Bethlehem Lutheran Church and School Schematic Design Options March 11, 2012


Existing Facilities

Vance St.

W. 23rd Ave.

W. 20th Ave.

W. 22nd Ave.

Wadsworth Blvd.

North


Existing

Area A Area C (Insert existing plan)

Area B

Floor Plan

North


Option 1

(Insert plan)

1st Floor


Option 1

(Insert plan)

1st Floor – School Administration


Option 1

(Insert plan)

1st Floor – Commons / Table


Option 1

(Insert plan)

2nd Floor


Option 1 – Pros and Cons

+

-

+ Basic Commons function + Improved security for School + Improved School Admin Location + Bathrooms at Church Entry + Gains 2 Classrooms + No additional debt + Windows remain in Kitchen

- Basic Commons, smaller, no theatrical light - Removes Computer Lab, redistribute computers to classrooms - Relocates Library to smaller room, less ideally located - Lacks dedicated Cafeteria, limiting flexibility of Commons usage - Separated Church/School Admin - Poor access to Toilet Rooms for Gym patrons - Lacks Life Group and other small group spaces - Limits ELC Growth - Limits ministry staff Office growth - Separate Entrances - Minimal Church reception, security - No change at PAC for Chapel - Music/Choir location challenges at PAC/Chapel - Potential acoustic issues from PAC/Chapel to Sanctuary - Access to Church Office - (e) 2nd Floor mech. stays in Classroom - Sanctuary mech. not included (Alt.) - No Sacristy Access to Chapel - No Improvement at Parlor for Coffee Shop - Fire Sprinklers exposed, unpainted - Add Alternate: Add ramps to improve HC/Accessibility to School


Option 2

1st Floor


Option 2

1st Floor – Chapel


Option 2

1st Floor – School Administration


Option 2

1st Floor – Commons / Table


Option 2

(Insert plan)

2nd Floor


Option 2 – Pros and Cons

+

+ Basic Commons Area + Some Commons theatrical lighting + Improved security for School, Church + Consolidated Main Entry + Bathrooms at Main Entry + Gains 3 Classrooms + Minimal upgrades at Parlor for Coffee Shop + Basic Sacristy access to Chapel + Some improvement at PAC for Chapel + Gains Cafeteria + Increases Commons availability + Better School Admin space and location + Better Toilet Room access for Gym and Cafeteria + School Admin structured to accept future Church Admin + Minor Church Admin renovation + Same cash flow

-

- Basic Commons, minimal theatrical lighting - Additional Debt incurred (but same cash flow) - Removes Computer Lab, redistributes computers - Relocates Library to smaller room, less ideally located - Lacks Life Group and other small group spaces - Limits ELC Growth - Limits ministry staff Office growth - Music/Choir location challenges at PAC/Chapel - Potential acoustic issues from PAC/Chapel to Sanctuary - Access to Church Office - (e) 2nd Floor mech. stays in Classroom - Sanctuary mech. not included (Alt.) - Sacristy passage impacts Nursery - Sacristy passage impacts corner of Sanctuary seating - Add Alternate: Add ramps to improve HC/Accessibility to School


Option 3

(Insert plan)

1st Floor


Option 3

(Insert plan)

1st Floor - Chapel


Option 3

(Insert plan)

1st Floor – School Administration


Option 3

(Insert plan)

1st Floor – Commons / Table


Option 3

(Insert plan)

2nd Floor


Option 3

(Insert plan)

2nd Floor – Church Administration


Option 3 – Pros and Cons

+

-

+ Enhanced Commons with theatrical lighting + Renovated of Parlor for Coffee Shop / Warming Kitchen + Enables enhanced security for School, Church + Bathrooms at Main Entry + Gains 3 Classrooms + Basic Sacristy access to Chapel + Gains Cafeteria + Increases Commons availability + Better School Admin space and location + Better Toilet Room access for Gym and Cafeteria + Enhanced Chapel + Enlarged Chapel* (requires new Sanctuary Mech.) + ELC Expansion + Bigger, Better Church Admin, closer to School Admin + Church Admin can expand + Adds Conference Room on 2nd Floor + Recapture ELC and Church Offices for Life Groups + Add Alternate: Elevator near Main Entry

- Additional Debt incurred, funding TBD - (e) 2nd Flr Mech stays in Classroom - Sacristy passage impacts Nursery - Sacristy passage impacts corner of Sanctuary seating - Add Alternate: Sanctuary RTU required in order to enlarge Chapel - Add Alternate: Add ramps to improve HC/Accessibility to School


Options Comparison + No additional debt - Small Commons (220 at tables/340 in chairs) - Lacks dedicated Cafeteria - Limits ELC Growth - Separate Entrances - No change at PAC for Chapel - No improvement at Parlor

OPTION 1

+

+/- Same cash flow, added debt Improvements over Option 1: + Basic, full-size Commons (320 at tables/500 in chairs) + Consolidated Main Entry + Minimal upgrades at Parlor + Basic Sacristy access to Chapel + Min improvement at Chapel + Regains Cafeteria + Better School Admin space + Provides for ELC Growth

OPTION 2

+

- Additional Debt, funding TBD Improvements over Option 2: + Enhanced Commons (320 at tables/500 in chairs) + Renovation of Parlor + Consolidates Church/School Admin + Enlarged Chapel (requires new RTU) + Provides Life Group spaces

OPTION 3


Group Discussion

The Next Door Project Revised Options March 2012  

Revised Options from March 2012 for The Next Door Project at Bethlehem Lutheran Church. This is a presentation presented at congregational m...