Wuzhi bridge

Site analysis foot path level original bridge level bamboo basket

max water level

2

cliff

1

3

mini water level

cliff

4

accumulated cobble

1. 2. 3. 4.

The original pier and cobbles have no rigid connection which leads to the low safety. The original bridge level is under the max water level. The original bridge is low in security and poor in comfort due to the big diffference in height with the side paths. The original bridge floor and pier have no connection which results in the unstability of the whole structure.

01

Concept • Big difference in height between original bridge floor and the surroundings • Can’t being used during the flood period

foot path level

max water level average water level

foot path level

• Placing the pier to the safe level

• Elevating the bridge to avoid the flood

accumulated cobble pier accumulated cobble pier original pier

foot path level elevated bridge level

Simple construction Safety

original bridge level

Function • Rationalizing the structure

foot path level min bridge span cantilevered brace

Yeah

max water level

bird’s view


Wuzhi bridge

Easy to build Material

bamboo

E

steel

D

bamboo

C

stone

B

steel

A

02

construction procedure • The loads on bridge floor transmit to the cantilever support. • The support and bridge pier work together as a self-balancing system. • The size and form of components may be further optimized if needed.

24000 mm 12000 mm

6000 mm

1500 mm

6000 mm

structure analysis

plan 1:10 24000 mm 12000 mm

4000 mm

2000 mm

1500 mm 2000 mm 1000 mm

4000 mm

2000 mm 1000 mm

2000 mm

elevation 1:10

elevation 1:10

Team No.29 XYZ  

Team No.29 XYZ