018

s2 l Work a r u t c e Archit


PROFES SI O N A L WO R KS

i.

ii.

iii.

EDU RESI COM DEN MER CA TION TIAL CIAL &others 04 Hillpark School 08 Bayswater School 09 Valley School

10 Redoubt road Develoment 14 Mountain road Apartment 20 Billbabourie Residence 24 Chippendale HNZ

26 FedEx Distribution Centre 28 Munna Point Bridge 30 Jacaranda Apartment 32 Competition - Australian House 34 Architectural Review 36 Architectural Thesis - The restitching of space A and B: Conidition of Betweeness


Street Elevation

0

1

5m

Photography by C.F. Jones B5 B 0

1

5m

Presentation drawings for publications of built projects. Drawings are by Ashley Lim on ArchiCAD 16.

15

10 9

8

7

11

2

6

A A5

5

4

1

12

3

A5 A 14

13

Ground Floor Plan

1 2 3 4 5 6 7 8

B B5

Entry Gallery Kitchen Dining Living Pool Room Cabana Outdoor Room

9 10 11 12 13 14 15

Guest Bedroom Ensuite WC Laundry Store Garage Outdoor Shower

Photography by C.F. Jones

A

10

A

15

16

B

19 20

21

18 11

14

9

19 1 8

13

18

17 12

1

9

10

8 3 4

2

11 4 5 2

6

3

9

7

5

9

7 6

12

13

14

15

A B

Noosa Heads Australia 4567 PO Box 1355 Queensland

Architects Registration No. 3664 (LA) 3668 (SG)

Telephone 07 5471 0340 Facsimile 07 5471 0343 Steve Guthrie 0418 876 394 Lindy Atkin 0412 127 904 Email info@barkdesign.com.au Web www.barkdesign.com.au

Photography by C.F. Jones

RAIA Member 28409

Bark Design Architects

A

Use figured dimensions in preference to scale. All dimensions to be varified and checked on site. These designs,drawings, specifications and the copyright thereof are the property of Bark Design Pty Ltd and must not be used, retained or copied without the written authority of Bark Design Pty Ltd.

Project

Blue Beach House

Drawing Title

0

1 2 3 4 5 6 7 8

Ground Floor Plan - A4

1

5m

Entry Driveway Garage Media Lounge Kitchen Living Room Living Terrace Double Height Dining Space

9 10 11 12 13

Double Height Living Space Pool Terrace Swimming Pool WC Laundry

15

Store

Project No. 14 Pantry

Drawing No.

Coolum Beach R

Margot and Christopher Blue Date

August 2010

Scale

1:200 @ A4

Revision

0818 01.8 0

C

1

5m

Ground Floor Plan

1 2 3 4 5 6 7 8 9 10 11

Entry Hall Dining Kitchen Living Lounge Covered Deck Open Deck Deck Laundry / Utility Powder Room

12 13 14 15 16 17 18 19 20 21

Drying Workshop Double Carport Visitor Carpark Driveway Covered Terrace Garden Pond Covered Walkway Ensuite

Photography by C.F. Jones


EDUCATION Hillpark School Refurbishment

Architectural Designer Concept Design - Building Consent

Design Partners May 2018 - August 2018

School refurbishment project briefed to have Block 1A and Block 2 Toilets Convert into large “superloo”type toilets that conform to modern MoE guidelines. The remaining toilet areas as indicated are to be converted into ILE / breakout spaces that can be effectively utilised by the nearby classrooms. As part of converting Block 5 into ILE environment, elements of the exterior including the cladding and window joinery to the western façade were to be replaced. Main design focus was to open up previously closed off cloak rooms and toilets. Converting these spaces into larger superloos involved creating new thoroughfare from exterior wall.

Per s

pec

tive

of B

loc

k5

Cla

ssro

om

DQ

LS w ork

t Space of Breakou e v ti c e p rs Pe


Budget $260,000

Project Lead Michael Davies

Perspe c

tive of

Super

loo

Structural Engineer Kopi Engineering

Fire Engineer Cove Kinloch

oo

rl ve of Supe

erspecti External p


EDUCATION Hillpark School Refurbishment

Architectural Designer Concept Design - Building Consent

Design Partners May 2018 - August 2018


Budget $260,000

Project Lead Michael Davies

Structural Engineer Kopi Engineering

Fire Engineer Cove Kinloch GENERAL NOTES All dimension on drawings to be checked on site. These drawings should be read in conjunction with all other Consultants drawings and specifications. Any discrepancy shall be referred to the Project Manager for decision before proceeding with the works. Confirm all existing construction, dimensions, heights and levels before commencing works.

As per current drawing

All workmanship and materials shall be in accordance with the latest NZBC and NZS Codes and Best trade practices.

Exis�����������������d���

All products, finishes, systems and fittings to be installed in accordance with manufacturers detail and specification.

Countersunk screw ���� backwards to 90 x 45 SG8 �����������

Exis��������������������� new screw ����������p���. 450mm centres. Vantage Residen���������� system

40 SHS rail ��������40 x 50 PFC 45 x 90mm �������������� 200 centres. GENERAL NOTES All dimension on drawings to be checked on site. These drawings should be read in conjunction with all other Consultants drawings and specifications. Any discrepancy shall be referred to the Project Manager for decision before proceeding with the works.

860 cos

Exis��������������������� new screw ����������p���. 450mm centres.

Confirm all existing construction, dimensions, heights and levels before commencing works.

Fibre cement panel to be glued on the exis�������l cladding with a layer of concrete primer and two coats of blackboard paint.

All workmanship and materials shall be in accordance with the latest NZBC and NZS Codes and Best trade practices. All products, finishes, systems and fittings to be installed in accordance with manufacturers detail and specification.

40 SHS rail ��������40 x 50 PFC PROJECT:

DRAWING TITLE :

Hillpark School

DETAILS - TIMBER SCREEN DETAILS in k

57 Grande Vue road, Auckland

SCALE @ A3: 1:5

450 cos

45 x 90mm �������������� 200 centres.

100

20

200 cos

100

40 cos

40 SHS rail ��������40 x 50 PFC

or W

ss re og Pr

JOB No : DATE : SHEET:

2002 7/31/2018

A602

REV:

A


EDUCATION Bayswater School Refurbishment

Architectural Project Architectural Designer Designer Design Partners Design Partners Concept Design Design -- Building Developed Consent Design May 2018 - JulyMay 2018 2018 - August 2018

As part of converting existing building into ILE environment, included upgrades in line with MOE ILE and DQLS standards. The design involved open up intermediate walls between classrooms and converting resource rooms into breakout spaces. Keeping accessibility and visibility from the teaching spaces was achieved by added sliding doors. Connection between front facade to back of the building was reating new access way with stairs and bleacher seats. Finishes in colour to break down the long corridor.


EDUCATION Valley School Refurbishment

Architectural Designer Design Partners Developed Design July 2018

Perspe c

tive of

Plan of Classroom 1 to 4

Overall perspective of Classroom 1 to 4

Classro

om 1 w

ith Bre

akout S

pace


RESIDENTIAL Redoubt road Development

HO

Architectural Designer Resource Consent - Building Consent

Design Partners September 2017 - Februdary 2018

GENERAL NOTES

LL

YF

OR

Drawings are for Resource Consent purpose only. Not for construction.

D

DR

IV

These drawings shall be read in conjunction with all other Consultants drawings, specifications and details.

E

Any discrepancy shall be referred to the project manager and architect for decisions before proceeding with onsite works.

54

Confirm all existing construction, dimensions, heights and levels before commencing onsite works.

56

Redoubt road in Goodwood Heights is a high density suburb in South Auckland and consideration of vehicular and pedestrian movement has been the key to positioning 19 houses.

SITE INFORMATION Address: 42, 42A, 42B Redoubt road, Goodwood Heights, Auckland 2105

52

Legal Description: Lot 1 DP 480592 Lot 2 DP 480592 Lot 3 DP 480592

58

Total Site Area: Zone:

48

Wind Zone:

40A

40

N

38

36

1

Location Plan

1:1000

REDOU

BT

42

R OAD

46

4,329.27m2 H4 Residential - Mixed Housing Suburban Medium Wind Zone

The site sits in Mixed Housing Suburban Zone, which involves working agains H4 regulation. With control of 2.5m + 45 degree HIRB the shape of roof on Norther boundary has been suited to comply on Northern boundary of the site. Proximity between each Lots to allow adequate liveout space has carefully carried out along with other Auckland Unitary Plan.


GFA 4,330m2

Project Lead Structural Engineer Civil Engineer Landscape Jonathan Lapham Envivo Envivo Bloomfield and Bark

GENERAL NOTES Drawings are for Resource Consent purpose only. Not for construction. These drawings shall be read in conjunction with all other Consultants drawings, specifications and details. Any discrepancy shall be referred to the project manager and architect for decisions before proceeding with onsite works. Confirm all existing construction, dimensions, heights and levels before commencing onsite works. 103.49m, 156° 48' 52" Boundary Height: 2,500mm, Daylight Angle: 45.00°

LOT 2 dr

W

W

W

dr

+66,180

+65,350

SITE INFORMATION

LOT 1 W

dr

Address: 42, 42A, 42B Redoubt road, Goodwood Heights, Auckland 2105

+66,460 31.71m, 156° 49' 5" Boundary Height: 2,500mm, Daylight Angle: 45.00°

+65,950

F

W

dr

W

F

W

O

dr

LOT 18

O

W

O

LOT 6 +64,210

F

LOT 10

F

LOT 7

dr

W

O

Total Site Area: Zone: Wind Zone:

4,329.27m2 H4 Residential - Mixed Housing Suburban Medium Wind Zone

UNIT TYPE LEGEND Stand-alone Housing Typology House type 1 7 LOTS Stand-alone, 2 storey, 4 Bedroom, 2 Bathroom Area: 148.35m2

dr

+66,340

O

O F

+65,850 dr

+65,450

LOT 15 F

W

F

dr W

LOT 19

House type 1A 7 LOTS Stand-alone, 2 storey, 4 Bedroom, 2 Bathroom Area: 148.35m2

O

+63,030

LOT 13

+64,040

O

dr

LOT 16

W

House type 2 1 LOT Stand-alone, 2 storey, 4 Bedroom, 2 Bathroom Area: 155.98m2

W

: 45.00 °

F

Bounda 57 ry Heigh .76m, 76° 38 ' t: 2,500 mm, Da 36" ylight An gle

12" le: 45.00° , 57° 58' 23.64m m, Daylight Ang t: 2,500m ry Heigh Bounda

+66,240 dr

+64,140

Legal Description: Lot 1 DP 480592 Lot 2 DP 480592 Lot 3 DP 480592

F O

F O

F O

O

F

O

+64,190

R OAD

LOT 3 dr

R ED O U BT

LOT 4

LOT 5

dr F

F

W

dr W

dr

O

+64,980

LOT 14 W

O

F

LOT 8

F

LOT 12 +63,770 O

F

dr

O

+64,530

F

W

dr

dr W

W

+62,890

House type 3 1 LOT Stand-alone, 2 storey, 3 Bedroom, 2 Bathroom Area: 138.36m2 House type 4 1 LOT Stand-alone, 2 storey, 4 Bedroom, 2 Bathroom Area: 148.44m2

O

+62,340

Bo un da ry He 1 igh 4.1 t: 1m 2,5 , 00 103 mm ° 2 , D 5' 2 ay 2" lig ht An gle :

dr

45 .00 °

LOT 11

+62,830

O

LOT 17

Duplex Housing Typology Duplex type 1 2 LOTS Duplex, 2 storey, 4 Bedroom, 2 Bathroom Area: 146.64m2

F

LOT 9 66.33m, 156° 37' 44" Boundary Height: 2,500mm, Daylight Angle: 45.00°

PAVING LEGEND Sandblasted Concrete - Provides contrast to permeable paving with strength on corners, Firth concrete in Mist Speed Bump - Slows down the speed of traffic

1

Proposed Site Plan

1:400 Permeable paving on driveway - Firth PorousPave

Permeable paver on shared pathway & visitor's carpark - Firth permeable paving system (FlowPave)

Scale 1:400 0

5

10

15

20m


RESIDENTIAL Redoubt road Development

Architectural Designer Resource Consent - Building Consent

House Type 1

House Type 3

House Type 2

Duplex 1

Design Partners September 2017 - Februdary 2018


GFA 4,330m2

Project Lead Structural Engineer Civil Engineer Landscape Jonathan Lapham Envivo Envivo Bloomfield and Bark

Northern Elevation


RESIDENTIAL Mountain road Apartment

Architectural Designer Resource Consent - Building Consent

The site layout and massing as picked up from previous Architect has been carefuly designed to suit unique environment of the site - situated at densly built urban area of New Market, with an elevation facing the motorway, acoustic functions has been conceptualized in its sculptural, angular forms. The roof and wall forms and materiality allude to the angular, vertical and folded forms of the Basalt rocks that form the walls of the old Mt Eden Quarry and reinforce the Volcanic architectural language in the area. By borrowing the folded verticality and rhythmic undulation of the rock face, the surface finish to the walls facing the motorway will be black oxided exposed aggregate concrete. The zoning allows for 18m maximum height with a limit of 16m for habitable space. The development site below the view shaft protection E9 from Mt Eden. The site abuts a residential zone one the eastern boundary which introduces a 2.5m + 45 degree HIRB control. To manage the bulk and scale of the proposal and protect the listed trees, the development has been broken into three discrete buildings (block 1, 2 and 3) with their own character and feel. Apart from 113 apartment units with 72 parking bays, line of shops are proposed to occupy the corner street position. Reduced 46 Apartment Types through rationalising to 24 and completed Resource Consent package drawings by building modules and main file on ArchiCAD.

Design Partners September 2017 - Februdary


Budget GFA $60,000,000 14,380m2

Project Lead Planner Structural Engineer Fire Engineer Jonathan Lapham B&A Envivo Anvil Fire Consultants


RESIDENTIAL Mountain road Apartment

Apartement Type A

Architectural Designer Resource Consent - Building Consent

Apartement Type A2

Design Partners September 2017 - Februdary 2018

Apartement Type A3

Apartement Type B

Apartement Type C

Apartement Type D

Apartement Type E

Apartement Type F

Apartement Type G

Apartement Type H

Apartement Type I


Budget GFA $60,000,000 14,380m2

Project Lead Planner Structural Engineer Fire Engineer Jonathan Lapham B&A Envivo Anvil Fire Consultants

Apartement Type J (double story)

Apartement Type K (double story)

Apartement Type L

Apartement Type N

Apartement Type M

Apartement Type O

Studio Unit 1 Bed Unit 2 Bed Unit

Apartement Type P

Apartement Type Q

Apartement Type R

Apartement Type S

3 Bed Unit


1 15.4

E

F

G

3,250

5,400

6,070

A310 11,750

621

W03* 3,300 x 2,400

W02* 300 x 2,400

F

DI02 860 x 2,400

DE05 2,650 x 2,400

DD2

DI02* 860 x 2,400

W

DD1*

RD01* 600 x 2,400

W04 1,800 x 2,400 2,375 x 1,325

DE13*

3,300 x 2,400

DI01* 860 x 2,400

DI01 860 x 2,400

RD01* 600 x 2,400

4 A311

x 66 5

DD1*

DI02 860 x 2,400

DI02 860 x 2,400

x 66 5 2,3 75

DI02 860 x 2,400

W04 1,800 x 2,400

DI02 860 x 2,400

DI14* 1,670 x 2,005

Timber treatments shall be in accordance w NZS3602:2003. Refer to Specifications for locations.

DUCT DD3

1,980 x 810

3

1

2

4

3

6

5

7

8

9

41.42m, 15° 5' 0" Boundary Height: 2,500mm, Daylight Angle: 45.00°

#LayID

2,375 x 900

BUILDING 3 / LV 2 A: 112.83 m2

2,375 x 900

2,975 x 414

DI02* 860 x 2,400

DI01* 860 x 2,400

UNIT: 3212 A: 69.34 m2

W

W

W

3,790

6

3,185

2,375 x 1,325

TYPE F

2,375 x 810

3,300 x 2,400

BALCONY UNIT: 3212 A: 7.00 m2

W

HW

58,748

x 66 5

DD1

DI02* 860 x 2,400

RD01 600 x 2,400

6.1

F

2

Podium Drain

W04* 1,800 x 2,400 DI02 860 x 2,400

x 66 5

7

DI02* 860 x 2,400

W04 1,800 x 2,400

x 66 5

DD1

2,3 75

DI02 860 x 2,400

UNIT: 2206 A: 8.82 m2

DD1

2,3 75

DI02 860 x 2,400

DD1*

DD1*

DI02* 860 x 2,400 W04* 1,800 x 2,400

DE14*

2,500 x 2,400

2,375 x 1,000

DI01* 860 x 2,400

UNIT: 2206 A: 36.91 m2

BALCONY

5 x 66

TYPE A

16

DUCT 75 2,3

F 2,375 x 810

3,210

2,375 x 1,325

DI02 860 x 2,400

DI02* 860 x 2,400

W04* 1,800 x 2,400

W04 1,800 x 2,400

W

5 x 66

DI02* 860 x 2,400

6,815

RD01 600 x 2,400

UNIT: 3211 A: 24.27 m2

DUCT

1,8 W05* 00 x 2,4 00

BALCONY

W

DI02* 860 x 2,400

DD1*

DI02 860 x 2,400

DI02* 860 x 2,400

DI02* 860 x 2,400

HW

2

DUCT 450 W07* x 2,4 00

7

UNIT: 3211 A: 74.95 m2

2,375 x 810

75 2,3

RD01* 600 x 2,400

HW

5 x 66

89 .00 °

HW

TYPE C

3,210

2,375 x 810

W

DUCT

DE13*

UNIT: 3206 A: 74.15 m2

3,300 x 2,400

F

TYPE C

DI01 860 x 2,400

UNIT: 2207 A: 49.71 m2

UNIT: 3206 A: 8.82 m2

DI01* 860 x 2,400

Podium Drain

RD01* 600 x 2,400

2,375 x 1,325

BALCONY Podium Drain

DE13

UNIT: 2207 A: 8.82 m2

3,300 x 2,400

2,375 x 1,325

DE13*

BALCONY

DD1

2,3 75

RD01 600 x 2,400

DI01* 860 x 2,400

HW

x 66 5

2,375 x 810

TYPE B

3,300 x 2,400

DI01 860 x 2,400

2,375 x 1,325

DE13 6,815

UNIT: 2205 A: 55.60 m2

75 2,3

He 36.68 igh m, t: 0 13 mm 3° , D 31' ayl 30" igh tA ng le:

F

F

2,375 x 810

TYPE Q

W

Bo un da ry

3

3,300 x 2,400

UNIT: 2205 A: 8.82 m2

A310

6.1

# F

BALCONY

E02

5

All waterproofing shall be in accordance wi NZBC E3/AS1. All floor & wall junctions are sealed to prevent water penetration. All fitti within these spaces shall also be sealed to prevent water penetration into concealed s Main contractor to confirm waterproofing b finishes conceal.

DI02* 860 x 2,400

DD1*

DD1*

2,3 75

x 66 5

DD1

2,3 75

DI02 860 x 2,400

W04* 1,800 x 2,400

DI02* 860 x 2,400

DUCT

DE13*

RD01* 600 x 2,400

W04* 1,800 x 2,400

DI01* 860 x 2,400

2,375 x 1,325

DE13

3,300 x 2,400

2,375 x 1,325

DE13*

3,300 x 2,400

W04 1,800 x 2,400

DI02* 860 x 2,400

DI02 860 x 2,400

DD1*

x 66 5 2,3 75

DUCT

5 x 66

DD1

HW

DD1

x 66 5 2,3 75

DD1*

RD01* 600 x 2,400

2,375 x 810

UNIT: 3205 A: 51.56 m2

75 2,3

DI02* 860 x 2,400

TYPE B

5 x 66

5 x 66

DI02 860 x 2,400

UNIT: 3205 A: 8.82 m2

DUCT 75 2,3

W04* 1,800 x 2,400

UNIT: 2208 A: 51.07 m2

BALCONY

UNIT: 2208 A: 8.82 m2

75 2,3

DUCT

Podium Drain

TYPE B HW

5 x 66

6 DUCT

DD2*

BALCONY

All insulation shall comply with the minimum requirements of NZBC H1 & NZS4218:200 4

DUCT

F

2,375 x 810

HW

RD01 600 x 2,400

2,375 x 810

UNIT: 2204 A: 51.70 m2

DI01 860 x 2,400

DI01* 860 x 2,400

2,375 x 1,325

TYPE B

75 2,3

W09 1,000 x 2,400

DE13

UNIT: 2204 A: 8.82 m2

3,300 x 2,400

F

BALCONY

Podium Drain

F

A312

3,000

CORRIDOR

Separate all timber from all concrete with D DPC as outlined in specification.

4

2,980

DE05* 2,650 x 2,400

DE05 2,650 x 2,400

DE05* 2,650 x 2,400

2,375 x 1,000

DE14*

W20* 5,480 x 2,400

W04 1,800 x 2,400

UP

1,980 x 810

UP 2

1

4

3

5

7

6

8

9

2,375 x 810

W

2,500 x 2,400

#DrgID

W04* 1,800 x 2,400

DUCT

W07 450 x 2,400

18

11

17

2,375 x 900

+81,400

2,375 x 900

2,375 x 900

BUILDING 2 / LV 2 A: 122.74 m2

Podium Drain

1,2 W06 00 x 2,4 00

BUILDING 3 A: 7.76 m2

DI06 860 x 2,005 FRR

CORRIDOR

F

DI02* 860 x 2,400

16

#LayID

15

#DrgID

14

Podium Drain

13

Podium Drain

UNIT: 1202 A: 8.82 m2

12

UNIT: 1202 A: 75.34 m2

BALCONY

ELEVATOR

BUILDING 3 A: 19.59 m2

The Contractor shall ensure all local autho consents have been obtained before comm any onsite works. A copy of all consent documentation shall r on site at all times.

All workmanship and materials shall be in accordance with the requirements of the la Building Code and NZ Standards and best practices.

7,020

DD1

2,3 75

DD1* DD1

DI02* 860 x 2,400

W04* 1,800 x 2,400

W04 1,800 x 2,400

DI14 1,670 x 2,005

RD01* 600 x 2,400

2,375 x 810

W04* 1,800 x 2,400 2,375 x 1,325

DE13

3,300 x 2,400

W04 1,800 x 2,400

DI02 860 x 2,400

x 66 5 2,3 75

DD1*

DD1

DI01* 860 x 2,400

DI02* 860 x 2,400

W DI02 860 x 2,400

DD1* DE06* 1,550 x 2,400

STAIRS

DOWN

DI06 860 x 2,005 FRR

DI06 860 x 2,005 FRR

DI06* 860 x 2,005 FRR

UP

UNIT: 3201 A: 8.71 m2

W04 1,800 x 2,400

BUILDING 2 A: 7.63 m2

10

18

17

DI02 860 x 2,400

DI02 860 x 2,400

RD01* 600 x 2,400 DI02* 860 x 2,400

DI02 860 x 2,400 W04* 1,800 x 2,400

2,375 x 810

DE14*

2,500 x 2,400

2,375 x 1,000 1

3

2

4

6

5

8

7

9

DI01 860 x 2,400

DI01* 860 x 2,400 DI01* 860 x 2,400

2,375 x 1,325

DE13

3,300 x 2,400

2,375 x 1,325

DI02* 860 x 2,400

DE13*

3,300 x 2,400

W04* 1,800 x 2,400 W14* 1,800 x 1,400

5 x 66

DOWN

2,980

75 2,3

5 x 66

18

17

16

15

14

13

12

11

DOWN

11

16

15

14

13

12

10

3,000

BALCONY

1,980 x 810

18R x 167 17G x 285

ELEVATOR

+81,400

2,375 x 900

TYPE N

3,790

5 x 66

DUCT

1,980 x 810

BUILDING 1 A: 5.54 m2

5

3,185

2,375 x 810

DUCT

ELEVATOR

58,748

UNIT: 3201 A: 67.30 m2

DUCT

BUILDING 2 A: 17.25 m2 18R x 167 17G x 285

DI02* 860 x 2,400

TYPE H

HW

W

1,980 x 810

STAIRCASE 2,375 x 500

DI02 860 x 2,400

W04* 1,800 x 2,400

UNIT: 3204 A: 49.22 m2

F

W

RD01 600 x 2,400

2,975 x 299

+81,400

DI01* 860 x 2,400

2

2,375 x 810

75 2,3

75 2,3

DI02* 860 x 2,400

DUCT

HW

TYPE B

DUCT

DI01* 860 x 2,400

CORRIDOR

1,980 x 810

DUCT

Confirm all existing construction, dimension heights and levels before commencing ons works.

2,375 x 810

DUCT

DUCT

BUILDING 1 / LV 2 A: 9.23 m2

4

UNIT: 3204 A: 8.82 m2

DI02 860 x 2,400

1,980 x 810

W

10

BUILDING 1 A: 16.42 m2

Any discrepancy shall be referred to the pr manager and architect for decisions before proceeding with onsite works.

DI02* 860 x 2,400

DI01* 860 x 2,400

F

BALCONY

HW

DUCT

DUCT

2,375 x 1,000 1,980 x 810

STAIRCASE

18R x 167 17G x 285

RD01 600 x 2,400

DD1*

RD01* 600 x 2,400

W

W04* 1,800 x 2,400

1,980 x 810

DE12* 1,670 x 2,200

DI02* 860 x 2,400

2,375 x 810

HW

5 x 66

7,020

UNIT: 2203 A: 49.16 m2

Podium Drain

UNIT: 1201 A: 8.82 m2

RD01* 600 x 2,400

HW

DI02 860 x 2,400

2,375 x 810

HW

5 x 66

TYPE B

BALCONY

DI02* 860 x 2,400

DD2

These drawings shall be read in conjunctio all other Consultants drawings, specificatio details.

W04 1,800 x 2,400

W

DUCT

75 2,3

UNIT: 2203 A: 8.82 m2

Podium Drain

DUCT

UNIT: 3202 A: 65.55 m2

DI02* 860 x 2,400

HW

HW

75 2,3

25.24m, 13° 26' 50" 89.00° Boundary Height: 0mm, Daylight Angle:

BALCONY

DUCT

2,975 x 414

4

5 x 66

DI09* 860 x 2,005

75 2,3

F

2,375 x 810

DI02* 860 x 2,400

DI02 860 x 2,400

3

DUCT

F

HW

UNIT: 3202 A: 12.04 m2

TYPE E

RD01 600 x 2,400

DUCT

W

2,975 x 414

DUCT

DUCT

F

GENERAL NOTES

BALCONY

DI02 860 x 2,400

DI02 860 x 2,400

W04 1,800 x 2,400

DE08 2,140 x 2,400

10,000

UNIT: 2202 A: 77.10 m2

UNIT: 2201 A: 112.69 m2

CORRIDOR

UNIT: 1201 A: 73.73 m2

DI02* 860 x 2,400

F

3,300 x 2,400

TYPE R

DI09* 860 x 2,005

TYPE O

2,375 x 1,325

DE13

3,300 x 2,400

DE14*

TYPE S

DI02 860 x 2,400

BUILDING 1 / LV 2 A: 18.13 m2

A312

UNIT: 3203 A: 75.07 m2

2,375 x 1,325

DE13*

1,980 x 810

DI02* 860 x 2,400

W04 1,800 x 2,400

2,375 x 1,000

2,375 x 1,000 2,375 x 900

DD1*

TYPE L

DI02 860 x 2,400

#LayID

1

DUCT

UNIT: 3203 A: 8.87 m2

#DrgID

UNIT: 1201 A: 9.21 m2

W04

1,800 x 2,400 28.39m, 105° 9' 16" Boundary Height: 0mm, Daylight Angle: 89.00°

BALCONY

UNIT: 2201 A: 15.56 m2

F

DE15*

2,200 x 2,400

2,375 x 1,075

1,925 x

DE11 3,497 x 1,950

DE14*

RT

NO

21,315

2,375 x 1,000

2,500 x 2,400

H

K1

7,325

11,501

2,500 x 2,400

SERV. YARD

3,200

5 x 66

09 DE 1,950 x 21 2,0

5 x 493 1,92

RETAIL 1 A: 94.62 m2

2,375 x 900

4

990

75 2,3

621

UNIT: 2202 A: 16.89 m2

#LayID

A311

4,910

BALCONY

#DrgID

2

6,501

W06 1,200 x 2,400

BALCONY

K

3 6,500

3 49

575

575

J A311

#

7,225 16,750

CAFE 1,925 x

3,625

50.30m, 105° 9' 16" Boundary Height: 0mm, Daylight Angle: 89.00° 5x 1,92

DE10* 7,500 x 1,950

1,925 x

i1

1

5,400

10,970

1,925 x

1

i

H

72,286

4 A310

3

8,000

g1

10,000

D

DE14

c1

2,500 x 2,400

C

2,375 x 1,000

B

DI02* 860 x 2,400

A

W06* 1,200 x 2,400

4

7.1

A310 2,375 x 1,325

x 66 5

5 A312

DI02 860 x 2,400

DD1

2,3 75

W

x 66 5

DI02 860 x 2,400

DD1

2,3 75

DI02* 860 x 2,400

DI02 860 x 2,400

W04* 1,800 x 2,400

UNIT: 3210 A: 24.12 m2

W

DI02 860 x 2,400

8

TYPE A2 UNIT: 3208 A: 34.64 m2

3,210

DI02* 860 x 2,400

W04 1,800 x 2,400

DD1*

x 66 5 2,3 75

F

2 16

DI02* 860 x 2,400

21.97m, 15° 5' 0" Boundary Height: 2,500mm, Daylight Angle: 45.00°

3,210

5 x 66

89.0 0°

DD1

DUCT 75 2,3

Hei 20.65m ght: , 0m 129° m, Day 32' 0" light Ang le:

1,0 W09 00 x 2,4 00

Bou ndar y

BALCONY HW

6,790

DD1*

5 x 66

5 A312

8

UNIT: 3210 A: 73.59 m2

75 2,3

DUCT

E03

TYPE C

2,375 x 810

HW

RD01* 600 x 2,400

UNIT: 3207 A: 50.05 m2

W04* 1,800 x 2,400

RD01* 600 x 2,400

TYPE B

DE13*

DI01 860 x 2,400

2,375 x 810

600 W08* x 2,4 00

6,790

DI01* 860 x 2,400

2,375 x 1,325

UNIT: 3207 A: 8.48 m2

DE13

Podium Drain

3,300 x 2,400

Podium Drain

3,300 x 2,400

F

F

BALCONY HW

W

DUCT

RD01 600 x 2,400

DI02 860 x 2,400

1,0 W09* 00 x 2,4 00

1,0 W09 00 x 2,4 00

W

W

F

RD01* 600 x 2,400

2,375 x 1,000

DI01 860 x 2,400

HW

DI01 860 x 2,400

RD02* 1,300 x 2,400

450 W07* x 2,4 00

HW

5 x 66 75 2,3DD1*

TYPE G UNIT: 3209 A: 64.45 m2

2,375 x 810 DI03 860 x 2,400

DI02 860 x 2,400

DE14*

DUCT 2,375 x 810

2,500 x 2,400

9

BALCONY UNIT: 3209 A: 8.63 m2

DI02 860 x 2,400

W06* 1,200 x 2,400

1,8 W04* 00 x 2,4 00

Bou ndar y

3 A311

12,128

10,542

8,000

3,250

5,400

17,320

6,070

5,400

10,471

3,625

7,225

6,500

22,098

6,501

4,910

990

3,200

Hei 29.57m ght: , 0m 129° m, Day 32' 0" light Ang le:

DI02* 860 x 2,400

W04 1,800 x 2,400

W/D W/D W/D

DUCT

W or ki nP ro gr es s

7.1

9

01 A Preliminary DD WIP Issue RevID Issue Name ID

Preliminary DD

PROJECT NAME:

Mountain Road Apartments

2,9 75

DD x 414 2*

89.0 0°

24 Mountain Road & 34 Seccombes Road, Auckland

7,325

DRAWING TITLE : 73,977

LEVEL 2 FLOOR PLAN

1 15.4

A

B

C

c1

D

E

F

G

g1

H

i

i1

J

K

K1

SCALE @ A1: 1:125, 1:100, 1:50

HALF SC

JOB No : SHEET: REVISION:

A


RESIDENTIAL Billbabourie Residence

Architectural Designer Concept Design - Resource Consent

Billbabourie

For Michelle & Jason Kane

View From North

SD.14 Sitting on a residential area of Queenland, Australia, the client required a house that hugs around a native Australian Tree. Natural Ventilation was also a big requirement and the house outlooked 10 years ahead in time for the clients children to be grown up and to be using the space differently. Thus the boundaries between different spaces were minimized. I have been in charge of this Duplex Residential from the start of the project on ArchiCAD through the design development to Contracting Tender Drawings, including:

Bark Design Architects June 2011 - December 2011

Preparation of presentation drawings for the client meetings, DA drawings to BA preparations and working with details. Working with Australian Building Code, client’s brief and other consultants as well as delivering accurate collection of site data for designing around the existing trees were essential task, Above: Sketch Design stage presentation images; sketch done by tracing ArchiCAD model which has been produced and then worked on Photoshop.

Billbabourie

For Michelle & Jason Kane


Site Alexandra Headland, Sunshine Coast, Queensland, Australia

A

B

6,134

C

Existing tree

D

3,600

2,700

E

3,600

F

3,600

G

7,800

3,600

H

B 402

24

I

3,600

2,000 Setback

3,600 27 C 403

27.5

Existing palm tree

Existing tree

24

28 4,517

New plants

Edible Garden

FFL. 26.93

RL. 26.68

RL. 25.68

1

Riser: 10 @ 175mm Going: 250mm

24.5 Balustrade

up 3,600

Existing Tuckeroo tree

up

FFL. 27.68

FFL. 28.68

Covered Deck Dining

Riser: 10 @ 164.4mm Going: 250mm

BBQ

BBQ

Line of roof above

2

3,600

up

28.5

Line of roof above

Covered Deck

25

Pool fence

Pool

up New tree

FFL. 25.231 FFL. 28.375

Pergola above

Void

Dining

FFL. 26.875

FFL. 27.18 FFL. 26.039

25 m2

4

up

FFL. 26.875

Line of floor above

FFL. 27.18

26.5

3,600

FFL. 28.38

Lin

Living

RL. 26.875

Existing tree

up

RF

Kitchen 2,000 Setback

5

Pool

Pantry

Deck Shute

25 m

Pantry

29.5

RF

2

L'dry

WC

WC RL. 28.68

5,000 ltr Water Tank

Drying

Existing tree

6,000 Setback

Kitchen Living

Existing tree Existing tree

up

Line of floor above

up

up

L'dry Existing palm trees

A 401

FFL. 28.68

Open Deck 26

up

Entry

Riser: 16 @ 187.5mm Going: 250mm

FFL. 28.83

Retaining Walls

3,600

Deck

up

Joinery

New plants

Library

Riser: 10 @ 163mm Going: 250mm

FFL. 28.68

A 401

RF

up

325.5

New tree

27.5

27

28

New tree

B 402

28.5

30

Drying

29

Aggi drain C 403 29.5

30

B

24.08.11

Draft issued to client

C

02.09.11

Draft issued to planner

Use figured dimensions in preference to scale. All dimensions to be varified and checked on site. These designs,drawings, specifications and the copyright thereof are the

RAIA Member

28409

Project

Billbabourie Alexandra Headlands Michelle & Jason Kane

Drawing Title

Ground Floor Plan N

Draft issued to client

Noosa Heads Australia 4567

21.08.11

07 5471 0340 07 5471 0343 0418 876 394 0412 127 904 rkdesign.com.au rkdesign.com.au

Description

A

n Architects

Not for Construction Rev. Date

29

FFL. 28.68

FFL. 28.53

up

Project No.

Drawing No.

1122


H

Site Boundary

F

G

3,600

3,600

C 403

E

F 7,800

3,600

D 404

D

E

C

3,600

7,800

RRV PO

PO

TBS 1

A

3,600

H 408

E 405

DP 1

B

3,600

6,197

2,700

Site Boundary

I 2,000 Setback

I 409

TBS 1 900 OH 900 OH

F

W 1.02

F

F

Pool

27,680 FFL

F F

W 1.02 BAL

F

2

W 2.12

F

Awn Awn RBW RBW Connecting Wall, Connecting Wall, Refer engineer. Refer engineer.W

W 2.03

F

F

F

F FC 2

Awn

F F

2.04

W 2.01

F F 5,000 ltr Water Tank 1/3 buried

F

F

W

B

Architects Registration No.

3664 (LA) 3668 (SG)

12.01.12 17.01.12

R

Spreader onto Roof

31,125 Roof Level

29,875 FFL F

CFC Adjustable Screens, Refer shedules.

F

BAL 2

D 2.12

F

D

Window / Door Joinery

26,875 FFL

F

G G.05

G G.06

RBW

Window / Door Joinery D 2.04

24,063 FFL

Project No.

Drawing No.

Noosa Heads Australia 4567

B

W 2.22

F

Vehicle height warning sign

1122

B

23,875 FFL

External SHR

Project

Billbabourie

CD. 301

Revision

PO Box 1355 Queensland

28409

DP 8 Refer hydraulics.

Awn

TBS

DP 9

Drawing Title

East Elevation House 1

Use figured dimensions in preference to scale. All dimensions to be verified For energy efficiency report application and checked on site. For energy efficiency report application Alexandra Headlands These designs,drawings, specifications and the Michelle & Jason Kane For Structural Design copyright thereof are the RAIA Member 28409 property of Bark Design Date 09 December 2011Pty Ltd and must not Scale be 1:100 @ A3 used, retained or copied 3664 (LA) without the written Architects authority of Bark Design Registration No. 3668 (SG) Pty Ltd.

Awn

F

Telephone 07 5471 0340 Facsimile 07 5471 0343 Steve Guthrie 0418 876 394 Lindy Atkin 0412 127 904 Email info@barkdesign.com.au Web www.barkdesign.com.au

RAIA Member

23.12.11

Project

Billbabourie

Description

W 2.23

W 2.24

F 2.02 2.01

Bark Design Architects

A

Noosa Heads Australia 4567

Rev. Date

PO Box 1355 Queensland

Use figured dimensions in preference to scale. All dimensions to be verified and checked on site. These designs,drawings, specifications and the copyright thereof are the property of Bark Design Pty Ltd and must not be used, retained or copied without the written authority of Bark Design Pty Ltd.

W 2.25

150

W 2.12

Boardwalk Boardwalk BAL 4 BAL 4 Existing Terrain Platforms,Platforms, Existing Terrain Refer detail Refer detail Refer detail. Refer detail.

Telephone 07 5471 0340 Facsimile 07 5471 0343 Steve Guthrie 0418 876 394 Lindy Atkin 0412 127 904 Email info@barkdesign.com.au Web www.barkdesign.com.au

gy efficiency report application

PO

Lower Terrace Lower Terrace

Bark Design Architects

tion

BALPO 2

F

25,867 FFL

F

Awn

TD TD Connecting Roof Connecting Roof

Upper Terrace Upper Terrace

26,680 FFL

gy efficiency report application

DP 5

W 2.26

W 2.27

W 2.28

3,000 2,400

F

DP 5

W 2.29

W 2.30

900

F

F

Awn

W 2.30

2,033

1,200

G G.09

F

F

TD

RRV

1,200

1,200

D 1.05

F

1.04

3,000

W 1.10

F

TD

Awn

2,813

Awn

Awn W F

3,000

Retain existing FCE

W F 1.04

2,813

28,680 FFL

PFCE

1,238

3,000

2,400

31,680 FFL

Window / Door Joinery

CFC Panels CFC Panels Refer detail Refer detail

BAL 2

2,000

2,100

D 1.15

ctural Design

Awn

600

Awn

Awn

Window / Door Joinery

900 OH

Colorbond Colorbond Flashing Flashing CO CO

1,200

FC 1

900 OH 900 OH

CO

W 1.28

1,200

W 1.32

W 1.28

3,000 2,100

CO W 1.29

Drawing Title

East Elevation House 2

Project No.

Drawing No

Alexandra Headlands Michelle & Jason Kane R

Date

09 December 2011

Scale

1:100 @ A3

Revision


F

Description

Issue for Structural Engineer

W 2.03

HR HWD timber handrail Refer schedules.

16. 15.

Inside 13.

PB

FLJ Floor to be packed over to match main floor level. Refer engineer.

12.

1,000

T&G Tongue and groove hardwood flooring. Refer Schedule

250

Batten

11.

TMBS 2 Open riser: 16 @ 187.5mm Going: 250mm

9.

188

10.

PAR Floor Substrate Refer schedules.

TMBS 2 Timber stair tread, Refer schedules.

Skirting 8.

28,375 FFL

TMBS 2 Open Risers Refer Schedule Riser: 16 @ 187.5 mm, Going: 250 mm

F Flashing, Refer schedules.

14.

15.

26,875 FFL LVR Breezway Easyscreen Window System 102mm Galleries. Refer schedule.

14. HRB Refer schedules.

TMBS 1 Closed Risers Refer Schedule Riser: 15 @ 187.5 mm, Going: 250 mm

1,500

J5 FLJ Refer Engineer

11.

W 2.01

Batten

1,000

10. 9.

Skirting

8. Store 7.

25,375 FFL F Flashing, Refer schedules.

4.

24,063 FFL

Bark Design Architects Telephone 07 5471 0340 Facsimile 07 5471 0343 Steve Guthrie 0418 876 394 Lindy Atkin 0412 127 904 Email info@barkdesign.com.au Web www.barkdesign.com.au

PO Box 1355 Noosa Heads Queensland Australia 4567

PAR Floor Substrate Refer schedules

R

Project

Billbabourie Alexandra Headlands Michelle & Jason Kane

Drawing Title

Stairs Project No.

TMBS 1 Timber stair tread, Refer schedules.

2. Approved self draining granular material Refer engineer

3668 (SG) 3664 (LA)

Stringer 3.

Waterproofing membrane

6 Stair Detail 408 Scale 1:20

Architects Registration No.

09 Decmber 2011 Scale 1:20 @ A3 @ A3 1:20, 1:16

TMBS 1 Closed riser: 15 @ 187.5mm Going: 250mm

5.

FLJ Refer engineer.

RAIA Member 28409

Date

PB Refer shedules

Storage Under 6.

FC 2 Refer Schedule

Use figured dimensions in preference to scale. All dimensions to be varified and checked on site. These designs,drawings, specifications and the copyright thereof are the property of Bark Design Pty Ltd and must not be used, retained or copied without the written authority of Bark Design Pty Ltd.

13. 12.

T&G Tongue & groove hardwood flooring . Refer schedules

05.03.12

Timber Studs 70x35mm

Outside

1,500

A

900

Timber Batten

29,875 FFL

1,312

Rev. Date

F Flashing, Refer schedules.

1.

SCS Structural Concrete Slab on Ground, Refer engineer

For Information Only - Not For Construction

Drawing No.

7 House 2 3D Stair View -

Scale 1:16

Revision

1122 CD. 503 A


RESIDENTIAL Chippendale HNZ Development

Interior Design Design Partners Construction Issue January 2018 GENERAL NOTES These drawings shall be read in conjunction with all other Consultants drawings, specifications and details. Any discrepancy shall be referred to the project manager and architect for decisions before proceeding with onsite works. Confirm all existing construction, dimensions, heights and levels before commencing onsite works. The Contractor shall ensure all local authority consents have been obtained before commencing any onsite works. A copy of all consent documentation shall remain on site at all times. All workmanship and materials shall be in accordance with the requirements of the latest NZ Building Code and NZ Standards and best trade practices. All timber construction shall be in accordance with NZS3604 unless noted otherwise. Timber treatments shall be in accordance with NZS3602:2003. Refer to Specifications for types & locations.

04

Separate all timber from all concrete with DPC, DPC as outlined in specification. All insulation shall comply with the minimum requirements of NZBC H1 & NZS4218:2004.

03

All waterproofing shall be in accordance with NZBC E3/AS1. All floor & wall junctions are sealed to prevent water penetration. All fittings within these spaces shall also be sealed to prevent water penetration into concealed spaces. Main contractor to confirm waterproofing before finishes conceal.

04

250

Dry bench required

3,000mm

Dry bench achieved 600

2,960mm 600

DRAWERS

FRIDGE

- All bench top to be 600mm deep - Dry bench with Laminate and 150mm integral upstand with 37mm high front edge.

600

DRAWERS

18 18 EQ 120 37

150 900

- Kitchen to have toughened painted glass as wall overlay between the stovetop and rangehood, extending 100mm below the stove top

Kitchen sink with150mm front plate

03 Removable unit

950mm wide removable unit

- Wet bench with polished stainless steel and150mm

450

DRAWERS intergral upstand, anti-spill lip to front and sides with 37mm

150

800

150

SINK

high front edge

- Note: Sufficient dry bench length has not been achieved

Underside of sink bowl and pipework to be insulated to prevent burns

18

2,800mm

5511 4.1 WET AREA BENCH TOP

READ DRAWING AND GENERAL NOTES IN CONJUNCTION WITH KEYNOTES SCHEDULE AND PROJECT SPECIFICATION.

EQ

Wet bench achieved

5511 4.1 WET AREA BENCH TOP

Selected kitchen mixer

18

150

2,000

Clearence for fridge

700

1,650mm

ALL DIMESIONS ARE INDICATIVE 5511 4.2 DRY AREA ONLY AND THE BENCH JOINER MUST TOP COMPLETE A SITE MEASURE TO Cutlery insert tray on top drawer CONFIRM ALL DIMESIONS BEFORE MANUFACTURING

250

EQ

18

900

18

Kitchen Cutaway

18 18 EQ 120 37

Kitchen bench requirements as of Housing New Zealand Design Standards M-255 Wet bench required

7151 4.6 KITCHEN SINK

Accessible Kitchen Joinery Note: Upstand 150mm

Kitchen bench requirements:

600

500

475

475

DRAWERS

DRAWERS

DOOR

DOOR

150

450 600 DRAWERS

- Cabinetry is minimum 18mm moisture-resistant carcass, doors and drawers with pre-finished low pressure laminate to both sides with 2mm PVC edgings - Toe kick is 250mm high and 150 depth to all units.

Dry Bench

- Doors are maximum width of 450mm, hinges are 115 degree to 170 degree opening and recess mounted, three per under-bench leaf and four to door over bench height

1:20

810

5511 4.2 DRY AREA BENCH TOP

IE01

IE02

Wet Bench

1:20

- Drawers to be in banks of four

03 SB-W03 900 x 900

600 I-D02

DRY BENCH

IE01

5511 4.1 WET AREA BENCH TOP

- Microwave to be located at bench height with an adjacent power outlet - Install white door stopper dots to carcass of joinery where joinery doors close onto.

04

700

600 WET BENCH

2,360

18 EQ 18

EQ

600

600

EQ 18

2,000 Clearance for fridge

2,200 18 EQ

EQ

EQ 18 250

18 150

Standalone 'B'

TOE KICK

600

560

450

450

600

300

DRAWERS

DRAWERS

DRAWERS

DRAWERS

STOVE / OVEN

DRAWERS

1,460

600

DRY BENCH

WET BENCH

600

380

380

STOVE / OVEN

PANTRY

PANTRY

850

HNZC 15-19 Chippendale Crescent 700 PANTRY

15-19 Chippendale Crescent, Birkdale, Auckland

WET BENCH

300

6mm toughened glass splashback full height to rangehood.

PROJECT NAME:

450 1,200

DRY BENCH

FRIDGE DRY BENCH STOVE / OVEN

Date

250

Selected electric bench top hob, separate circuit

SB-W03 900 x 900

04

4/16/2018

15-19 FC Joinery Drawings Amendments

Removable unit

Back panel of removable unit to stop short to allow for waste Selected electric bench top hob, separate circuit

18

EQ

Kitchen sink with150mm front plate

Underside of sink bowl and pipework to be insulated to prevent burns

18

03

2/7/2018 2/20/2018 3/5/2018

EQ

Selected rangehood above

15-19 FC Issue 15-19 FC Joinery Amendment 15-19 FC Joinery Amendment 2 15-19 FC Joinery Drawings 04 Amendments RevID Issue Name

Upstand 150mm

TOE KICK

600

600

PANTRY

5511 4.2 DRY AREA BENCH TOP

PANTRY

01 02 03

2,200

5511 4.1 WET AREA BENCH TOP

PANTRY

Cutlery insert tray on top drawer

6mm toughened glass splashback full height to rangehood

WET BENCH

18

18

IE03

18

IE04

5511 4.2 DRY AREA BENCH TOP

7151 4.6 KITCHEN SINK

700

EQ

IE02

Selected rangehood

Selected kitchen mixer

PANTRY

PANTRY

18 6mm toughened glass splashback full height to rangehood from level of bench top

04

EQ

F 1,600

760

PANTRY

8

KITCHEN

WET BENCH

850

FRIDGE

Selected rangehood 950mm wide removable unit below bench top

DRAWING TITLE :

KITCHEN LAYOUT SCALE @ A1: 1:20

Kitchen Layout

1:20

IE03

Dry Bench with Stove

1:20

JOB No : SHEET: REVISION:

HALF SCALE @ A3

1063

A701 04

IE04

Pantry & Fridge

1:20

03


Level Access

Offset Waste

Cut to Length

100% Recyclable

Recycled Content

22mm

The Premier Shower Deck’s 22mm profile allows easy installation into either timber or concrete shower areas.

Lifetime Warranty

Installation Timber

Concrete

REFER TO FIGURE 5 OF G1/AS1 PAGE 18 FOR ACCESIBLE TOILET SHOWER COMPARTMENT AND GRAB RAILS

960

GENERAL NOTES These drawings shall be read in conjunction with all other Consultants drawings, specifications and details.

Install bevel-edge tile reducer to form wet flooring well at bathroom entry

GENERAL NOTES

6mm HardiGlaze lining with factory radiused edge to bottom in all cases. Apply to shower walls and 150mm past shower tray edge

I-D04

These drawings shall be read in conjunction with all other Consultants drawings, specifications and details.

910

1:100 fall

400

Hardiglaze to full height accessible WC Any discrepancy shall be referred to the project manager and architect for decisions before proceeding with onsite works.

MB DB

ACC WC DATA

BASIN

Confirm all existing construction, dimensions, heights and levels before commencing onsite works. The Contractor shall ensure all local authority consents have been obtained before commencing any onsite works. A copy of all consent documentation shall remain on site at all times.

1:100 fall 1:50 fall

IE04

All workmanship and materials shall be in accordance with the requirements of the latest NZ Building Code and NZ Standards and best trade practices.

Screed

All timber construction shall be in accordance with NZS3604 unless noted otherwise.

Concrete slab Solid concrete

The Premier Shower Deck can be installed into an existing concrete floor by removing the screed and setting the floor former in a position to leave it level with the remainder of the shower room Accessible Bathroom Details floor. When all pipework is complete the whole shower room floor, including the new shower area can be covered with suitable vinyl flooring or tiled.

can be installed into an existing timber floor by removing the floorboards and fixing the former directly joists. If the deck protrudes more than 100mm over a be for a suitable floor covering.

7151 4.1onto TOILETthe

joist, 450mm from the support side wall noggins should be installed. The floor should to the centre line of pan brought level with the former to make the room level and ready

All waterproofing shall be in accordance with NZBC E3/AS1. All floor & wall junctions are sealed to prevent water penetration. All fittings within these spaces shall also be sealed to prevent water penetration into concealed spaces. Main contractor to confirm waterproofing before finishes conceal.

9

750 x 750mm grab rail, 30mm dia.

450

200

Centre of toilet SB-W09

Timber treatments shall be in accordance with NZS3602:2003. Refer to Specifications for types & locations.

Selected shower rose

SEAT

1,300

Sloped area

03

Theself Premier Shower Hinged seat, draining and non-slipDeck 468

TOILET

All insulation shall comply with the minimum requirements of NZBC H1 & NZS4218:2004.

Slip resistant vinylSlip flooring over resistant cement coated flooring shower tray

Plywood Floor sloped to drain without sudden change in level. Floor boards Line of showerSB-W02 rail

R 1,500

IE03

600

Separate all timber from all concrete with DPC, DPC as outlined in specification.

The Contractor shall ensure all local authority consents have been obtained before commencing any onsite works. A copy of all consent documentation shall remain on site at all times.

Shower tray with Shower deck 2-3mm cement coatin g over

960 x 2,200

SHOWER ROSE

All timber construction shall be in accordance with NZS3604 unless noted otherwise. Timber treatments shall be in accordance with NZS3602:2003. Refer to Specifications for types & locations.

Confirm all existing construction, dimensions, heights and levels before commencing onsite works.

Allproof flush vinyl floor waste

Goldair 3508W 2400 white heater, face mounted with base at 1.6m min. aboce FFL Shower deck

Slipsplashback resistant to basin Hardiglaze flooring

IE02

IE01

All workmanship and materials shall be in accordance with the requirements of the latest NZ Building Code and NZ Standards and best trade practices.

Any discrepancy shall be referred to the project manager and architect for decisions before proceeding with onsite works.

7151 4.8 TOWEL RAIL

Separate all timber from all concrete with DPC, DPC as outlined in specification.

Accessible Bathroom Details

All insulation shall comply with the minimum requirements of NZBC H1 & NZS4218:2004. All waterproofing shall be in accordance with NZBC E3/AS1. All floor & wall junctions are sealed to prevent water penetration. All fittings within these spaces shall also be sealed to prevent water penetration into concealed spaces. Main contractor to confirm waterproofing before finishes conceal.

www.ncdirect.co.uk

1,100 CURTAIN RAIL

600 x 900

Accessible Kitchen Joinery Note:

Accessible Bathroom Note:

ALL DIMESIONS ARE INDICATIVE ONLY AND THE JOINER MUST COMPLETE A SITE MEASURE TO CONFIRM ALL DIMESIONS BEFORE MANUFACTURING

Accessible Bathroom Layout

ALL DIMESIONS ARE INDICATIVE ONLY AND THE JOINER MUST COMPLETE A SITE MEASURE TO CONFIRM ALL DIMESIONS BEFORE MANUFACTURING

1:20

READ DRAWING AND GENERAL NOTES IN CONJUNCTION WITH KEYNOTES SCHEDULE AND PROJECT SPECIFICATION.

19mm dia. stainless steel curtain rail fixed to allow 1.8m length curtain to touch the finished floor level and 200mm inside the perimeter of the sloping shower area

900

MIRROR

- Wet bench with polished stainless steel and150mm intergral upstand, anti-spill lip to front and sides with 37mm high front edge

Selected mirror

SHOWER RAIL

- All bench top to be 600mm deep - Dry bench with Laminate and 150mm integral upstand with 37mm high front edge.

- Provide 150mm high coving to all walls with aluminium coved capping strip to exposed top edge. Recess the coving behind wet-wall linings

Shower rail for sliding hand shower with 1,500mm long flexible hose

- Wet wall lined with 6mm Hardiglaze splashback at all surrounds of shower, bath tub, laundry tub, separate toilet room and behind basin.

CURTAIN RAIL

- Accessible bathroom has Vinyl safety 2mm commercial grade non slip sheet flooring system. Selected shower mixer rose

- Install white door stopper dots to carcass of joinery where joinery doors close onto.

750 x 750mm grab rail, 30mm dia.

900

450

- Curtain rail fixed at a height to ensure the shower curtain touches the floor and located 200mm inside the perimeter of the sloping shower area.

150mm high vinyl coving behind Floor sloped to drain without sudden change in level. 1:50 fall, as per G1/AS1

CL

117

- The entire bathroom floor falls to the floor drain with a fall no less than 1:50 in the shower and no less than 1:100 to the balance of the bathroom floor.

Hinged seat, self draining and non-slip

SEAT

150mm high vinyl coving with aluminium coved capping strip to exposed top edge

SHOWER GRAB RAIL

1,000

- Bevel-edge tile reducer is indicated under vinyl to form wet flooring well at bathroom entry.

900

1,000

865

- Drawers to be in banks of four - Microwave to be located at bench height with an adjacent power outlet

Height of basin

- Doors are maximum width of 450mm, hinges are 115 degree to 170 degree opening and recess mounted, three per under-bench leaf and four to door over bench height

03

LEVER CONTROL

Hardiglaze splashback to basin

- Toe kick is 250mm high and 150 depth to all units.

1,825

7151 4.8 TOWEL RAIL

- Cabinetry is minimum 18mm moisture-resistant carcass, doors and drawers with pre-finished low pressure laminate to both sides with 2mm PVC edgings

117

- Grab rails peened finished, 30mm diameter minimum, to be wall mounted beside the shower and toilet. Load capacity is to support minimum 200kgs in any direction.

600 Position of shower rose

200

- Towel rail to be in 19mm diameter grade 304 1.2mm stainless steel, minimum length of 900mm per bedroom. Securely fix at 1m above finished floor level.

1,100 Position of curtain rail

IE01

Basin & Towel Rail

1:20

IE02

Shower

- Laundry Tub with dedicated washer discharge pipe and galvanised steel powdercoated cabinet securely fixed to the wall, child resistant catch to the cabinet door.

1:20 03

- Install white door stopper dots to carcass of joinery where joinery doors close onto.

Hardiglaze to full height 01 15-19 FC Issue 02 15-19 FC Joinery Amendment 15-19 FC Joinery Drawings 03 Amendments RevID Issue Name

2/7/2018 2/20/2018 4/16/2018

19mm dia. stainless steel curtain rail fixed to allow 1.8m length curtain to finished floor level, 200mm inside the shower

Date

15-19 FC Joinery Drawings Amendments

Selected mirror minimum width 400mm and height 720mm

REVISION:

03

Towel rail

Hardiglaze splashback to basin

865

1,000

Base of mirror

150mm high vinyl coving with aluminium coved capping strip to exposed top edge

Height of basin

1063

A702

700

HALF SCALE @ A3

Floor sloped to drain without sudden change in level. 1:50 fall, as per G1/AS1

Height of grab rail

SHEET:

Hinged seat, self draining and non-slip

460

JOB No :

01 15-19 FC Issue 02 15-19 FC- Minor Amendments 02 15-19 FC Joinery Drawings 03 Amendments RevID Issue Name

750 x 750mm grab rail, 30mm dia.

03

Selected toilet roll holder 7151 4.1 TOILET 150mm high vinyl coving with aluminium coved capping strip to exposed top edge

4/16/2018 Date

15-19 FC Joinery Drawings Amendments

800

230

1,100

200

1,300 SHOWER

1,424

750

560

BASIN

400

TOILET

374

Standalone 'B' 15-19 Chippendale Crescent, Birkdale, Auckland

750 GRAB RAIL

SEAT CURTAIN RAIL

PROJECT NAME:

HNZC 15-19 Chippendale Crescent

CL

120

DRAWING TITLE :

ACCESSIBLE BATHROOM LAYOUT AND ELEVATIONS

450 Centre of toilet

700

SCALE @ A1: 1:20

Line of Hardiglaze

JOB No :

IE03

2/7/2018 2/13/2018

Selected basin TOILET GRAB RAIL

SCALE @ A1: 1:20

1,000

KITCHEN ELEVATIONS

TOILET SEAT

DRAWING TITLE :

700

1,825

CURTAIN RAIL

15-19 Chippendale Crescent, Birkdale, Auckland

LEVER CONTROL

HNZC 15-19 Chippendale Crescent

450

Standalone 'B'

750

PROJECT NAME:

GRAB RAIL MIRROR

Selected shower mixer rose

SEAT

03

READ DRAWING AND GENERAL NOTES IN CONJUNCTION WITH KEYNOTES SCHEDULE AND PROJECT SPECIFICATION.

Hardiglaze to full height

- Kitchen to have toughened painted glass as wall overlay between the stovetop and rangehood, extending 100mm below the stove top

Toilet & Shower

1:20

IE04

Toilet & Basin

1:20

SHEET: REVISION:

HALF SCALE @ A3

1063

A703 03


COMMERCIAL FedEx Distribution Centre

Architectural Designer Concept Design - Developed Design

DHL - DISTRIBUTION CENTRE INCHEON AIRPORT

This Project was for Global logistics corporation, FedEx on development of its new distribution centre in Incheon International Airport. Brief was to design a centre with distribution machine and office blocks.

Kunwon Architects & Partners January 2016 - July 2016

KOREAN AIR - CARGO A, INCHEON AIRPORT

As part of the Kunwon Architects project team, I have individually designed the following conceptual design which has been selected by the client for Development, then worked on Sketchup, AutoCAD and Photoshop towards DD and WD.

FEDEX - DISTRIBUTION CENTRE, KANSAI AIRPORT


GFA Site 23,425m2 Incheon International Airport


CIVIC Munna Point Bridge

Architectural Designer Bark Design Architects Concept Design February 2011

Located at the holiday destination, Noosa Heads, Queensland Australia, the project seeks the answer for an addition of a bridge to prevent the tourist to attempt in jumping into the river. A project for the local council to design the pedestrian + motor vehicle bridge barrier for falling and carry the concept of this river. The bridge barrier is designed to be kinetic, which differs according to the speed of the pedestrian; walking, running, on bicycle, or car. The balustrade is then prefabricated to be fixed to the existing balustrade at the site and have been designed in such way to be easily transported to other sites and possibly reused in future. I have worked on ArchiCAD from the concept design stage to producing perspective images, VBE , documentation for Structural Engineers (Arup) and for shop drawings for steel sub-contractors.


Site Noosa Heads, Sunshine Coast, Queensland, Australia


RESIDENTIAL / RENOVATION Jacaranda Apartment

Architectural Designer Bark Design Architects Concept Design August 2011


COMPETITION ENTRY Australian House Echigo Tsumari

Australia House is used for art installations during the contemporary international arts festival, which takes place every three years in the mountainous Echigo-Tsumari region of Niigata Prefecture. The house will provide space for Australian artists to live, work and present their artworks, whilst serving as a venue for joint projects between Australia and Japan. This competition was judged by Tadao Ando and worked in conjuction with Arup Japan, I have worked on this project from the start; setting up on ArchiCAD, then using Adobe Photoshop on hand sketches which has been done by local artist.

Architectural Designer Bark Design Architects Concept Design March 2012


The Bark Team joined the Brisbane Open House 2011 tour trailing along our own itinerary from Roma Street Station to Fortitude Valley. It was a great opportunity to see various architecture projects in Brisbane City that respect Queensland’s character and history. Our most memorable and engaging projects were Santos Place, Hassell Studio and Riddel Studio. Santos Place by Donovan Hill Architects is a fascinating high-rise project that has successfully integrated the sense of street lanes and human scale experiences. Walking into the Ground floor foyer, we could feel the compression of space immediately; the space is intimate and comfortable which is contrasting to the typical corporate space. The fantastic installation of lanterns, sculptural elements of raw, natural rocks add to these rich spatial experiences.

The building facade brightly adds Queensland’s heritage colours into the palette and the beautifully detailed fragmentation of the building plays with the penetrations of Brisbane’s intense light. This project has achieved the dilemma of the often missing human intact on high rise building with site specific gesture, embracing Queensland’s character Santos Place brightens up not only the Brisbane skyline but as a hub that interlinks the surrounding streets successfully like a ‘lane’ or ‘pedestrian street’ on its ground floor.

The next project, Hassell Studio in Fortitude Valley, was most impressive in its monumental, raw and honest expressions. This former Bread Factory's history has been celebrated by Hassell through exposing and thoughtfully adding - the new spaces respect the previous by integrating and the evolving, exposing and thoughtfully adding - the new spaces respect the previous by integrating and then evolving.


The old and new buildings open towards the symbolic, yet physical gathering court; as the centre point and bringing the spaces together. This relationship between the outdoor and the indoor delivers abundant light and air. Then it spreads into smaller spaces which are cleverly organised into different stations of working platforms, meeting spaces and even a space for art exhibition that are harmoniously interconnected with each other the studio is

"...successfully integrated the sense of street lanes and human scale experiences."

a hub for working, socialising and a space to be interactive between each other. The honest space and the use of raw materials provide this free-flowing open planned space with a balance of strong expressions where the existing and the new elements work in a simple yet delicate language that can be found in every detail.

The last project that we visited was a 1950’s Furniture Store which has been gently assisted to uncover its beauty the water garden and the slanted front façade came together as this refurbished architecture gem by Riddel Architecture Studio. We loved the elegantly curved water garden with living gold fish that wraps around the front perimeter of the studio and how the edge invitingly opens up its ‘garden’ to the pedestrians on Wickham Street.

The interior of the Studio has its traces of pervious and the new with the unique oval roof lights bringing the day lights, warming up the eclectic character of this studio space. Other projects on the tour were: Brisaben Magistrates court, Arkefield Studio, BVN Architecture Studio, James Russell Studio, Brand & Slater Offices and HQ Leightons. Ashley Lim, Bark Design Architects


The re-stitching of space A and B: Condition of Betweeness

AC ADEM I C WO R KS

This project reflects the ‘in-between space’ as the key concept to reconnect the spaces that we work, relax and live in. The questions of what is the best way to re-connect spaces together when they differ in qualities of condition. How they are occupied by different group of people and activities are being addressed throughout this thesis

project by the study of Eldo Van Eyck’s Structuralism and Peter Eisenman’s Deconstructivism. Site map of Grafton, looking at the large context of the connection to the central city district and motorways hugging around the Grafton: Red marking the site and showing the relationship between the site and the Park

road and the link to the City centre. Each images specifying the different relationship between the site and the surrounding facilities.

MArch Prof. University of Auckland Year 2 2010

THESIS


Site Grafton, Auckland

The conceptual model expressing the central slope and the relationship to the ground level.

Physical model expressing the grid and the elements inserted on the grid, circling around the central tree and garden.


CONCEPT

MArch Prof. University of Auckland Year 2 2010

AC ADEM I C WO R KS

The in - between space

Above: Expression of the project on the Grafton Right: The perspective view shows the central in-between space site by model and sketch

One of the developing idea of this project was to set up the stong axis points driven by the street and the building for a strong visual linkage that opens up the Auckland City into the Library and the Gallery space of the building


Site Grafton, Auckland

Perspective of the central in-between space where the residential and the public sides of the building encounters. This idea was organised through the setting out of different sets of grid lines. Programs used are: Rhino, Auto CAD and Photoshop.


CONCEPT

Study of different forms of units on the residential side of the building. The units are designed to have relationship between and to create community spaces between them. The final design units interlock vertically and could possibly continue to grow.

MArch Prof. University of Auckland Year 2 2010

AC ADEM I C WO R KS

The in-between space


DETAILS

Site Grafton, Auckland

The in-between space

The front facade is to open up towards the Park road and create betweeness of interior and exterior through the ‘fluidity’ explored earlier with sets of models. The fragmented facade in the rhythm of openness and closure creates several pockets of unique spaces that visually blends the interior into the city, yet keeping the territorial boundary for one to feel comfort in this space as their home for the time of the stay.


MArch Prof. University of Auckland Year 2 2010

AC ADEM I C WO R KS


Site Grafton, Auckland

Architectural Portfolio - August 2018  

Ashley Lim | University of Auckland, New Zealand

Architectural Portfolio - August 2018  

Ashley Lim | University of Auckland, New Zealand

Advertisement