Page 81

SOMA Propsed Green Connector [Highway Removed]

4th Street Promenade

1:20 Section of 4th Stree & Harrison St. [Current]

1:25 Section of 4th St. [Proposed]

1:20 Section of 4th & Brannan St. [Proposed]

1

3

Implementation of a levee at Mission Creek

Apply bioretention system on a street level

Intergrate bioretention system with the green connector

2 LANDSCAPE AS INFRASTRUCTURE

1:35 Section of 4th & Stillman St. [Proposed]

Disc*2016

final presentation 79 CURRENT ELEVATION

Profile for UC Berkeley Summer [IN]STITUTE

Disc*2016 (Design & Innovation for Sustainable Cities) Catalog  

A compendium documenting the final student projects completed during summer 2016.

Disc*2016 (Design & Innovation for Sustainable Cities) Catalog  

A compendium documenting the final student projects completed during summer 2016.

Advertisement