Northern Gateway will be one of the safest energy pipelines because it’s been designed by engineers, safety experts and the people of British Columbia.

Our every intention is to ma make ke the North ther ern n Ga Gate tewa way y Pi Pipe peli line ne the str tron ngest st and safestt of its kin nd in Can anad ada. ad a. And the people o of British Columbia have told us that we must exceed safety standards if it is to cross this beautiful province. We’ve heard their concerns and have continually incorporated their feedback into our plans. We have added $500 million in extra safety measures–like thicker pipe, more isolation valves, meticulous pipeline construction techniques, and plans for around the clock monitoring by real people, in real time, with sophisticated technology.

We will use thicker pipe...

We will have advanced monitoring and response systems...

Northern Gateway pipe will have

Constant, diligent monitoring is vital for safe pipeline operation. Northern

an average thickness of 0.80 inches.

Gateway will be monitored on-site and via the control centre 24/7, in

That’s 20% over and above current

real time to allow operators to rapidly respond to any incidents. As

Canadian safety standard requirements

well, extensive geotechnical investigation and route planning

for the Northern Gateway Project. The pipe

has taken place and this, combined with sophisticated

will be even thicker when it crosses major rivers and tributaries.

monitoring techniques, will provide protection against

It will be welded with exacting precision and its integrity checked

geotechnical and other natural hazards. Pump stations in

using ultrasonic inspection and hydrostatic testing methods. And

remote areas will be staffed around the

to ensure safe operation, the frequency of high resolution, in-line

clock. Dual leak detection systems

inspection surveys will be increased across the entire pipeline system

will be installed and remotely

by a minimum of 50% over and above current practices.

operated isolation valves will be used, increasing their number in BC by 50%.

We will respect wildlife habitats and migration routes... To address concerns from the public that the construction of the pipeline will affect the

We will practice and be prepared for incidents...

environment, we have pledged to build it in such a way that natural wildlife habitats,

Our goal is always zero spills. To help achieve that, the

migration routes and fish spawning sites will be respected. During the building phase,

pipeline will be monitored from the air and the ground and

disturbances will be kept to a minimum by having construction vehicles access most of

routinely inspected inside and out to identify and address

the pipeline using existing forestry roads. Instead of building all new bridge structures, it

any integrity issues. But that doesn’t mean we will not

will use existing watercourse crossings where possible. When construction is completed

prepare for an incident. We will adhere to world-leading

on each section, soil will be returned and shrubs and grasses native to the region will be

practices for oil spill response and recovery systems. Emergency response equipment

planted. If any large trees are removed to make way for the pipeline, a new tree will be

and training will be provided and constantly updated and upgraded. Training exercises

planted in another location as part of Enbridge’s commitment to plant a tree for every

with our own operations personnel and local emergency providers will be conducted on a

tree we remove to build our projects.

regular basis. Can we guarantee that there will never be a significant pipeline failure? Our original pledge to build a safe pipeline combined with further enhancements made after hearing the concerns of British Columbians puts us closer than any other pipeline system in the world to providing that guarantee.

Discover more about our rigorous design and safety standards and join the conversation at

safety.northerngateway.ca.

It’s more than a pipeline.

It’s a path to delivering energy safely.

©2012 Northern Gateway Pipelines Inc.

EN9020_BC_PipelineSafety_Version_#2.indd 1

15/11/12 2:17 PM


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.