AREA

WORK

AMOUNT

(RS.IN LAKHS)

A gigantic pipe line of 18 k.m has been installed to supply Cauvery water

2200.00

264 Bore wells to supply water to the areas covered under B.W.S.S.B .

1320.00

TOTAL AMOUNT OF COMPLETED WORKS

10924.71

Works in progress Bellanduru

Chalaghatta: The drainage system has been improved in Chalaghatta area with huge pipe lines

900.00

Bellanduru

Kadubisanahalli: Rain water canal to be started near Kadubisanahalli B.W.S.S.B water treatment plant

18.00

Bidarahalli

Gunduru: Irrigation with Borewell to the fields of Shri Balappa, Muniyappa of Gunduru

6.00

Bidarahalli

Gunduru: irrigation with Bore well facility to the fields of Shri Gangappa, Oddadappa of Gunduru

6.50

Bidarahalli

Gunduru: irrigation with Bore well facility to the fields of Shri Appayyappa, Muniyappa of Gunduru

6.00

Manduru

Nimbekayipura: irrigation with Bore well facility to the fields of Shri Muniyamma, late Munijambavappa of Nimbekayipura

6.00

Manduru

Nimbekayipura: irrigation with Bore well facility to the fields of Shri Hanumappa, Giddappa of Nimbekayipura

6.00

Manduru

Nimbekayipura: irrigation with Bore well facility to the fields of Shri Muniannappa, Giddappa of Nimbekayipura

6.00

Manduru

Khaji Sonnenahalli: irrigation with Bore well facility to the fields of Shri Nagaraju Kadamppa of Khaji Sonnenahalli

7.00

Hagaduru

Vijayanagara: Vijayanagara Raja canal development (M.D 451 to M.D 453)

700.00

Kadugodi

Kadugodi: Construction of Raja canal from Patalamma layout to South Pinakini river

550.00

425 KMs of drainage work is in progress

16864.00

TOTAL AMOUNT OF WORK IN PROGRESS

19075.50

Sanctioned works Bellanduru: Development of saline water lake

250.00

Haraluru: Haraluru Lake development

250.00

Kasavanahalli: Kasavanahalli Lake development

250.00

Doddakannalli: Doddakannalli Lake development

250.00

Varturu

Munnekolalu: Munnekolalu Lake development

250.00

Hagaduru

Ramagondanahalli: Sheelavanta Lake development

250.00

Varturu

Varturu: Comprehensive development of varturu lalalake evacuation and fencing (BDA)

200.00

Bellanduru

Bellanduru: Comprehensive development of bellanduru lake (evacuation and fencing, BDA)

300.00

Bellanduru

TOTAL AMOUNT OF APPROVED WORK TOTAL AMOUNT OF ANNEXURE 7

MAHADEVAPURA JANAHITA

2000.00 32000.21

111

ARVIND LIMBAVALI JANAHITA ENGLISH  

A book on the developmental activities carried out by Shri Arvind Limbavali in Mahadevapura Assembly Constituency during 2008-12. The book...