Project Details Fieldway was awarded a multi-discipline contract to undertake various fire safety and improvement works across Pendleton Together’s property portfolio. We completed works at nine high-rise blocks across 833 flats, so we developed bespoke processes for this property type to ensure seamless delivery. The packages we worked on included fire alarm system and detection installations, general and emergency lighting renewals, fire door upgrades, new sprinklers, and fire compartmentation works/fire stopping.
Finance Director, Pendleton Together
Ownership of Design We produced a design in line with customer requirements and the fire strategy of each block. We developed a design proposal that included technical drawings, zone plans, and data sheets detailing the systems we would be fitting. As part of our design process, we undertook bespoke customer profiling, which included a pre-entry, non-intrusive survey to each flat where we assessed potential risks to property, carpets, furniture, and belongings, noting any lifting or moving of objects required to ensure safe working.
“
“
Since inception of the contract, Fieldway had delivered all works to the highest standard and had worked tirelessly to meet all completion timescales. All site- and office-based staff were approachable, adaptable, and willing to go the extra mile to ensure the needs of the contract and residents were met and exceeded. Fieldway prioritised the safety of all workers and residents whilst providing a service that minimised disruption through coordinating multiple workstreams simultaneously. Fieldway provided us with confidence that they had the resources and management structure to take accountability for all work areas, underpinned by detailed weekly updates in line with the project programme. I have no hesitation in recommending Fieldway for any complex, multidisciplinary contract within high-rise properties and looked forward to continuing our working relationship with them.
Specifications Fire alarm and detection installations Emergency and communal lighting renewals Fire door upgrades Sprinkler system installations Fire compartmentation and fire stopping works
Mobilisation Delivery Team Due to the size and complexity of the project, we assembled a dedicated project team to deliver the works at Pendleton Together. This included a project manager, site supervisor, health and safety manager, resident liaison officer, and a team of 16 operatives, all of whom were ringfenced for this project. This approach allowed us to ensure the programme ran smoothly in line with the pre-agreed timescales and provided accountability for all phases of the work.
Our industry-proven mobilisation process ensured that systems, processes, and resources were in place to meet the project timescales. Upon contract award, we held mobilisation workshops with Pendleton Together to agree on a project plan and programme of works.
Contact 0151 480 9909 | www.fieldway.co.uk
Working in High-Rise Blocks We used detailed coordination and a floor-byfloor approach to move through each high-rise block, completing all workstreams in each flat simultaneously to minimise disruption and prevent multiple visits. Our works coordinators arranged appointments in set periods per floor to ensure we moved through the property in a smart, systematic fashion. The use of our Resident Liaison Officer (RLO) was key, as they knocked at each property to speak with residents about the works taking place and to increase awareness of fire safety. As we moved through the building, we posted individual letters on the next floor we were moving onto to remind residents that their works would be taking place soon. This was in addition to the 28-day letters, 7-day notices, and 24-hour reminders via phone call or text message.
CDM Responsibility We developed a construction phase Health and Safety Plan to ensure compliance with CDM 2015, including design Hazard Analysis, Risk Profiling, and Dynamic Risk Assessment. This document set out the H&S arrangements and site rules, taking into account the activities taking place on site, and included specific measures concerning the work. Throughout the project, the dedicated H&S Manager undertook both random and planned audits to ensure operatives and subcontractors worked to safe systems of work. Any non-conformances resulted in re-training or toolbox talks where trends were identified.
Managing Multiple Disciplines The delivery of this contract involved the management and coordination of multiple packages of both directly employed and subcontracted work. We delivered the fire alarm installation, lighting renewal, and fire stopping using in-house resources, while the sprinklers were completed by our specialist subcontractors. We held pre-start meetings with our subcontractor partners to ensure we created a programme that incorporated all workstreams. To ensure the quality of works was maintained across all packages, our site supervisor remained present at all times to oversee the works. Additionally, we held regular site meetings with subcontractors during which performance was reviewed and any issues were raised.
Resident Engagement & Social Value We hosted coffee mornings to explain the works to residents, scheme staff, and wardens. These sessions detailed the works we would be completing in each scheme and within the properties. Examples of the products being installed were shown, and we introduced our operatives and management staff who would be onsite. We also held question-and-answer sessions to address any queries residents or staff may have had. Our RLO made regular visits to the schemes throughout the project to speak with staff and residents to ensure Pendleton Together and their customers remained satisfied with the works being carried out. As part of our social value commitments to the contract, we engaged with Pendleton Together and Procure Plus to identify and hire eight new local operatives/apprentices to support delivery of the works. Additionally, after interacting with a Pendleton Together resident during a coffee morning about their experience as a fire stopper, we offered them an interview and a full-time position on the contract.
Client & Tenant Benefits Enhanced Protection Comprehensive fire safety systems improve resident protection
Fewer Visits Multiple workstreams completed during single property visits
Clear Communication Regular letters, calls, texts, and face-to-face updates
Reduced Disruption Floor-by-floor delivery maintained organised, predictable access
Safer Homes Pre-entry surveys protected residents’ belongings and property