Page 1

PORT TARIFFS 2013. PORT AUTHORITY OF CASTELLÓN

WASTE FEE FOR SEAGOING VESSELS

ZONE I SOLID SHIP-RELATED WASTE (appendix V, MARPOL 73/78 Agreement) Positioning and removal of container 1m3………94,94 €/Cont

SHIP-RELATED WASTE CONTAINING OIL (appendix I, MARPOL 73/78 Agreement) 24 hours service……………………………………40,25 €/m3 Pumping service: st

- 124,91 € 1 hour nd - 78,65 € 2 hour onwards

RECEPTION OF BLACK AND GREY WASTE WATERS (appendix IV of the MARPOL 73/78 Agreement) Tariff: Positioning, receipt, transfer and delivery in the treatment plant……. 46,26 €/m3 Minimum billing…………………………………………… 15 m3/Vessel

ZONE II On BP concession as provider and user of barge exclusively.

SOLID SHIP-RELATED WASTE (appendix V of the MARPOL 73/78 Agreement) Positioning and removal of container 1m3………118,67 €/Cont

SHIP-RELATED WASTE CONTAINING OIL (appendix I of the MARPOL 73/78 Agreement) 24 hours service……………………………………50,31 €/m3

1/5


PORT TARIFFS 2013. PORT AUTHORITY OF CASTELLÓN

PILOTAGE Flat rate with no surcharges and new tariff for maneuvers in Infinita dock, future docks and berths for ships carrying IMO 2 and 3 liquid bulks in the South Basin.

ZONE I ENTRY / EXIT

GT

ENTRY / EXIT

Up to 1,000

254,48

317,33

From 1,000 to 5,000

254,48 + 0,0301 x GT

317,33 + 0,0377 x GT

From 5,000 to 10,000

254,48 + 0,0315 x GT

317,33 + 0,0393 x GT

From 10,000 to 25,000

254,48 + 0,0268 x GT

317,33 + 0,0335 x GT

From 25,000 to 50,000

254,48 + 0,0207 x GT

317,33 + 0,0258 x GT

(Infinita dock)

For operations related to sifting and docking change the price charged will be 75% and 100% respectively taking as a reference the entry or exit rates.

MOORING AND UNMOORING ZONE I COMMERCIAL PORT T (€/MOV) = 0,019 * GT + 46,89 € Mooring boat = 96,07 € (no compulsory) INFINITA RENOVABLE DOCK IN SOUTH BASIN T (€/MOV) = 0,038 * GT + 383,27 € (including mooring boat)

ZONE II BP PLATFORM T (€/MOV) = 0,0506 * GT + 689,45 € (including mooring boat)

BP BUOY FIELD T (€/MOV) = 0,0246 * GT + 1.900,06 € (including mooring boat)

The application rules in the two zones are invariable.

2/5


PORT TARIFFS 2013. PORT AUTHORITY OF CASTELLÓN

TOWAGE

ZONE I ZONE I GT Euros/GT by docking maneuver 0-6,000 0.1334 6,001-7,000 0.1906 7,001-16,000 0.227 16,001-19,000 0.2529 From 19,001 the following formulas apply, where GT is the GTs of the ship and the result of the formula is the cost in euros of docking or undocking maneuver. ZONE I GT Euros/GT by docking maneuver 19,001-25,000 0.0109 x (GT) + 4,602.27 25,001-30,000 0.085 x (GT )+ 2,750.08 30,001-35,000 0.3278 x (GT) + -4,534.89 35,001-40,000 0.00266 x (GT) + 6,853.92 40,001-50,000 0.1627 x (GT) + 443.17 From 50,001 onwards 208.97 € is added per 5,000 GT or part thereof. Apply fee for Infinita Renovables in South Basin of Zone I

GT 0-6,000 6,001-7,000 7,001-16,000 16,001-19,000

ZONE I - INFINITA RENOVABLES Euros/GT by docking maneuver 0.2365 0.2687 0.2902 0.3118

GT 19,001-25,000 25,001-30,000 More than 30,000

ZONE I - INFINITA RENOVABLES Euros/GT by docking maneuver 0.0136 x (GT) + 5,681.28 0.1264 x (GT) + 4,090.74 0.4706 x (GT) - 6,509.76

ZONE II

GT 30,000 – 90,000

ZONE II (BUOY FIELD) Euros/GT by docking maneuver 0.3905

From 90,001 GT onwards 499.56 € is added per 5,000 GT or part thereof. ZONE II (PLATFORM) GT Euros/GT by docking maneuver 1,000 – 13,000 0.6975 13,001 – 50,000 0.7097 From 50,001 onwards 339.93 € is added per 5,000 GT or part thereof.

3/5


PORT TARIFFS 2013. PORT AUTHORITY OF CASTELLÓN

COMMERCIAL SERVICES 2012. FRESH WATER VESSELS PROVISION Rate M3 fresh water by pipeline

3.65 €

M3 fresh water by barge in Zone I

5.1191 €

M3 fresh water by barge in Zone II

7.6735 €

Extra hour

46.44 €

MINIMUM SERVICES

Minimum service of 25 m3 in Zone I Minimum service of 40 m3 in Zone II (dock)

SHIP - GENERATED WASTE Size of vessels:

Less or equal to 2,500 GT: 1.50 From 2,501 GT to 25,000 GT: 6*0.0001*GT From 25,001 GT to 100,000 GT: 1.2*0.0001*GT)+12 As from 100,000 GT: 24

COMMECIAL SEVICES 2013. OWN SERVICES BY STORAGE -

Uncovered

0.03 €/m2/day

-

Covered

0.06 €/m2/day

-

Closed

0.07 €/m2/day

BY SUPPLY -

Electrical energy

0.114 €/Kw.

-

Electrical energy for cranes

0.140 €/Kw.

-

Water

0.610 €/m3.

BY OTHER SERVICES -

Lighting to cranes (per tower)

1.59 €

-

Railroad traces (per tower)

0.60 €

4/5


PORT TARIFFS 2013. PORT AUTHORITY OF CASTELLÓN

-

Docks’ cleaning at Comercial Basin: o

Bulk solids

0.03 €/Tons

o

Rest of cargo

0.02 €/Tons

o

Removal and disposal of inert bulk

12 €/Tons

solid waste -

Docks’ cleaning al Fishing Basin

0.40 €/Tons

5/5

PORT TARIFFS2013  

PORT TARIFFS2013