Project Report: Urban Public Transportation Planning - The feasibility of the new LRT system

Page 58

The feasibility of the new LRT system in the city of Bryan and College Station

the other line and follows West 27th and West 28th Streets and SH 21 out of town (BCSMPO 2015-2035 Metropolitan Transportation Plan).

Within the city of College Station, two rail tracks are all closed and paralleled with each other along the Old Wellborn Road and Wellborn. When approaching the point where FinFeather road begins, two tracks are parallel as well while they are divided by some landscapes and a gutter. But, at the point of north of Villa Maria Road in Bryan, two tracks approach again and then diverge widely to two direction. One of The tracks runs all the way along the FinFeather Road, then goes through the 32th Street, 31th Street, 30th Street, 29th Street, 28th street and then ahead to west along the 27th street out of town. The other track diverges into two tracks when crossing the 32th street: one branch merges into the track along the FinFeather Road; the other branch goes to north to the downtown Bryan between Main Street and the Tabor Street. Diverse rail tracks are illustrated by figure 25.

Figure 25: Railroad alignment At the finfeather

58 | P a g e


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.