Page 1

at

Po

rtf

ol

io a

e

ur an

du

Kh

ra

ya

rg

an

de

Ar

Un


Aranya Khurana 9th September 1995 English, Hindi, French aranya.gtr09@gmail.com +91 98 108 29 570 I have a keen interest in combining concepts and understandings from varied fields such as art, science, music, philosophy, and architecture without restraining myself to any one for too long. Keeping an attitude of open-minded skepticism has proved to be helpful more than a few times. My philosophy is to approach everything with calmness, kindness and creativity. Bachelor of Architecture

2013 - 2018

Sushant School of Art and Architecture, Gurugram, Harayana, India

Senior Secondary School [CBSE]

2013

Delhi Public School, Noida

- Presented Architects’ work at IAD, 2017 - Mobile Installation for metaSSAA 2017 - Educational trip to

Italy 2014 : Rome, Florence, Venice India 2015 : Sumari, Uttarakhand Japan 2016 : Tokyo, Kyoto, Osaka

AutoCAD

Sketchup

PLAYING GUITAR - 1.0

MUSIC

V-Ray

READING

Photoshop

WRITING

Illustrator

InDesign

MS Office


- 1.0

Curriculum Vitae

Âą 0.0

Contents

+ 1.0

+ 2.0 + 3.0

+ 4.0

CONTENTS

The Music Street Public Nexus for Musicians Tughlaqabad, Delhi

Urban Design Studio Former Birla Mills, Shakti Nagar, Delhi

Housing High-End Apartments Greater Kailash II, Delhi

Spirals of Contrast Mobile Wall Installation Sushant School of Art and Architecture, Gurugram

+ 5.0

Working Drawings

Âą0.0


The Music Street Public Nexus for Musicians Tughlaqabad, Delhi The project was conceptualised as an amalgamation of a good public space as well as an immersive experience for musicians of all kinds. By doing this, it attempts to fill the dearth of these in the city. Insipred by the street musicians found

occasionally

in

Con-

naught Place and cities more encouraging of street music, the project is a vibrant elliptical street flanked by performance niches, a large stage, food stalls, an arcade with open seating, private

practice

rooms

and

instrument rental and storage. Inside are a music school, a library on the first floor and lodging for visitors on the second floor. Also present is a large auditorium. The curved and meandering form of the building is inspired by the Tughlaqabad fort closeby and done in pigmented concrete around a steel skeleton. Working drawings for the same were developed in the subsequent semester.

+1.1






+1.2


+2.1

Former Birla Mills, Shakti Nagar, Delhi

Urban Design Studio


+2.2


Housing High-End Apartments Greater Kailash II, Delhi

+3.1


+3.2


Spirals of Contrast Mobile Wall Installation Sushant School of Art and Architecture, Gurugram

+4.0


Working Drawings Steel Truss

+5.1


NOTES:

Working Drawings

ALL MEASUREMENTS ARE IN MM ALL DRAWINGS ARE TO BE READ NOT MEASURED.

The Music Street

SLOPE 1 IN 10

DOWN

KEY PLAN COLONNADE IN KOTA STONE AS/DETAIL

FOOTPATH IN ROUGH CHISELED DELHI QUARTZITE AS/DETAIL

PLANTER AS/DETAIL



T'

DATE ISSUES



UP

SLOPE 1 IN 20

DOWN

S.NO.DATE REVISION

DETAIL EW TYPICAL EXTERNAL WALL SECTION AS/DRAWING TMZ-011

T

PE

1

IN

BY

20

O

SL

PROJECT NAME TUGHLAQABAD MUSIC ZONE

N

PROJECT DRAWING TITLE: SITE PLAN NAME: ARANYA KHURANA ROLL NO. 6 THIRD YEAR (C)

SCALE 1:200 DATE 21-01-2016 SIGNATURE

+5.2

REMARKS

SUSHANT SCHOOL OF ART AND ARCHITECTURE

DRAWING NO.

TMZ-01


NOTES:

Working Drawings

ALL MEASUREMENTS ARE IN MM ALL DRAWINGS ARE TO BE READ NOT MEASURED C1, C2, C3... ARE CURVES AND MARK THE BEGINNING, MIDDLE AND END OF A CURVE ALL CURVES AND REFERENCES ARE WITH RESPECT TO CENTRE LINES RING BEAM OFFSET IS 360MM ON BOTH SIDES OF CENTRE LINE R1, R2, R3... ARE STEEL RIBS OR THEIR CORRESPONDING STEEL GUSSET PLATES

The Music Street

R37 R36

C10 R38

R35 C9

C10

C10 R39

R29 C8

KEY PLAN

C11

R30

C8

R31 C9

R34

R40

C9

R28

C11

R33

R32

C11

C8

R43 C12

R41

R44 R45 C12

R42

R27 C7

C12 R26

R48

C1

DATE ISSUES

R46

R47

R49 C7 R25

C1

R1

C7 R22 C6 R23

R24

R9

R2 C3

R21

S.NO.DATE REVISION

R8

C6 R20

BY

C1 C2 C6

R18

R3 R10

R19 C5

C3

R17

C2

C5

R7

R4 R6

C3

R16 R11 C5

R5

C2

C4

R15 C4 R12

N

PROJECT NAME TUGHLAQABAD MUSIC ZONE PROJECT

R14 C4 R13

DRAWING TITLE: CENTRE-LINE SETTING OUT PLAN NAME: ARANYA KHURANA ROLL NO. 6 THIRD YEAR (C)

SCALE 1:100 DATE 21-01-2016 SIGNATURE

+5.3

REMARKS

SUSHANT SCHOOL OF ART AND ARCHITECTURE

DRAWING NO.

TMZ-09


NOTES:

Working Drawings

ALL MEASUREMENTS ARE IN MM ALL DRAWINGS ARE TO BE READ NOT MEASURED.

The Music Street

1'

GP 2' G G P3' GP P4' GP 1 5' G GP G P6' 2 G G P7' P3 P8 G G G ' P4 G P1 P9' G P1 0' P5 1' G P6

GP24

6

12

GP2

GP 90 GP 91 GP 92 GP 3 GP9 4 GP9

GP95

GP96

Footpath Right Side Point Coordinates Point GP1' GP2' GP3' GP4' GP5' GP6' GP7' GP8' GP9' GP10' GP11' GP12' GP13' GP14' GP15' GP16' GP17' GP18' GP19' GP20' GP21' GP22' GP23' GP24' GP25' GP26' GP27' GP28' GP29' GP30' GP31' GP32' GP33'

Vertical Distance from Gridline 1 41753.0247 42542.9583 43316.3253 44065.1446 44788.177 45485.4002 46158.6307 46808.2354 47432.3835 48025.7991 48582.7001 49097.1772 49563.8062 49979.5202 50342.0735 50649.2816 50899.0816 51089.5686 51217.3473 51276.2433 51259.2223 51158.8302 50967.6838 50679.2289 50326.5815 49801.9471 49227.0652 48573.1335 47847.6192 47059.7139 46206.5546 45301.2966 44345.5081

Horizontal Distance from Gridline H 10766.4022 11603.5882 12456.562 13331.1394 14227.038 15143.4268 16077.4541 17028.0667 17995.571 18982.205 19989.8804 21019.8401 22072.3268 23145.9375 24238.6408 25348.1703 26472.0119 27607.4068 28751.5347 29901.2354 31052.2782 32199.0132 33334.0987 34448.3789 35547.3899 36574.0618 37571.2903 38518.6033 39412.3088 40251.5615 41024.7848 41735.8563 42377.3861

Point GP34 GP35 GP36 GP37 GP38 GP39 GP40 GP41 GP42 GP43 GP44 GP45 GP46 GP47 GP48 GP49 GP50 GP51 GP52 GP53 GP54 GP55 GP56 GP57 GP58 GP59 GP60 GP61 GP62 GP63 GP64 GP65 GP66

Vertical Distance from Gridline 1 44616.2704 43419.2078 42178.9435 40902.1319 39598.0466 38277.6847 36950.5048 35624.0059 34303.846 32994.1271 31697.9099 30436.8053 29157.7213 27919.0167 26704.2995 25515.5913 24354.7502 23223.5441 22123.5673 21056.5459 20024.0983 19027.738 18068.7798 17148.3474 16267.3791 15426.642 14627.4654 13872.7242 13165.7255 12510.0144 11909.3353 11367.5702 10888.6518

Horizontal Distance from Gridline H 45124.2171 45698.3482 46171.868 46535.3193 46783.886 46922.5385 46958.95 46901.76 46759.7512 46541.3032 46253.2819 45823.834 45481.4557 45003.1167 44466.7617 43874.9826 43230.2419 42534.8173 41790.9638 41000.5639 40165.5051 39287.6993 38369.1772 37412.0486 36418.4724 35390.6263 34330.1488 33237.6101 32113.5975 30958.9252 29774.7036 28562.41 27323.9551

Footpath Right Side Point Coordinates Point GP34' GP35' GP36' GP37' GP38' GP39' GP40' GP41' GP42' GP43' GP44' GP45' GP46' GP47' GP48' GP49' GP50' GP51' GP52' GP53' GP54' GP55' GP56' GP57' GP58' GP59' GP60' GP61' GP62' GP63' GP64' GP65' GP66'

Vertical Distance from Gridline 1 43343.3775 42299.2727 41218.1559 40106.2135 38972.3567 37825.9919 36674.9744 35525.464 34382.0593 33248.0552 32125.8641 31017.8611 29926.2751 28853.0723 27799.9812 26768.5249 25760.0554 24775.7899 23816.847 22884.2818 21979.1375 21102.6046 20255.9067 19440.2022 18656.5854 17906.0884 17189.6967 16508.8462 15865.6564 15262.3715 14701.2938 14184.7494 13715.0441

Horizontal Distance from Gridline H 42943.7643 43428.3566 43823.4249 44120.7403 44318.9305 44423.2097 44440.4668 44378.2928 44244.3095 44045.7359 43788.5916 43475.8918 43109.9588 42693.165 42227.8757 41716.4022 41160.9677 40563.6827 39926.529 39251.351 38539.8304 37793.3462 37013.1842 36200.671 35357.1679 34484.0652 33582.7672 32654.3333 31699.4287 30718.831 29713.4931 28684.5704 27633.445

Footpath Left Side Point Coordinates Point GP67 GP68 GP69 GP70 GP71 GP72 GP73 GP74 GP75 GP76 GP77 GP78 GP79 GP80 GP81 GP82 GP83 GP84 GP85 GP86 GP87 GP88 GP89 GP90 GP91 GP92 GP93 GP94 GP95 GP96 GP97

Vertical Distance from Gridline 1 10476.4485 10134.6227 9866.1817 9672.8944 9556.7865 9520.4777 9567.1142 9700.2594 9923.7222 10241.2998 10656.4185 11171.6439 11786.6282 12497.6851 13300.8182 14191.7729 15165.7374 16215.537 17326.725 18486.2677 19684.8714 20916.0724 22175.7123 23461.3523 24763.1679 26068.1739 27382.9056 28703.5758 30029.0727 31355.6613 32681.5124

Horizontal Distance from Gridline H 26061.7389 24778.6855 23478.3024 22164.6493 20841.9473 19514.6687 18187.7304 16866.6879 15557.9199 14268.7849 13007.7111 11784.159 10607.5911 9486.4751 8429.3801 7445.1912 6543.1019 5730.4578 5003.8306 4357.0313 3785.7675 3288.6138 2868.7974 2537.3043 2275.2912 2029.4029 1843.2825 1705.2297 1625.8986 1648.8297 1729.733

DATE ISSUES

Footpath Right Side Point Coordinates Point GP67' GP68' GP69' GP70' GP71' GP72' GP73' GP74' GP75' GP76' GP77' GP78' GP79' GP80' GP81' GP82' GP83' GP84' GP85' GP86' GP87' GP88' GP89' GP90' GP91' GP92' GP93' GP94' GP95' GP96' GP97'

Vertical Distance from Gridline 1 13294.4114 12924.9526 12608.5723 12347.21 12144.4647 12005.2175 11935.1732 11940.7624 12028.923 12206.6952 12480.5743 12896.2602 13367.0008 13907.5041 14533.2742 15240.5783 16025.5708 16883.955 17809.3799 18787.9135 19806.8501 20916.0724 21915.7154 23014.0543 24131.1459 25260.7743 26398.389 27542.9297 28690.6209 29840.7411 30976.3915

Horizontal Distance from Gridline H 26561.7438 25471.3476 24364.3891 23243.172 22109.9052 20967.12 19818.0441 18666.885 17519.1374 16381.8703 15263.9072 14192.0485 13141.3411 12125.0921 11159.0139 10250.9449 9409.1535 8642.3761 7957.9585 7351.6926 6815.9591 6315.4847 5896.382 5551.5577 5273.1976 5050.8776 4873.6442 4752.4805 4660.2355 4636.9874 4819.8222

S.NO.DATE REVISION

BY

1

GP25

89

Footpath Left Side Point Coordinates

P1

G

28

P7

29

88

GP

Horizontal Distance from Gridline H 7676.493 8583.3601 9575.8112 10603.0678 11662.1708 12749.1452 13862.0255 14997.4658 16153.7502 17329.6482 18523.962 19736.9625 20970.1027 22222.5098 23513.3185 24779.0788 26079.7625 27392.5063 28714.3108 30041.2858 31368.3556 32688.9861 33994.9905 35276.5049 36522.4213 37723.6685 38874.1877 39969.066 41003.9996 41974.876 42877.4232 43706.9208 44457.9554

G

14

17

15 GP

GP 27

7

P8

G

Vertical Distance from Gridline 1 43458.4717 44427.7182 45309.8656 46151.3154 46952.3357 47715.1175 48439.5981 49128.2016 49781.1954 50398.1730 50978.6992 51519.042 52011.6472 52452.9571 52771.0399 53169.4031 53436.6093 53635.9687 53761.959 53807.7192 53766.0117 53629.4035 53390.7923 53044.1521 52585.8456 52020.6169 51358.1230 50607.1796 49775.5306 48869.9042 47896.1587 46859.4837 45764.6438

3

1 GP

GP

GP

6

P8

GP1 GP2 GP3 GP4 GP5 GP6 GP7 GP8 GP9 GP10 GP11 GP12 GP13 GP14 GP15 GP16 GP17 GP18 GP19 GP20 GP21 GP22 GP23 GP24 GP25 GP26 GP27 GP28 GP29 GP30 GP31 GP32 GP33

16

GP

GP

9

8

GP1

GP20

GP1

GP21

GP22

GP23

GP

GP

GP75

GP

G G P3 GP P32 3' GP 31' ' GP 30' 2 GP2 9' 8 GP2 ' 7' GP26' GP25'

P3 2

5

G

GP97

P9 G 0 P1

30

G

7' P8 G 88' P ' G 89 P G 0' 9 GP 1' 9 GP ' 92 GP ' 93 GP ' 94 GP 95' GP ' GP96 GP97'

G

P3 1

Point

P8

P8 G

G

Footpath Left Side Point Coordinates

G

2' P1 G 13' P G 14' P ' G 15 GP 6' 1 GP 7' 1 GP 18' GP 19' GP 0' GP2 1' GP2 GP22' GP23' GP24'

GP

GP78' GP76 GP79' GP77 GP80 ' GP8 GP78 GP 1' 82' G GP7 9 GP P83' G 8 GP G P8 4' 80 P8 5' GP 6' 81 GP 82 G P8 G 3 P8 4

7

GP74

P5

56

GP73

GP77' GP76' GP75' 4' GP7 3' GP7 72' GP ' 71 GP ' 70 GP 9' 6 GP 8' 6 GP 7' P6 G 66' P G 65' P G

G

G P6 G P6 4' G P62 3' P6 G GP 1 ' 55 GP P60 ' GP GP 59' ' 54 5 8' GP GP 53 GP 57' GP GP 56' 52 55' GP GP 5 51 GP5 4' GP5 3 0 GP5 ' 2 ' GP4 GP5 9 1' GP50 GP48 ' GP49' GP47 GP48' GP46 GP47' GP46 ' GP45 GP45' GP44 GP44' GP43 GP43' P42' G 2 GP4 ' GP41 GP41 0' GP4 39' GP40 GP ' 38 9 GP 7' GP3 P3 ' G 6 38 P3 GP G 35' P 37 G 34' GP P G 36 GP 5 3 P G 4 P3 G 3 P3 G

G

GP

GP72

1 GP7 0 GP7

68

69

GP

GP

67

GP

66

GP

65

GP

4

P6

G

3

1

0

2

P6

8

9

G

P5

P5

P6

P6

P6

G

G

G

G

G

KEY PLAN

N

PROJECT NAME TUGHLAQABAD MUSIC ZONE PROJECT

DRAWING TITLE: PLAN SHOWING FOOTPATH GUIDE POINTS NAME: ARANYA KHURANA ROLL NO. 6 THIRD YEAR (C)

SCALE 1:200 DATE 21-01-2016 SIGNATURE

+5.4

REMARKS

SUSHANT SCHOOL OF ART AND ARCHITECTURE

DRAWING NO.

TMZ-013


NOTES:

Working Drawings

ALL MEASUREMENTS ARE IN MM ALL DRAWINGS ARE TO BE READ NOT MEASURED ALL FOOTINGS ARE OFFSET 450 FROM THE OUTER EDGE OF COLUMNS, SHEAR WALLS AND RETAINING WALL

The Music Street

UP

DOWN

KEY PLAN

DATE ISSUES

S.NO.DATE REVISION

BY

N

PROJECT NAME TUGHLAQABAD MUSIC ZONE PROJECT DRAWING TITLE: FRAMING PLAN NAME: ARANYA KHURANA ROLL NO. 6 THIRD YEAR (C)

SCALE 1:200 DATE 21-01-2016 SIGNATURE

+5.5

REMARKS

SUSHANT SCHOOL OF ART AND ARCHITECTURE

DRAWING NO.

TMZ-010


NOTES:

Working Drawings

ALL MEASUREMENTS ARE IN MM ALL DRAWINGS ARE TO BE READ NOT MEASURED.

The Music Street

METAL GRILLE

AS/DRAINAGE DESIGN AND APPROVED SAMPLE

CONVEX MIRROR

UP

SLOPE 1 IN 10

AS/APPROVED SAMPLE

CONVEX MIRROR

DOWN

SLOPE 1 IN 10

AS/APPROVED SAMPLE

KEY PLAN

C1

AS/STRUCTURAL DETAIL

ECS 12

ECS 1

ECS 2

ECS 3

ECS 4

ECS 5

ECS 6

ECS 7

ECS 8

ECS 9

ECS 10

ECS 11

ECS 13

ECS 14

ECS 15

ECS 16

ECS 17

ECS 18

ECS 19

ECS 20

ECS 21

ECS 22

ECS 23

C1

AS/STRUCTURAL DETAIL

ECS 63

ECS 64

ECS 65

ECS 66

ECS 67

ECS 68

ECS 69

ECS 70

ECS 71

ECS 72

ECS 73

ECS 74

DATE

C1

ISSUES

AS/STRUCTURAL DETAIL

ECS 75 ECS 24

ECS 25

ECS 26

ECS 27

ECS 28

ECS 29

ECS 30

ECS 31

ECS 32

ECS 33

ECS 34

ECS 35

ECS 36

ECS 37

ECS 38

ECS 39

ECS 40

ECS 41

ECS 42

ECS 43

ECS 44

ECS 45

ECS 46

ECS 47

C1

AS/STRUCTURAL DETAIL

ECS 77

ECS 78

ECS 79

ECS 80

ECS 81

ECS 82

ECS 83

ECS 84

METAL GRILLE

AS/DRAINAGE DESIGN AND APPROVED SAMPLE

UP

SHEAR WALL

ECS 76

ECS 85

ECS 86

ECS 87

ECS 88

ECS 89

ECS 90

ECS 91

ECS 92

ECS 93

ECS 94

ECS 95

ECS 96

ECS 97

ECS 98

ECS 99

ECS 100

ECS 101

ECS 102

ECS 103

ECS 104

AS/STRUCTURAL DETAIL

S.NO.DATE REVISION SPIRAL STAIRCASE

SHEAR WALL

AS/DRAWING NO. TMZ-07

AS/STRUCTURAL DETAIL

BY

METAL GRILLE

AS/DRAINAGE DESIGN AND APPROVED SAMPLE

ECS 48

ECS 49

ECS 50

ECS 51

ECS 52

ECS 53

ECS 54

ECS 55

ECS 56

ECS 57

ECS 58

ECS 59

ECS 60

ECS 61

ECS 62

PROJECT NAME TUGHLAQABAD MUSIC ZONE

N

PROJECT DRAWING TITLE: TYPICAL BASEMENT PLAN NAME: ARANYA KHURANA ROLL NO. 6 THIRD YEAR (C)

SCALE 1:200 DATE 21-01-2016 SIGNATURE

+5.6

REMARKS

SUSHANT SCHOOL OF ART AND ARCHITECTURE

DRAWING NO.

TMZ-06


NOTES:

Working Drawings

ALL MEASUREMENTS ARE IN MM ALL DRAWINGS ARE TO BE READ NOT MEASURED R1, R2, R3... ARE STEEL RIBS OR THEIR CORRESPONDING STEEL GUSSET PLATES

The Music Street

R17

R41

KEY PLAN

DATE ISSUES SECTION TT' TYPICAL SECTION THROUGH BUILDING

R13

R12 R11 R10

R6 R9 R7 R5 R8

R4 R3 R2

R1

R49

R48

R47

R46

R45

S.NO.DATE REVISION

BY

PROJECT NAME TUGHLAQABAD MUSIC ZONE PROJECT ELEVATION EE' TYPICAL ELEVATION OF BUILDING

DRAWING TITLE: SECTIONS AND ELEVATIONS NAME: ARANYA KHURANA ROLL NO. 6 THIRD YEAR (C)

SCALE 1:100 DATE 21-01-2016 SIGNATURE

+5.7

REMARKS

SUSHANT SCHOOL OF ART AND ARCHITECTURE

DRAWING NO.

TMZ-07


NOTES:

Working Drawings

ALL MEASUREMENTS ARE IN MM ALL DRAWINGS ARE TO BE READ NOT MEASURED. R1, R2, R3... ARE STEEL RIBS OR THEIR CORRESPONDING STEEL GUSSET PLATES

The Music Street

VIEW SHOWING RING BEAM TO STEEL RIB JOINERY SCALE 1:100

DATE 1 IN 10 SLOPE INWARDS GROOVE

STAIRCASE SECTIONAL ELEVATION

5

6

7

4

ISSUES

3

8

2

9

1

10 UP

11 12 13

21 14

20 15

16

17

18

S.NO. DATE REVISION

19

DETAIL S STAIRCASE TYPICAL PLAN DETAIL P TYPICAL PLATE FOR FIXING OF PRECAST RIBS SCALE 1:25

R9

R8

R7

R6

R5

R17

TYPICAL ELEVATIONS OF PRECAST STRUCTURAL STEEL RIBS AS/SHOP DRAWINGS SCALE 1:50

+5.8

DETAIL EW TYPICAL EXTERNAL WALL SECTION SCALE 1:50

STEEL "I" SECTION STEEL FIN ANCHORED STEEL RAILING PRECAST RCC BALCONY 10 THK TILE 10 THK MORTAR 150 THK RCC SLAB ANCHOR BOLTS LEFT IN WHILE CASTING HOOKS AND WIRE WIRE MESH 25 THK FALSE CEILING STEEL CAP FOR STEEL RIB ALCOVE FOR 12' CONCEALED SPEAKER DRY CLADDING IN PRECAST CONCRETE STEEL RIB 16 THK WELDED FINS 8 THK STEEL PLATE ANCHOR BOLTS LEFT IN WHILE CASTING CONCRETE TIE BEAM AS/ 10 THK MORTAR 10 THK TILE 150 THK PCC

BY

N

PROJECT NAME TUGHLAQABAD MUSIC ZONE PROJECT DRAWING TITLE: DETAILS NAME: ARANYA KHURANA ROLL NO. 6 THIRD YEAR (C)

SCALE REFER TO DETAIL DATE 21-01-2016 SIGNATURE

REMARKS

SUSHANT SCHOOL OF ART AND ARCHITECTURE

DRAWING NO.

TMZ-011


NOTES:

Working Drawings

ALL MEASUREMENTS ARE IN MM ALL DRAWINGS ARE TO BE READ NOT MEASURED.

Toilet Details

DETAIL T1

DETAIL T5

KEY PLAN DETAIL T3

DETAIL T2

DETAIL T6 DETAIL T4

SECTION AA' SECTION BB'

B'

SECTION CC'

DATE ISSUES

C

S.NO.DATE REVISION A'

BY

DETAIL T1 DETAIL T5

A

DETAIL T3

B

C'

PROJECT NAME TUGHLAQABAD MUSIC ZONE

TYPICAL TOILET PLAN

PROJECT DETAIL T2 DETAIL T6 DETAIL T4

DRAWING TITLE: TOILET DETAILS NAME: ARANYA KHURANA ROLL NO. 6 THIRD YEAR (C)

SCALE 1:25 DATE 21-01-2016 SIGNATURE

+5.9

REMARKS

SUSHANT SCHOOL OF ART AND ARCHITECTURE

DRAWING NO.

TMZ-012

B.Arch. Undergraduate Portfolio - Aranya Khurana  

Contains projects worked on at Sushant School of Art and Architecture upto Fourth Year (Eighth Semester) including: 1. Mini-Thesis 2. Urban...

B.Arch. Undergraduate Portfolio - Aranya Khurana  

Contains projects worked on at Sushant School of Art and Architecture upto Fourth Year (Eighth Semester) including: 1. Mini-Thesis 2. Urban...