N A M E : N U RA T I Q A HB I N T IN O R A Z A M I DN U M B E R : 0 3 2 8 7 2 8 S E M E S T E R : B I A-0 4 /0 2 M O D U L EC O O R D I N A T O R: N O R J IN A S I R N O RA Z I A HH A S S A N


1

4

e ur ed,meas epar epr epar ngspr awi odr ert Ref r e t f A . l l a w he tont awi onsanddr i mens hedi t h t twi ngi i k o o h h t i w s r e n r o c e h t k r ,ma hat t . s l nai

2

ound hebeam ar ort kf mwor or hef dt l Bui e as c r i a t s e h ot hedt ac t e,at as c r ai t hes t . k mwor or f

5

eof hebas ht t ngwi i t ar t ,s k mwor or hef dt l Bui . t h g i e h s t i d n a ) r nge i r t s e( as c r ai t hes t

3

he hapeoft hes awt ,dr mber i aboft l hers Onanot e)on v o b a e g ma i e h nesont i angel heor et k i l e( as c r ai t s he koft m wor or hef deoft i hes abast l hes et ab.Us l hes t e. as c r ai t s

6

7

haped s Les( ec barpi eerr l mal hes ht ac t abandat l hes eont ec barpi eatr l eaf ac Pl . t oi )ont ones

8

he dt omoul kt mwor or hef ort esf ec mberpi i het Cutt he ot t k r o mw r o f e h t l e.Nai mageabov ni howni sass er s i r e. ur ec os t l mberandwal i det i s

9

1 0 edwood nat ami hel t l al t ns I ng i t r i k ngands i nos ng, i oor l f epsby t es et r onc hec ont e. ac f r u s e h t ton ngi ui gl e nat ami hel ht s i ,pol y l t Las h. s ni i nyf hi oras f

e hebas absast l mbers i Putont . t l i u b k r o mw or hef ort f

c i f i pec ss t oi nt si ementbar c or nf ei her hapet Cutands . es z i s

he t el ev .Then,l k mwor or hef ot nt xi emi et r onc hec Pourt e. bl i s easpos at ur c handac eadsasmuc r t


wal l / di v i dert o suppor tst epsaf t er l andi ngs. beam bel ow t het op f l oorl ev el . vi ew f r om l ev el1 mat er i aldet ai l

1 06( 1 )-RI SEi sl esst han1 80mm and t r eadi sl esst han250mm.Al t hough, t her i ser sdi mensi oni snotc onsi st ent t hr oughout . 1 06( 2)-Ful l f i l l ed 1 07 ( 1 )-st ai r s mor et han 4,has 2 handr ai l s. 1 07( 2)-wi dt hofst ai r c asei sl esst han 2225mm 1 08( 1 )-f ul l f i l l ed. 1 08( 2)-f ul l f i l l ed. 1 1 0( 1 )-f ul l f i l l ed. 1 1 0( 2)-f ul l f i l l ed. 1 1 1-f ul l f i l l ed.Pr oper l yl i ght edaswel l as emer genc yl i ghti nst al l ed on t he c ei l i ng.

ski r t i ngdet ai l

l andi ng

f r ontvi ew

REFERT O

SECTI ONDRAWI NG REFERT O

FLOORPLANDRAWI NG

ov er al lvi ew

ushapedst ai r c ase -DOUBLEWI NDERst ai r c ase 2l ev el s f l oor i ngmat er i al: l ami nat edwood r ai l i ngmat er i al: wr oughti r on bal l ust er ( wel dedt oget her )&wooden handr ai l .


NOTE : 1. CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS. 2. FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. 3. DISCREPENCIES OR INCONSISTENCIES IN THIS DRAWING OR BETWEEN DRAWING ARE TO BE BROUGHT TOT HE ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FUL RESPONSILBILITY FOR INCORRECT WORKS. 4. COPYRIGHT OF DESIGN SHOWN HERE ON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.

2270 65 1095

1110

A

950

TITLE : 10

240 240

7

240

6

4

240

240

5 DETAIL 1

11 12

8

13

1230MM(L)X90MM(W)X90MM(H) CARVED WOOD HANDRAIL W POLISH FIN. SCREWED IN TO WROUGHT IRON BALLUSTER W MATTE FIN.

INTERIOR DESIGNER: STUDIO + WORKS Centrio Pantai Hillpark, Jalan Pantai Murni, 59200 Kuala Lumpur

14 15 16

1110MM(L)X190MM(W)X6MM(H) LAMINATED WOOD PANEL GLUED TO CONCRETE TREAD SURFACE W POLISH FIN.

C&S ENGINEER: ANGKASA CONSULTING SERVICES SDN BHD 49, Jalan USJ 10/1a, Taipan Business Centre, 47620 Subang Jaya, Selangor

17

240

3 2

240

2870

240

9

AS-BUILT STAIRCASE DRAWING AT NO.2, JALAN USJ 9/5G 47620 SUBANG JAYA SELANGOR.

LAMINATED WOOD NOSING GLUED TO CONCRETE TREAD SURFACE W POLISH FIN.

ARCHITECT:

1

DTLM Architects 19, Jalan SS 15/4c, Ss 15, 47500 Subang Jaya, Selangor

UP A

DRAWING TITLE : GROUND FLOOR PLAN

FL 1

GROUND FLOOR LAYOUT PLAN SCALE 1:25

DRAWN BY :

ATIQAH

CHECKED BY :

MS. AZIAH

DATE :

29/08/2020

DRAWING REV : DRAWING NO : DWG_WD_AA_WD_01


NOTE : 1. CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS. 2. FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. 3. DISCREPENCIES OR INCONSISTENCIES IN THIS DRAWING OR BETWEEN DRAWING ARE TO BE BROUGHT TOT HE ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FUL RESPONSILBILITY FOR INCORRECT WORKS. 4. COPYRIGHT OF DESIGN SHOWN HERE ON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.

2270 65 1095

1110

A

TITLE : 950

AS-BUILT STAIRCASE DRAWING AT NO.2, JALAN USJ 9/5G 47620 SUBANG JAYA SELANGOR. 10

240 240 240

7 6

240

11 12

8

5

220

2130

9

4

13

1230MM(L)X90MM(W)X90MM(H) CARVED WOOD HANDRAIL W POLISH FIN. SCREWED IN TO WROUGHT IRON BALLUSTER W MATTE FIN.

INTERIOR DESIGNER:

1110MM(L)X190MM(W)X6MM(H) LAMINATED WOOD PANEL GLUED TO CONCRETE TREAD SURFACE W POLISH FIN.

C&S ENGINEER:

STUDIO + WORKS Centrio Pantai Hillpark, Jalan Pantai Murni, 59200 Kuala Lumpur

14 15 16 17 DN

LAMINATED WOOD NOSING GLUED TO CONCRETE TREAD SURFACE W POLISH FIN.

ANGKASA CONSULTING SERVICES SDN BHD 49, Jalan USJ 10/1a, Taipan Business Centre, 47620 Subang Jaya, Selangor

ARCHITECT: DTLM Architects 19, Jalan SS 15/4c, Ss 15, 47500 Subang Jaya, Selangor

A

DRAWING TITLE : FIRST FLOOR PLAN

FL 2

FIRST FLOOR LAYOUT PLAN SCALE 1:25

DRAWN BY :

ATIQAH

CHECKED BY :

MS. AZIAH

DATE :

29/08/2020

DRAWING REV : DRAWING NO : DWG_WD_AA_WD_02


NOTE : 1965 725

240 240

240 240

280

WALL (FIRST FLOOR) 1405 200

232

816

584

90

90MM(L)X90MM(W) TIMBER CARVED AND FIXED TO WROUGHT IRON BALLUSTER THROUGH TONGUE AND GROOVE JOINERY

TITLE :

1F

AS-BUILT STAIRCASE DRAWING AT NO.2, JALAN USJ 9/5G 47620 SUBANG JAYA SELANGOR.

600

150

885

175 175

40MM(L)X40MM(W)X816M(H) WROUGHT IRON BALLUSTER WELDED TOGETHER IN MATTE FIN.

0

8 14

INTERIOR DESIGNER: STUDIO + WORKS Centrio Pantai Hillpark, Jalan Pantai Murni, 59200 Kuala Lumpur

135

175

165

285

165

1. CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS. 2. FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. 3. DISCREPENCIES OR INCONSISTENCIES IN THIS DRAWING OR BETWEEN DRAWING ARE TO BE BROUGHT TOT HE ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FUL RESPONSILBILITY FOR INCORRECT WORKS. 4. COPYRIGHT OF DESIGN SHOWN HERE ON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.

C&S ENGINEER: ANGKASA CONSULTING SERVICES SDN BHD 49, Jalan USJ 10/1a, Taipan Business Centre, 47620 Subang Jaya, Selangor

140 180

1500MM(L)X6MM(W)X135MM(H) LAMINATED WOOD PANEL GLUED TO CONCRETE SURFACE W POLISH FIN.

ARCHITECT: DTLM Architects 19, Jalan SS 15/4c, Ss 15, 47500 Subang Jaya, Selangor

175

175

175

DETAIL 2

WALL (GROUND FLOOR)

175

175

1550

DRAWING TITLE : SECTION A-A

175

175

305MM(L)X65MM(W)X6MM(THK) LAMINATED WOOD SKIRTING CUT AT 45° ON BOTH ENDS W POLISH FIN.

36°

175

3130

135

135

30MM(L)X275MM(W)X6MM(THK) LAMINATED WOOD SKIRTING IN POLISH FIN.

150

2545

GF 315

DRAWN BY : CHECKED BY :

MS. AZIAH

DATE :

29/08/2020

DRAWING REV : SEC SECTION A-A 1 SCALE 1:20

ATIQAH

DRAWING NO : DWG_WD_AA_WD_03


NOTE : 1. CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS. 2. FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. 3. DISCREPENCIES OR INCONSISTENCIES IN THIS DRAWING OR BETWEEN DRAWING ARE TO BE BROUGHT TOT HE ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FUL RESPONSILBILITY FOR INCORRECT WORKS. 4. COPYRIGHT OF DESIGN SHOWN HERE ON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.

90 45 30

40

TITLE : AS-BUILT STAIRCASE DRAWING AT NO.2, JALAN USJ 9/5G 47620 SUBANG JAYA SELANGOR. 260MM(L)X30MM(W)X6MM30MM(H) LAMINATED WOOD W POLISH FIN. SKIRTING GLUED TO CONCRETE STAIRCASE SURFACE

175

(TREAD) LAMINATED WOOD FLOORING W POLISH FIN. GLUED TO CONCRETE BASE

60

40MM(L)X40MM(W)X840MM(H) WROUGHT IRON BALLUSTER W MATTE FIN. WELDED TOGETHER

65

2230MM(L)X90MM(W)X90MM(H) CARVED WOOD HANDRAIL W POLISH FIN. SCREWED IN TO WROUGHT IRON BALLUSTER W MATTE FIN.

INTERIOR DESIGNER: STUDIO + WORKS Centrio Pantai Hillpark, Jalan Pantai Murni, 59200 Kuala Lumpur

C&S ENGINEER: ANGKASA CONSULTING SERVICES SDN BHD 49, Jalan USJ 10/1a, Taipan Business Centre, 47620 Subang Jaya, Selangor

ARCHITECT: DTLM Architects 19, Jalan SS 15/4c, Ss 15, 47500 Subang Jaya, Selangor

DRAWING TITLE : DETAIL 1

LAMINATED WOOD NOSING GLUED TO CONCRETE FLOORING DT 1

DETAIL 1 SCALE 1:2

DRAWN BY :

ATIQAH

CHECKED BY :

MS. AZIAH

DATE :

29/08/2020

DRAWING REV : DRAWING NO : DWG_WD_AA_WD_05


NOTE : 1. CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS. 2. FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. 3. DISCREPENCIES OR INCONSISTENCIES IN THIS DRAWING OR BETWEEN DRAWING ARE TO BE BROUGHT TOT HE ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FUL RESPONSILBILITY FOR INCORRECT WORKS. 4. COPYRIGHT OF DESIGN SHOWN HERE ON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION. 305MM(L)X65MM(W)X6MM(THK) LAMINATED WOOD SKIRTING CUT ON BOTH ENDS AT 45째 IN POLISH FIN.

45째 65

AS-BUILT STAIRCASE DRAWING AT NO.2, JALAN USJ 9/5G 47620 SUBANG JAYA SELANGOR.

65

20

6

45째

65MM(L)X240MM(W)X6MM(THK) LAMINATED WOOD SKIRTING CUT ON BOTH ENDS AT 45째 IN POLISH FIN.

65MM(L)1090MM(W)X20MM(H) LAMINATED WOOD SKIRTING GLUED ON CONCRETE STAIRCASE W POLISH FIN.

175

TITLE :

1090MM(L)X175MM(W)X6MM(THK) LAMINATED WOOD PANEL GLUED ON CONCRETE STAIRCASE W POLISH FIN.

INTERIOR DESIGNER: STUDIO + WORKS Centrio Pantai Hillpark, Jalan Pantai Murni, 59200 Kuala Lumpur

C&S ENGINEER: ANGKASA CONSULTING SERVICES SDN BHD 49, Jalan USJ 10/1a, Taipan Business Centre, 47620 Subang Jaya, Selangor

ARCHITECT: DTLM Architects 19, Jalan SS 15/4c, Ss 15, 47500 Subang Jaya, Selangor

1090MM(L)X200MM(W)X6MM(THK) LAMINATED WOOD SKIRTING GLUED ON CONCRETE STAIRCASE W POLISH FIN. 240

6

DRAWING TITLE : DETAIL 2

65

DRAWN BY : DT 2

DETAIL 2 SCALE 1:2

ATIQAH

CHECKED BY :

MS. AZIAH

DATE :

29/08/2020

DRAWING REV : DRAWING NO : DWG_WD_AA_WD_05


REFLECTION This assignment was a simple task with detailed bits of information gained. For myself, I have always had the information of standard size of thread, riser and railing but there is more to know than just that. Such as the angle of the stringer, the headroom space, lighting and ventilation basics and also fire safety. Besides that, since this project is an as-built drawing, I have also realised the factors that may have been the causes of unusual measurements and the irregularity of constructed staircase. Not to forget, knowing the construction method of the staircase also really helped me in understanding the drawings produced better.


CONTENTS TITLE

1.0

INTRODUCTION - Kitchen - Toilet

PAGE 1 2

2.0

General Arrangement Drawings

3.0

Schedule of Finishes 3.1 : Floor Finish 3.2 : Wall Finish 3.3 : Ceiling Finish 3.4 : Kitchen Cabinets 3.5 : Kitchen Electrical Appliances 3.6 : Sanitary Fittings

10 11 12 13 14 15-16

Building Services 4.1 : Electrical System 4.2 : Lighting System 4.3 : Water, Drainage & Plumbing System

17 18 19-21

4.0

5.0

Conclusion - UBBL - Kitchen issues & solution proposal - Toilet issues & solution proposal

3-9

22 23 24


1.0 : INTRODUCTION - Kitchen

Stove

Overview of the kitchen

Front view of Sink, Kitchen cabinets and window (ventilation)

Front view of Stove, Oven and Kitchen cabinets

Sink Description : •Landed house (2-storey terrace) •type of kitchen (wet and dry combined together) •L-shaped island. • Built-in kitchen includes: ▪ ▪ ▪ ▪ ▪ ▪ ▪ ▪ ▪ ▪

4 drawers cabinets with shelving cabinets without shelving 1 built in oven (plug in) 1 built in stove with 3 burners 1 built in stove hood 1 sink with triple basin 2 faucets 3 plug points 1 drain

Plug points

Stove hood

Piping for the sink

Sink insert & strainer

Gas for stove

Cabinets without shelving

Plugs for the stove


1.0 : INTRODUCTION - Toilet Description : •Landed house (2-storey terrace) •Toilet situated on ground level •Nearest to kitchen •Rectangular shape •Size of toilet , 2210MM X 1510MM •Toilet includes:

Toilet entrance

Overview of toilet on one side

Overview of sink side

Toilet door

Piping of the Water Closet

Piping of the Sink

▪ ▪ ▪ ▪ ▪ ▪ ▪

1 shower 1 water closet 1 spray bidet 1 sink 1 drain 1 window (ventilation) Toilet fittings


2.0 : General Arrangement Drawings


NOTE : 5150 100

1000

750

2700

600 280

320

150

2000

600

2000MM(L) X 2500MM (W) STAINLESS STEEL GRILL IN WHITE PAINT FINISH F03

80

1900 1000

F01

KA04

50

60

A

TRIPLE BASIN SINK TOP MOUNTED 80MM AWAY FROM EDGE OF COUNTER

A

TITLE : T07

EL A

100

FLOOR TRAP INSTALLED 60MM AWAY FROM COUNTER EDGES

KC03 KITCHEN CABINET INSTALLED 80MM BELOW CEILING LEVEL

150

1. CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS. 2. FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. 3. DISCREPENCIES OR INCONSISTENCIES IN THIS DRAWING OR BETWEEN DRAWING ARE TO BE BROUGHT TOT HE ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FUL RESPONSILBILITY FOR INCORRECT WORKS. 4. COPYRIGHT OF DESIGN SHOWN HERE ON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.

AS-BUILT KITCHEN AND TOILET AT NO.2, JALAN USJ 9/5G 47620 SUBANG JAYA SELANGOR.

INTERIOR DESIGNER: STUDIO + WORKS Centrio Pantai Hillpark, Jalan Pantai Murni, 59200 Kuala Lumpur

KA02 FL 1

STOVE HOOD HUNG ON BRACKETS AND SCREWED ON TO WALL

KITCHEN LAYOUT PLAN SCALE 1:25 2210

150 T09

T07

150

T08 B

580MM(L) X 30MM (W) AWNING WINDOW INSTALLED 150MM AWAY FROM EDGE OF WALL

150

ANGKASA CONSULTING SERVICES SDN BHD 49, Jalan USJ 10/1a, Taipan Business Centre, 47620 Subang Jaya, Selangor

KA03

150 580

C&S ENGINEER:

TRIPLE BURNER STOVE TOP MOUNTED ON COUNTER 100MM AWAY FROM SIDE WALL & 50MM AWAY FROM COUNTER EDGE

ARCHITECT: DTLM Architects 19, Jalan SS 15/4c, Ss 15, 47500 Subang Jaya, Selangor

T05 230

T03

WATER CLOSET INSTALLED 230MM AWAY FROM WALL

3-FUNCTION ADJUSTABLE SHOWER HEAD SET FIXED TO WALL

DRAWING TITLE :

1510

KITCHEN FLOOR PLAN TOILET FLOOR PLAN 600

T04

FIXED 50MM AWAY FROM WALL

150

400

F02

T02

1000 B

FL 1

TOILET LAYOUT PLAN SCALE 1:25

TWO WAY TAP + HAND BIDET IN CHROME FINISH FIXED TO WALL

DRAWN BY :

ATIQAH

CHECKED BY :

MS. AZIAH

DATE :

29/09//2020

DRAWING REV : DRAWING NO : DWG_WD_AA_WD_01


NOTE : 1. CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS. 2. FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. 3. DISCREPENCIES OR INCONSISTENCIES IN THIS DRAWING OR BETWEEN DRAWING ARE TO BE BROUGHT TOT HE ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FUL RESPONSILBILITY FOR INCORRECT WORKS. 4. COPYRIGHT OF DESIGN SHOWN HERE ON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.

1900 150

1600 600

150

460

460

80

80

WT CL

750

TOP HUNG CABINETS BUILT 80MM BELOW CEILING LEVEL

25

INTERIOR DESIGNER: STUDIO + WORKS Centrio Pantai Hillpark, Jalan Pantai Murni, 59200 Kuala Lumpur

STOVE HOOD HOOKED ON BRACKETS FIXED TO WALL

PLUG POINTS FIXED 25 MM BELOW CABINET

330 W01

WATER INLET FROM WATER TANK TO KITCHEN SINK

KA03 100

KA05

100

625

AS-BUILT KITCHEN AND TOILET AT NO.2, JALAN USJ 9/5G 47620 SUBANG JAYA SELANGOR.

EXTERIOR

KA02

STOVE BUILT IN 100MM AWAY FROM WALL

C&S ENGINEER: ANGKASA CONSULTING SERVICES SDN BHD 49, Jalan USJ 10/1a, Taipan Business Centre, 47620 Subang Jaya, Selangor

WATER OUTLET PIPE FROM SINK TO DRAIN OUTSIDE

DRAINAGE SYSTEM CONNECTING KITCHEN SINK WASTE PIPE TO SEWAGE

KA01

ARCHITECT: DTLM Architects 19, Jalan SS 15/4c, Ss 15, 47500 Subang Jaya, Selangor

270

900

KA04

90

FL 250

2355

TITLE :

F01 T07

F01

90MM(H) L-SHAPED CONCRETE BASE BUILT AS CABINET BASE W F01 TILE FIN.

DRAWING TITLE : INTERIOR ELEVATION OF KITCHEN

LEGEND : WT - WATER TANK EL A

KITCHEN INTERIOR ELEVATION A SCALE 1:20

DRAWN BY :

ATIQAH

CHECKED BY :

MS. AZIAH

DATE :

29/09//2020

DRAWING REV : DRAWING NO : DWG_WD_AA_WD_02


NOTE : 3300

150

2000

850

80

80

2000MM(L)X2500MM(H) X 30MM(W) STEEL GRILL IN WHITE PAINT FIN. INSTALLED 250MM ABOVE THE COUNTER TOP

1. CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS. 2. FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. 3. DISCREPENCIES OR INCONSISTENCIES IN THIS DRAWING OR BETWEEN DRAWING ARE TO BE BROUGHT TOT HE ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FUL RESPONSILBILITY FOR INCORRECT WORKS. 4. COPYRIGHT OF DESIGN SHOWN HERE ON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.

CL

TITLE :

1250

DETAIL '2'

W01

280MM(D) X 900MM(L) X 12MM(H) ADJUSTABLE FIBRE BOARD SHELF IN MELAMINE LAMINATE FIN.

AS-BUILT KITCHEN AND TOILET AT NO.2, JALAN USJ 9/5G 47620 SUBANG JAYA SELANGOR.

320MM(D) X900MM(L) X 580MM(H) FIBRE BOARD CABINET IN MELAMINE LAMINATE FIN. INSTALLED 80MM BELOW CL

INTERIOR DESIGNER: STUDIO + WORKS Centrio Pantai Hillpark, Jalan Pantai Murni, 59200 Kuala Lumpur

KA02 FIXED BELOW TOP HUNG CABINET

C&S ENGINEER: 2355

ANGKASA CONSULTING SERVICES SDN BHD 49, Jalan USJ 10/1a, Taipan Business Centre, 47620 Subang Jaya, Selangor

125

F03 KA03 STOVE TOP MOUNTED ON THE COUNTER TOP100MM AWAY FROM EDGE

1000

100

KA04

ARCHITECT: DTLM Architects 19, Jalan SS 15/4c, Ss 15, 47500 Subang Jaya, Selangor

KA01 BUILT IN BELOW STOVE

DETAIL '1' 710

DRAWING TITLE : SECTION A-A ( KITCHEN )

F01

W01

W01

T07 FLOOR TRAP

90

FL

DRAWER SLIDER RUNWAY

SEC SECTION A-A (KITCHEN) A SCALE 1:10

DRAWN BY :

ATIQAH

CHECKED BY :

MS. AZIAH

DATE :

29/09//2020

DRAWING REV : DRAWING NO : DWD_WD_AA_03


NOTE :

150

1510

150

SURFACE MOUNTED LIGHT

CL

430

C02

AWNING WINDOW

1. CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS. 2. FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. 3. DISCREPENCIES OR INCONSISTENCIES IN THIS DRAWING OR BETWEEN DRAWING ARE TO BE BROUGHT TOT HE ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FUL RESPONSILBILITY FOR INCORRECT WORKS. 4. COPYRIGHT OF DESIGN SHOWN HERE ON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.

TITLE : AS-BUILT KITCHEN AND TOILET AT NO.2, JALAN USJ 9/5G 47620 SUBANG JAYA SELANGOR.

875

W03 PIPING FOR WATER INLET FROM WATER TANK TO SANITARY FITTINGS

W04

WATER INLET FROM WATER TANK TO SINK

INTERIOR DESIGNER: STUDIO + WORKS Centrio Pantai Hillpark, Jalan Pantai Murni, 59200 Kuala Lumpur

2350

W05

T06

215

85

T03 3-FUNCTION ADJUSTABLE SHOWER HEAD SET FIXED TO WALL 1100MM ABOVE FLOOR LEVEL

T01 STAINLESS STEEL BASIN TAP

C&S ENGINEER: ANGKASA CONSULTING SERVICES SDN BHD 49, Jalan USJ 10/1a, Taipan Business Centre, 47620 Subang Jaya, Selangor

DETAIL '3' T05 WASH DOWN WATER CLOSET IN GLOSSY FIN.

ARCHITECT: 750

T02

DTLM Architects 19, Jalan SS 15/4c, Ss 15, 47500 Subang Jaya, Selangor

PORCELAIN SINK IN GLOSSY FIN.

WATER OUTLET FROM SINK TO SEWERAGE

DRAWING TITLE : FL

SECTION B-B ( TOILET ) T07 FLOOR TRAP

DRAWN BY : SEC SECTION B-B (TOILET) B SCALE 1:10

ATIQAH

CHECKED BY :

MS. AZIAH

DATE :

29/09//2020

DRAWING REV : DRAWING NO : DWD_WD_AA_04


NOTE : 1930 40

50

50 340

40

105

340

MIDDLE BASIN

RIGHT BASIN

DETAIL 1A CONCRETE KITCHEN COUNTER

180

LEFT BASIN

180

STAINLESS STEEL BASIN IN CHROME FIN. TOP MOUNTED ON THE KITCHEN COUNTER TOP

WHITE L- SHAPED PVC PIPES CONNECTED FOR WASTE OUTLET

TITLE : AS-BUILT KITCHEN AND TOILET AT NO.2, JALAN USJ 9/5G 47620 SUBANG JAYA SELANGOR.

INTERIOR DESIGNER: STUDIO + WORKS Centrio Pantai Hillpark, Jalan Pantai Murni, 59200 Kuala Lumpur

180

W01

C&S ENGINEER: ANGKASA CONSULTING SERVICES SDN BHD 49, Jalan USJ 10/1a, Taipan Business Centre, 47620 Subang Jaya, Selangor

DET KITCHEN SINK DETAIL 1 SCALE 1:5

ARCHITECT: 20

25

DTLM Architects 19, Jalan SS 15/4c, Ss 15, 47500 Subang Jaya, Selangor

6

STAINLESS STEEL BASIN INSERT FOR MIDDLE BASIN

RUBBER SPACE FILLER

DRAWING TITLE : DETAIL 1

10

540

SINK STRAINER

1. CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS. 2. FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. 3. DISCREPENCIES OR INCONSISTENCIES IN THIS DRAWING OR BETWEEN DRAWING ARE TO BE BROUGHT TOT HE ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FUL RESPONSILBILITY FOR INCORRECT WORKS. 4. COPYRIGHT OF DESIGN SHOWN HERE ON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.

DRAWN BY : LEFT BASIN

DET DETAIL 1A 1A SCALE 1:1

ATIQAH

MIDDLE BASIN

STAINLESS STEEL BASIN

CHECKED BY :

MS. AZIAH

DATE :

29/09//2020

DRAWING REV : DRAWING NO : DWG_WD_AA_WD_05


NOTE :

17 150

17 303

80

PRE-MADE HOLES FOR SHELF ADJUSTMENT

1. CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS. 2. FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. 3. DISCREPENCIES OR INCONSISTENCIES IN THIS DRAWING OR BETWEEN DRAWING ARE TO BE BROUGHT TOT HE ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FUL RESPONSILBILITY FOR INCORRECT WORKS. 4. COPYRIGHT OF DESIGN SHOWN HERE ON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.

TITLE : AS-BUILT KITCHEN AND TOILET AT NO.2, JALAN USJ 9/5G 47620 SUBANG JAYA SELANGOR.

900MM(L) X 17MM(THK) X 545MM (H) FIBRE BOARD BACKING IN WHITE LAMINATE FIN.

INTERIOR DESIGNER: STAINLESS STEEL HANDLE IN CHROME FIN. SCREWED TO CABINET DOOR 20MM ABOVE BOTTOM EDGE

280MM(D) X 900MM(L) X 12MM(H) ADJUSTABLE FIBRE BOARD SHELF IN WHITE LAMINATE FIN.

580

STUDIO + WORKS Centrio Pantai Hillpark, Jalan Pantai Murni, 59200 Kuala Lumpur

C&S ENGINEER: ANGKASA CONSULTING SERVICES SDN BHD 49, Jalan USJ 10/1a, Taipan Business Centre, 47620 Subang Jaya, Selangor

ARCHITECT:

900MM(L) X 17MM(THK) X 580MM(H) FIBRE BOARD FLUSHED CABINET DOOR IN MELAMINE LAMINATE FIN.

DTLM Architects 19, Jalan SS 15/4c, Ss 15, 47500 Subang Jaya, Selangor

DRAWING TITLE : DETAIL 2 - KITCHEN CABINET

DET KITCHEN CABINET DETAIL 2 SCALE 1:5

DET DETAIL 2A 2A SCALE 1:1

DRAWN BY :

ATIQAH

CHECKED BY :

MS. AZIAH

DATE :

29/09//2020

DRAWING REV : DRAWING NO : DWG_WD_AA_WD_06


NOTE :

185

22

T01 STAINLESS STEEL BASIN TAP IN CHROME FIN. FIXED 22MM AWAY FROM WALL

YELLLOW RUBBER PIPE FOR WATER INLET FROM TANK TO SINK TAP 30 T02 PORCELAIN SINK PLACED ON THE SINK BASE

1. CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS. 2. FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. 3. DISCREPENCIES OR INCONSISTENCIES IN THIS DRAWING OR BETWEEN DRAWING ARE TO BE BROUGHT TOT HE ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FUL RESPONSILBILITY FOR INCORRECT WORKS. 4. COPYRIGHT OF DESIGN SHOWN HERE ON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.

TITLE : AS-BUILT KITCHEN AND TOILET AT NO.2, JALAN USJ 9/5G 47620 SUBANG JAYA SELANGOR.

INTERIOR DESIGNER: STUDIO + WORKS Centrio Pantai Hillpark, Jalan Pantai Murni, 59200 Kuala Lumpur

C&S ENGINEER:

135

ANGKASA CONSULTING SERVICES SDN BHD 49, Jalan USJ 10/1a, Taipan Business Centre, 47620 Subang Jaya, Selangor

ARCHITECT: DTLM Architects 19, Jalan SS 15/4c, Ss 15, 47500 Subang Jaya, Selangor

260

615

WHITE 30MM(dia) PVC PIPE AS WATER OUTLET DRAIN

130

PORCELAIN SINK BASE IN GLOSSY FIN. PLACED 130MM AWAY FROM THE WALL

DRAWING TITLE : DETAIL 3 - TOILET

DRAWN BY : DET 3

TOILET DETAIL SCALE 1:5

ATIQAH

CHECKED BY :

MS. AZIAH

DATE :

29/09//2020

DRAWING REV : DRAWING NO : DWG_WD_AA_WD_07


3.0 : Schedule of Finishes


3.1 : Floor Finishes CODE

IMAGE

SPECIFATIONS

SUPPLIER

QUANTITY

LOCATION

F01

Size : 30CM X 30CM - (LXW) Material : Homogenous tiles Finish : Matte glaze Area : 20.10m²

JUBIN MBS KLANG

200 pcs

Kitchen

F02

Size : 20CM X 20CM - (LXW) Material : Homogenous tiles Finish : Matte glaze finish Area : 3.30m²

JUBIN MBS KLANG

88 pcs

Toilet

F03

Size : 30CM X 30CM - (LXW) Material : Homogenous tiles Finish : Polished finish Area :

JUBIN MBS KLANG

42 pcs

Kitchen Counter


3.2 : Wall Finish CODE

IMAGE

SPECIFATIONS

SUPPLIER

QUANTITY

LOCATION

W01

Size : 20CM X 25CM (LXH) Material : Ceramic tile Finish : Polished Area : 14.50m²

JUBIN MBS KLANG

165 pcs

Kitchen

W02

Size : 3.65m² Material : Concrete walls Finish : Off-white paint finish

NIPPON PAINT

-

Kitchen

W03

Size : 20CM X 25CM (LXH) Material : Porcelain mosaic Finish : Glazed Area : 5.95m²

JUBIN MBS KLANG

136 pcs

Toilet

W04

Size : 20CM X 6CM (LXH) Material : Ceramic tile Finish : Polished Area : 0.45m²

JUBIN MBS KLANG

34 pcs

Toilet

W05

Size : 20CM X 25CM (LXH) Material : Ceramic tile Finish : Polished Area : 11.20m²

JUBIN MBS KLANG

204 pcs

Toilet

Code : Roseptal 5083


3.3 : Ceiling Finish CODE C01

C02

IMAGE

SPECIFATIONS

SUPPLIER

Size : irregular Material : Plaster ceiling Finish : white paint finish Note : has skirting (4CM X 1CM) (LXH) Area : 3.30m²

NIPPON PAINT

Size : 2120MM X 1510MM - (LXW) Material : Plaster ceiling Finish : white paint finish Note : has skirting (4CM X 1CM) (LXH) Area : 20.10m²

NIPPON PAINT

LOCATION Kitchen

Code : Brilliant White 1101

Code : Brilliant White 1101

Toilet


3.4 : Kitchen Cabinets CODE

IMAGE

SPECIFATIONS

SUPPLIER

QUANTITY

LOCATION

KC01

Cabinet doors Size : 20.5CM X 70CM X 1.7CM (LXHXW) Material :Particle board Finish : Melamine laminate finish

FORMICA

2 UNITS

Cabinets below stove

KC02

Drawers door Size : 50CM X 17CM X 1.7CM (LXHXW) Material :Particle board Finish : Melamine laminate finish

FORMICA

4 UNITS

Drawers

KC03

Cabinet doors Size : 50CM X 70CM X 1.7CM (LXHXW) Material :Particle board Finish : Melamine laminate finish

FORMICA

7 UNITS

Cabinet doors near sink

KC04

Cabinet door hinge Material : Stainless steel Screwed on

LOONG SHEN HARDWARE SDN BHD

18 UNITS

Cabinet doors

KC05

Stainless steel cabinet handle With lacquer finish Screwed on cabinet doors.

LOONG SHEN HARDWARE SDN BHD

13 UNITS

Cabinet doors & drawers

KC06

2CM X 70CM (LXH) Rubber strip glued on one side of each set of cabinet doors.

LOONG SHEN HARDWARE SDN BHD

7 UNITS

Cabinet doors


3.5 : Kitchen Appliances & Fittings CODE

IMAGE

SPECIFATIONS

SUPPLIER

QUANTITY

LOCATION

KA01

59CM X 59CM X 59CM (LXWXH) Two-tier adjustable inserts built in oven Plug - in

ELBA Oven

1 UNIT

Kitchen

KA02

90CM X 17CM X 60CM (LXHXW) Double fan stove hood Wall hung by brackets

ELBA Stove Hood

1 UNIT

Kitchen

KA03

86CM X 50CM X 2CM (LXWXTHK) ELBA Stove Triple burner stove (2 large 1 cmall) Built in to counter top

1 UNIT

Kitchen

KA04

90CM X 46CM (LXW) Stainless steel top mounted Triple Basin Sink in chrome finish

Loong Shen Hardware

1 UNIT

Kitchen

KA05

10CM X 32CM X 30CM (LXWXH) Stainless steel Double pipe Water faucet In chrome finish

Loong Shen Hardware

1 UNIT

Kitchen


3.6 : Sanitary Wares & Fittings CODE

IMAGE

SPECIFATIONS

SUPPLIER

QUANTITY

LOCATION

T01

OSUKI Zinc Stainless Steel Basin Tap 791 Material : Zinc alloy stainless steel with chrome mirror finish

OSUKI

1 UNIT

Toilet

T02

600MM X 495MM X760MM (LXWXH) YELLOWISH WHITE PORCELAIN SINK WITH GLOSSY FINISH

OFIA

1 UNIT

Toilet

T03

650MMX140MMX70MM 3-FUNCTION STAINLESS STEEL SHOWER HEAD SET IN CHROME FINISH COMES WITH ADJUSTABLE SHOWER HEAD HOLDER.

OSUKI

1 UNIT

Toilet

T04

STAINLESS STEEL BIDET + TWO WAY TAP IN MIRROR CHROME FINISH

SORENTO

1 UNIT

Toilet

T05

670MM X 420MM X 765MM (LXWXH) WELLOWISH WHITE PORCELAIN WATER CLOSET WITH GLOSSY FINISH. S- TRAP : 250MM (ROUGHING IN) P-TRAP : 180MM (ROUGHING IN) CISTERN : CCS018 WASHDOWN PEDESTAL WC

OFIA

1 UNIT

Toilet


3.6 : Sanitary Wares & Fittings CODE

IMAGE

SPECIFATIONS

SUPPLIER

QUANTITY

LOCATION

T06

ZINC ALLOY SINGLE CUP HOLDER IN CHROME FINISH

BODIE

1 UNIT

Toilet

T07

150MMX150MM (LXW) STAINLESS STEEL FLOOR TRAP

EVANS

1 UNIT

Toilet

T08

125MMX120MMX120MM (LXWXH) FULLY COVERED STAINLESS STEEL TOILET ROLL HOLDER

DUVENA DUVAK

1 UNIT

Toilet

T09

250MM X 250MM X 60MM (LXWXH) CHROME PLATED BRASS CORNER SHOWER SHELF

SANLIV

1 UNIT

Toilet

T10

900MM X 43MM X 70MM (LXWXD) STAINLESS STEEL TOWEL RAIL WALL MOUNTED IN CHROME FINISH

INOX

1 UNIT

Toilet

T11

750MM X 500MM (LXW) OVAL WALL HUNG GLASS MIRROR

INOX

1 UNIT

Toilet


4.0 : Building Services


4.1 : Electrical System

Switch Controls

Stove hood switches

Stove – triple burner

Stove Hood (front view)

Plug points for Electrical appliances

Built in oven (front view)

Stove Hood – double fans

Kitchen • •

There are 3 electrical appliance here which are stove hood, stove and oven. Although, the stove hood has never been used to absorb the smoke and heat. The oven functions properly, the plug needs to be switched on to function. Although, it cannot operate while the stove above is being used. Gas

Plug points for oven


4.2 : Lighting System

Surface mounted light At the kitchen

Bottom view of lighting At the kitchen

Overview of the kitchen

Besides the artificial lighting available, sunlight can also light up the kitchen through the triple panel window at the sink. Although, the existing room on the right side of the kitchen limits the amount of sunlight coming in. Hence, there is always less light and people tend to just turn it off

Surface mounted light At the toilet Overview of the toilet

As for the toilet, no sunlight can come in the space as it is really in the middle of the house


WATER INLET WATER TANK WATER OUTLET CL

>

>

>

Sink Faucet 1F

>

Shower head Water Closet Hand bidet

MAIN PIPE (FROM SYABAS)

>

Kitchen

> Wash down WC Floor trap

Sewerage

To outdoor drain

GF Floor trap

Initially, the water supply for kitchen came directly from the main pipe but after the renovation works in 2005, it was changed

Main pipe > water tank > kitchen sink


Kitchen Water System

How the piping looks like. From 3 basin traps (3 different pipes) to one same pipe to drain outside to sewerage

Kitchen sink Below the cabinets are the water piping to drainage to sewerage.

Piping for the water inlet from water tank to faucet Piping that protrudes the wall to exterior, to drain


Toilet Water System

Water from water tank to WC tank Water from tank to faucet

* Water

outlet to sewerage is not seen as it is concealed (washdown WC)

Water outlet to sewerage Piping for the shower is concealed in the walls. Same goes to the hand bidet piping.


5.0 : Conclusion


UBBL 39 (1) - openings

UBBL 41(4) Stove hood

UBBL 42 (3) UBBL 43


UBBL 44 (1)


Kitchen – Issues & Solution Proposal After living in this house for 22 years, I think there are some issues that needs to be fixed for a better living quality. Besides the design of the space, certain furnitures, fixtures and fittings should also be updated as it has been 15 years since the last renovation happened. For the kitchen, I think there are two issues that needs to be fixed. Firstly, the poor ventilation system. Based on the floor plan below, you can see that there is lack of openings (highlighted in red) and the current opening placement does not allow the air the ventilate out very well. It is also unfortunate that the stove hood does not work, so that adds up to the poor ventilation system of the kitchen.

This affects the whole household as the whole house becomes stuffy, hot and reeks when cooking is done. Hair and clothes will definitely smell of oil/food even if you enter the kitchen for one minute during cooking time. My suggestion to solve this problem, if a major renovation could happen, is to move the location of the kitchen to the right end (higlighted in orange) and add more openings on side A (highlighted in green). This would help ventilate the inside air out. Wind from side A will help push out the air through current openings. Also, add fans at the area to help the ventilation work better. Besides better ventilation, it also provides more natural lighting to enter the space. Hence, less electrical usage on lighting during daytime. Another suggestion that does not require major renovations is to get the stove hood repaired and depend on it to suck all the hot air when cooking. Rarely open due to pest problem

toilet

airflow Current opening

current kitchen area

Suggested kitchen placement Suggested additional Opening placement

room

Diagram 1


Toilet – Issues & Solution Proposals As for the toilet, physically, the sanitary fittings such as the water closet and the sink urgently needs to be replaced with a new one. The water closet no longer has a cover and the flush has to be done manually. The fact that it is the guest toilet that visitors use, most of the sanitary fittings needs to be changed for a more comfortable usage for the users.

Besides that, the placement of the fittings could also be improved. As in the placement of the door, the water closet and the shower. In my opinion, it is better to have the sink as the first thing you see when you enter instead of the shower or water closet. This is because, sometimes people may forget to lock the door while using the toilet so, when the entrance does not point to these two fittings, there is less chance of an embarrassing episode to happen. Currently, the toilet door area is directly facing the living room and also the dining space, therefore, I think it would better if the placement of door and certain fittings is rearranged. Either the door placement should be changed to a more private side or fittings should be rearranged (please refer to diagram 2). As for the plumbing, both kitchen and toilet receives a good amount of water pressure. Although we currently have a water pump installed, the water pressure works fine without the pump on the ground floor.

Diagram 2

Suggested do or placement Suggested sink placement Suggested shower placement

Hole in the door

Condition of WC

Height of sink is unsuitable 745MM (H) and no drain cover

The direction of door Opening is also important

Living room

Suggested WC placement

Dining room


REFLECTION After doing this project, i realise there are a lot of problems with my kitchen and toilet. Something that we (occupants of the house) have ignored for years. I have also identified why some problems happen in my house, such as why does the whole house smell of oil/ food every time someone cooks. It is because we have a poor ventilation system not just in the kitchen but in the common areas of the house. Lastly, I have also begin to think of the changes that should/could be made in the future such as mentioned in the previous proposal.


ASSIGNMENT 03 CHE – DOK MARKET NAME

:

NUR ATIQAH BINTI NORAZAM

ID NUMBER

:

0328728

SEMESTER

:

04/02

MODULE

:

IDS 60804 – DETAILING & WORKING DRAWINGS

LECTURER

:

MS NORJI NASIR & Ar. AZIAH HASSAN


PROPOSED INTERIOR DESIGN & RENOVATION WORK FOR TEEJ & CO - CHE-DOK Spice Market,REKAScape, Cyberjaya. NOTICE : •

ALL CONTRACTORS AND CARPENTERS TO RE-CONFIRM THE SITE MEASUREMENT BEFORE ORDERING THE WORK.

CONTRACTORS ARE TO CLARIFY WITH CONDITION AT EXISTING TO COMPLIMENT WITH DESIGN AND ADVICE ACCORDINGLY ESPECIALLY IN TERMS OF MECHANICAL AND ENGINEERING (TECHNICAL).


DRAWING LIST NO.

DRAWING

DRAWING NO.

GENERAL ARRANGEMENT 1

SETTING OUT PLAN

DWD_AA_WD_ST_01

2

FURNITURE LAYOUT PLAN

DWD_AA_WD_FLP_02

3

REFLECTED CEILING PLAN

DWD_AA_WD_RCP_03

4

FLOOR FINISH PLAN

DWD_AA_WD_FFP_04

SECTIONAL DRAWINGS 5

SECTION X-X

DWD_AA_WD_SC_05

FURNITURE DETAIL 6

CHEDOK MOBILE STALL – TOP VIEW & ELEVATION A

DWD_AA_WD_FD_06

7

CHEDOK MOBILE STALL – SECTION Y-Y

DWD_AA_WD_FD_06A

8

CHEDOK MOBILE STALL – DETAIL 1

DWD_AA_WD_FD_06B

9

CHEDOK MOBILE STALL – ISOMETRIC VIEW

DWD_AA_WD_FD_06C

10

CHEDOK MOBILE STALL – BQ

11

CHEDOK MOBILE STALL – WATER SUPPLY SINGLE LINE DIAGRAM

DWD_AA_WD_FD_06D – DWD_AA_WD_FD_06F

DWD_AA_WD_FD_06G


NOTE :

LEGEND

DOOR LEGEND

WALL LEGEND

TO BE DEMOLISHED

D1 750MM X 30MM DOUBLE SLIDING DOOR

P1 TEMPERED GLASS CURTAIN WALLS

EXISTING

D2 670MM X 40MM DOUBLE DOORS

P2 100MM (THK) PARTITION WALL

PROPOSAL

D3 1000MM X 30MM SINGLE DOOR

P3 50MM (THK) WIRE MESH PARTITION

A

B

1. CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS. 2. FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. 3. DISCREPENCIES OR INCONSISTENCIES IN THIS DRAWING OR BETWEEN DRAWING ARE TO BE BROUGHT TOT HE ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FUL RESPONSILBILITY FOR INCORRECT WORKS. 4. COPYRIGHT OF DESIGN SHOWN HERE ON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.

C 15100 2585

10815 3865

1700

11235

TITLE :

X EXISTING DOOR TO BE REMOVED

CHE-DOK, SPICE MARKET PROJECT AT REKASCAPE, CYBERJAYA

EXISTING DOOR TO BE REMOVED

1 P1

P2 D3

3450

1800

D3

EXISTING DOOR TO BE REMOVED

P1

P3

P3

P3

ARCHITECT: DTLM Architects 19, Jalan SS 15/4c, Ss 15, 47500 Subang Jaya, Selangor

P3

3300

D1

CHE-DOK MARKET

P1

P2

EXISTING DOOR TO BE REMOVED

P3

P3

P3

Macdrex M&E Engineer BLK-B-G-27, Kompleks Suria Kinrara, Persiaran Kinrara Seksyen 3, Taman Kinrara, 47100 Puchong, Selangor

INTERIOR DESIGNER:

P3

P1

1800

3450

6900

M&E ENGINEER :

STUDIO + WORKS Centrio Pantai Hillpark, Jalan Pantai Murni, 59200 Kuala Lumpur

D2 P1

P1

D3

2

DRAWING TITLE : SETTING OUT PLAN

X

EXISTING CURTAIN WALL TO BE REMOVED

DRAWN BY : ST SETTING OUT PLAN GF SCALE 1:75

ATIQAH

CHECKED BY :

MS. NORJI

DATE :

27/11/2020

DRAWING REV : DRAWING NO : DWG_WD_AA_ST_01


LOOSE FURNITURE LEGEND SYM.

LF1

LF2

DESCRIPTION

QUANTITY

3945MM(L)X1650MM(W)X2500MM(H) STALL STAND C/W ONE OVERHANG WIREMESH CABINET AND ONE LOW CABINET WIREMESH CABINET IN BLACK MATTE PAINT FIN. 2585MM(L)X1850MM(W)X2500MM(H) STALL STAND C/W ONE OVERHANG WIREMESH CABINET, ONE LOW CABINET WIREMESH CABINET IN BLACK MATTE FIN.

SYM.

1

BF1

1

BF1a

DESCRIPTION 3945MM(L)X1650MM(W)X2500MM(H) STALL STAND C/W ONE OVERHANG WIREMESH CABINET AND ONE LOW CABINET WIREMESH CABINET IN BLACK MATTE PAINT FIN. 2585MM(L)X1850MM(W)X2500MM(H) STALL STAND C/W ONE OVERHANG WIREMESH CABINET, ONE LOW CABINET WIREMESH CABINET IN BLACK MATTE FIN. 2535MM(L)X1850MM(W)X2500MM(H) STALL STAND C/W ONE OVERHANG WIREMESH CABINET AND ONE LOW CABINET WIREMESH CABINET IN BLACK MATTE PAINT FIN.

BF1b

2485MM(L)X1850MM(W)X2500MM(H) STALL STAND C/W ONE OVERHANG WIREMESH CABINET, ONE LOW CABINET WIREMESH CABINET IN BLACK MATTE FIN.

BF1c

2535MM(L)X1850MM(W)X2500MM(H) STALL STAND C/W ONE OVERHANG WIREMESH CABINET, ONE LOW CABINET WIREMESH CABINET AND ONE SEATING UNIT IN BLACK MATTE FIN.

BF1d

A

NOTE :

BUILT-IN FURNITURE LEGEND

B

C

QUANTITY

1

1

1

1

1

1. CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS. 2. FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. 3. DISCREPENCIES OR INCONSISTENCIES IN THIS DRAWING OR BETWEEN DRAWING ARE TO BE BROUGHT TOT HE ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FUL RESPONSILBILITY FOR INCORRECT WORKS. 4. COPYRIGHT OF DESIGN SHOWN HERE ON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.

TITLE : CHE-DOK, SPICE MARKET PROJECT AT REKASCAPE, CYBERJAYA

15100 2585

10815 3865

1700

ARCHITECT:

11235

DTLM Architects 19, Jalan SS 15/4c, Ss 15, 47500 Subang Jaya, Selangor

X

LF1

1435

1825

BF1a

910 200

3450

2450

1800

1400

1

BF1

BF1b

BF1b

BF1c

200

STUDIO + WORKS Centrio Pantai Hillpark, Jalan Pantai Murni, 59200 Kuala Lumpur

LF2

1010

1550

1600

DRAWING TITLE :

1400

1800

2400

CHE-DOK MARKET 3450

Macdrex M&E Engineer BLK-B-G-27, Kompleks Suria Kinrara, Persiaran Kinrara Seksyen 3, Taman Kinrara, 47100 Puchong, Selangor

INTERIOR DESIGNER:

2750

3300

6900

1000

1425

1170

M&E ENGINEER :

FURNITURE LAYOUT PLAN

2

X

FLP FURNITURE LAYOUT PLAN GF SCALE 1:75

DRAWN BY :

ATIQAH

CHECKED BY :

MS. NORJI

DATE :

27/11/2020

DRAWING REV : DRAWING NO : DWG_WD_AA_FLP_02


A

B

C 14800

1485

2940

4800

2730

2015

830

1

1230

840

EXIT

1680

185 2550

F

600

840

1340

260

600

E

3890

3865

3990

1310

2450

1800

EXIT 2220

150

E

E 1900

1790

6600

1500

E VOID

MARKET SPACE 810

185

CH : 2700MM 3890

3865

3990

1310

1630

1230 2200

600

F

1450 840

2330

930

1350

1670

1200

260

1340

2600

2550

1800

E

BARE CONCRETE CEILING IN POLISHED FIN.

2200

F

EXIT

2

RCP GF

REFLECTED CEILING PLAN SCALE 1:50

NOTE : 1. CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS. 2. FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. 3. DISCREPENCIES OR INCONSISTENCIES IN THIS DRAWING OR BETWEEN DRAWING ARE TO BE BROUGHT TO THE ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FUL RESPONSILBILITY FOR INCORRECT WORKS. 4. COPYRIGHT OF DESIGN SHOWN HERE ON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.

TITLE :

LEGEND SYMBOL

DESCRIPTION

QUANTITY

SELECTED 1000MM(L) X 100MM(W) FLUORESCENT LIGHT

8

SELECTED 150MM(rad) DOWNLIGHT

5

SELECTED 1000MM(L) X 100MM(W) SPOT LIGHT C/W 5 LIGHT BULBS

12

M&E ENGINEER: ARCHITECT:

SYMBOL

EXIT

E

DESCRIPTION

QUANTITY

CASSETTE AIR-COND

6

GREEN FACE LUMINOUS EXIT SIGN

3

EMERGENCY LIGHT UNIT C/W 2 ADJUSTABLE 5.4 WATTS TUNGSTEN LAMPS

INTERIOR DESIGNER:

CHE-DOK, SPICE MARKET PROJECT AT REKASCAPE, CYBERJAYA

SYMBOL F

DESCRIPTION FIRE ALARM

8

WATER SPRINKLER

3

5

DRAWING TITLE : REFLECTED CEILING PLAN

ANGKASA CONSULTING SERVICES SDN BHD 49, Jalan USJ 10/1a, Taipan 47620 Subang Jaya, Selangor

DTLM Architects 19, Jalan SS 15/4c, Ss 15, 47500 Subang Jaya, Selangor

STUDIO + WORKS Centrio Pantai Hillpark, Jalan Pantai Murni, 59200 Kuala Lumpur

QUANTITY

DRAWN BY : CHECKED BY : DATE : DRAWING NO : DWG_WD_AA_RCP_03

ATIQAH ATIQAH

MS. NORJI 27/11/2020


NOTE : LEGEND SYMBOL

A

B

C

15100 10815

2585

X

1700

DESCRIPTION

AREA (m²)

CONCRETE FLOORING IN POLISHED FIN.

79,765.5

CONCRETE FLOORING IN MATTE TEAL PAINT FIN.

14,584

PLYWOOD BASE C/W GREEN VELVET FABRIC COVERING

785.5

1. CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS. 2. FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. 3. DISCREPENCIES OR INCONSISTENCIES IN THIS DRAWING OR BETWEEN DRAWING ARE TO BE BROUGHT TOT HE ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FUL RESPONSILBILITY FOR INCORRECT WORKS. 4. COPYRIGHT OF DESIGN SHOWN HERE ON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.

TITLE :

1

3450

1800

CHE-DOK, SPICE MARKET PROJECT AT REKASCAPE, CYBERJAYA

DTLM Architects 19, Jalan SS 15/4c, Ss 15, 47500 Subang Jaya, Selangor

3300

517500

ARCHITECT:

M&E ENGINEER :

1800

3450

Macdrex M&E Engineer BLK-B-G-27, Kompleks Suria Kinrara, Persiaran Kinrara Seksyen 3, Taman Kinrara, 47100 Puchong, Selangor

INTERIOR DESIGNER:

2

STUDIO + WORKS Centrio Pantai Hillpark, Jalan Pantai Murni, 59200 Kuala Lumpur

X

DRAWING TITLE : FLOOR FINISH PLAN

FFP FLOOR FINISH PLAN GF SCALE 1:75

DRAWN BY :

ATIQAH

CHECKED BY :

MS. NORJI

DATE :

27/11/2020

DRAWING REV : DRAWING NO : DWG_WD_AA_FFP_04


NOTE : A

B

6750

D

C

2250

6750

ROOF LVL

METAL DECK ROOFING SHEET AT 20° PITCH W CONCEALED GUTTER

4990

STEEL ROOF TRUSS IN MATTE BLACK PAINT FIN.

1. CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS. 2. FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. 3. DISCREPENCIES OR INCONSISTENCIES IN THIS DRAWING OR BETWEEN DRAWING ARE TO BE BROUGHT TOT HE ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FUL RESPONSILBILITY FOR INCORRECT WORKS. 4. COPYRIGHT OF DESIGN SHOWN HERE ON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.

TITLE : BLACK PERFORATED METAL DROPPED CEILING IN POLISHED FIN.

CHE-DOK, SPICE MARKET PROJECT AT REKASCAPE, CYBERJAYA

INTERIOR DESIGNER:

MEZZANINE FL. LVL

2940

CURTAIN WALLS WITH BLACK METAL PANELS AND GREY GLASS WINDOW

STUDIO + WORKS Centrio Pantai Hillpark, Jalan Pantai Murni, 59200 Kuala Lumpur

M&E ENGINEER: ANGKASA CONSULTING SERVICES SDN BHD 49, Jalan USJ 10/1a, Taipan Business Centre, 47620 Subang Jaya, Selangor

CONCRETE FLOORING W WHITE CERAMIC MOSAIC TILES W BLACK GROUT IN GLOSSY FIN.

FIRST FL. LVL

3375

BARE CONCRETE CEILING IN MATTE FIN.

ARCHITECT: DTLM Architects 19, Jalan SS 15/4c, Ss 15, 47500 Subang Jaya, Selangor

CONCRETE WALL W PALE YELLOW MOSAIC TILES IN GLOSSY FIN.

DRAWING TITLE : GROUND FL. LVL

SECTION X-X CHE-DOK MARKET BARE CONCRETE FLOORING W TEAL PAINT FIN. LINES FOR DIRECTIONAL PURPOSES AS PER DESIGNER'S SPECIFICATION

SC X

SECTION X-X SCALE 1: 50

CURTAIN WALLS WITH BLACK METAL PANELS AND GREY GLASS WINDOWS

DRAWN BY :

ATIQAH

CHECKED BY :

MS. NORJI

DATE :

27/11//2020

DRAWING REV : DRAWING NO : DWD_WD_AA_SC_05


NOTE : 2030 735

1200

95

W01 1045MM(L) X 160MM(W) X 15MM(THK) SEL. PLYWOOD IN BLACK PAINT FIN.

80

W02

540

700

Y

PC01

AL01

80

70MM(RAD) X 350MM(HT) SEL. CYLINDRICAL POLYCARBONATE TUBE C/W BLACK ALUMINIUM TUBE HOLDER

W03

A

1

W16

W04

735MM(L) X 480MM (W) X30MM(THK) SEL. PLYWOOD FLEXIBLE COUNTER BASE C/W SEL. PLYWOOD FRAMES OF WIRE MESH IN CHROME FIN.

TOP VIEW SCALE 1:20

TITLE : SPICE MOBILE STALL AT CHE-DOK, SPICE MARKET PROJECT AT REKASCAPE, CYBERJAYA

W04 SEL. WIRE MESH C/W SEL. PLYWOOD FRAMING IN CHROME FIN.

2040 100

1200

660

INTERIOR DESIGNER: STUDIO + WORKS Centrio Pantai Hillpark, Jalan Pantai Murni, 59200 Kuala Lumpur

40 PC02

CONTRACTOR : ANGKASA CONSULTING SERVICES SDN BHD 49, Jalan USJ 10/1a, Taipan Business Centre, 47620 Subang Jaya, Selangor

200

245

1200MM (L) X 780MM(W) SEL. TEAL POLYCARBONATE EXTENDABLE ROOF IN GLOSSY FIN.

PC01

AL01

795

1240

70MM(RAD) X 350MM(HT) SEL. CYLINDRICAL POLYCARBONATE TUBE C/W BLACK ALUMINIUM TUBE HOLDER

W03

W16

ARCHITECT: DTLM Architects 19, Jalan SS 15/4c, Ss 15, 47500 Subang Jaya, Selangor

W04

735MM(L) X 480MM (W) X30MM(THK) SEL. PLYWOOD FLEXIBLE COUNTER BASE C/W SEL. PLYWOOD FRAMES OF WIRE MESH IN CHROME FIN.

2220

M02

DRAWING TITLE : TOP VIEW ELEVATION A

825

20MM (dia) MILD STEEL SQUARE HOLLOW SECTION IN CHROME FIN.

DRAWN BY : 150

980

780

Y

595MM(L) X 160MM(W) X15MM(THK) SEL. PLYWOOD SHELF IN TEAL PAINT FIN.

1. CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS. 2. FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. 3. DISCREPENCIES OR INCONSISTENCIES IN THIS DRAWING OR BETWEEN DRAWING ARE TO BE BROUGHT TOT HE ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FUL RESPONSILBILITY FOR INCORRECT WORKS. 4. COPYRIGHT OF DESIGN SHOWN HERE ON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.

M01 320MM(L) X180MM(W) SEL. ZINC DRAWER IN CHROME FIN. C/W BLACK STEEL HANDLE

EL ELEVATION A A SCALE 1:20

ATIQAH

CHECKED BY :

MS. NORJI

DATE :

27/11/2020

DRAWING REV : DRAWING NO : DWG_WD_AA_FD_06


NOTE : 2040 100

1200

700

40

245

PC02

200

1200MM (L) X 780MM(W) SEL. TEAL POLYCARBONATE SEM. EXTENDABLE ROOF IN GLOSSY FIN.

PC01

AL01

1240

70MM(RAD) X 350MM(HT) SEL. CYLINDRICAL POLYCARBONATE TUBE C/W BLACK ALUMINIUM TUBE HOLDER

W03

W16

W04

795

735MM(L) X 480MM (W) X30MM(THK) SEL. PLYWOOD FLEXIBLE COUNTER BASE C/W SEL. PLYWOOD FRAMES OF WIRE MESH IN CHROME FIN.

1. CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS. 2. FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. 3. DISCREPENCIES OR INCONSISTENCIES IN THIS DRAWING OR BETWEEN DRAWING ARE TO BE BROUGHT TOT HE ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FUL RESPONSILBILITY FOR INCORRECT WORKS. 4. COPYRIGHT OF DESIGN SHOWN HERE ON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.

TITLE : SPICE MOBILE STALL AT CHE-DOK, SPICE MARKET PROJECT AT REKASCAPE, CYBERJAYA

INTERIOR DESIGNER:

2220

STUDIO + WORKS Centrio Pantai Hillpark, Jalan Pantai Murni, 59200 Kuala Lumpur

CONTRACTOR :

210

ANGKASA CONSULTING SERVICES SDN BHD 49, Jalan USJ 10/1a, Taipan Business Centre, 47620 Subang Jaya, Selangor

M02

615

DRAWER RUNNER

DTLM Architects 19, Jalan SS 15/4c, Ss 15, 47500 Subang Jaya, Selangor

DRAWING TITLE : SECTION Y-Y

WATER WASTE TANK

DRAWN BY : 150

980

DETAIL 1

ARCHITECT:

20MM (dia) SEL. MILD STEEL SQUARE HOLLOW SECTION IN CHROME FIN.

SEC SECTION Y-Y Y SCALE 1:10

HEAVY DUTY CASTER WHEELS

ATIQAH

CHECKED BY :

MS. NORJI

DATE :

27/11/2020

DRAWING REV : DRAWING NO : DWG_WD_AA_FD_06A


NOTE :

100 70

1. CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS. 2. FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. 3. DISCREPENCIES OR INCONSISTENCIES IN THIS DRAWING OR BETWEEN DRAWING ARE TO BE BROUGHT TOT HE ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FUL RESPONSILBILITY FOR INCORRECT WORKS. 4. COPYRIGHT OF DESIGN SHOWN HERE ON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.

590 30

40

215

70

45

180

SEL. STAINLESS STEEL BASIN IN MATTE BLACK FIN. VERTICAL STALL STRUCTURE SUPPORT TO BE FIXED 70MM AWAY FROM EDGE

TITLE : SPICE MOBILE STALL AT CHE-DOK, SPICE MARKET PROJECT AT REKASCAPE, CYBERJAYA

INTERIOR DESIGNER: 35

90

55

STUDIO + WORKS Centrio Pantai Hillpark, Jalan Pantai Murni, 59200 Kuala Lumpur

W09 SEL. 1200MM (L) X 700MM (W) OSB BOARD IN CLEAR VENEER FIN. TABLE TOP FIXED TO STALL STRUCTURE BASE

CONTRACTOR : ANGKASA CONSULTING SERVICES SDN BHD 49, Jalan USJ 10/1a, Taipan Business Centre, 47620 Subang Jaya, Selangor

SEL. STAINLESS STEEL BAR HANDLE IN GLOSSY BLACK FIN.TO BE FIXED 55MM FROM THE TABLE TOP

ARCHITECT: DTLM Architects 19, Jalan SS 15/4c, Ss 15, 47500 Subang Jaya, Selangor

SEL. GREY PVC PIPE TO CONNECT BASIN HOLE TO WASTE WATER COLLECTION CONTAINER

DRAWING TITLE : DETAIL 1

DT 1

DETAIL 1 SCALE 1:5

DRAWN BY :

ATIQAH

CHECKED BY :

MS. NORJI

DATE :

27/11/2020

DRAWING REV : DRAWING NO : DWG_WD_AA_FD_06B


NOTE : 1. CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS. 2. FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. 3. DISCREPENCIES OR INCONSISTENCIES IN THIS DRAWING OR BETWEEN DRAWING ARE TO BE BROUGHT TOT HE ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FUL RESPONSILBILITY FOR INCORRECT WORKS. 4. COPYRIGHT OF DESIGN SHOWN HERE ON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.

TITLE : SPICE MOBILE STALL AT CHE-DOK, SPICE MARKET PROJECT AT REKASCAPE, CYBERJAYA

INTERIOR DESIGNER: STUDIO + WORKS Centrio Pantai Hillpark, Jalan Pantai Murni, 59200 Kuala Lumpur

CONTRACTOR : ANGKASA CONSULTING SERVICES SDN BHD 49, Jalan USJ 10/1a, Taipan Business Centre, 47620 Subang Jaya, Selangor

ARCHITECT: DTLM Architects 19, Jalan SS 15/4c, Ss 15, 47500 Subang Jaya, Selangor

DRAWING TITLE : ISOMETRIC VIEW

3D

ISOMETRIC VIEW NOT TO SCALE

DRAWN BY :

ATIQAH

CHECKED BY :

MS. NORJI

DATE :

27/11/2020

DRAWING REV : DRAWING NO : DWG_WD_AA_FD_06C


NOTE : 1. CONTRACTOR TO VERIFY ALL DIMENSION ON SITE BEFORE COMMENCING WORKS. 2. FIGURED DIMENSIONS GIVEN ARE TO BE TAKEN IN PREFERENCE TO SCALING. 3. DISCREPENCIES OR INCONSISTENCIES IN THIS DRAWING OR BETWEEN DRAWING ARE TO BE BROUGHT TOT HE ATTENTION IMMEDIATELY. OTHERWISE THE CONTRACTOR SHALL BEAR FUL RESPONSILBILITY FOR INCORRECT WORKS. 4. COPYRIGHT OF DESIGN SHOWN HERE ON IS RETAINED. AUTHORITY IS REQUIRED FOR ANY REPRODUCTION.

TITLE :

WATER TANK

RF

CHE-DOK, SPICE MARKET PROJECT AT REKASCAPE, CYBERJAYA

ARCHITECT: DTLM Architects 19, Jalan SS 15/4c, Ss 15, 47500 Subang Jaya, Selangor

FRESH HERB GARDEN SPRINKLER

MERKET4ALL BASIN

1F

GILING COUNTER BASIN

FRESH HERB GARDEN DRAIN

STRUCTURAL ENGINEER : Macdrex M&E Engineer BLK-B-G-27, Kompleks Suria Kinrara, Persiaran Kinrara Seksyen 3, Taman Kinrara, 47100 Puchong, Selangor

GF

MAIN PIPE

INTERIOR DESIGNER: E-MART BASIN

KAKI STALL BASIN

SKRUB STALL BASIN

LIPS&FACE STALL BASIN

STUDIO + WORKS Centrio Pantai Hillpark, Jalan Pantai Murni, 59200 Kuala Lumpur

MAN HOLE

DRAWING TITLE : WATER SUPPLY SINGLE LINE DRAWING

LEGEND WATER PUMP VALVE WATER INLET PIPE

DRAWN BY :

ATIQAH

WATER OUTLET PIPE

CHECKED BY :

MS. NORJI

DATE :

27/11/2020

DRAWING REV : DRAWING NO : DWG_WD_AA_WS_06G


UBBL involved

39. Natural lighting and ventilation

172. Emergency exit signs.

Every room designed, adapted or used for residential, business or other purposes except hospitals and schools shall be provided with natural lighting and natural ventilation by means of one or more windows having a total area of not less than 10% of the clear floor area of such room and shall have openings capable of allowing free uninterrupted passage of air of not less than 5% of such floor area

1) Storey ecits and access to such exitsshall be marked by readily signs and shall not be obscured by any decoration, furnishing or other equipment.

3) Every exit sign shall have the word "KELUAR" in plainly legible letters not less than 150mm high with the principle strokes of the lettersnot less than 18mm wide. The lettering shall be in red against a black background.

4) All exit signs shall be illuminated continuously during periods of occupancy.

96. Non load bearing partition.

Every non load-bearing partition adequately restrained or buttressed.

2) A sign reading "KELUAR" with an arrow indicating the direction shall be placed in every location where the directionof travel to reacch the nearest exit is not immediately apparent.

shall

be

5) Illuminated signs shall be provided with two electric lamps of not less than fifteen watts each.

225. Automatic system for hazardous fire.

228. Sprinkler valves

Where hazardous processes, storage or occupancy are of such character as to require automatic sprinklers or other automatic extinguishing system, it shall be of a type and standard appropriate to extinguish fires in the hazardous materials stored or handled or for the safety of the occupants.

1) Sprinklers valves shall be located in a safe and enclosed position on the exterior wall and shall be readily accessible to the Fire Authority. 2) All sprinkler systems shall be eletricity connected to the nearest fire station to provide immediate and automatic relay of the alarm when activated.


REFLECTION In my opinion, this final assignment has really given me a glimpse of what I will be doing in the industry most of the time. Compared to the previous assignments, this last one has opened my eyes to really think of external factors that I should be aware of while producing Working Drawings. I now understand that we as Interior Designers have to becareful and mindful of what is presented in the drawings. Which detail is important and whichis best notshown and should be passed to other 'experts'. Besides that, I also learned that some parts of the Building by-law should be at the back of our minds so that designs produced does not endanger or harm the users in any way. We should not be too restricted by it but we should know the limits. I believe that this scope of knowledge will be an on-going learning process that will never end. In a nutshell, to interior designers, this module is as crucial as water for fishes!

Profile for Atiqah Azam

Atiqah Azam 0328728 - Final Submission of DWD (IDS60804)  

A compilation of 3 assignments done by myself throughout the semester with guidance from Lecturers and peers. Assignment 01 - As-built dra...

Atiqah Azam 0328728 - Final Submission of DWD (IDS60804)  

A compilation of 3 assignments done by myself throughout the semester with guidance from Lecturers and peers. Assignment 01 - As-built dra...