ARDEX Guide To Waterproofing Sheet Membranes

Page 12

ARDEX Torch Applied Membrane Installation Details TYPICAL IRMA ROOF DETAIL

BELOW GRADE DETAIL Preferred Option

Top of ARDEX Torch Applied Membrane turned and sealed into chase

Ground Level

Top of ARDEX bitumen mineral turned and sealed into chase

Protection Board

Vertical ARDEX bitumen membrane

Sheet piling and formwork Vertical ARDEX Torch Applied Membrane

Horizontal ARDEX bitumen membrane

Structural Floor Slab Steel reinforcing Protection Screed

Alternate Option Drainage Fill

Perforated Drainage Core

Site Concrete

Horizontal ARDEX Torch Applied Membrane

Top of ARDEX bitumen mineral turned and sealed into chase

Important Note: Drainage core should always be positioned lower than the horizontal membrane

Vertical ARDEX bitumen membrane

Horizontal ARDEX bitumen membrane

12

July 2007


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.