Page 83

AREA

Varturu

WORK

AMOUNT (IN RS. LAKHS)

Development of road and drainage works in layouts in Varturu Halsahalli road Median from Kundalahalli gate to Rajagudi via Varturu Kodi

10.00 100.00

Chikkabellanduru

Development of road and drainage in Chikkabellanduru up to Martin’s house

10.00

Chikkabellanduru

Chikkabellanduru road development work

10.00

Chikkabellanduru

Chikkabellanduru road development work

15.00

Hosahalli

Fencing the empty land in Hosahalli

Gunjuru

Highmast lights in Gunjuru - 2

12.00

Gunjuru

Concrete road and drainage work in Gunjuru colony

10.00

Gunjuru

Drainage and road development in Gunjuru [remaining part]

30.00

Gunjuru Palya

Development of main road and drainage in Gunjuru Palya

10.00

1.50

Bellanduru Bellanduru

Compound to Bellanduru burial ground

15.00

Bellanduru

Development work of asphalting and metalling of 2 remaining roads and 4 slab drainage in Bellanduru Green Glan layout

60.00

Bellanduru

Metalling work and Asphalting roads near the houses of Rameshreddy, kyYallamma and Munireddy

30.00

Bellanduru

Road development through road side drainage work and asphalting work next to Pearl apartment,sun villa road, Bellanduru ring road up to Munireddy’s house

40.00

Bellanduru

Concreting from Bellanduru sweet water well road up to Angala Parameshwari temple lane

10.00

Bellanduru

Development work including road side drainage and slab drainages, asphalting from Bellanduru ring road up to Janardhana Reddy’s house.

20.00

Bellanduru

Bellanduru tank bund road

Bellanduru

Bellanduru road development and asphalting

20.00

Bellanduru

Road development and drainage for pending roads around Bellanduru Gopalaswami temple

15.00

Bellanduru

Concreate road in Bellanduru

30.00

Bellanduru

Construction of Culvert, metalling, asphalting and side drainages for Ambalipura Jana jeeva apartment road and bakery road and other 2 cross roads

30.00

Bellanduru

Development of road side drainage, slab drainage, and pedestrian walkways from Ambalipura outer rind road up to Shahi Garments

80.00

Bhoganahalli

Concrete road and covering slabs work in Bhoganahalli Ashraya Colony

Bhoganahalli

Concrete drainage and S.S.M drainage development work from Nagarajappa’s house up to Venkatachala’s house and Ramachandrappa’s house, from Muniraju’s house and from Ravikumar’s house till Bhoganahalli

B. Nagasandra

Power supply to Belur Ambedkar Nagar

B. Nagasandra

Bore wells to Belur Ambedkar Nagar - 2

10.00

B. Nagasandra

Road and drainage development work in Belur Ambedkar Nagar

20.00

B. Nagasandra

Road and drainage construction in B. Nagasandra road

Junnasandra

Asphalting and drainage construction from Junnasandra Sarjapura main road to Narayana Reddy’s house

MAHADEVAPURA JANAHITA

6.00

8.00 10.00

8.00 45.00

83

ARVIND LIMBAVALI JANAHITA ENGLISH  

A book on the developmental activities carried out by Shri Arvind Limbavali in Mahadevapura Assembly Constituency during 2008-12. The book...

Read more
Read more
Similar to
Popular now
Just for you