Issuu on Google+


Adress: Telephone: Web: Email adress: Nationality:

7, San Gabriel Street, 03005 Alicante +34 686512001 www.aq-am.es angelmunozperez@gmail.com Spanish

WORK EXPERIENCE July 2009 - present: Self - employed (www.aq-am.es) Roles assumed: Concept design visualization. Direct contact

Freelance Architect and Building Engineer. for architectural competitions; Concept and development design for residential buildings; 3D modelling and Development design and project management of housing internal reforms. Concrete and steel structural designer. with customers and building developers.

2007 - June 2009: Andrés Perea Ortega´s Architecture Studio (http://www.andrespereaarquitecto.com) Roles assumed: Architect; Team Coordinator; Project Leader. Concept design for Architectural Competitions, Architectural drawings and Construction Documents. Direct dealing with Consultant engineers. Member of Project Management teams. October 04-December 05: Joaquín Alvado´s Architecture Studio (www.joaquinalvado.wordpress.com) Role assumed: Intern Architect Concept Designs for Architecture Competitions, Architectural drawings and Construction documents.

EDUCATION AND TRIANING.

September 2011 - June 2012: Master in Academic Staff of Secondary Education. (Civil construction, Building and Technical drawing speciality). Universidad de Alicante, Spain (www.ua.es) Nov 2009 - Dec 2010: Master. Structural calculation specialist by CYPE Ingenieros. Zigurat, Technical training consulting. (http://www.e-zigurat.com) September 1999 - September 2006: Arquitecto (equivalent to M. Arch + Civil engineer). Escuela Politécnica Superior de Alicante. Universidad de Alicante, Spain (www.ua.es) September 1995 - June 2000: Building Engineer. Escuela Politécnica Superior de Alicante. Universidad de Alicante, Spain (www.ua.es) September 2005 - June 2006: Intern at Departamento de Expresión Gráfica y Cartografía. Area of Architectural Projects.Escuela Politécnica Superior de Alicante. Universidad de Alicante (www.ua.es) LANGUAGES:

SPANISH: ENGLISH: CATALAN:

Mother Tongue. June 2013. Certificate in Advanced English (University of Cambridge). Equivalent to level C1 (Proficient user). November 2013. Nivel Mitjà (Junta Qualificadora de Coneixements del Valencià). Equivalent to C1 (Proficient user).


PROFESSIONAL CV: WORKS DEVELOPED. OWN PROJECTS. Architect June 2013: June 2011: March 2011: December 2009: October 2009: September 2009: August 2009: May 2008: September 2007:

(www.aq-am.es) Residential complex with 45 housing units for old people with comercial facilities in Orihuela, Alicante. New Emergency Center in La Manga del Mar Menor, Murcia . Sixteen Subsidized Housing Units in Ca ñada, Alicante. Pere Garau Square and Public Market, Palma de Mallorca. Public Housing Building in San Juan, Alicante. Kindergarten and Public Square in Altea (Alicante) - 2nd PRIZE . 260 Social Housing Units at the Advanced District, Toledo . Public Housing for Young People in Cerro Muriano, Cordoba . Administrative Courts Building City of Justice, Madrid - 3rd PRIZE .

January 2007 June 2009: ANDRÉS PEREA ORTEGA´S ARCHITECTURE STUDIO. Architectural Competitions as a Project Leader: January 2007: Provincial Direction of the Social Security Treasury, Vitoria October 2007: Provincial Direction of the Social Security Treasury, León October 2007: Provincial Direction of the Social Security Treasury, Málaga Sept-Dec 2008: Construction documents for the Office and Workshop Buildings and urbanization at the Administrative Complex of the Autonomous Administration in Santiago de Compostela. April 2009: 180 Public Housing, New “Uva de Hortaleza” development. Madrid. May 2009: Civic Center in Salburúa District, Vitoria May 2009: Civic Center in Zabalgana District, Vitoria Architectural Competitions as a Team member: February 2007: New Urban Planning Administration Building for Sevilla City Council March 2007: Urban planning administration building for the Murcia City Council. 1st prize. March 2007: Interactive History Museum, Lugo, 2nd prize November 2007: Especial "Ahijones" Plan for 375 and 410 Public Housing, Madrid. April 2008: New Design for Public Space (Toftegards Plads), Copenhagen (Denmark) March 2008: New Art and Technology Quarter in Segovia. November 2008: New Convention Center of Vitoria. February 2009: Headquarters of the Central American Parliament, Guatemala . March 2009: 40 Public Housing for students and youth people, Santiago de Compostela. Architectural Drawings Nov 2007-Jan 2008: April-July 2008: Jan 2009-March 2009: June 2009:

and Construction Documents: Construction Documents for Urban planning Administration Building, Murcia City Council. 1st prize. Basic drawings and Constructions Documents for Huelva Provincial Historical Archive. Construction documents for the Opera Theatre of the City of Culture. Santiago de Compostela. Construction Documents for Companies, Innovation and Science Building in Sevilla.

October 2004 - December 2005: JOAQUÍN ALVADO´S ARCHITECTURE STUDIO. October 2004: F House. (Architectural drawings, construction documents) February 2005: E House. (Architectural drawings, construction documents) November 2005: Architectural Competition for 140 Housing Units in Sagunto. 2nd PRIZE. July 2005: Renovation of Pilar de la Horadada´s Major Street and Church Square. 1st PRIZE. COMPUTER SKILLS: AutoCAD 2013 Revit Adobe Acrobat 9 Autodesk 3ds Max 2009 Microsoft Office (Word, Excel, Powerpoint)

Professional (10 years) Medium (2 years) Professional (5 years) Medium (3 years) Professional (12 years)

Corel Draw + Photopaint Adobe Photoshop CS3 SketchUp V - Ray 1.50 renderer Adobe InDesign CS3

Professional(10 years) Professional(3 years) Professional(2 years) Medium (3 years) Beginner (1 year)


GRAPHIC PORTFOLIO

July 2009 - present


ÁNGEL MUÑOZ PÉREZ, Architect


ADMINISTRATIVE COURTS BUILDING CITY OF JUSTICE, MADRID - 3rd PRIZE Date: Location: Typology: Area: Project Team:

September 2007 Madrid, Spain Office 26.350 mツイ テ]gel Muテアoz, V. Castillo, C. Garcテュa

Our work aims to give the proposal a very recognizable and powerful brand image for the new building of administrative litigation. The simplicity and effectiveness of the organization of every level and the simplification of materials and techniques that come into play try to draw attention to the important thing: the recognizable image of the proposal and its abstract character associated with an image of stability and confidence to justice. The universe of Justice contacts with the new technologies, the Information Society. The building represents this impossible union: a Roman amphora to drink Coca-Cola.

Concept idea: external shape.

1st PANEL

1st PHASE

Building outer shape

2nd PANEL

Regulatory compliance verification


3rd PANEL

1st PHASE


ADMINISTRATIVE COURTS BUILDING CITY OF JUSTICE, MADRID - 3rd PRIZE Date: Location: Typology: Area: Project Team:

September 2007 Madrid, Spain Office 26.350 mツイ テ]gel Muテアoz, V. Castillo, C. Garcテュa

Our work aims to give the proposal a very recognizable and powerful brand image for the new building of administrative litigation. The simplicity and effectiveness of the organization of every level and the simplification of materials and techniques that come into play try to draw attention to the important thing: the recognizable image of the proposal and its abstract character associated with an image of stability and confidence to justice. The universe of Justice contacts with the new technologies, the Information Society. The building represents this impossible union: a Roman amphora to drink Coca-Cola.

2nd PHASE

1st UNDERGROUND FLOOR PLAN

GROUND FLOOR PLAN


FIRST FLOOR PLAN

SECOND FLOOR PLAN

3rd,4th,5th FLOOR PLAN

STRUCTURAL MODEL

MAIN ENTRANCE INNER COURTYARD ELEVATION

SECTION

2nd PHASE


HOUSING STATE BUILDING FOR YOUNG PEOPLE, CERRO MURIANO, CORDOBA Date: Location: ypology: Area: Project Team:

May 2008 Cerro Muriano (Córdoba), Spain Housing 5.800 m² Ángel Muñoz Pérez, Vicente Castillo

The more air, the better. This is our aim. Houses will be inhabitated around the outside. We are searching for light, air, sun, the sky. Houses are organized around a void, which articulates them. You circulate, rest, cook, eat, dance, sleep there ... It's a cool, permeable, appropriable, desirable space. It is the heart of the home. The house is organized as a stack of spaces surrounding the void, which will be present at all levels through highly permeable enclosures. It configures the interior home landscape. The vegetation inside will generate a living landscape with shades of light and color. We are looking for a friendly, welcoming and easily appropriable interior space. We look for homes.

PERSPECTIVE

GROUND FLOOR PLAN


FIRST FLOOR PLAN

SECOND FLOOR PLAN

BIOCLIMATIC OPERATING SCHEMES

CROSS SECTION

INNER SPACE


260 SOCIAL HOUSING UNITS AT THE ADVANCED DISTRICT, TOLEDO Date: Location: ypology: Area: Project Team:

August 2009 Toledo, Spain Housing 40.400 mツイ テ]gel Muテアoz Pテゥrez

We propose a housing community that encourages a high identification of their inhabitants with it, with a lot of commun al areas for users. The dwellings are organized around four large courtyards, located on the free ground floor over its entire surface generating an inner landscape that will be discovered when entering the building. The free spaces both in the ground floor and the upper floors will be the protagonists of the community, providing the residents with meeting and expansion spaces that will encourage its sense of community. All homes, of various types, have double orientation and high functional versatility.

WEST ELEVATION FOURTH FLOOR PLAN

SECOND FLOOR PLAN

GROUND FLOOR PLAN

PERSPECTIVE


EAST ELEVATION NINTH FLOOR PLAN

TYPE 1: ONE-BEDROOM APARTMENT

EIGHTH FLOOR PLAN

TYPE 2: TWO-BEDROOM HOUSING

FIFTH FLOOR PLAN TYPE 3: THREE-BEDROOM HOUSING

TYPE 4: THREE-BEDROOM ADAPTED HOUSING

LEVEL´S OVERLAPPING SCHEME INNER COURTYARD


KINDERGARTEN AND PUBLIC SQUARE IN ALTEA - 2nd PRIZE Date: Location: Typology: Area: Project Team:

September 2009 Altea (Alicante), Spain Educational 700 mツイ テ]gel Muテアoz Pテゥrez + dooa arquitecturas

The proposal for a new kindergarten in Altea poses a clear urban vocation. The slope of the site helps us set a building that provides a landscaped public space on its cover which offers continuity to the existing nearby square. The cover becomes an artificial landscape with a topography that invites to be explored. The kindergarten is organized in small units, freeing up space between each of them, as a recreational space and an outdoor playground. Large skylights connect both spaces visually, and the Mediterranean vegetation of the upper square will be present on the ground floor.

CONCEPT SCHEME

CROSS SECTION

URBAN IMPLEMENTATION


SITE PLAN

KINDERGARTEN FLOOR PLAN

KINDERGARTEN COURTYARD - OUTER COVERED SPACE


PUBLIC HOUSING BUILDING IN SAN JUAN DE ALICANTE Date: Location: Typology: Area: Status: Project Team:

October 2009 San Juan (Alicante), Spain Housing 5.300 m² Idea Ángel Muñoz Pérez + dooa arquitecturas

We were faced with an ambiguous approach by the organizer of the competition, keeping part of the land for a later development for a later development of a public program by the city council. Therefore, we outline a proposal which, completely freeing the ground floor, is able to absorb the future development of that private equipment. Programmatically, the building will be a public-private hybrid able to generate intense street life and urban diversity to the site. Every house has double orientation and a distribution which provides high functional flexibility. The building is also equipped with communal spaces that will encourage a sense of community for the users.

BASES´ DEMANDS

FLOOR DIVISION PLOT

VS

ECT BASES´ ROJ NS! ¡P ICIO DEMANDS DES

SECTION DIVISION PLOT

5m

PARTIAL INTERVENTION (2 UNRELATED PHASES)

AGREED INTERVENTION (2 INTERRELATED PHASES)

PROPERTY LEVELS / USE (PRIVATE / PUBLIC) NIVEL 1 PRIVATE RESIDETIAL BUILDING + HUOSING COMMON SPACES

LEVEL 0 CORE BUILDING ACCESS + PUBLIC FACILITIES - PUBLIC PARKING

UNDERGROUND FLOOR HOUSING PRIVATE PARKING + PUBLIC PARKING OR PUBLIC FACILITIES

3D DRAWING: URBAN IMPLEMENTATION


CROSS SECTION

TWO - BEDROOM HOUSING TYPE LEVEL 1: HOUSING AND COMMON SPACES

GROUND FLOOR PLAN: PUBLIC SPACE

SOUTHWEST ELEVATION

KINDERGARTEN COURTYARD - OUTER COVERED SPACE

INNER HOUSING SPACE


PERE GARAU SQUARE AND PUBLIC MARKET, PALMA DE MALLORCA (SPAIN) Date: Location: Typology: Area: Status: Project Team:

1

3

5

2

4

6

December 2007 Palma de Mallorca, Spain Commercial + public space 12400m²(built)+9200m²(public space) Idea Ángel Muñoz Pérez

The needed renovation in the market´s building for the modernization of its facilities presents an opportunity to reshape the urban environment in which the building is inserted and to generate an equipment with a true social status. Thus, the market becomes permeable to pedestrian flows, overlapping public meeting spaces to neighborhood associations. The pedestrianization the built environment to be the true heart activity and life. It and its citizens.

of the with a of the will be

square will provide number of conditions urban space, full of a space for the city


casal de jovenes

WEST ELEVATION

FIRST FLOOR PLAN

CROSS SECTION

SOUTH ELEVATION URBAN PLAN. MARKET AND PERE GARAU SQUARE


SIXTEEN SUBSIDIZED HOUSING UNITS IN CAÑADA (ALICANTE) Date: Location: Typology: Area: Status: Project Team:

March 2011 Alicante, Spain Housing 3.300 m² Architectural drawings Ángel Muñoz Pérez

In a context of budgetary austerity, this project proposes housing with the maximum benefits for the user. The dwellings are organized around two large courtyards, and the residents access to their houses through them. These courtyards will be spaces for community relationship and will also be playgrounds for children. Each home will have 200 square meters distributed in four floors. All homes will have a green roof top as a place of domestic expansion. It will be a place for sunbathing, organizing a barbecue ... Users will sit outdoors to get some fresh air, to play cards. ..

SOUTHWEST CORNER PERSPECTIVE

10%

10%

ROOF FLOOR PLAN

10%

10%

FIRST FLOOR PLAN

12%

12%

5%

5%

10%

10%

Cocina

Cocina

GROUND FLOOR PLAN

INNER COURTYARD PERSPECTIVE

UNDERGROUND FLOOR PLAN


WEST ELEVATION PERSPECTIVE

ROOF LEVEL PERSPECTIVE


NEW EMERGENCY CENTER IN LA MANGA DEL MAR MENOR, MURCIA Date: Location: Typology: Area: Project Team:

June 2011 San Javier (Murcia), Spain Office 3.000 m²(built) + 3.300 m²(site area) Ángel Muñoz Pérez + dooa arquitecturas

The programmatic conditioning factors arising from the need to locate a heliport on the roof of San Javier´ New Emergency Center will be an opportunity to raise an open building with external circulations. Thus, we try to take advantage of our excellent weather conditions and the scenic location on the Mediterranean coast. Soft landscaped slopes will organize circulations at the place, and will separate the parking area reserved for urban cleaning machinery. The building's inner circulations will form a rich spatial experience for users, enhancing the mix between different uses of the building.

PERSPECTIVE

LONGITUDINAL SECTION


SOUTH ELEVATION

1.48

1.60

NF 1.73

1.85

1.98

2.10

+8.51m

13

08

07

06 05

04

03 02

01

30 31 23 22

2.23

Minimum excavation depth

2.48

2.60

26 2.73

20

FIRST FLOOR PLAN +1.25

+1.00 cota de acceso a calle

+1.00 cota de acceso a calle 1.48

5%

+0.5

23

+2.

00

5

50 +1.

+1.7

+0.75

0

+5.00

+1.0

+0.75

26

5%

+0.25 +0.0 -.25

14

14

01

01

16

%

-0

.3

3

1.60

+2.

5

+0.0

16

25

-.2

+0.5

15 1.73

+0.2

28

5

0

+2.5

1.85

29 13

01

30 31

23

+2.75

+0. -0. 00 25

33

-0.

5 +0.2

1.98

+2.87

22

Natural light optimization

+2.87m

5.00 2.10

+2.87

24

2.23

+2.62

24

24

20

23 -0.25

-0.33 2.48

+0.

+0.0 +0.25

-0.33 -0.25 +0.0

75

+0.5

+1.

+2.50

19

19

18

18

16

00 +0.5

15

28

2.60

+0.75

+2.25

+1.5

+2.00

+1.25

+1.75

5.00

+1.0 0

+1.75

29

2.73

+1.5

13

01

23

30 31

21

GROUND FLOOR PLAN +1.00

+1.25

+1.00 cota de acceso a calle 5%

+1.0

+0.75

+0.75

26

0

26

+0.5

5%

+0.25 +0.0 -.25

Installations centralisation

16 %

-0

.3

3

+0.75

-.2 +0.0

5

+0.5

+0.2

OE

5

16% -0.33

+0. -0. 00 25

-0.33m

-0. 33

13

5

+0.2

12

11

09

32

-0.33m

-0.25

+0.

-0.33

+0.0 +0.25

75

-0.33 -0.25 +0.0

E

+0.5

+1. 00

+0.5 +0.75

S +1.00

+1.25

+1.5

UNDERGROUND FLOOR PLAN

Solar protection

CONCEPT SCHEMES

DETAIL SECTION


ANDRÉS PEREA ORTEGA Architecture Studio

January 2007 - June 2009


Architectural Competitions - Construction drawings - Project Management

ANDRÉS PEREA ORTEGA Architecture Studio


PROVINCIAL DIRECTION OF THE SOCIAL SECURITY TREASURY, VITORIA Date: January 2007 Location: Vitoria, (Spain) Size: 16.500 m2 (built) Status: Idea

PROVINCIAL DIRECTION OF THE SOCIAL SECURITY TREASURY, LEÓN Date: October 2007 Location: León, (Spain) Size: 8.750 m2 (built) Status: Idea

PROVINCIAL DIRECTION OF THE SOCIAL SECURITY TREASURY, MÁLAGA Date: October 2007 Location: Málaga, (Spain) Size: 9.500 m2 (intervention area) Status: Idea

ANDRÉS PEREA ORTEGA Architecture Studio

January 2007 - June 2009


180 PUBLIC HOUSING, NEW “UVA DE HORTALEZA” DEVELOPMENT. MADRID. Date: March 2009 Location: Madrid, (Spain) Size: 27.500 m2 (built) Status: Idea

CIVIC CENTER IN SALBURÚA DISTRICT, VITORIA Date: May 2009 Location: Vitoria, (Spain) Size: 15.800 m2 (built) Status: Idea

CIVIC CENTER IN ZABALGANA DISTRICT, VITORIA Date: May 2009 Location: Vitoria, (Spain) Size: 15.600 m2 (built) Status: Idea

Architectural Competitions as TEAM LEADER

ANDRÉS PEREA ORTEGA Architecture Studio


NEW URBAN PLANNING ADMINISTRATION BUILDING FOR SEVILLA CITY COUNCIL Date: February 2007 Location: Sevilla, (Spain) Size: 49.500 m2 (built area) Status: Idea

INTERACTIVE HISTORY MUSEUM, LUGO, Date: February 2007 Location: Lugo, (Spain) Size: 2.800 m2 (built area) Status: Idea

URBAN PLANNING ADMINISTRATION BUILDING FOR MURCIA CITY COUNCIL. 1ST PRIZE. Date: March 2007 Location: Murcia, (Spain) Size: 51.000 m2 (built) Status: Built

ANDRÉS PEREA ORTEGA Architecture Studio

January 2007 - June 2009


ESPECIAL "AHIJONES" PLAN FOR 375 AND 410 PUBLIC HOUSING, MADRID. Date: November 2007 Location: Madrid, (Spain) Size: 26.250 m2 (intervention area) Status: Basic Drawings.

DESIGN FOR NEW PUBLIC SPACE (TOFTEGARDS PLADS), COPENHAGEN (DENMARK) Date: March 2008 Location: Copenhagen, (Denmark) Size: 65.000 m2 (intervention area) Status: Idea

NEW ART AND TECHNOLOGY QUARTER IN SEGOVIA. Date: March 2008 Location: Segovia, (Spain) Size: 120.000 m2 (intervention area gross floor area) Status: Idea

ARCHITECT - Architectural Competitions - Team Member

ANDRÉS PEREA ORTEGA Architecture Studio


NEW CONVENTION CENTER OF VITORIA. Date: November 2008 Location: Vitoria, (Spain) Size: 76.000 m2 (built area) 33.500 m2 (intervention area) Status: Idea

HEADQUARTERS OF THE CENTRAL AMERICAN PARLIAMENT, GUATEMALA. Date: February 2009 Location: Guatemala Size: 31.200 m2 (built area) 14.500 m2 (intervention area) Status: Idea.

40 Public Housing for students and youth people, Santiago de Compostela. Date: March 2009 Location: Santiago de Compostela, (Spain) Size: 3.800 m2 (built area) Status: Idea.

ANDRÉS PEREA ORTEGA Architecture Studio

ARCHITECT - Architectural Competitions - Workgroup Member


EXTENSION II TO MADRID EXHIBITION GROUNDS. IFEMA MADRID (SPAIN) Collaborator In

Project

Management Team. Date:

March - September 2007

Location:

Madrid, (Spain)

Size:

77.000 m2 (built area)

Status:

Built

Cost:

€80 million

BASIC DRAWINGS AND CONSTRUCTIONS DOCUMENTS FOR HUELVA PROVINCIAL HISTORICAL ARCHIVE. Date: Location: Size: Status:

April - July 2008 Huelva, (Spain) 6.100 m2 (built) Construction in progress

Role assumed: Constructive

definition of the ground floor´s inner spaces.

BUILDING PROJECT FOR THE OPERA THEATRE. CITY OF CULTURE. SANTIAGO DE COMPOSTELA. Date:

January - February 2009

Location:

Santiago de Compostela

Size:

54.500 m2 (built area)

Status:

Construction in progress

Role assumed: Definition of inner carpentries types of the building.

ARCHITECT - Construction Drawings - Project Management

ANDRÉS PEREA ORTEGA Architecture Studio


DECEMBER 2008: CONSTRUCTION DOCUMENTS FOR THE OFFICE AND WORKSHOP BUILDINGS AND URBANIZATION AT THE ADMINISTRATIVE COMPLEX OF THE AUTONOMOUS ADMINISTRATION IN SANTIAGO DE COMPOSTELA Date: September-December 2008 Location: Santiago de Compostela, (Spain) Size: 12.300 m2 (urbanization); 2600 m2 (built) Status: Construction documents Role assumed: PROJECT LEADER 60.40

H2'

A8

T13

T13

A11

L40.40 J1

A3

A3

R5 J1

R8 A3

CV1 CV3 •

CV1 I6

H2'

H18

17

M2

H18

M2

I4

I6

17 •

H2 TC2

T15

M4 1 T15

5 D.03

H2'

A18

A3

M4

T15

L40.40.6

I8

T13

D.03

M4

J2 •

30.30 A8

R8

R8

T13

T13

M1

CV5

CV3

M1

60.40 A8

H2'

H2'

M1

A3

S5

L15

DETALLE 3 E:1/5

DETALLE 2 E:1/5

H18

CANALETA INSTALACIONES

3

TC2

TC2

M2

I6

17

M2

M2

H18

T13

M4

D.03

M1

M4

T15

M1

M4

T13

M1 L1

H2

A9

T13

T15 CV5

CV1

H2´

A3

3

TC2

D.03

M4 T15

T15

SECCION VENTANA OSCILOBATIENTE TIPO CV1 HACES EXTERIORES FACHADA NORTE

M1

M6

L50.50 A11

T13

T13

SECCION VENTANA OSCILOBATIENTE CON PARASOL FACHADA SUR O5

T13

R8

CV1 A3

D.03

CV1

2

D.03

2

H2' M1

M1

S5

L15

M6

R5

3

TC2

M4

T15

T15

S5

L15

´

A3 ´

M1 H2

T15

M4

M4

T13

R5

T13

A18

T13

H2 M1

CV3

L90.90.10

CV3 T13

M1

CV3

A1

I8

M4

3

M4

CV3

A3

M6

D.03

T13

A11

CARTELA E=5mm

TC2

D.03

T 30.30

M1

O5

CANALETA INSTALACIONES

T13

T13

T13 M1

O5

M1

CV5

M1 H2'

T13

T13

A1 SECCIÓN TRANSVERSAL 1

SECCIÓN TRANSVERSAL 3

D.02 3

H2'

D.02 1

M1 T13 D.03

2

S5

L15 M6

H3' CANALETA INSTALACIONES

H15

A9 R5

L6 S5

L15

M6 R5 M6

I5

SECCIÓN TRANSVERSAL 1 E:1/25

A9 M2

O5

SECCIÓN TRANSVERSAL 3 E:1/25

D.02 2

O5

CV10

T13

T13

S5

L15

S5

DETALLE 1 E:1/5

VENTANA CORREDERA TIPO CV5 PLANTA SEGUNDA-BIBLIOTECA

January 2007 - June 2009


80.40.6

80.40.6

C1

A11

3

M2

I4

I6

V12

A11

e:3mm

A3

I7

D 20

H18

H6 6

TC2

D 20

T7

R2

R5

R2 T9

T7

H2

H6

R2 O7

7

S8 O7

O7

R2

R2

L3

R5

TC1 •

T9

T9

H3´

D 20

T9 R2

R5

O7

T7

T3

R2

PM 1

R2

S8

R2

4/5

T3

T9 R2

R2

S8

T9

D 20

R2

PM 1

T9

O7

O7

O7

O7

S8

R2

R2

PM 1

T9

PM 1

M6

R2

S5

TC2

O9

R2

T9

T9

R2

PM 1

PM 1 R2

3 D 20

T9

T9

9. DETALLE CONDUCTOS DE CLIMATIZACIÓN EN EDIFICIO DE TALLERES. SECCION. E: 1/5

T9

R2 A11

T9 PM 1

T3 R2

R2

PM 1

T9

A3 T3

TRAMO DE BAJANTE EMBEBIDO EN LOSA

T9

R5 T17

R2

R2 T9

T9

T9

T9

D 20

PM2

S8

PM 4 PM 4

S8

PM 4

7

H6

8

S8

S8

PM 4

PM 1

DETALLE ENCUENTRO TABIQUE-VENTANA . PLANTA. E: 1/5

e:5mm

A3

R5

e:5mm

T40.40

A3

A11

4

DETALLE TABIQUE ASEO . PLANTA. E: 1/5 A5

J2 A11

´

5 ´

T9

T3

PM 1

R2

T3

T3

e:2cm

H2

PM 3

PM 3

R2

R2

H6

T9

R2

R2

T40.40

e:5mm

M4

H2 R5

T3

9 D 20

1 PLANTA ASEOS GENERALES. E: 1/25

7

DETALLE ENCUENTRO TABIQUE-VENTANA . SECCION. E: 1/5

6

DETALLE ENCUENTRO VENTANA . PLANTA. E: 1/5

T17 LUMINARIA

T3

O7 T9 R2

R2

O7

T9 R2

PM 1

R2

T9 PM 4

R2

PM 1

PM 1

PM 1

R2

T17

2 2 SECCION ASEOS TRANSVERSALES. E: 1/25

Construction Documents - TEAM LEADER

D 20

3 DETALLE SECCION LONGITUDINAL. E: 1/25

5

DETALLE TABIQUE ASEO . PLANTA. E: 1/5

T9



Graphic portfolio angel muñoz architect