Project Summary
Table 10 displays the raw
0.89%
material balance of the enterprise after completion of the enterprise construction in basic prices on 59.46%
May 1, 2008.
39.65%
Natural gas
Coal
Others
Figure 46. The structure of the raw materials consumption after completion of the first stage construction.
Table 10. Raw material balance of the enterprise after completion of enterprise construction in basic prices on May 1, 2008. Name
Purchased amount, tonnes per annum
1. In the year, that provides the stopping repair. 14,595,011 11,002,855 Natural gas (thousand m3) (15,159,025) Other materials 318,588 Crude oil 9,800,570 TOTAL: 35,717,023 2. In the year, that does not provide the stopping repair. Coal 15,485,986 11,674,541 Natural gas (thousand m3) (16,084,431) Other materials 338,037 Crude oil 10,398,860 TOTAL: 37,897,424 Coal
Purchased amount, USD. 1,678,426,265 2,538,378,736 334,517,400 4,348,875,906 8,900,198,307 1,780,888,390 2,693,337,971 354,938,850 4,614,359,338 9,443,524,549
Table 11 displays the raw material balance of the enterprise after completion of the enterprise construction in basic prices on September 1, 2010.
Project Scales and Results