termination 8 FT

8 FT

5 FT

8 FT

8 FT

OR

12 Gauge Wire

12 Gauge Wire NOTE: User must determine which post will receive power based on rail lengths and trimmed LED strips for custom sized rails.


Page 3

Layout Overview

Lighted Post Caps & Lighted Rail

Lighted Post Cap (x10)

For both top rail lighting and lighted post caps

GFI

Example

Transformer

The transformer provided should not deliver more than 80% of its rated wattage. 80% of 200 Watt = 160 Watts max.

6 FT LED Strip (x8) Junction Box

Calculate the total wattage of your layout using the following values. Villa Post Cap draws 0.53 watts, Island Post Cap draws 2.2, LED strip draws 1.5 watts foot. 80% of 200 Watt = 160 Watts max and 80% of 35 Watt = 28 Watts.

6 FT Rail with Light (x8)

Example: 10 Villa Post Caps and x feet of rail desired. 10 x 0.53= 5.3 Watts 160 Watts-5.3= 154.7 watts available for LED Strip. 154.7 ÷ 1.5 = 103 feet potential lighted rail.

12 Gauge Wire

NOTE: Each 12Ga Power line can drive no more than 24’ of chained LED strips (four 6’ or three 8’ segments)

No lighted rail in this area

Wire Connection

Transformer Connections

Red positive on Post Cap

+ +

+ 18 Gauge LED Wire

+

+

Black is always negative

Junction Box Bus Bar (x2)

+ 18 Gauge LED Wire

12 Gauge Wire 12 Gauge Wire

From Transformer

To lights

To Power

Post Size Options

NOTE: Polarity must be maintained

Corners must be planed or routed to allow wires to feed up along post.

Post Layouts Three 24” LED extrusions are used with 6’ post spacing 6 FT 6 FT 6 FT

1/2”

3 Extrusions

NOTE: Last extrusion must be trimmed to fit between valance covers.

12 Gauge Wire

18 Gauge LED Wire

18 Gauge LED Wire

Four 24” LED extrusions are used with 8’ post spacing 8 FT 8 FT 8 FT 4 Extrusions

OR

12 Gauge Wire 8’ post spacing with lighted Post Cap scenarios 8 FT 8 FT 12 Gauge Wire 5” x 5” post configuration

12 Gauge Wire

8 FT

8 FT

OR

4” x 4 post configuration 12 Gauge Wire

12 Gauge Wire

12 Gauge Wire


LIGHT INSTALLATION GUIDELINES for AZEK Premier

AZEK Trademark

For 6’ or 8’ post spacing

1

May need to temporarily shim post sleeves plumb and leave shims in place prior to drilling holes.

Page 4

2

Preparing for LED Strip Installation Measure up 34” for a 36” tall rail or 40” for a 42” tall rail from surface of deck on all posts that require drilling. Mark a spot on the post’s centerline.

Rail Height

OR

2”

Retrofit

3

NOTE: For custom rail heights measure down 2” from top of handrail.

NOTE: In order to retrofit, remove all rail sections.

New Construction

Drill here

Drill 1/4” holes at marked locations on posts. Make sure to drill at a 45 degree angle.

4

NOTE: Refer to layout to determine which posts require holes.

Remove post sleeve and route a 1/4” slot into wood post from drilled hole away from the 12 ga. wire side and towards corner of post. Post 12 Gauge Wire

Sleeve

Tape

5” x 5” post configuration 4” x 4” post configuration

45° degrees

12 Ga Wire location

5a

TIP: 1. For ease of wiring route slot to corner away from power cable. 2. Start router at drill hole.

WARNING: Do not rout up as this may cause short when installing screws.

45° degrees

Reinstall and plumb sleeves with vertical level and install rail sections.

Preparing for LED Strip Installation

Measure between posts under top rail and subtract a total of 1 3/4” to account for both valance covers. This measurement equals total length of extrusion needed.

NOTE: Install rail sections per railing installation guide.

Wood post

12 Ga Wire location

5b

Preparing for LED Strip Installation

Each extrusion is 24” long. Measure and cut end off a single LED extrusion to accommodate width of valances. 48” Post to Post (Example) Valance

24” LED Extrusion

Valance

22 1/4” Cut Extrusion

Total Length 7/8”

1 3/4” Total Length of Extrusion Needed

Length of 2 Valance Covers

Use 80 tooth fine tipped carbide finish blade for best result.

7/8” NOTE: Butt extrusions tight at joint TIP: Recommended to use chop saw and to CUT SLOWLY.


Page 5

5c

Preparing for LED Strip Installation Select 6’ or 8’ LED strip as appropriate to the length of rail being used. Feed lead wires through hole in post and fish wires to post top with wire snake.

5d

Preparing for LED Strip Installation Mark hole and pre drill with 1/16” bit for valance screw. Gently pull LED strip to be flush with the rail and install valance using #6 1/2” long screw.

TIP: A simple wire snake can be formed from a wire coat hanger. 18 Gauge Wire 18 Gauge Wire LED Strip

Valance 12 Gauge Wire 5” x 5” post configuration

6

12 Gauge Wire 4” x 4” post configuration

Feed 24” PVC extrusion onto LED strip.

7

Insert 24” LED extrusion between handrail and retainer.

Handrail Retainer

24” LED Extrusion

Insert into gap between retainer and handrail NOTE: Handrail is not fastened to retainer

Face LED Strip Down 24” LED Extrusion 24” LED Extrusion

NOTE: 1. Ensure 24” LED extrusion flange is facing out. 2. Ensure LED’s are facing down.

8

Slide remaining LED extrusions onto LED strip and butt tight against previous extrusion.

LED Extrusion

9

Press LED extrusion into place, between handrail and retainer.

Insert LED Extrusion


LIGHT INSTALLATION GUIDELINES for AZEK Premier

10

AZEK Trademark

FIsh lead wire through opposite post

Page 6

11

Install valance on opposite post using #6 1/2 long screw.

Mark hole and pre drill with 1/16” bit for valance screw.

LED Strip Wire

Valance

12

Install or re-install screws to attach handrail to retainer rail using 1” screws from rail kit

13

Terminating end of LED strip

Trim excess LED strip at correct marked location. NOTE: Ensure no LED’s are outside of extrusion. It is OK to cut strip one set of LED’s shorter than required if an LED lands outside of extrusion.

Cut LED Strip to terminate.

Cut here NOTE: Ensure that 24” LED extrusions are firmly pressed into place. This step secures 24” LED extrusions.

12V+

12V+

12V-

12V-

TIP: Be sure to cut only at designated areas to ensure lighting remains functional. NOTE: You cannot add additional LED strips to a LED strip with a trimmed end.

14

Terminating end of LED strip 18 Gauge LED Wire

+

+

LED Strip to LED Strip NOTES: 1. A maximum of 24’ of LED strips can be wired together off of one 12Ga. wire (Does not include illuminated post caps) 2. Strip all wires back 1/2”. Wire nut all white (+) wires together and wire nut all black (-) wires together.

+ 18 Gauge LED Wire

12 Gauge Wire

+ +

12 Gauge Wire

To Power

LED Strip to LED Strip To Power NOTES: 1. “T” condition 2. Strip all wires back 1/2”. Wire nut all white wires together and wire nut all black wires together. LED Strip to LED Strip to Cap to Power NOTES: 1, Strip all wires back 1/2”. Wire nut all white wires together and wire nut all black wires together. 2. Illuminated post cap condition can only be combined with two LED strips.