About Me. Growing up in Louisiana, I was surrounded by historical architecture from all different periods in time—Spanish Colonial New Orleans, Acadian Plantation Homes, and historical “Charpentier” homes just to name a few. I am fortunate enough to have traveled growing up, and was always attracted to the role architecture played in creating a sense of ‘place’ wherever we went. I decided to study architecture as a way to combine my interests in math and art with my family-instilled passion for traveling and history. I moved to Baton Rouge to attend LSU and worked as an architectural intern during my time as a student from my third year on. The summer before my final year, I attended the College of Art & Design Rome Program and spent the summer studying architecture in and around Rome, Italy. Upon arriving home, I spent the fall working for a local architecture firm before returning to LSU to graduate in the spring of 2014 with a Bachelor of Architecture and minor in Architectural History. After continuing to work for a year after graduation, I moved to New York to broaden my architectural experience. For nearly the past three years I’ve managed projects at a high end residential architecture firm renovating apartments and townhouses throughout the city.


West End Avenue Full Renovation Platt Dana Architects | Completed December 2016 Principal | Hope Dana Contractor | A.L.L. Construction and Design, Inc. Decorator | Nokta Studio Location | Upper West Side, New York, NY

This project involved the gut renovation of a 7th Floor, corner-unit, 2100 SF apartment. The floor plan layout was re-configured to

suit the family’s lifestyle, with an open Kitchen / Dining Room along with a reading nook separate from a formal Living Room. Image Left. Entry Foyer Image Center. Living Room Image Right. Powder Room (off Study) Drawing. Construction Plan

WEST END AVENUE | Full Renovation


4|5


WEST END AVENUE | Full Renovation


New sub-flooring, finish flooring and interior finishes were installed throughout, as well as new Kitchen/Dryer exhausts and PTAC mechanical units beneath existing windows. The latter involved coordination with the Landmarks Preservation Commission for approval of exterior penetrations along 85th street and prominent West End Avenue. New electrical and plumbing fixtures were installed throughout including a Lutron Casseta lighting system, extensive AV

networking, and an electric heated floor at the Master Bath. Platt Dana Architects specified all new finishes iand designed new custom millwork including enclosures at all PTAC units, Kids’/Master Bath Vanites, Master Closet cabinetry, Kitchen cabinetry, Living Room bookcases, and Powder Room paneling.

I took over Construction Administration on the project as the rough framing was being completed. My tasks involved visiting the site weekly to review progress and provide additional drawings for clarification as needed in addition to general coordination items between the contractor and client. I also handled the review of all fixture, equipment, and finish submittals; millwork shop drawings; and change orders/ payment applications from the contractor.

Images Left. Kitchen Images Center. Master Bath Image Right. KIds’ Bath Drawings. Kitchen Elevations

6|7


West 77th Street Penthouse Partial Renovation Platt Dana Architects | Completed January 2017 Principal | Hope Dana Contractor | Trieste Corp Location | Upper West Side, New York, NY

Left. Floor Plan Top. Kitchen Elevations

WEST 77TH STREET PENTHOUSE | Partial Renovation


Bottom Left. Kitchen North Bottom Middle. Kitchen South Bottom Right. Kitchen West

This project at West 77th Street involved the installation of a new central air conditioning system throughout the 2500 SF penthouse apartment. Minimizing the dropped ceilings as necessary was a key priority. The Kitchen was completely renovated and updated with new cabinetry, appliances, and range/dryer exhaust; the Maids’ Room and Bathroom were refinished as well. New millwork was installed in the Dining Room and upstairs Family Room to conceal new floor standing AHU’s. I worked on the project from start to finish, coordinating all necessary Building and DOB approvals and preparing all drawings for construction. Throughout construction I visited the site weekly, preparing meeting minutes and reviewing all shop drawings and submittals.

8|9


A

Northeast Harbor Vacation Home New Construction

+/- 18' +/- 18'-0" PLATE PLATE HT

Platt Dana Architects | Construction beginning Fall 2018 Principal | Hope Dana Location | Northeast Harbor, Maine

USE MOLD-RESISTANT GYP. AT RANGE/ SINK WALL IN KITCHEN AS REQUIRED 19'-3" W-15 W-14 6" 6"

3:12

W-34 4'-0"

4'-0"

A-501

3'-5 1/2"

3'-3"

8 +/- 7'-10" PLATE HT

PROVIDE BLOCKING FOR OWNER-SUPPLIED BATH ACCESSORIES

18 5 3/4 6 2

11'-1"

22'-6"

+/- 10'-0" 2ND FFL +/- 9'-0" CLG

2 A401 10'-4"

3'-6"

10 5'-6"

1-05

5'-3"

W-21 5'-2"

3'-3" W-26 2'-6"

BATHROOM 2

Stall S

6'-5" W-25 2'-2 1/2"

1. 3. 4. 5.

A-502

10'-3"

ALL EL PLAST ALL DR CLEAN DRYER EXTER

A 4" M FINISH SHOW CONN REFER A WAT SHOW

PROVIDE BLOCKING FOR OWNER-SUPPLIED BATH ACCESSORIES

BEDROOM 2

5 A402

6'-4"

6'-4"

6'-4" 2'-10"

W-24 11'-4"

4 A402

W-08 11'-4"

04

18'-3"

18'-3"

17'-6" 4 A402

12'-8"

2'-10"

W-07

DRY STONE KNEE WALL

1. 2. 3.

STUDY

2-06

SCALE: 1/4"=1'-0"

3'-6"

2-05

Dryer

13

1-07

PROVIDE ALLOWANCE FOR WOOD PERGOLA

FIRST FLOOR PLAN

6'-9"

11

HEAT GLO EXCLAIM WOOD FIREPLACE-42 WOOD-BURNING FIREPLACE WITH FLUE

10 11 9 8

12 2'-6"

CONNE

LINE OF CRAWL SPACE 4. FOUNDATION BEYOND

PROVIDE BLOCKING FOR OWNER-SUPPLIED BATH ACCESSORIES

HALLWAY

EXTERIOR HOSE BIB, COORDINATE LOCATION WITH ARCHITECT

1

3'-6"

W-20

A-502 10'-3"

3'-6"

BATHROOM 1

SCALE: 1/4"=1'-0"

NORTHEAST HARBOR VACATION HOME | New Construction

2

15'-6"

SECOND FLOOR PLAN SCALE: 1/4"=1'-0"

1 A401

+/- 7'-10" PLATE HT

PROVIDE BLOCKING FOR OWNER-SUPPLIED WALL HOOKS

12'-8" W-23

15'-6" 1 A401

ALT

+/- 18'-0" PLATE HT

LINE OF ROOF PEAK ABOVE, TYP. 6'-4"

21'-11"

1-06

14 15 13 12

14 NORTH ELEVATION DN

17'-6"

11'-2"

3

W-22

03

W-09 2'-2 1/2"

0'-0" 1ST FFL

CLOSET

PROVIDE POWER HALLWAY 2-03 FOR FIXTURES BY OWNER

2'-6"

2'-6"

09

6'-5"

22

5'-0"

W-06 3'-3"

08

3'-3"

N

W-28 4'-9"

15

LINE OF ROOF PEAK ABOVE, TYP. EQ

ADJUSTABLE SHELVING AT CLOSETS

2-03A 21

W-19

4'-9"

USE MOLD-RESISTANT GYP. AT STAIR WALLS

EQ

CLOSET

W-27 15'-3"

STAIR

WATER THE VA WATER MACH ENCLO

4.

5'-0"

1-04A

-1'-2" 1ST FFL

14'-8"

A-502

2-03B

BEDROOM 1

PROVIDE BLOCKING FOR OWNER-SUPPLIED WALL HOOKS

15'-3"

4'-9" 16'-0" W-05

16

2-04 LIVING

1-04

2.

WASH MIN DI WATER AND B SENSO 6. LEAK S IN CUR WATER CEDAR TRIM AT EDGES, DEDIC TYP. (FINISH TBD) 7. WASH 0'-0" 1ST FFL REINFO THE H A LEAK

4'-9"

3'-3" W-04

3'-3 1/2"

3 2 4 5

2'-0"

3 A402

UP

ALL PL BE FIR REQU

5.

4'-3" W-10 2'-4 1/2"

ALIGN 3 A402

4.

1.

+/- 10'-0" 2ND FFL +/- 9'-0" CLG

A-502

17

2.

Washi

W-29

14'-6"

3'-6" 12

MASTER BATH

2 A400

MUDROOM

1-03 4'-3" W-10 2'-4 1/2"

07

3'-4 1/2" W-17

2-02

G)

8

19

7'-9 1/2"

1 A402

CUSTOM MILLWORK @ MUDROOM

A-502

F) +/- 18'-0" PLATE HT

8'-0"

W-03

3 4 5

E)

CUSTOM MILLWORK @ CLOSET

+/- 18'-0" PLATE HT

38'-6" 6'-6" W-18

2

9 6 7

A-501

MASTER BED

2 A401

8'-0"

8

8

7'-6"

7'-6"

W-16

2-01

6'-0"

7'-6" CUSTOM MILLWORK @ DINING ROOM

7

LINE OF ROOF PEAK ABOVE, TYP.

3 A401

D)

2-01A MASTER CLOSET

SCALE: 1/4"=1'-0"

USE MOLD-RESISTANT GYP. AROUND WASHER/DRYER

05

7'-2 1/2"

GARAGE FLOOR PLAN

EXTERIOR HOSE BIB, COORDINATE LOCATION WITH ARCHITECT

W-02

7'-6"

11'-6"

7'-6" 02

3:12

PROVIDE BLOCKING FOR OWNER-SUPPLIED WALL HOOKS

1 A402

NEW W A) B)

2'-9"

C)

3

W/D

Gener

5'-6" W-30

2'-9"

15'-0"

CUSTOM MILLWORK @ MUDROOM

DINING

5/8 MOLD-RESIS OR LINECEME OF WHERE FOUNDA

1. 19'-3"

12'-0" W-31

W-32

15'-0"

A-500

20

30'-0"

2 3 4

06

2 A400

3 5/8" (5 1/2" A METAL STUD WITH SOUN

LINE OF CRAWL SPACE FOUNDATION BEYOND

A-400 EXTERIOR ELEVATIONS

EXPOSED CONCRETE SLAB

3'-0"

PANTRY

LINE OF BREAK IN CEILING ABOVE 7'-6"

14'-3"

36" REF/ FRZ

7"

7'-6"

7"

1-02

2 A402

W-12 W-11

6"

5 A402

W-33

4'-0 1/2" 7'-6"

W-01

30" GAS RANGE (WALL HOOD ABOVE)

5

0'-0" 0'-0"TYPIC 1ST F 1ST FFL

5/8 MOLD-RESIS OR CEME WHERE

1 A400

W-13

24" DW

01

5/8 MOLD-RESIS OR CEME WHERE

Top Left. Site Photos Bottom Left. 1st and 2nd Floor Plans Top Right. Building Sections Bottom Right. Exterior Elevations

CUSTOM MILLWORK @ KITCHEN

1 A400

KITCHEN

1-01

2X6 FRAM O.C. R CELL I

21

23'-0"

2 A402

2X6 COLUMNS, 1X CEDAR-WRAPPED

TYPIC

+/- 10' +/- 10'-0" S 2ND F 2ND FFL WATERPR +/- 9'-0 +/9'-0" CLG CLGEXTER

GARAGE

0-01

EXTERIOR HOSE BIB, COORDINATE LOCATION WITH ARCHITECT

Typica 3 A400

+/- 10'-0" 2ND FFL +/- 9'-0" CLG

3


A-400 EXTERIOR ELEVATIONS

General Elevati

LINE OF BASEMENT FOUNDATION BEYOND

HALLWAY

2 A402

2 A402

8

6"

7'-6"

DINING

STUDY

1-07

6"

LIVING

1-04

8'-0"

1-02

+/- 7'-10" PLATE HT

3

+/- 13'-9 1/2"

12

8'-0" +/- 9'-1"

+/- 9'-1"

KITCHEN

3'-6"

0-01

W-15

02

5" CEMENT BOARDS AT BASE OF HOUSE/TOP OF FOUNDATION WALL

GARAGE

SCALE: 1/4"=1'-0"

GAS TANK, BOILER & WATER HEATER AT BASEMENT (SEE A-201 FOR MODEL INFORMATION), COORDINATE LOCATIONS WITH ARCHITECT

3 A402

FIREPLACE EXTENDS 3'-0 5/32" ABOVE ROOF

SCALE: 1/4"=1'-0" COORDINATE ALL EXTERIOR VENT LOCATIONS (FOR BASEMENT/CRAWL SPACE, DRYER & RANGE EXHAUST) WITH ARCHITECT. PROVIDE ALLOWANCE FOR OUTLETS/CAPS AS REQUIRED.

1 A402

2 A402

NO.

1.

SECTION (FACING SOUTH)

LINE OF CRAWL SPACE FOUNDATION BEYOND

A-401 EXTERIOR ELEVA

4

General Elevation Notes SECTION (FACING NORTH)

LINE OF BASEMENT FOUNDATION BEYOND

1

1

DATE

SCALE: 1/4"=1'-0"

NORTH ELEVATION EXPOSED JOISTS/FOUNDATION WALLS AT BASEMENT & CRAWL SPACES, TYP. SCALE: 1/4"=1'-0"

5

PROVIDE POWER FOR FIXTURE BY OWNER OPENING IN FOUNDATION WALL TO BASEMENT BEYOND

02-16-2018

W-14

DESCRIPTION

2

W-13

MATCH WINDOW SILL HEIGHT TO W-13 - W-15

8'-0" BASEMENT

4'-0" CRAWL 4'-0" CRAWL SPACE SPACE

W-10

SECTION (FACING EAST)

2 A402

4 A402

12

8

DIPPED CEDAR SHINGLES ALT: CLAPBOARD SIDING

3

E1 W-16

12

W-19

12 8 W-20

STUDY

1-07

6"

LIVING

W-18

W-17

8'-0" +/- 9'-1"

3

+/- 9'-1" 8'-0"

3

S5

2 A403

W-22

+/- 7'-10" PLATE HT

architects

12 +/- 10'-0" 2ND FFL +/- 9'-0" CLG

plattdana

6"

W-32

6"

6"

+/- 9'-0"

BEDROOM 2

8'-0"

6"

2-06

0-01

GARAGE

5'-6"

CEDAR TRIM AROUND DOORS & WINDOWS, TYP. (FINISH TBD)

5 A402 12

7'-6" +/- 8'-1"

+/- 18'-0" PLATE HT

+/- 13'-9 1/2"

6"

E2

80 fifth avenue, eleventh floor, new york, ny 10011 tel 646 336 6270 fax 646 336 6271

+/- 12'-10"

8 DIPPED CEDAR SHINGLES ALT: ARCHITECTURAL SHINGLES

6"

W-31

4'-0" CRAWL SPACE

-1'-2" 1ST FFL

02

W-33

PROVIDE POWER FOR FIXTURE BY OWNER

Northeast Harbor, Maine 04662

13 home in Northeast Harbor, Maine. I worked

EXPOSED JOISTS/FOUNDATION WALLS AT BASEMENT & CRAWL SPACES, TYP.

1 A402

3 A402

Construction Plan 1/4" = 1'-0"

29-31 Neighborhood Road

Drayton Residence

closely with principal, Hope Dana, and the clients throughout schematic design to develop a house to suit the clients’ goals. Positioned on the eastern, highest portion of the site, the primary spaces of the house focus West towards the extensive landscaping and down towards nearby A-200.00 Gilpatrick Cove. The main entrance to the E1

Scale as Noted

W-17

Project No. 16.08

W-18

01

W-02

W-03

5" CEMENT BOARDS AT BASE OF PORCH

WEST ELEVATION LINE OF BASEMENT

W-19

SECTION (FACING NORTH)

FOUNDATION BEYOND

SCALE: 1/4"=1'-0"

SCALE: 1/4"=1'-0"

4 A402

W-20

W-22

S5

W-04

W-05

OPENING IN FOUNDATION WALL TO BASEMENT BEYOND

house is situated alongside a garden path 2 4 leading up to the porch which, along with the Dining and Living Room, focuses out towards the landscaped site. Circulation paths and Utility/Storage areas are situated on the less desirable Eastern side of the house. The first floor Study and Living Room open out onto a deck with a southwest exposure for enjoying the summer sunsets. The Kitchen features Northeast corner FIREPLACE EXTENDS 3'-0 5/32" ABOVE ROOF

PDA was contacted to design a vacation

Shower Notes

NORTH MINIMUM CURB SHALLELEVATION BE INSTALLED, MEASURED FROM THE SECTION (FACINGASSOUTH) HED INTERIOR FLOOR OF THE SHOWER TO THE TOP OF THE CURB. SCALE: 1/4"=1'-0" SCALE: 1/4"=1'-0" WER WASTE CONNECTIONS SHALL BE LEADED. BOLTED & HUB NECTIONS NOT PERMITTED. R TO SHOWER DRAIN MANUFACTURER INSTALLATION METHODS. TERPROOFING MEMBRANE SHALL EXTEND TO THE CEILING AT WER & BATH ENCLOSURES, SEE FLOORING DETAIL ON A-201.

W-01

W-06 STONE CAP @ FIREPLACE, SEE FINISH SCHEDULE

5

DRY STONE KNEE WALL

S4

SECTION (FACING SOUTH) SCALE: 1/4"=1'-0"

PROVIDE POWER FOR FIXTURE BY OWNER

04 PROVIDE ALLOWANCE FOR WOOD PERGOLA PROVIDE ALLOWANCE FOR RAISED STONE PATIO & STEPS, SEE FINISH SCHEDULE

windows overlooking the woods to the North, one of the clients’ favorite features of the property. The upstairs Master Bedroom also takes advantage of this view along with the view to the West. A soaking tub at the Master Bath as well as two additional guest bedrooms are positioned to offer desirable views of the property. The project will begin construction early fall. arbor, Maine 04662

0'-0" 1ST FFL 8'-0" BASEMENT

-1'-2" 1ST FFL

W-16

1-01

W-09

LINE OF BASEMENT FOUNDATION BEYOND

LECTRIC DRYERS W-09 REQUIRE A DEDICATED W-10ELECTRIC CIRCUIT. W-13 W-15 W-14 TIC EXHAUST DUCTS ARE PROHIBITED. RYER EXHAUST MUST BE HARD-DUCTED, WITH AIR-TIGHT 5" CEMENT BOARDS AT BASE OF MATCH WINDOW SILL HEIGHT NOUTS. HOUSE/TOP OF FOUNDATION WALL TO W-13 - W-15 R EXHAUST DUCTWORK SHALL TERMINATE AT THE BUILDING RIOR WITH A FULL SIZED RAIN CAP.

12

W-32

6"

8'-0" BASEMENT

BEDROOM 1

2-04

ECTIONS.

3

8'-0"

+/- 9'-1" 8'-0"

+/- 8'-7"

6"

architects

+/- 14'-1"

12

RPROOFING IN LAUNDRY AREA TO EXTEND TO THE HEIGHT OF ALVE BOX. RPROOF CURBED ENCLOSURE TO ENCOMPASS BOTH THE W-30 HINE & THE DRAIN PIPE. NO DRAIN SHALL BE PROVIDED FOR THE OSURE. PAN WILL EXTEND UNDER THE VALVE BOX AND FUNNEL DRAIN

HER MUST DRAIN VIA AN INDIRECT STAND PIPE CONNECTION, 2" +/- 7'-10" IAMETER, WITH A INDIRECT TRAP CONNECTION TO WASTE STACK. PLATEHAVE HT AT LEAST A FOUR INCH RETURN RPROOF CURB/PAN MUST BE INSTALLED WITH AN AUTOMATIC EMERGENCY SHUTOFF 1-04 OR CONNECTED TO AUTOMATIC FEED LINE SHUT OFF VALVES. SENSOR TO SHUT OFF HOT & COLD WATER IF WATER BUILDS UP RBED ENCLOSURE. ALARM DEVICE WIRED TO SHUT DOWN THE R SUPPLY & EQUIPMENT IF SENSOR ACTIVATED. PROVIDE CATED OUTLET. HING MACHINE FEED LINES MUST BE STAINLESS STEEL ORCED HIGH PRESSURE HOSES WITH BACK FLOW PREVENTERS. HOSES MUST BE ORIENTED IN SUCH A WAY THAT IN THE EVENT OF K THE WATER IS DIRECTED INTO THE DRIP PAN BELOW. OPENING IN FOUNDATION WALL TO CRAWL SPACE BEYOND

80 fifth avenue, eleventh floor, new york, ny 10011 tel 646 336 6270 fax 646 336 6271

2 A402

W-25 ing Machine Notes

CEDAR TRIM AROUND DOORS & WINDOWS, TYP. (FINISH TBD)

W-31

0'-0" 1ST FFL

+/- 4'-3"

+/- 8'-1"

ALL WALLS AND CEILINGS OF SPACES CONTAINING 1212 CONDENSERS, WATER TANKS, WATER PUMPS AND/OR PRESSURE 8REDUCTION 8 VALVES MUST USE MOLD RESISTANT DRYWALL LYWOOD INSTALLATIONS FOR BACKING CABINETRY, ETC. ARE TO RE-RETARDENT TREATED PLYWOOD. UIRED INSULATION VALUES TO BE CONFIRMED BY G.C.: 6" ROOF: R49 CLOSED CELL. EXTERIOR WALLS: R20 CLOSED CELL FLOOR ABOVE CRAWL SPACE/BASEMENT: R20 CLOSED CELL.

DIPPED CEDAR SHINGLES ALT: CLAPBOARD SIDING

W-30

CEDAR TRIM AT EDGES, TYP. (FINISH TBD)

4'-0" CRAWL SPACE

NORTH ELEVATION

E2

6"

PROVIDE POWER FOR FIXTURES BY OWNER

(FACING WALL CONSTRUCTION TO COMPLY WITHSECTION 2014 BUILDING CODE: SOUTH) SCALE: 1/4"=1'-0"MUST WALLS IN ALL BATHROOMS, IF NOT USING CEMENT BOARD, SCALE: 1/4"=1'-0" USE MOLD RESISTANT DRYWALL FOR ALL PORTIONS OF WALLS WITHIN 2 FEET OF A SNK, UP TO 4 FEET HIGH. CLOSET 2-03B ALL PORTIONS OF WALLS WITHIN 2 FEET OF A KITCHEN SINK AND/OR STOVE UP TO 4 FEET HIGH MUST USE MOLD RESISTANT DRYWALL. HALLWAY 2-03 INTERIOR FACES OF EXTERIOR WALLS OF BASEMENTS, CELLARS AND OTHER BELOW GRADE ROOMS MUST USE MOLD RESISTANT DRYWALL. (NOT APPLICABLE) ALL WALLS AND CEILINGS IN LAUNDRY ROOMS MUST USE MOLD RESISTANT DRYWALL. ALL WALLS AND CEILINGS IN SERVICE SINK CLOSETS MUST USE MOLD RESISTANT DRYWALL. (NOT APPLICABLE) PORTIONS OF WALLS WITHIN 2 FEET OF A MOP/SERVICE SINK UP 12 TO 4 FEET HIGH MUST USE MOLD RESISTANT DRYWALL. (NOT 8 APPLICABLE)

DIPPED CEDAR SHINGLES T: ARCHITECTURAL SHINGLES

2-06

-1'-2" 1ST FFL

plattdana

21

ral Construction Notes

Notes

12

6"

BEDROOM 1 2-04 BEDROOM 2

2'-0"

2'-0"

5/8"

3 5/8" 4 7/8" 5/8"

1

SECTION (FACING SOUTH) *VERIFY FINISH MATERIALS WITH ELEVATIONS & FINISH SCHEDULE SCALE: 1/4"=1'-0"

33

LIVING

TO CRAWL SPACE BEYOND DESCRIPTION

8" GWB (USE STANT GWB ENT BOARD CRAWL SPACE REQUIRED) ATION BEYOND

1-04

OPENING IN FOUNDATION WALL MUDROOM

1-03

3

MASTER BATH

12

ISSUED TO G.C. FOR INITIAL PRICING

CAL INTERIOR PARTITION WALL

-1'-2" 1ST FFL

W-25

3

2-02

8

DINING

FFL

8" GWB (USE STANT GWB ENT BOARD REQUIRED)

12

3

6"

+/- 9'-1" 8'-0"

1-02

EXPOSED ROOF PITCH AT KITCHEN 12

MASTER BED

2-01

+/- 10'-0" 2ND FFL +/- 9'-0" CLG

5/8"

8'-0"

*VERIFY FINISH MATERIALS WITH ELEVATIONS & FINISH SCHEDULE

AS NEEDED) D @ 16" O.C. ND BATT INS.

+/- 8'-1" 7'-6"

+/- 8'-1"

NO.

1 1/2 8 +/- 7'-10" PLATE HT

DATE

5 1/2" 7 5/8"

12

2-04

1

+/- 4'-3"

'-0" SHEATHING, FFL ROOFING & 0" RIOR FINISH

+/- 18'-0" PLATE HT

BEDROOM 1

02-16-2018

al Wall Details (N.T.S.)

CAL EXTERIOR WALL

MASTER BED

2-01

7'-6" +/- 8'-1"

8

8" GWB (USE STANT GWB ENT BOARD REQUIRED)

6"

12 8

6"

MING @ 16" R20 CLOSED INSULATION

8

12

1 A403

6"

12

3"

2 A402 12

8

8

+/- 14'-1"

+/- 14'-1" 6"

2 A402

3"

12

12

'-0" E HT

GAS TANK, BOILER & WATER HEATER AT BASEMENT (SEE A-201 FOR MODEL INFORMATION), COORDINATE ALL EXTERI 4 COORDINATE LOCATIONS WITH 1. ARCHITECT A402 SPACE, DRYER & RANGE E ALLOWANCE FOR OUTLET

3 A402

ISSUED TO G.C. FOR INITIAL PRICING

2-03

1 A402

CLOSET

+/- 12'-10"

2-03B

10 | 11


Boerum Hill Townhouse Full Renovation

B-05

36" RANGE DW

DESCRIPTION

1 BOARD BOARDER

DESCRIPTION

36" RANGE

1 BOARD BOARDER

DATE

DATE

Top Left. Front Facade Top Middle. Rear Facade (New Extension) Top Right. Rear Deck and Garden Bottom. Flooring Plans

signs of being compromised. New steel floor joists were installed throughout with the addition of a 13’ extension at the rear wall to maximize the property’s FAR. NO.

Currently under construction in historic Boerum Hill, this project, involves the complete gut renovation of an existing townhouse whose structure was beginning to show

NO.

Platt Dana Architects | In Progress Principal | Hope Dana Contractor | Grant Davis Thompson Location | Boerum Hill, Brooklyn, NY

DW

FAMILY ROOM

B-05

KITCHEN 1-04

1-04

KITCHEN

FAMILY ROOM

C-07 CRAWL SPACE

18" FR.

18" FR.

30" REF.

30" REF.

2 BOARD BOARDER

ROOMPOWDER ROOM 1-05 POWDER 1-05 24" BEV. CTR.

2 BOARD BOARDER

24" BEV. CTR.

DINING ROOM 1-03 DINING ROOM

B-00

HALL

B-01a

CLOSET

B-01b

CLOSET 1 BOARD BOARDER

1 BOARD BOARDER

B-01 C-01 MECH/ELEC RM

1-00

CELLAR

NEW HONED ABSOLUTE BLACK SADDLE AT ENTRY DOOR

NEW HONED ABSOLUTE BLACK SADDLE AT ENTRY DOOR

NEW 24x24 BLUESTONE PAVERS AT STOOP AREA

NEW 24x24 BLUESTONE PAVERS AT STOOP AREA

1 BOARD BOARDER

BEDROOM

VESTIBULE 1-00

B-01a

CLOSET

B-01b

CLOSET

B-01

BEDROOM

GARDEN (BASEMENT)

One Broad Street Suite 310 Bethlehem, PA 18018 T 610 865 3000

D'Huy Engineering

architects

LIVING ROOM 1-02 LIVING ROOM

NEWAND HEARTHSTONE AND NEW HEARTHSTONE FIREPLACE FIREPLACE SURROUND, SEESURROUND, SEE FINISH SCHEDULE FINISH SCHEDULE

VESTIBULE

PARLOR (1ST FLOOR)

BOERUM HILL TOWNHOUSE | Full Renovation

Structural Engineer:

One Broad Street Suite 310 Bethlehem, PA 18018 T 610 865 3000

architects

1 BOARD BOARDER

1-02

BATH 1

80 Fifth Avenue, Suite 1105 New York, NY 10011 T 646 336 6270 F 646 336 6271

WINE CELLAR HALL

B-02

HALL

ng Plan

HALL1-01

2 BOARD BOARDER

plattdana

C-03 B-00

2 BOARD BOARDER

BATH 1

B-02 1-01

MUDROOM

Architect:

WINE CELLAR

B-03

Street, Brooklyn, NY 11217

1 BOARD BOARDER

BOARDER C-06 MECH. CLOSET

C-06 MECH. CLOSET C-03

MUDROOM

s-Jinks Residence

1 BOARD

HALL

B-03

STAIR TREADS TOSTAIR MATCH TREADS TO MATCH NEW WOOD FLOORING. NEW WOOD FLOORING. PAINTED RISERS PAINTED AND RISERS AND STRINGERS STRINGERS

STORAGE

B-04

80 Fifth Avenue, Suite 1105 New York, NY 10011 T 646 336 6270 F 646 336 6271

STAIR TREADS TO MATCH NEW WOOD FLOORING. PAINTED RISERS AND STRINGERS

STORAGE

D'Huy Engineering

STAIR TREADS TO MATCH NEW WOOD FLOORING. PAINTED RISERS AND STRINGERS

B-04

ng Plan

C-00

CELLAR AREA

plattdana

CELLAR STAIR: PAINTED TREADS, RISERS AND STRINGERS

C-04

Architect:

CELLAR AREA

s-Jinks Residence

C-04

STORAGE

n Street, Brooklyn, NY 11217

C-05

Structural Engineer:

1-03


NO. DATE

BEDROOM

DESCRIPTION

1 BOARD BOARDER

BEDROOM 2-03

2-03

NO.

BEDROOM

DATE

BEDROOM 2-01

DESCRIPTION

1 BOARD BOARDER

2-01

R

1 BOARD BOARDER

1 BOARD BOARDER

2-04

2-02

CLOSET 2-02

3-05 MECH CLOSET

CLOSET

W

CLOSET

CLOSET 2-04

1 BOARD BOARDER

3-05 MECH CLOSET

W

2-06

BATH2-06 2

BATH 2

2-05

LAUNDRY 2-05

LAUNDRY

1 BOARD BOARDER

2ND FLOOR

2-07

BEDROOM 2-07

BEDROOM

T 610 865 3000

One Broad Street Suite 310 Bethlehem, PA 18018 T 610 865 3000

architects

One Broad Street Suite 310

D'Huy Engineering

plattdana

1 BOARD BOARDER

1 BOARD BOARDER

Architect:

1 BOARD BOARDER

Structural Engineer: Bethlehem, PA 18018

architects

CLOSET

3-02a

New York, NY 10011 T 646 336 6270 F 646 336 6271

CLOSET 2-08

1 BOARD BOARDER

Architect: 80 Fifth Avenue, Suite 1105

2-08

HALL

M BATHROOM

VESTIBULE

3-02 MASTER CLOSET

3-01

M BEDROOM

NEW HEARTHSTONE AND FIREPLACE SURROUND, SEE FINISH SCHEDULE

3RD FLOOR

Residence

1 BOARD BOARDER

3 1BATH BOARD BOARDER

-Jinks Residence

HALL2-00

BATH2-09 3

3-03

M BATHROOM

3-02a

VESTIBULE

3-02 MASTER CLOSET

3-01

M BEDROOM

NEW HEARTHSTONE AND FIREPLACE SURROUND, SEE FINISH SCHEDULE

ROOF

-Jinks g Plan

1 BOARD BOARDER

2-00

HALL

2-09

Street, Brooklyn, NY 11217

3-00

1 BOARD BOARDER

D'Huy Engineering

HALL

plattdana

3-00

Street, Brooklyn, NY 11217

STAIR TREADS TOSTAIR MATCH TREADS TO MATCH NEW WOOD FLOORING. NEW WOOD FLOORING. PAINTED RISERS PAINTED AND RISERS AND STRINGERS STRINGERS

D

Structural Engineer:

3-03

D

ROOF

3-04 SITTING ROOM

80 Fifth Avenue, Suite 1105 New York, NY 10011 T 646 336 6270 F 646 336 6271

1 BOARD BOARDER

1 BOARD BOARDER

12 | 13 g Plan

3-04 SITTING ROOM


The Cellar was excavated a few additional feet to provide height for a new in-home Gym and Wine Cellar. The Garden Level consists of a Guest Bedroom/Bathroom, multiple Storage spaces, and a Family Room opening out onto the rear garden through floor-to-ceiling Optimum steel windows and doors. The Parlor Level offers formal Living and Dining Rooms off of a Kitchen with cabinetry by Bulthaup and 9’ tall steel windows and doors in line with those below. A new steel deck and stair off the Kitchen leads down to the rear yard below where a new Detention tank, required by DEP for the extension, will be disguised with landscaping. A new expansive 5’ x

10’ skylight crowns top of the stairs, while two smaller skylights provide natural light for the Master Bath and Closet. The house features radiant heating via a Warmboard sub-floor throughout with a new central air conditioning system for cooling. New electrical systems have also been installed including a Lutron RadioRA 2 lighting system. PDA designed custom cabinetry to be installed throughout including Bathroom vanities, Storage room shelving, Wine Cellar shelving, Master Closet cabinetry, and floorto-ceiling white oak cabinetry at the Study and Family Room. Custom Statuario marble fireplace mantels will be featured in the Living Room and Master Bedroom.

Left. Custom Millwork Middle. Custom Stone Mosaic Right. Rear wall at Kitchen

BOERUM HILL TOWNHOUSE | Full Renovation

I took over Construction Administration on the project as the construction contract was being finalized. Since the start of work, my tasks have included visiting the site weekly to review progress, preparing detailed weekly meeting minutes for reference, providing additional and updated drawings for clarification, coordination with DOB and DEP for necessary approvals, review and coordination of mechanical ductwork & grilles, review of millwork shop drawings, review of lighting and plumbing fixture submittals, as well as review off all Payment Applications and Change Orders from the contractor.


Top Left. Stir Skylight Top Right. Skylight Detail Bottom Left. Entry Foyer and Stair Bottom Right. Custom Millwork

14 | 15


Laight Street Loft Full Renovation Platt Dana Architects | In Progress Principal | Hope Dana Contractor | Trieste Corp Location | Tribecca, New York, NY HALLWAY

08

General Flooring No

Currently under construction, this project involves the gut renovation of a 4000 SF Tribecca loft that was originally three separate apartments. Previous renovations had been minimal to connect the apartments, leaving an awkward layout that didn’t maximize the space’s potential, along with severely un-level floor and ceiling slabs. I worked closely with principal, Hope Dana, and the client throughout schematic design to develop a new layout to suit the clients’ lifestyle and family needs.

+/62 SF

1.

NEW WOOD FINISH FLOOR AT STORAGE ROOM SEE DETAIL ON A001

CLOSET

08A

+/10 SF

HALLWAY

08

+/62 SF

2.

W2 FLOOR AT NEW WOOD FINISH STORAGE ROOM SEE DETAIL ON A001

05

PLAYROOM

+/207 SF

CLOSET

08A

LAUNDRY

10

+/10 SF

T3

+/85 SF

NEW WATERPROOFING MEMBRANE BELOW TILE FINISH FLOOR OF LAUNDRY ROOM, SEE DETAIL ON A001

W2 W2

+/NEW08B CHEVRONCLOSET WOOD FINISH 10 SF FLOOR AT PLAYROOM, SEE DETAIL ON A001

05

PLAYROOM

LAUNDRY

10 T3

+/207 SF

W1

3.

+/85 SF

NEW WATERPROOFING MEMBRANE BELOW TILE FINISH FLOOR OF LAUNDRY ROOM, SEE DETAIL ON A001

W2

4.

W2 +/NEW08B CHEVRONCLOSET WOOD FINISH 10 SF FLOOR AT PLAYROOM, SEE DETAIL ON A001

W2

W1

09 UTILITY BATH

DINING RM

RAISED STONE SADDLE AT +/BATHROOM FOR WATERPROOFING 09 UTILITY BATH 40 SF NEW WATERPROOFING MEMBRANE STEP-UP AT THRESHOLD BELOW TILE FINISH FLOOR OF T3 POWDER ROOM, SEE DETAIL ON A001

+/325 SF

HEIGHT OF EXG ENTRY SADDLES TO REMAIN, TYP.

02

KITCHEN 247+/SF

NEW WATERPROOFING MEMBRANE BELOW CHEVRON WOOD FINISH FLOOR OF KITCHEN, SEE DETAIL ON A001

5.

NEW WATERPROOFING MEMBRANE BELOW TILE FINISH FLOOR OF POWDER ROOM, SEE DETAIL ON A001

T3

03

+/40 SF

03

DINING RM

+/325 SF

KITCHEN

8.

STEP-UP AT THRESHOLD W1

02

6.

7.

RAISED STONE SADDLE AT BATHROOM FOR WATERPROOFING

T6

W1

10.

Left. Flooring Plan Top. Future Living Room & Kitchen 11. Bottom Right. Paneling Detail

+/125 SF

MUDROOM

07

+/247 SF

9.

HEIGHT OF EXG ENTRY SADDLES TO REMAIN, TYP.

T6 NEW TILE FINISH FLOOR AT MUDROOM, SEE DETAIL ON A001

NEW WATERPROOFING MEMBRANE BELOW CHEVRON WOOD FINISH FLOOR OF KITCHEN, SEE DETAIL ON A001

07

MUDROOM

+/125 SF

NEW TILE FINISH FLOOR AT MUDROOM, SEE DETAIL ON A001

20 MASTER BED 208+/SF +/76 SF

PANTRY

02A

W1

R

01 POWDER RM

W1

HEIGHT OF EXG ENTRY R SADDLES TO REMAIN, TYP. NEW CHEVRON WOOD FINISH FLOOR AT FOYER, SEE DETAIL ON A001

R W1

R

W2

R

00A COAT CLOSET

W2

HALLWAY 176+/SF FOYER

00

W2 NEW WOOD FINISH FLOOR AT DRESSING ROOM, SEE DETAIL ON A001

+/166 SF

11

HALLWAY 176+/SF NEW WOOD FINISH FLOOR AT DRESSING ROOM, SEE DETAIL ON A001

NEW WOOD FINISH FLOOR WITH BORDER AT HALLWAY, SEE DETAIL ON A001

R RAISED STONE SADDLES AT BATHROOMS FOR WATERPROOFING

W2 W2

18

+/15 SF

M BATH

+/107 SF

NEW WATERPROOFING MEMBRANE BELOW TILE FINISH FLOOR OF MASTER BATH, SEE DETAIL ON A001

1 BOARD BORDER

W2

W2

NEW WOOD FINISH FLOOR AT ALL CLOSETS (TYP.) SEE DETAIL ON A001

19 DRESSING RM265+/SF

+/42 SF

11B LINEN/ AV CL

R +/32 SF

2 BOARD BORDER

19 DRESSING RM265+/SF 11

W2

W2

NEW WOOD FINISH FLOOR AT ALL CLOSETS (TYP.) SEE DETAIL ON A001

W2

NEW WATERPROOFING MEMBRANE BELOW CHEVRON WOOD FINISH FLOOR OF POWDER ROOM, SEE DETAIL ON A001

HEIGHT OF EXG ENTRY NEW WOOD FINISH FLOOR WITH BORDER SADDLES TO REMAIN, TYP. AT HALLWAY, SEE DETAIL ON A001 NEW CHEVRON WOOD FINISH +/LINEN/ AV CL SEE 11B FLOOR AT FOYER, 15 SFDETAIL ON A001

W1

W1

00A COAT CLOSET 32+/SF

+/166 SF

FOYER

00

W1

NEW WOOD FINISH FLOOR WITH BORDER AT MASTER BEDROOM, SEE DETAIL ON A001

NEW WATERPROOFING MEMBRANE BELOW CHEVRON WOOD FINISH FLOOR OF POWDER ROOM, SEE DETAIL ON A001

W1

R

20 MASTER BED 208+/SF

+/76 SF

+/42 SF

01 POWDER RM

W1

04 LIVING ROOM 380+/SF

PANTRY

2 BOARD BORDER

NEW WATERPROOFING MEMBRANE BELOW WOOD FINISH FLOOR OF PANTRY, SEE DETAIL ON A001

W2

NEW CHEVRON WOOD FINISH FLOOR AT LIVING ROOM / DINING ROOM, SEE DETAIL ON A001

W2

02A

04 LIVING ROOM 380+/SF NEW CHEVRON WOOD FINISH FLOOR AT LIVING ROOM / DINING ROOM, SEE DETAIL ON A001

NEW WOOD FINISH FLOOR WITH BORDER AT MASTER BEDROOM, SEE DETAIL ON A001

NEW WATERPROOFING MEMBRANE BELOW WOOD FINISH FLOOR OF PANTRY, SEE DETAIL ON A001

W2

EXG SLAB TO BE LEVELED THR SELF-LEVELING CONCRETE. G Gener SUB-FLOOR THROUGHOUT. HE TO REMAIN. EXG AREAS TO RECEIVE 1. WATERPRO SELF USE LATICRETE #9235. WATER SUB WALLS A MIN. OF 12". WALLS A R BE WATERPROOFED FROMTO FLO 2. ARE TO ALSO RECEIVE DURAROCK USE SEE DETAIL ON A001 WAL NEW WOOD FLOORING THROU BATHROOMS. COVER ALL BE OUTW A TO SANDING FLOORS ANDTO REM SEE ALL NEW WOOD FLOORS SHAL 3. WATER NEW ON FINISH SCHEDULE, COVERINGS STREET SHOEBATH FIN TORE S INTERMEDIATE SANDING AS 4. ALLT NEW FLUSH WOOD SADDLES ONSF OTHERWISE NOTED (RAISED COV NEW RAISED STONE SADDLES AND BATHROOMS 1, 2 & 3.INTE 5. NEW GC SHALL SUBMIT WOOD FLO OTH & STAIN COLOR/FINISH APPRO NEW ALL NEW TILE & STONE WORK AND CONSTRUCTION. 6. GCOS GC SHALL SUBMIT SAMPLES & ST OWNER/ARCHITECT APPROVAL 7. ALL GC SHALL SUPPLY GROUT FOR LATICRETE GROUT CHARTCON FOR 8. GC S ARCHITECT. OWN ONLY LOW VOC PAINTS AND F GC SHALL BE UTILIZED, 9. WATER BAS LATI RECOMMENDED. G.C. TO PRO ARC FINISH APPLICATIONS. ONL NEW GENIE MAT RST10. 10 SOUN BELOW FINISH FLOORING SHA THR REC A-001 FINIS 11. NEW BELO A-00

18

T1 W2

W2

M BATH

+/107 SF

NEW WATERPROOFING MEMBRANE TILE BORDER CONTINUES BENEATH BELOW TILE FINISH FLOOR OF MASTER MILLWORK KICK BATH, SEE DETAIL ON A001

1 BOARD BORDER

RAISED STONET5 SADDLES AT BATHROOMS FOR WATERPROOFING

W2

T1 W2 T5

W2

16A

CLOSET

+/12 SF

16B

CLOSET

+/9 SF

TILE BORDER CONTINUES BENEATH MILLWORK KICK

W2 W2 W1

NEW CHEVRON WOOD FINISH FLOOR AT STUDY, SEE DETAIL ON A001

T4

W1

STUDY

T4

T5

RAISED STONE SADDLES AT BATHROOMS FOR WATERPROOFING

12

GUEST BED

12A

+/146 SF

CLOSET

+/41 SF

13

GUEST BATH 42+/SF CLOSET

12

GUEST BED

12A

+/146 SF

CLOSET

+/41 SF

2 BOARD BORDER

14A

N

W2 RAISED STONE SADDLES AT BATHROOMS FOR WATERPROOFING

W2

W2

NEW CHEVRON WOOD FINISH FLOOR AT STUDY, SEE DETAIL ON A001

N

T5

RAISED STONE SADDLES AT BATHROOMS FOR WATERPROOFING

+/262 SF

13

+/29 SF

GUEST BATH

+/42 SF

14

17

BATHROOM 3 48+/SF

RAISED STONE SADDLES AT BATHROOMS FOR WATERPROOFING

16 BEDROOM 3

+/29 SF

NEW WOOD FINISH FLOOR WITH BORDERS AT BEDROOMS , SEE DETAIL ON A001

+/12 SF

16B

CLOSET

+/9 SF

2 BOARD BORDER

+/214 SF

NEW WATERPROOFING MEMBRANE BELOW TILE +/FINISH FLOOR OF BATHROOMS, SEE ON A001 3 48+/BATHROOM 14 BEDROOM 2 214 17DETAIL SF SF NEW WOOD FINISH FLOOR WITH BORDERS AT BEDROOMS , SEE DETAIL ON A001 15 BATHROOM 2 38+/SF

CLOSET

CLOSET

2 BOARD BORDER

15 BATHROOM 2 38+/SF

14A

LAIGHT STREET LOFT | Full Renovation

BEDROOM 2 214+/SF

W2

2 BOARD BORDER

06

16A W2

W2

W2

+/262 SF

2 BOARD BORDER

STUDY

2 BOARD BORDER

06

W2

NEW WATERPROOFING MEMBRANE BELOW TILE FINISH FLOOR OF BATHROOMS, SEE DETAIL ON A001

16 BEDROOM 3

+/214 SF


NO. DATE

architects

plattdana

80 fifth avenue, eleventh floor, new york, ny 10011 tel 646 336 6270 fax 646 336 6271

DESCRIPTION

architects

plattdana

80 fifth avenue, eleventh floor, new york, ny 10011 tel 646 336 6270 fax 646 336 6271

DESCRIPTION

GOOFING SLAB TOARE BE INDICATED LEVELED THROUGHOUT APARTMENT USING BY: F-LEVELING TO CONCRETE. RPROOFING TURN UP G.C. THE TO INSTALL NEW B-FLOOR THROUGHOUT. HEIGHT AT ALL SHOWERS AND TUBS TO OF EXG ENTRY SADDLES REMAIN. OOR TO CEILING. WET AREAS EAS RECEIVE WATERPROOFING ARE INDICATED BY: K ORTO PERMA-BASE SHEATHING. E LATICRETE #9235. WATERPROOFING TO TURN UP THE LLS A MIN.EXCEPT OF 12". AT WALLS AT ALL SHOWERS AND TUBS TO UGHOUT WATERPROOFED FLOOR TO CEILING. WET AREAS TLETS WITH BLUE FROM TAPE PRIOR ALSO DURAROCK OR PERMA-BASE SHEATHING. MOVERECEIVE SANDING DUST DAILY. ELL DETAIL ON A001 BE STAINED AS CALLED OUT W WOOD FLOORING THROUGHOUT RPROOFED, & FINISHED IN BASIC EXCEPT AT HROOMS. COVER ALL W/ OUTLETS WITH BLUE TAPE PRIOR NISH (TOTAL 3 COATS) SANDING FLOORS ANDCOATS. REMOVE SANDING DUST DAILY. EQ'D BETWEEN FINISH NEW WOOD FLOORS SHALL BE STAINED AS CALLED OUT THROUGHOUT UNLESS FINISH SCHEDULE, WATERPROOFED, & FINISHED IN BASIC SADDLES DESIGINATED BY 'R'). STREET FINISH (TOTAL 3 COATS) W/ SVERINGS AT GUEST BATH,SHOE MASTER BATH, ERMEDIATE SANDING AS REQ'D BETWEEN FINISH COATS. W FLUSHSAMPLES WOOD SADDLES THROUGHOUT UNLESS OORING FOR SPECIES HERWISE NOTED & (RAISED SADDLES DESIGINATED BY 'R'). OVAL BY OWNER ARCHITECT. WSHALL RAISED AT GUEST BATH, MASTER BATH, BESTONE BASEDSADDLES ON THINSET D BATHROOMS 1, 2 & 3. SHALL SUBMIT&WOOD FLOORING SAMPLES FOR SPECIES OF ALL STONE TILE FOR TAIN L. COLOR/FINISH APPROVAL BY OWNER & ARCHITECT. & STONE WORK SHALL BE BASED ON THINSET RNEW ALL TILE WORK. GC SHALL SUBMIT NSTRUCTION. R COLOR SELECTION BY SHALL SUBMIT SAMPLES OF ALL STONE & TILE FOR NER/ARCHITECT FLOOR FINISHINGAPPROVAL. MATERIALS SHALLPRODUCTS SUPPLY GROUT ASED ARE FOR ALL WORK. GC SHALL SUBMIT ICRETE GROUTVENTILATION CHART FOR COLOR SELECTION BY OVIDE PROPER FOR CHITECT. LY LOW VOC PAINTS AND FLOOR FINISHING MATERIALS NDPROOFING TO BE INSTALLED ALL BE UTILIZED, ROUGHOUT, SEE WATER DETAILSBASED ON PRODUCTS ARE COMMENDED. G.C. TO PROVIDE PROPER VENTILATION FOR SH APPLICATIONS. W GENIE MAT RST 10 SOUNDPROOFING TO BE INSTALLED OW FINISH FLOORING THROUGHOUT, SEE DETAILS ON 01

DRAFT

DATE

DRAFT

NO.

otes

ROUGHOUT APARTMENT USING G.C. TO INSTALL NEW ral Flooring Notes EIGHT OF EXG ENTRY SADDLES

Flooring Plan 1/4" = 1'-0"

New York, NY 10013 92 Laight Street Apt. 3ABC

Hill-Kirby Residence

Flooring Plan 1/4" = 1'-0"

New York, NY 10013 92 Laight Street Apt. 3ABC

Hill-Kirby Residence

The new apartment configuration features direct circulation off of a formal Entry Foyer to either the Living spaces, Kitchen service area, or private bedroom wing. The Kitchen has been repositioned to the center of the apartment with a larger layout to suit the scale of the apartment. Open to the Living and Dining Room, the Kitchen also offers direct access to a walk-in Pantry, additional informal Entry and Mudroom, as well as a Utility area featuring a full bathroom and expanded Laundry Room. The Study, Living Room, and Playroom have been partitioned to make better use of the expansive space along the West wall with Hudson River views. The enlarged ‘private’ wing of the apartment features an additional bedroom and full bathroom with an expansive Master Closet, one of the clients’ main requests. After demolition, self-leveling concrete was poured throughout the apartment, with some locations A-201.00 requiring nearly 4” to even out the floors. New Scale as Noted

Project No. 17.04

Scale as Noted

plumbing fixtures and finishes will be installed throughout in addition to electrical services, mechanical & sprinkler systems, and new recessed motorized shades with Lutron’s RadioRA 2 lighting system. The project also involves extensive custom millwork throughout with full-height paneling planned for the Living/Dining Room, Study and Master Closet. My tasks for this project have involved schematic design, design development, construction documents, coordination with the building’s reviewing architect for approval, and DOB submission. Since the start of construction, my responsibilities have been comprised of visiting the site weekly to review progress/ provide clarifications, preparing detailed weekly meeting minutes for reference, reviewing all shop drawings and submittals as well as all payment applications and change orders from the contractor.

Project No. 17.04

A-201.00

16 | 17


Brooklyn Heights Full Renovation Platt Dana Architects | Completed July 2017 Principal | Hope Dana Contractor | Taffera Fine Building & Finishes, Inc, Decorator | Giovanni Foroni Lo Faro Location | Brooklyn Heights, Brooklyn, NY

This project at 1 Pierrepont St involved the gut renovation of an 8th Floor end-unit apartment with multiple exposures, one of which overlooking the lower Manhattan skyline. The

BROOKLYN HEIGHTS | Full Renovation

3000 SF floor plan layout was re-configured to suit the clients’ lifestyle, with an open Kitchen/ Family Room separate from formal Living and Dining Rooms.


Left. Dining Room Middle. Family Room Right. Floor Plan

18 | 19


New finish flooring and interior finishes were installed throughout, as well as new Kitchen/ Dryer exhausts, central air conditioning, and new windows. New plumbing and electrical fixtures were also installed including a Lutron RadioRA 2 lighting system. PDA designed all new custom millwork including nearly twenty pieces throughout - radiator covers, bathroom vanities, master closet cabinetry, bar and tv cabinetry with cabinetry by Bulthaup installed at the Kitchen. I took over Construction Administration on the project as the rough framing was being completed. My tasks involved visiting the site weekly to review progress and provide additional drawings for clarification as needed. I also handled the review of all fixture, equipment, and finish submittals as well as millwork and mechanical shop drawings.

Top. Master Closet Drawings Bottom Left. Bulthaup Kitchen Bottom Middle Left. Master Closet Bottom Middle Right. Master Bathroom Bottom Right. Bathroom Vanity

BROOKLYN HEIGHTS | Full Renovation


20 | 21


Office Park New Construction Ritter Maher Architects | Fall 2014 - Spring 2015 Principal | Scott Ritter Location | Baton Rouge, LA

CYPRESS TITLE | Office Park


RMA worked together with a developer to design an office park on prominent Jefferson Highway. I assisted with the development of the design for the office building prototype

to be repeated and modified throughout the site. Using Revit for modeling, we were able to explore and present to the client multiple design renditions. I also worked

with the project manager to put together the construction set for submittals to the Permit Office and Fire Marshal.

24 | 25


Medical Office New Construction Ritter Maher Architects | Spring 2015 Principal | Scott Ritter Location | Baton Rouge, LA

MEDICAL OFFICE | Plastic Surgeon


0’ 2’ 4’

8’

16’

32’

RMA was hired to design a new stand-alone office for a plastic surgeon in Baton Rouge, LA. I assisted Scott Ritter with schematic development for the project, using Revit to model and render multiple design schemes for client presentations. These particular views aimed to present the initial schematic design to the client, while maintaining an abstract aesthetic so as not to appear a finished building.

Bottom Left. Entry/ Porte Cochere Top Right. Floorplan

26 | 27


Office Plaza New Construction Ritter Maher Architects | Spring 2015 Principal | Scott Ritter Location | Baton Rouge, LA

Studio Park was a new office development proposed for the Sherwood area in Baton Rouge, Louisiana. I assisted the project manager in the schematic design phase, modeling and rendering the project to

present to the client for review. These views aimed to present the initial schematic design, while maintaining abstract enough so as not to imply specific material selection. Bottom Left. Front Overall Bottom Right. Covered Drop Off Top Right. Central Plaza/Courtyard

STUDIO PARK | Office Plaza


28 | 29


DESIGN-BUILD CAMPUS Living, Learning, Making, & Displaying LSU Art & Design Rome Program | 5th Year Studio Design Project Professor | William Doran Location | Baton Rouge, LA Period | 3 Months - Spring 2014

DESIGN INTENT. The Design-Build Laboratory and Fabrication Shop proposes a complex for living, learning, creating, and exhibiting for students and professionals engaging with the surrounding community. The project focuses on the integration of

DESIGN-BUILD CAMPUS | Living, Learning, Making, & Displaying

the community with the program. The two maintain a visual collaborative presence on the site, with a physical disconnection for functional purposes. The goal is to allow the architecture to revitalize the surrounding area, implementing an “eyes on the street�


LIBRARY STUDIOS

LIVE/WORK LOFTS

BUILD YARD

GALLERY WORKSHOP

CAFE

policy to improve safety conditions, and reestablishing a connection with the street and the public realm. The design also focuses on bringing the community in and through the new built program, mitigating the existing restrictiveness of the site.

DESIGN EXECUTION. Public space is integrated throughout the site in the form of a raised pedestrian bridge linking the gallery to the library. Exposing the outdoor workspace of the building shop beneath allows the public to see and be inspired

while maintaining their separation for functional and protective purposes. The live/work lofts are raised off the street with semi-transparent cladding to serve as an elevated “light box,� lighting up the once crime-ridden street corner.

30 | 31


THE GREAT MOSQUE AT CARACALLA Ruin Re-Adaptation LSU Art & Design Rome Program | 5th Year Studio Design Project Professor | Ursula Emery McClure Site Location | Rome, Italy Period | 2 Months - Summer 2013

N

SITE. The Termi di Caracalla (Baths of Caracalla) are evocatively situated within one of the world’s most historic and well preserved cities, Rome. They are majestic in both their current ruin and in their past glory. The Termi are one of the grandest and best preserved bathhouse complexes of the ancient world. The ruins are incredibly tall and their height enables visitors to truly comprehend the scale

of the complex and to experience the grandiose spatial conditions. Besides being representative of monumental and unique architectural space, the Termi and their site exhibit incredible feats of engineering, landscape architecture, infrastructure, and thermal systems management. Part of the palimpsest of Rome, the whole site has had many occupancies since the original program was abandoned in 537 ACE.

THE GREAT MOSQUE AT CARACALLA | Ruin Re-Adaptation

MECCA

0’

20’

40’

80’

160’

When the Goths seized the city and cut off the water sources, Romans clustered in the Centro. The Termi were too far away, unsafe, and there was no water. For the next 1500 years, the site served as a cemetery, seminary, playground, Opera House, and most recently a tourist site and summer Opera facility. This project had intentions of transforming its occupancy once again.


Top. Level 0 Plan Middle. Level -1 Plan Bottom. Level -2 Plan

12 32 | 13 33


DESIGN PROBLEM. Respecting the natural beauty of the site along with the historic integrity of the baths, this design project challenged the occupation of a mere tourist site to create a site to be visited both episodically (as a once in a lifetime tour) and daily (as a religious practice.)

DESIGN INTENT. There is [new] and there is [old]. They are separate, but equal. The mosque is visible to the tourist but is not their focus and the ruins are visible to the Muslims but they are not their focus. The new operates on its own axis (aligned with Mecca) and level leading

THE GREAT MOSQUE AT CARACALLA | Ruin Re-Adaptation

to a state of occupational duality and equanimity throughout the site. The ruins and the mosque inhabit the same site, yet they generate entirely different sets of experiences.


0’ 4’ 8’

Left. SE Elevation Middle. SW Elevation Right. Minaret Elevation Bottom Right. Parti Diagram

UR

TO

32’

64’

IST

WUDU

MINARET. The high point, from which the summons to prayer is executed, serves as both a visual and audible cue for the faithful. SEHAN. >40,000 s.f. The courtyard space offers a tranquil framed space before one enters the interior including shade, seating, space for gathering, and vegetation. WUDU. The ceremonious cleansing space prepares Muslims for entry into the Musalla. MUSALLA. >40,000 s.f. The prayer hall serves both locals and visitors to the eternal city.

MINARET

PROGRAMMATIC PARTI. The primary programmatic elements of the mosque have been broken down into two interlocking “L’s.” The MINARET and the SEHAN progression inform the first “L” sequence, while the WUDU and the MUSALLA inform the second.

16’

SE

N HA

MU

SA

LLA

34 | 15 35 14


THE GREAT MOSQUE AT CARACALLA | Ruin Re-Adaptation


STRUCTURE & MATERIALITY. Foundation piles distribute the building load to prevent further damage to unknown archaeological conditions below. The roof structure,

supported by a reinforced column-truss system, is clad in white stucco and features an in-fill of mullion-less glazing screened by perforated wood panels.

Top Left. Wudu Collage Bottom Left. Section (Wudu-Musalla) Middle. Section (Musalla) Bottom Right. Section (Sehan)

0’ 4’ 8’

16’

32’

64’

16 36 | 17 37


ST. STEFANO ROTONDO Section Axon and Interpretive Site Sections LSU Art & Design Rome Program | Hand Drawing Professor | Kristi Dykema Cheramie Location | Rome, Italy Period | 1 Week - Summer 2013

ST. STEFANO ROTONDO | Section Axon and Interpretive Site Sections


SITE. St. Stefano Rotondo is an ancient basilica in Rome, Italy. The walls of the church are decorated with numerous frescoes portraying thirty-four scenes of martyrdom.

PRODUCT. On LSU’s College of Art and Design Rome Program, the advanced drawing class challenged my artistic as well as analytical abilities. This graphite and colored pencil drawing captures the interior

spatial conditions of the church and provides an analysis of half of the frescoes. The site sections are interpretive to show the depth of the scenes as well as their topography, natural features, and populations.

38 | 39


CHARLESTOWN TOWERS Gallery, Restaurant, and Living LSU | 4th Year Studio Design Project Professor | Michael Desmond Site Location | Boston, MA Period | 3 Months - Spring 2013

CHARLESTOWN TOWERS | Gallery, Restaurant, and Living CHARLESTON TOWERS | Gallery, Restaurant, and Living

SITE. Charlestown, the oldest area in Boston, was laid out in 1629 before Boston was settled. The area is historically known for its shipping industry and features a historic navy yard in close proximity to


the project’s site. The extension of the Harborwalk around the edge of the site presents the opportunity to bridge two historical, maritime areas of Charlestown with a new, vibrant community.

DESIGN INTENT. The site acts as a peninsula jutting out into the Boston Harbor. It offers three distinctive views (the Mystic River Bridge, Charlestown’s Historic Navy Yard, and Downtown Boston’s Waterfront).

The design is oriented around framing and taking advantage of these three key views, with all apartments having access to at least one major view. Bottom. Panoramic View from Harbor

|5 404| 41


0 BR

1 BR

2 BR

3 BR CHARLESTOWN TOWERS | Gallery, Restaurant, and Living

UNIT FEATURES. All apartments are split level and offer views out into the Boston Harbor. Operable glazing on both ends allow for cross ventilation through the units. Each Apartment has the same common area (kitchen and living) plan, with bedrooms added off the common room as needed. The units are stacked in such a way to only require three common hallways despite the buildings rising thirteen stories high. Left. Floorplan Models Right. View from Harbor


|7 42 6| 43


PUBLIC USE. The ground floor provides public split level gallery spaces bridging the exterior courtyards with an interior plaza. The site also connects two existing portions of the Harborwalk together, along which visitors can stroll and take advantage of the many views of the Harbor, learning about Boston along the way. The added gallery space compliments the existing cultural and educational purpose of the Harborwalk. STRUCTURE AND MATERIALITY. The building is supported by a steel skeleton and clad in white aluminum panels with operable wood screens over the glazing to mimic the materiality of ships in the harbor.

CHARLESTOWN TOWERS | Gallery, Restaurant, and Living


0’

1’

2’

4’

8’

16’

Left. Looking Towards Charlestown Harbor Right. Apartment Unit Section Detail

448| 45 |9


CHARLESTOWN TOWERS | Gallery, Restaurant, and Living


Studio Unit Model Photos

46 10 || 47 11


Design Portfolio 2013-2018  
Design Portfolio 2013-2018  
Advertisement