Current Magazine May 2018

Page 42

Perma-Manhole®

A NEW ERA IN MANHOLE CONSTRUCTION Fast off-site manufacture up to 6m diameter; integrated design for one-piece manhole and channel invert liner delivery; vastly lessened site risks and public disruption due to ease and speed of installation; corrosion resistant; low maintenance asset life of more than 50+ years.

Engineered to serve the growing needs of new and upgrading sewerage networks in Australia and South East Asia, RPC’s Perma-Manhole® solutions have been successfully manufactured, supplied and installed to the John Holland Group for Yarra Valley Water’s Amaroo Sewer Main Upgrade, Melbourne Water’s Carlton Sewer Upgrade, and to Abergeldie for Queensland Urban Utilities Bulimba Sewer Duplication. RPC’s integrated Perma-Manhole® liners can be delivered to site complete with RPC manufactured ancillary structures such as vortex structures, drop pipes, support clamps and ladders. GRP in-situ cast-in place formwork resists both short-term construction loads and long-term hydrostatic ground water pressure.

Visit RPC Technologies at Ozwater’18

Stand J32

For further information: Paul Sproules – Manager, Infrastructure (02) 9624 9831 paul.sproules@rpctechnologies.com

Engineered Solutions for the Future

AWA10_38-45_Greenfrastructure.indd 42

26/4/18 3:55 pm


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.