Bethani S. Puzo || Mountain Vista Mountain Vista Park objective: Design a facility with predetermined programming, working with existing topography, while creating a free-flowing and aesthetically appealing movement through the facility. The site is located North of Fort Collins with views of Longs Peak, which should be considered in the final design. Process: Site visit to determine best views, along with construction of a clay model to understand topography. Identify key words and concept imagery for design base. Creating design alternatives to best determine flow and programming placement. Master Plan development with site grading, tying to existing contour lines.


Bethani S. Puzo || Mountain Vista


Bethani S. Puzo || Rocky Flats Restoration Proposal Rocky Flats Restoration Objective: Focus on a site that has experienced significant impacts as a result of a major chemical crisis. Focusing on history of site, post-disaster recovery assisting with rebuilding, rehabilitation and restoration. Process: Understanding extent of contamination and history of site, (what caused accident, what steps have been taken through the EPA to clean up site currently). Extensive research on the rehabilitation and restoration of the site through detoxification of site using phytoremediation. Site analysis, topography analysis, ecological setting and evaluation done for location. Proposing design alternatives representing all elements of site. Final presentation included three phases showing the progression of the project.

Phase: I 2015-2030

Phytoremediation with use of wheat, rye, barley and native grasslands

Phase: II 2030-2045

Implementation of trail system, water system, road, amphitheater, parking, and trees

Phase: III 2045-2060

Implementation of ecological systems and buffalo range

Heavy Remediation:

-Ripping of all soils to break compaction -Replanting of site with alternating rows of rye, wheat and barley (annual rotation of planting)

Moderate Remediation:

-Moderate soil ripping in compation areas -Half native grasses, half rye/barley/wheat mixture

Heavy Remediation

Trail System

Trail System

Water

Water

Road System

Road System

Site Boundaries

Site Boundaries

Parking

Parking

Amphitheater

Amphitheater

Moderate Remediation Mild Remediation

Previous Building Locations

0

Central Mixedgrass Prairie

Inter-Mountain Basins Big Sagebrush Shrubland

Rocky Mountain Aspen Forest and Woodland

North American Arid West Emergent Marsh

Rocky Mountain Lower Montane Riparian Woodland and Shrubland

Rocky Mountain Gamble OakMixed Montane Shrubland

800

1,600

Western Great Plains Shortgrass Prairie

Prairie Buffalo Range

Rocky Mountain Sub-AlpineMontane Riparian

Western Great Plains Sandhill Shrubland

Rocky Mountain Lower Montane-Foothill Shrubland

Western Great Plains Foothill and Piedmont


Bethani S. Puzo || Rocky Flats Restoration Proposal


Bethani S. Puzo || U.S. Forest Service Trail Design U.S. Forest Service Trail Design: Duties include but are not limited to: Use of inclinometer, flagging new trail with blue and white flagging tape, surveying picnic locations for picnic table type, river/flood damage, fill out trail survey sheet, including: Location of water breaks, check dams, rutting, trail braiding, erosion, new trail proposals. Use of measuring wheel for two miles along trail. Use of GPS devices to mark trails, download GPS data map on GIS current trail compared to new data

Youngs Gulch Trail Layout


Bethani S. Puzo || U.S. Forest Service Trail Design Hewlet Gulch Trail Survey


Bethani S. Puzo || Jefferson Street Development Jefferson Street Development objective: Design a facility with to fit the needs of a gateway into Ft. Collins. Enhancing the historical proximity to downtown while creating its own identity. Process: Site visit to determine best views, historical aspects and development process. Creating design alternatives to best determine flow. Master Plan development with connection between north and south of railroad.

Jefferson Street Promenade Fort Collins, CO

Bethani Puzo || LAND 670 || Fall 2015

Legend Walking Path Brick Path Water Feature Commercial Buildings Residential Buildings Play Area Natural Lawn Area Greenway Vegetation Restoration Area


Bethani S. Puzo || Berkana Rehabilitation Institute Therapy Gardens The Berkana Rehabilitation Institute Therapy Gardens is focused on the whole body healing for those individuals that have suffered a traumatic amputation of a limb. The therapy gardens encompass nature and art to build a state-of-the-art facility working with individuals in all stages of their amputation, including pre-rehabilitation and post-rehabilitation. This one-of-a-kind facility will allow families to share the rehabilitation experience with their loved ones as they experience real world challenges on site. Working with staff to overcome all obstacles found throughout the facility, the rehabilitation gardens are set to get those with an outdoor adventure back on path.

Concept Development: Model reflecting the broken pieces one may feel after a loss of limb or traumatic experience.

Working model reflecting the form and figure of facility.


Bethani S. Puzo || Berkana Rehabilitation Institute Therapy Gardens East-West Cross section view of facility, showing top and bottom floor.

Massage-Core Center: Second Floor

Balance Center: Second Floor

Yoga - Pilates Center: First Floor

North-South Cross section view of facility, showing top and bottom floor.


Bethani S. Puzo || Berkana Rehabilitation Institute Therapy Gardens Therapy Pools

Agility & Balance Course

Flowering Crabapple

Yoga Studio

Seating Aluminum Sculptures

Seating Trail Course Mixed Use Studio Indoor Aerobic Gym Rock Wall Seating Incline Course

Therapy Studio Seating Rock Course


Bethani S. Puzo || Cascade Technology Park Cascade Technology objective: Design a parking lot based around confined spaces with specific requests from proposed client. Process: Site analysis with construction of multiple design alternatives. Master Plan development with site grading, tying to existing contour lines. Working on irrigation, planting and cost estimation of sites.

PREFERRED ALTERNATIVE

Alternative 1

Alternative 2

Bethani Puzo

Bethani Puzo

2%

2%

2%

2%

2%

2%

2%

1/2%

A

0

50

100

)'9)'*+ :+). 6'81

DESIGN ALTERNATIVES WITH CONCEPT GRADING

B

0

50

100

BETHANI PUZO


)'9)'*+ :+). 6'81

Bethani S. Puzo || Cascade Technology Park MASTER PLAN

Legend Ornamental tree Shade tree

Conifer tree

The concept design for this master plan comes from a functional, yet creative design. It embraces the views going out towards the lake for employees to enjoy from the patio. There is also positive movement around the parking lot, with a designated permeable paving surface setting the plaza entrance apart from others. The native seed and marsh lands are found towards the southern point of the location creating a wetland habitat with drainage towards the detention pond. The free flowing movement throughout the space creates a home away from home, enclosing the back terrace in a cascade of natural color and water.

Native Seed & Marsh Area

Lawn

Shrub Bed

Lighting

Permeable Paving Plaza

N

0

25

50

100


Legend Proposed Contour Lines Existing Contour Lines

4550

4551 4550

3:1

+ HP 4543.5 4551 4551

4551

+4551

+

1.5 %

+

4550.48 4550.13

+

+ +

+ LPS 4549.5

4549.85

+

+

+

2%

4549.57

4549.21

4549.21

+

+4548.89

Low Point of Bio Swale

+ HPS

High Point of Bio Swale

+ FFE

First Floor Elevation

+ WS

Water Surface

4549 4549 4549

4548

+ LPS 4547.5

+ + +

4547.96 4547.93 4547.69

+ FFE 4549.5

4547.63

+

+

4547.40

1.5 %

4549

+4547.40 4547

+ 4548.67

+ 4548.67

4548.30

4548.30

+

4550

Low Point

+ LPS

+4548.21 + HPS 4549

+

4549.57

+

4549.89

+ HP 4552.5 3:1

+

4550.48 4549.21 4550.13

+

+4548.96

High Point

+LP

Consistent Slope

+ 4549.98

4549.98

4550.79 4549.96

+

+ HP 4551.5

+

4550.12

4550.79

+

4550

3:1

+HP

+4546.35

+

+ LPS 4545.5

4546

4548

+ WS 4545.5

4546

Catch Basin RIM 4542 N

4549 + LPS 4545.5

0

50

25

100

4548

MH INV 4347 30” SS 6” W

MH INV 4370

30” SAN

Legend

Transformer 4551.5 MH INV 4342

Parking Lot Light

12 “ SS Line Below Grade Powerline

6” Potable Water Line

Pedestrain Light 8 “ SAN Line

Bioswale

4 ”Area Drain

30” SS @ .5%

Bio Swale

Catch Basin Rim 4542

8” SS Line N

Bioswale

0

25

50

100

Legend Large Radius Circular 25’ or 50’

The irrigation concept plan took into account minimal water use. Irrigated sites are found within planting beds, lawn areas and sections of the marshland area. The use of large radius circular sprinkler heads were 25’ or 50’ radius heads. The use of short radius circular sprinkler heads were either 10’ or 15’ radius heads. The drip system was placed in the shrub beds located on the east side parking lot. The marshland/wetland area near the lake is not irrigated; this will be filled with native grass seed that will be irrigated through the runoff from the site.

Short Radius Circular 10’ or 15’

Drip Line

N 0

50

25

100

COST ESTIMATION Cascade Tech Park Preliminary Opinion of Probable Construction Cost Date: 5/10/15 Prepared By: Bethani Puzo Item Earthwork Strip Soil (6" EnƟre Site) ExcavaƟon (cut) Embankment (Įůů) Imported Įůl Haul excess cut Spread topsoil (6" all planƟng areas) Utilities Parking area and roadway lights Pedestrian Lights Transformer Misc. Electrical 8" PVC sanitary sewer 4" PVC storm sewer 8" PVC storm sewer- potable water 12" PVC storm sewer Manholes (4' deep) Area Drain Catch Basin Bio swales Paving Curb and GuƩer Pavement Striping Asphalt paving (3" asphalt w/ 6" road base) 4" concrete walls Special Plaza Paving Porous Asphalt Paving (6" asphalt, 30" gravel)

Qty.

Unit

Price*

Total

188,788.93 48,022.60 55,083.94 0 7,061.34 1,300.44

3,496.09 1,778.61 2,040.15 2,353.78 24.08

$ $ $ $ $ $

$ 10,488.27 $ 7,114.46 $ 8,160.58 $ $ 18,830.24 $ 72.25

12 9 1 159 192 238 3 2 1 1,466

1,647 48,977.74 4,319.59 7,394.93

3.00 4.00 4.00 10.00 8.00 3.00

$ 4,500.00 $ 3,000.00 $ 6,000.00 $ 20,000.00 $ 25.00 $ 20.00 $ 28.00 $ 32.00 $ 5,000.00 $ 1,200.00 $ 5,000.00 $ 20.00

$ $ $ $ $ $ $ $ $ $ $ $

54,000.00 27,000.00 6,000.00 20,000.00 3,975.00 5,376.00 6,144.00 15,000.00 2,400.00 5,000.00 29,320.00

$ 18.00 $ 10,000.00 $ 4.50 $ 4.00 $ 18.00 $ 8.00

$ 29,646.00 $ 10,000.00 $ 220,399.82 $ 17,278.36 $ 133,108.73 $ -

Item Planting Sod Seed, hydromulch Seed, hydromulch Shade trees 3" cal Ornamental trees 2" cal Coniferous trees 8' ht IrrigaƟon- Short radius IrrigaƟon- Large radius Drip

Price*

Total

$ $ $ $ $ $ $ $ $

0.30 0.13 3.00 350.00 250.00 400.00 1.50 0.80 0.30

$ $ $ $ $ $ $ $ $

14,180.74 5,469.04 162.00 5,600.00 11,000.00 2,000.00 16.50 16.00 83.40

$ 10,000.00 $ 10,000.00 $ 1.50 $ 20,000.00

$ $ $ $

10,000.00 10,000.00 72,033.89 20,000.00

Subtotal 25% general condiƟons, mobilizaƟon, overhead and proĮt 20 % preliminary design conƟngency

$ $ $

779,875.30 194,968.82 155,975.06

Grand Total

$ 1,130,819.18

Miscellaneous sitework PaƟo Furniture Benches, Trash Pond Liner Entry Signage

Qty. 47,269.12 42,069.55 54 16 44 5 11 20 278.00

48,022.60

Unit

)'9)'*+ :+). 6'81

SITE UTILTIES & SITE LIGHTING PLAN

SITE IRRIGATION CONCEPT PLAN

)'9)'*+ :+). 6'81

SITE GRADING PLAN

)'9)'*+ :+). 6'81 )'9)'*+ :+). 6'81

Bethani S. Puzo || Cascade Technology Park

Bethani Puzo Portfolio  

Colorado State University MLA-I || 2016

Read more
Read more
Similar to
Popular now
Just for you