Page 1

ANTONY TSELIOS CV mail: antonytselios@gmail.com phone: 6970661974 OBJECTIVE Looking for a professional team environment, a challenging architecture and engineering experience. CORE COMPETENCIES Over 10 years of architectural experience with new design and construction Experienced in managing construction details while implementing the design process Detailing and waterproofing experience Strong ability to multi-task, able to perform creatively and efficiently within project deadlines Extremely good at sketching – drawing PROFESSIONAL EXPERIENCE ARCHITECT- DESIGNER FerrariMoe LLP SAN RAFAEL, ARCHITECT- DESIGNER CJK design group, SAN RAFAEL, ARCHITECT- PARTNER “Tselios, Mariatos, Papageorgiou, Molla Ltd.” JUNIOR ARCHITECT “Theros Architecture Ltd.” Reserve officer - Greek army DESIGNER “Theros Architecture Ltd.” JUNIOR DESIGNER “Triantafillou & partners Architects Ltd.“

CALIFORNIA USA, 2014-2017 CALIFORNIA USA, 2012-2014 ATHENS, GREECE, 2006-2012 ATHENS, GREECE, 2004-2006 ATHENS, GREECE, 2002-2004 ATHENS, GREECE, 1999-2002 ATHENS, GREECE, 1998 -1999

RESIDENTIAL PROJECTS Housing-complexes, vacation houses, family houses, multi-story, luxury complexes, small hotels and rental housing projects (Athens greater area). Olympic Village housing installations projects, Athens 2004 Olympics facilities COMMERCIAL PROJECTS Renovations of multi-story office buildings Renovation of commercial shops, cafés, lounges, and restaurants projects Landscaping studies for large enterprise’s properties Studies and planning of cinema complexes projects SPORTS FACILITIES Architectural ontest for the Athens Equestrian center, 2004 Olympic Games installations. Swimming training center installation, Veria city. (Construction Bidding contest, Greece 2004) RESTORATION PROJECTS Restoration study of a traditional neighbourhood. Amfissa city, Greece 2004 Measurement and plan imprinting of churches of the Hellenistic period in Istanbul and monasteries. “Agio Oros” (1997-1999) MUNICIPAL PROJECTS National architectural contest for the Agrinio city Town Hall as part of the team of “Theros architects” and created the project’s model (1st PRIZE) Model building for the architectural contest of Agia Paraskevi city hall Participated in architectural contest for the re-design of the central square of Kozani city, Northern Greece


OTHER Design study of a cohesive agency image applied to 200 agencies in Crete Island, Greek Organization of Football Prognostics SA Athens, Greece (OPAP) 2011 Designed the logo of the newly build premises of TEXACO Greece S.A. 2001 EASA organizing team (European Architecture Students Assembly). Design and construction of light-temporary infrastructure for 200+ participants 1999 Representative of the Architectural school of Athens at the University’s Senate 1997-1999 Co-creator and comics designer of the magazine “The foundation” published by the Architects students association 1994-1996 EDUCATION NATIONAL TECHNICAL UNIVERSITY OF ATHENS Athens, Greece DIPLOMA DEGREE OF ARCHITECT ENGINEER (equivalent to a master’s degree 5 years studies) 2004 Concentration: Urban and construction analysis, planning of an educational complex with environmental design, translated a traditional earthquake-resistant method into modern constructions Thesis : Construction and processing methods of reinforced concrete TECHNICAL SKILLS Autodesk AutoCAD 2015 2D-3D Adobe Photoshop CS5 Adobe In Design CS5.5 Vectorworks 2017 3D Studio MAX 2010 Autodesk Revit 2013 LANGUAGES English Fluent Certificate of Proficiency in English, Univ. of Cambridge French Good (Superieure III) Native Greek speaker


A N TO N Y T S E L I O S WORK SAMPLES


Antony Tselios work samples

MULTISTORY HOUSING WATER MIGRATION MITIGTION

400 BEALE ST. SAN FRANCISCO ,CA 2017

Working on multistory housing waterproofing repairs is a complex task of reproducing the drawings, verifying all problems and conditions that need to be hanfled and find the optimum in terms of efficiency and finance solution. Organizing the process, prioritizing the tasks was crucial for a small size firm in order to provide the best possible service

2


2016-2017

Working at FerrariMoe LLP meant starting with field studies of the existing structural conditions and details, analyzing, measuring and creating sketches and drawings. Then providing the best possible solutions and material choices. New structures and design solutions were chosen according to each clients budget.

Antony Tselios work samples

VARIOUS DETAILS FROM RENOVATION PROJECTS, FERRARIMOE LLP

3


STRUCTURAL STUDY OF RESIDENSE - FERRARI MOE LLP

Antony Tselios work samples

Participated in studies of small residential projects. Gained valuable knowledge working in coordination with the chief Structural engineer of the firm throughout the whole process of structural study and detailing

STINSON BEACH, CA 2017

4


Antony Tselios work samples

WATER PROOFING DETAILS AT HOUSING COMPLEX FERRARI MOE LLP

2016

Working on waterproofing studies and drawings means one has to be totally clear on the choices and provide all the info needed without creating confusion

5


Antony Tselios work samples

WATER PROOFING REPAIRS AT HOUSING & COMMERCIAL COMPLEX FERRARI MOE LLP 2014

z

Waterproofing repairs on large building complexes is a challenging process. A lot of methodical field work required just to define the scope of work. Categorizing, prioritizing and proposing the right solution for each location creates a complex grid of special areas that need to be handled in coordination, a task that requires a lot of focus on behalf of all parts of the team and serious management.

6


2012-13

Antony Tselios work samples

CJK DESIGN GROUP RELIGIOUS BUILDINGS

ST. CONSTATNINE AND HELEN, ONE OF THE MANY GREEK ORTHODOX CHURCHES CJK GROUP DESIGNED AND SUPPORTED THROUGH ALL THE PHASES, FOUNDING/DONATIONS, PERMIT AND CONSTRUCTION

v

FLOOR MEDALLION, DECORATIVE ELEMENT FOR BIDDING

7


2012-13 WORKING AT CJK DESIGN GROUP, DESIGNED ALL ELEMENTS OF GREEK ORTHODOX CHURCHES INTERIOR LIKE TRADITIONAL “TEMPLON” AND ALL FURNISHING. FROM SKETCHES, INITIAL CONCEPT, TO SHOP DRAWINGS AND ALSO COORDINATING THE PRODUCTION

Antony Tselios work samples

CJK DESIGN GROUP RELIGIOUS BUILDINGS

2012-13

THOROUGH STUDIES OF THE CHURCH AND ALL ITS’ COMPONENTS WERE PRODUCED IN ORDER TO HELP THE COMMUNITY PROMOTE AND MOVE FORWARD WITH THE PROJECTS ALWAYS FOCUSING ON THE SPECIFIC NEEDS OF EACH PARISH

8


Antony Tselios work samples

BLOCK OF HOUSES ATHENS “PERISTERI” SUBURB 19.800 sq. feet 2011

This was a team work with 2 colleagues, Ilias Papageorgiou and Elia Karakasi. It is now build as seen in the photo.

9


Re-design the central and most important square of the city.

ARCHITECTURAL CONTEST CENTRAL SQUARE OF KOZANI CITY

2010

Antony Tselios work samples

Based on the form of traditional dances, the most important happening at festivals, we introduced the spiral shape in the center of the square that deepens towards it’s center.

10


Antony Tselios work samples

Kiosks, benches, lights , children playground v and all other details where custom designed in order to blend with the concept. ARCHITECTURAL CONTEST CENTRAL SQUARE OF KOZANI CITY 2010

All the equipment where designed in detail and explained

11


HOUSING PROJECT ZZ HOUSING PROJECT 4 STOREY HOUSING BUILDING 3 SMALL VACATION HOUSESZ “SWEET WATERS” ATTICA 3.730 sq. feet

2008

Family 3 houses building with apartments for rent on the top floor.

12

Antony Tselios work samples

The complexity of the form was designed according to the will of the owner who wanted traditional elements to be added to this rather modern construction.


28 BED HOTEL VILLAGE “FOURNA� 6.600 sq. feet 2007

Antony Tselios work samples

This hotel has 28 beds in 12 rooms and follows the regulations of the Greek Tourism Organisation. 2 building complex. One building contains all the needed supporting installations, restaurant, living space, bar and offices and the other is the accommodation building.

2007

Designed using elements from traditional style that dominates the area. Situated on a mountain side It is taking full advantage of the slope and all spaces face the view.

13


HOUSING PROJECTS FAMILY VACATION HOUSE AT “AXLADI� VILLAGE

Antony Tselios work samples

Designed for a family with 3 kids that wanted to have 5 bedrooms in a small building. It is 400 feet from the coast. I tried to maintain low cost and so had to compromise the initial design according to constantly changing decisions on behalf of the owner.

2007

14


Small complex of 3 houses that had to be conjoined according to legislation. One of the main goals was that the houses would be balanced in terms of space, view and courtyard since they belong to 2 brothers and a sister . The construction has started in 2006. Unfortunately due to economic reasons the project is not finished yet.

2006

Antony Tselios work samples

HOUSING PROJECTS VACATION HOUSES AT “DILESI” ATTIKI GREECE

15


8 vacation house complex for rent. We kept traditional forms and materials but not in va way of reproducing the old forms but we used them in order to create contemporary buildings with the construction and spacious values of the houses of the nearby villages.

VACATION APPARTMENTS COMPLEX NEAR VILLAGE “GERAKARIS”,KITHIRA,GREECE 3.500 sq. feet

2006

It is now constructed and working as vacation settlement for tourists.

Antony Tselios work samples

16


RESTORATION PROJECT “TABAKIKA” NEIGHBORHOOD , AMFISSA CITY 4.300 sq. feet

2004

“Tabakika” is a traditional neighborhood situated in the south limits of Amfissa city. The project was an effort to“revive” this beautiful and historical part of the city. I worked as a project manager on detailed restoration studies with an integrated approach including use decisions, structural and facades restorations, interior space designs, construction details and solutions.

The last few years 6 buildings have been restored according to our study seting an example that promotes the overall revival of the neighborhood

We worked on 7 buildings owned by the municipality.

Antony Tselios work samples

17


SPORT INSTALLATIONS SWIMMING POOL 70.000 sq. feet

municipality of Veroia Greece

2003

This project was designed in the context of a contractors contest, lowest possible cost was the most important evaluation criteria This 330.000 sq. feet project was designed by me and a colleague facing a 20 days deadline. We faced all kind of problems and also had to coordinate a mechanical engineers team and a structure specialists civil engineer team. The contest was cancelled since only 2 teams managed to finish in time. Proud to say that ours was one of them

Antony Tselios work samples

18


Antony Tselios work samples

ATHENS EQUESTRIAN CENTER “CLOSED” ARCHITECTURAL CONTEST

2001

Architectural contest for the Athens 2004 (Olympic games) organization. 3 architecture firms were selected to participate. The project included a number of horse arenas, dressage jumping, hostel, restaurant, vet’s installations and horses installations. Working with “Theros” architecture we did an effort for a quality result in the cost limits defined by the Athens 2004 organisation.The master plan was pre-decided by the 2004 organization also. Time limits were quite short and we concentrated our efforts on the most public and important buildings.

19


The buildings of the complex varied in size and complexity. Our efforts were channeled at maintaining the picture of a whole while complying with completely different needs and demands. I personally leaded in the designing and plan solving of a big part of the complex and participated in the design of most. ATHENS EQUESTRIAN CENTER “CLOSED� ARCHITECTURAL CONTEST 2001

Antony Tselios work samples

20


Antony Tselios work samples

Working with ‘Theros� architecture I had the chance to participate in the planning of various cinemas and theaters. Designed and managed renovations of old cinemas. Re-usage of old manufacturing facilities as cinema complexes. Theater with a revolving scene that had to be able to work as a closed winter theater and as an open summer theater using the same support installations.

21


At “Lefkada� island there is a great tradition of wood crafting and a traditional construction system that can withstand the strong earthquakes that take place at the area. It was the one part of a double final project that we worked with 2 classmates. We explored the possibilities of development of this island beyond tourism. We took urban design decisions, choosing location, routes and arranging the limits and restrictions of the site which is of public interest. We had to make our own scenario on how such a school works since we were unable to retrieve any info on similar schools.

2002

Antony Tselios work samples

FINAL PROJECT SCHOOL OF WOOD STRUCTURES Lefkada island , Greece

22


Antony Tselios work samples

FINAL PROJECT SCHOOL OF WOOD STRUCTURES 2002

The other part of the final project is a housing project for students that will inhabit the island and it uses a ‘modernized� version of the traditional wood-stone system that we invented. A double supporting construction system was traditionally used to face the severe earthquakes that frequent the island. We re-invent it with modern means, replacing the stone base floor with concrete and designing with a more contemporary aspect the upper floors.

23


Antony Tselios work samples

v I had the Throughout my career opportunity and enjoyed designing interiors for various of the projects I have worked on. Always in direct communication with the “user� of the space I designed original ideas complying with their needs and taste. Using sketches and fast 3D drawings in cobination with craftsmanship knowledge made this easy and fun.

24


Working on interior spaces v is the completion of the architectural process and is the final step towards providing customers the quality and asethetic feeling they dreamed and sometimes help them go even beyond their expectations. Part of my experience includes customized furniture of various sizes.

25

Antony Tselios CV and Work Samples  

Choices on projects and work experience shown are made using importance of participation

Antony Tselios CV and Work Samples  

Choices on projects and work experience shown are made using importance of participation

Advertisement