Biomass boiler case study E.ON district heating plant Broby The Professionalツエs choice since 1935 Location

Village of Broby, Sweden

Date delivered

November 2006

Fuel used

Briquettes from wood waste

Output delivered

13GWh/year

CO2 saving

3,500 tonnes/year

Scope of supply

2x Biomass boilers PB2, 3MW & 1MW with all associated sensors & switches and control system. Flue gas equipment consisting of multi cyclone and flue gas fan.

2011-11-18. All rights reserved. Information subject to change without notice.

Ash container and chimney. Description

Dual setup with Biomass boilers PB2 delivering 3MW and 1MW of hot water for district heating of village. The boilers are fed with briquettes from an underground fuel pocket

Operation

The boilers are part of a big facillity featuring in total five Osby Parca boilers. The smaller 1 MW PB2 boiler caters to low summer loads. Automatic ash handling transports the ash from the boiler out to an ash bin. The flue gases are cleaned with an multi cyclone assuring that local emission protocoll is met.

+46 479 177 00窶ェax +46 479 177 25 sales@osbyparca.se www.osbyparca.se Box 93, 283 22 Osby

Case study Broby  

Scope of supply Operation 13GWh/year Output delivered Date delivered Fuel used Location Description The boilers are part of a big facillity...

Case study Broby  

Scope of supply Operation 13GWh/year Output delivered Date delivered Fuel used Location Description The boilers are part of a big facillity...