Issuu on Google+

Argamassa Armada in Salvador de Bahia _ Elements 1 : 1 UE from ENAC IA ALICE with ENAC IA IIC BETON in collaboration with Faculdade de Arquitectura da Universidade Federal da Bahia (FAUFBA)_ 2016


Transitory School, pilars with an external cross-section of 15x15 cm with 1,5 x 4 cm slots in each face

Joao Filgueiras Lima, Lele (1932 -2014)


Argamassa Armada: Recovering a Building Technology for Social Housing in Salvador de Bahía

2016 JAN

2017 FEB MAR APR

MAY JUN

JUL

AUG

SEP

OCT

NOV

DEC

JAN

2018 FEB

MAR

APR MAY

JUN

JUL

AUG

SEP

OCT

NOV

DEC

JAN

FEB MAR APR MAY JUN JUL

AUG

SEP

OCT

NOV

Elements_Details 1:1

RESEARCH TEAM (students EPFL + FAUFBA)

Elements_ in situ 1:1

Elements_ Systems 1:1 preparation

preparation seed money_iBETON + ALICE + LASUR

preparation FNS _iBETON + ALICE + LASUR

Trip I

UE _site

UE FAUFBA 1/1 tests and mock ups Lausanne

MILESTONES

TEAM and COLLABORATIONS

ELEMENTS / DETAILS

W phase I W phase II 1/1 Elements in situ

• 1-2 weeks • organisation mini-usine in SB

• exchange of material and information • define precise team structure

• visits in Salvador de Bahia (potential sites for mini-plants), measuring site • visits of the archives preserving the documents • PG / RB / YP/ PV (EPFL)

• PG / RB / YP / PV (EPFL) • OO / CF (FAUFBA)

• OO / CF /SE (FAUFBA)

• DESAL (SB)

• DESAL (SB)

ELEMENTS / SYSTEMS

SB

STRUCTION SUPERVISION

Trip II

• visits DESAL : technique formworks and armature /casting

• PG / RB / YP (EPFL) • OO / CF (FAUFBA) • contacts with DESAL

• PG / RB / PV (EPFL) • OO / CF (FAUFBA) • contacts with DESAL (SB)

Trip II

UE _site Kick-off meeting, investigation groundwork

• analysis of the elements with focus on the re-construction of the formworks • construction of a series of 1:1 detail formworks element working with technologies • implemented in Switzerland.

synthesis

preparation

synthesis

preparation

)

funding II

UE ENAC EPFL

funding I

(students EPFL)

synthesis

versi on 150916_ PG

preparation

Research team (Alice +I-BETON +LASUR + FAUFBA)

ELEMENTS IN SITU

• students from EPFL and FAUBA • 2 - 3 weeks • installation miniusine in the site • working on the site

• students from EPFL and FAUFBA • 2 weeks • working on the site

DEC


Teaching Team - Raffael Baur, Scientific Collaborator, ENAC IA ALICE - Patricia Guaita, Scientific Collaborator, ENAC IA ALICE -  Patrick Valeri, Dott. Mag. Ing., ENAC IIC IBETON

Lecturers and Experts (Internal) - Miguel Fernández Ruiz, Senior Scientist, ENAC IIC IBETON - Carolina Fialho Silva, Doctoral Assistant, UFBA / PhD Internships EPFL Progamme de Recherche Scientifique sans Frontières – CAPES Brazil - Yves Pedrazzini, Senior Scientist, ENAC IA LASUR

Lecturers and Experts (External) - Dirk Hebel, Assistant Professor of Architecture and Construction ETH Zurich

- Dominique Moullet, MFP Prefabrication SA - Olivia de Oliveira, Architecte Dr, Prof. Chercheur invitée du Progamme de Recherche Scientifique sans Frontières – CAPES Brazil


First factory, Abadiania, 1982 - 84

Second factory, Abadiania, 1982 - 84


Part with holder for ropes tying, Salvador 1989

Part with holder for ropes tying, Salvador 1989


Shed, Day Nurseries, Salvador de Bahia, 1987

Shed, Day Nurseries, Salvador de Bahia, 1987


Joseph Monier, Paris (1823 - 1906),

Reinforced Concrete (steel-reinforcement)

First patent for Iron + Cement in 1867 Test, i- beton EPFL 2016


Block I _Week 1-5 Analysis / Dessin / Test Fragments / (salle AAC006) Week 1_ 24.02 13h 15 Visit MFP Prefabrication SA Week 2_ 02.03 13h 15 Conference I: Olivia de Oliveira, Architecte Dr, Prof. Chercheur invitée du Progamme de Recherche Scientifique sans Frontières – CAPES Brazil
 14h 00 Work-session Week 3_ 09.03 13h 15 Work-session: Reconstruction of the molds E : 1/5 / Redrawing of plans/sections (by hand) Introduction japonaise scie /wood Week 4_ 16.03 13h 15 Conference II: Yves Pedrazzini, Senior Scientist, ENAC IA LASUR 14h 00 Work-session: Fragments of the molds in wood E : 1/5 _ 1/2 Week 5_ 23.03 13h 15 Work-session: Fragments of the molds in wood E : 1/5 _ 1/2


Study for future hospitals of Sarah Chain built with reinforcer mortar, 1988


Study for future hospitals of Sarah Chain built with reinforcer mortar, 1988


Study for future hospitals of Sarah Chain built with reinforcer mortar, 1988


Section of the steps made in the factory with the extent of 1,25 m


Block II Week 6 - 12 Elements 1 :1 _ i-beton space / Conferences (AAC006) Week 6_ 06.04 13h 15 Conference III: Miguel Fernández Ruiz, Senior Scientist, ENAC IIC IBETON 14h 00 Work-session ( i-beton ) Week 7_ 13.04 ( i-beton ) 13h 15 Conference IV: Dirk Hebel, Assistant Professor of Architecture and Construction ETH Zurich 14h 00 Work-session ( i-beton ) / Learning the technics for the construction of a mold / Mould construction 1:1 Fragment /details Week 8_ 20.04 ( i-beton ) 13h 15 Work-session (i-beton) Invited expert: Dominique Moullet, MFP Prefabrication SA Week 9_ 27.04 ( i-beton )/ 10_04.05 (i-beton) / 11_11.05 (i-beton) 13h 15 Work-session (i-beton)/ Working in concrete Week 12_ 18.05 ( i-beton ) 13h 15 Etat de lieu _ Invited guests Miguel Fernández Ruiz, Senior Scientist, ENAC IIC IBETON / Dominique Moullet, MFP Prefabrication SA / Olivia de Oliveira, Architecte Dr, Prof. Chercheur invitée du Progamme de Recherche Scientifique sans Frontières / Yves Pedrazzini, Senior Scientist, ENAC IA LASUR


Hall i- beton EPFL_2016


Hall i- beton EPFL_2016 Hall i- beton EPFL_2016


Hall i- beton EPFL_2016


Hall i- beton EPFL_2016


Hall i- beton EPFL_2016


Hall i- beton EPFL_2016


Hall i- beton EPFL_2016


Hall i- beton EPFL_2016


Hall i- beton EPFL_2016


Argamassa armada in Salvador de Bahia - PENS-308