Page 69

Kadugodi. Another road starting from K R Puram hanging bridge reaches Road Number 208 via Garudachar Palya , Hoodi circle, hope farm and Channasandra. The BBMP road division has taken up arterial and sub-arterial road construction work. Under rural development schemes 100 kilometre long roads will be laid-down in various routes. Erecting peripheral roads are also in the list.

I have a dream that in coming 5-6 years Mahadevapura should emerge as the foremost developmental model of Bangalore Some developmental works might be slow pace; but don’t think that they are not given priority. I have been continuously organising review meetings and discussions with the officials in order to get all the developmental works to be implemented. I humbly submit that I have spent most of my time in activating the administrative machinery.

The second phase of `Namma Metro’ will cover Mahadevapura, Garudachar Palya, Graphite India, Doddanekkundi industrial area, Vishveshwaraiah industrial area, Vaidehi hospital, Satya Sai hospital, ITPL, Whitefield, Hope form and finally reaches Kadugodi railway station.” Construction of pedestrian bridges is also in the list. ƒƒ Have you prepared an action plan of future works in the constituency? Indeed in addition to the works completed in last 4 years we have the responsibility to complete many works that have been sanctioned recently. In Gunjuru an international sports stadium will be constructed, which will be stretched to 27 acres. Construction of Vemana Jnana Mandira and Vemana Ranga Mandira in Doddakannalli; providing more and more basic infrastructure facilities in EPIP area is the priority. I am aware that constituency needs some more primary health centres. The hundred bed hospital is planned in the Siddapura village in Hagadur ward for which the foundation stone laying ceremony took place in the presence of the Chief Minister recently. We need to strengthen education sector. So we need to start ITIs, polytechnics, along with degree as well Pre-university colleges. We have plans to build a market place in Varturu. We also have plans to rehabilitate people live on tank-bund area. For the comprehensive development of lakes from BDA, we have evacuated encroachers of Varturu and Bellandur lakes and tender has been called for chain linked fencing. Rs. 850 crore Detailed Project Report (DPR) is ready for the development of these two lakes. ƒƒ What is your plan of action for social development? In these four years the crime rate in Mahadevapura has drastically been reduced by 25%. I will put my efforts to reduce it further. I am committed to the upliftment of all SC, ST, OBC people and the poor of my constituency and their social development. We implement all state and BBMP social schemes and programs with complete seriousness. Shelter and water for the homeless is my slogan. My aim is to provide all basic facilities, including water to all 34 villages which have been included in BBMP jurisdiction. ƒƒ What is your overall feeling, when you look at the work you have done? I have a dream of making Mahadevapura the foremost developmental model in Bangalore. I have been working towards the dream since 2008. I am sure that, I will achieve the dream with the love and support of the people in another 5 years i.e.,by 2018.

MAHADEVAPURA JANAHITA

69

ARVIND LIMBAVALI JANAHITA ENGLISH  

A book on the developmental activities carried out by Shri Arvind Limbavali in Mahadevapura Assembly Constituency during 2008-12. The book...

Read more
Read more
Similar to
Popular now
Just for you