Adam Kor's Portfolio

Page 9

Construction & Installation After finalizing the design, we began constructing the Hoop House. From experimenting with the material to optimizing the assembly methods, we modified the design by trial and error and eventually installed the final product on site.

We learned to adhere the plastic sheet to the frame by ironing the seams

We began to manually bend aluminum conduits

However, shrink wrapping the plastic caused the frame to deform

So we improvised and added support elements to counter the tension

Finished frames were stacked and transported on site

We assembled the greenhouse on site

9


Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.